CN102277869B CN201110123233.7A CN201110123233A CN102277869B CN 102277869 B CN102277869 B CN 102277869B CN 201110123233 A CN201110123233 A CN 201110123233A CN 102277869 B CN102277869 B CN 102277869B
Authority
CN
China
Prior art keywords
template
pile tube
pile
embolism
plug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110123233.7A
Other languages
Chinese (zh)
Other versions
CN102277869A (en
Inventor
梅国雄
梅岭
张乾
徐美娟
宋林辉
蔡烽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hongsheng Construction Investment Group Co ltd
Original Assignee
Nanjing Tech University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University filed Critical Nanjing Tech University
Priority to CN201110123233.7A priority Critical patent/CN102277869B/en
Publication of CN102277869A publication Critical patent/CN102277869A/en
Application granted granted Critical
Publication of CN102277869B publication Critical patent/CN102277869B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The plug hole type pressure reducing and draining pipe pile comprises: the tubular pile comprises a tubular pile body and a pile cap, wherein at least one row of plug holes axially distributed along the tubular pile body are formed in the tubular pile body, plugs are arranged in the plug holes, one end of each plug, which is located on the inner wall of the tubular pile body, is connected with a traction cable, and the traction cable extends in the tube of the tubular pile body until the top of the tubular pile body. The preparation process comprises the following steps: reserving through hollow holes serving as plug holes at the periphery of the template, welding steel bars at the periphery of the through hollow holes, and then manufacturing plugs; putting a reinforcement cage into a template, inserting a plug into a reserved hollow hole on the template, abutting against an inner template and exposing the plug out of the template, pulling a traction cable out of the inner template of the tubular pile along a pile body, binding the plug on the template by using a steel wire, pouring concrete, performing prestress tensioning and centrifugal forming after film combination, performing autoclave curing, cutting off the steel wire bound outside the template after strength is achieved, demolding by using a demolding agent, flattening the plug with the exposed pile body along the pile body, and welding a pile cap.

Description

Jack decompression draining pile tube and preparation technology thereof
Technical field
This technology relates to a kind ofly considers that the pile tube consent utilizes embolism the reduce pressure pile tube and the preparation technology of draining.
Background technology
In the basic engineering construction, the prefabricated reinforced concrete pile tube has bearing capacity of single pile high, and speed of application is fast, and the duration is short, and workmanship is easy to control and guarantee the low characteristics that wait of cost.Yet the prefabricated reinforced concrete pile tube belongs to crowded soil stake, and in work progress, pile sinking need arrange the soil body with volume; Especially in the saturated soft soil big in compressibilty, that transmission coefficient is less; In pile driving process, will cause high excess pore water pressure, great changes will take place thereby make around it stress field in soil; This possibly cause the displacement of pile peripheral earth protuberance and occurred level direction; Adjacent pile head produces come-up and shift phenomenon, and come-up and side-play amount can increase in time gradually, and this will have influence on next step construction equally.Meanwhile, the bearing capacity of stake because of pile sinking after negative friction effect under the stake side direction of the fixed generation of pile peripheral earth reduce, these are to constructing and environment has all produced great negative effect.
For the above-mentioned negative effect that reduces to cause in the pile tube pile driving process; Must reduce the excess pore water pressure that produces in the piling construction process; Accelerate the dissipation of excess pore water pressure, thereby improve the shear strength of the soil body, improve speed of application; Reduce harm, guarantee the quality of pile tube in construction environment.Therefore, the decompression drainability of pile tube is directly connected to the quality of pile sinking quality, develops a kind of not only simple but also economic decompression draining pile tube and seems particularly urgent.
Summary of the invention
Technical problem to be solved by this invention is the shortcoming to above-mentioned prior art, and a kind of jack decompression draining pile tube and preparation technology thereof of the draining of reducing pressure are provided.
The present invention adopts following technical scheme:
A kind of jack decompression draining pile tube of the present invention; Comprise: pile tube body and pile cover; On the pile tube body, be provided with at least delegation along the consent of pile tube body axial distribution; In consent, be provided with embolism, be connected with drawing rope and drawing rope extends the top until the pile tube body at the pipe of pile tube body at the end that is positioned at the pile tube inner body wall of embolism.
The preparation technology of a kind of jack decompression draining pile tube of the present invention, step is following:
Step 1 is produced in factory normalization around the template of pile tube along the pile tube body shaft to reserving the perforation hollow hole of oblique 45 ° of holes as consent; And on template each weld rod iron around connecting hollow hole, makes on several tether and the outer cover siliceous leather sheath, diameter again and equal to connect on the template hollow hole, length and radially leave the embolism that connects straight rod iron greater than template pipe shaft thickness, near the top.
Step 2 is put into the template that has prepared with the reinforcing cage that processes, and the embolism that will tightly overlap siliceous leather sheath passes reinforcing cage and be inserted in the reservation hollow hole on the template, prop up inner formword and make embolism expose to template, and drawing rope is pulled out along pile body in the pile tube inner formword; Then utilize rod iron with embolism with steel wire lashing on template, and the concrete for preparing of cast carries out prestressed stretch-draw and centrifugal forming after closing film; After this carry out autoclave curing; Maintenance 2 days reaches the steel wire of cutting off the outer colligation of template after the intensity, uses the release agent demoulding; And the embolism that will expose pile body scabbles the pile cover of burn-oning along pile body.
Compared with prior art, the present invention has following advantage:
The present invention is put in drawing rope on the ground.Measure the fixed stake of unwrapping wire position, pile-forming machine perching also lifts by crane prefabricated tubular pile, adopts hammering method or static pressure construction.During pile sinking, the verticality of strict control pile tube, and guarantee pile sinking speed notices preventing that drawing rope from breaking falls or embolism comes off.When treating that pile tube stake end reaches design elevation, stop piling.At this moment; Strain at some and be in the drawing rope that connects embolism on the ground; Make the embolism of filling pile tube sidewall consent come off, formed a series of holes on the pile tube, this just lets the hole suffered extruding force of the soil body on every side be eased; Thereby reduced because the caused excess pore water pressure of pile sinking plays depressurization; And; Hole on the pile tube sidewall is that the discharge of pore water provides passage, and the earth in the hole becomes permeable at this moment, under the excess pore water pressure effect that in pile driving process, causes; The pore water not hole of cracked ends tubular pile body flows in the pile tube; Connect in the pipe that pumping equipment draws water or collection and treatment after make his usefulness in addition, thereby play a role in the drainage, the water content of inter-pile soil is reduced; Quicken dissipation and inter-pile soil body fixed of pore water pressure, improved the native shear strength and the supporting capacity of pile foundation.So the present invention has the effect of decompression and draining.
Description of drawings
Below in conjunction with accompanying drawing and implementation method this technology is further specified.
Fig. 1 is the embolism elevational schematic view of jack decompression draining pile tube of the present invention.
Fig. 2 is the cope match-plate pattern sketch map of jack decompression draining pile tube of the present invention.
Fig. 3 is the lower bolster sketch map of jack decompression draining pile tube of the present invention.
Fig. 4 is the inner and outer template sketch map of jack decompression draining pile tube of the present invention.
Fig. 5 is the template assembling sketch map of jack decompression draining pile tube of the present invention.
Fig. 6 is the front and back template sketch map of jack decompression draining pile tube of the present invention.
Fig. 7 is the A-A sectional drawing of jack decompression draining pile tube of the present invention.
Fig. 8 is the floor map of jack decompression draining pile tube of the present invention.
Fig. 9 is the B-B sectional drawing of jack decompression draining pile tube of the present invention.
Figure 10 is a jack decompression gutter pile constructing process flow chart of the present invention.
Among the figure: 1. siliceous leather sheath; 2. embolism; 3. consent; 4. rod iron; 5. drawing rope 6. pile tube bodies.
The specific embodiment
Embodiment 1
A kind of jack decompression draining pile tube; Comprise: pile tube body 6 and pile cover; On pile tube body 6, be provided with at least delegation along the consent 3 of pile tube body axial distribution; In consent 3, be provided with embolism 2, be connected with drawing rope 5 and drawing rope 5 extends the top until the pile tube body at the pipe of pile tube body at the end that is positioned at the pile tube inner body wall of embolism 2.In the present embodiment; The central axis of consent 3 intersects or intersects with pile tube body central axis; And an end that is positioned at the pile tube inner body wall of consent 3 is higher than an end that is positioned at pile tube body outer wall of consent 3; In the present embodiment, the central axis of consent 3 and pile tube body central axis angle can be 45 degree, are provided with siliceous leather sheath 1 in the outside of embolism 2.
Embodiment 2
A kind of preparation technology of jack decompression draining pile tube, step is following:
The template that step 1 is produced pile tube in factory normalization is reserved the perforation hollow hole of oblique 45 ° of holes as consent all around vertically; And on template each weld rod iron around connecting hollow hole, makes on several tether and the outer cover siliceous leather sheath, diameter again and equal to connect on the template hollow hole, length and radially be provided with the embolism that connects straight rod iron greater than template pipe shaft thickness, near the top.
Step 2 is put into the template that has prepared with the reinforcing cage that processes, and the embolism that will tightly overlap siliceous leather sheath passes reinforcing cage and be inserted in the reservation hollow hole on the template, prop up inner formword and make embolism expose to template, and drawing rope is pulled out along pile body in the pile tube inner formword; Then utilize rod iron with embolism with steel wire lashing on template, and the concrete for preparing of cast carries out prestressed stretch-draw and centrifugal forming after closing film; After this carry out autoclave curing; Maintenance 2 days reaches the steel wire of cutting off the outer colligation of template after the intensity, uses the release agent demoulding; And the embolism that will expose pile body scabbles the pile cover of burn-oning along pile body.
Preparation technology of the present invention and construction technology are described below in more detail:
(1) pile tube production technology
Make the prefabricated reinforced concrete pile tube of diameter 450mm, wall thickness 90mm, the long 10m of stake, percent opening about 5% adopts the pre-tensioned prestressing centrifugal molding process, stream curing.
1. reinforcing bar processing
By necessary requirement reinforcing bar is processed, the PCB rod iron is carried out customized cut-off, heading and roll welding moulding (configuration principal rod and stirrup).
2. the preparation of tubular pile concrete
Tubular pile concrete intensity is selected high-strength concrete C80 for use, adopts a stepwise alr mode, and Mixing Machine is selected double-shaft horizontal for use, and alr mode is selected for use horizontal, accomplishes in short-term, " to stir ", and adopts the water reducing agent latter admixing method, prepares mould after preparation is accomplished.
3. template construct
Around the template of factory normalization production pile tube, reserve the about 20mm perforation of several oblique 45 ° of diameters hollow hole before the fluid concrete along the stake length direction; About percent opening 5%; And 2 about 10mm rod irons of diameter are welded along the stake length direction in each hole two outside template; Make several tether again and put siliceous leather sheath all around and (prevent embolism and concrete binding; Siliceous leather sheath can be anti-high temperature during stream curing), diameter equals to connect hollow hole on the template, grow up in template pipe shaft thickness and expose to the exterior sheathing place and leave about 5mm and connect the rod iron that the embolism of hollow hole and diameter that fixing plug is used equal to connect on the embolism hollow hole; At first the reinforcing cage that processes is put into the template that has prepared; And the embolism (band rope) that will tightly overlap siliceous leather sheath passes reinforcing cage and is inserted into oblique 45 ° of template and reserves and prop up inner formword (note embolism and reinforcing bar in the pile tube stagger each other and guarantee the protective layer thickness of the interior reinforcing bar of pile tube) in the hollow holes; Pull out along pile body in the pile tube inner formword other end of drawing rope, then with rod iron pass on the embolism consent and with template on welding is good in advance rod iron utilize the colligation of steel wire two that embolism is fixed, and the concrete for preparing of cast; After closing film, prepare next step technology.
4. prestressed stretch-draw and centrifugal forming
Envelope is carried out prestressed stretch-draw and centrifugal forming behind the mould, and the outer stretching mode of prestressed stretch-draw process using is controlled the stretch-draw precision well, and the stretch-draw Displaying Meter selects minimum scale at 0.5Mpa.Centrifuging process adopts the stage moulding, i.e. low speed cloth, and middle low speed refining, middle one-tenth speed shape, high speed is closely knit; Densification pressure is 5~10 N/
Figure 2011101232337100002DEST_PATH_IMAGE001
(being that centrifugal acceleration is 35~40 g) down at a high speed, and controlling desirable middling speed value is that Vmax/
Figure 2011101232337100002DEST_PATH_IMAGE002
reaches preferable inside and outside layering; Control value at a slow speed is 30k/
Figure 2011101232337100002DEST_PATH_IMAGE003
; Abundant refining is so that concrete material evenly distributes in the pile tube mould.Total centrifugation time should not fully take into account the centrifugation time and the speed of middling speed less than 18min when parameter of noncentricity is selected, farthest to reduce interior layering.
Figure DEST_PATH_IMAGE004
autoclave curing
Pile tube adopts autoclave curing, makes concrete obtain the Zhang Qiangdu of putting that requires at short notice, adds admixture and make between the quiet stopping time to be controlled in 2 h, notes rational heating curve and temperature lowering curve, constant temperature and pressure, and saturated-steam temperature is controlled under the 1.0MPa.The intensification scope is controlled at 35~40 ℃/h, can not be too fast in order to avoid cause thermal stress cracks.Process about 2~3 h to be arranged during step-down, prevent that instantaneous controlled pressure drop from causing the unexpected evaporation and the concrete explosion of concrete mesopore water.Maintenance 2 days reaches the steel wire of cutting off the outer colligation of template after the intensity, use the release agent demoulding, and the embolism that will expose pile body scabbles along pile body, and the pile cover of burn-oning is transported to the job site through after the assay was approved, the preparation pile sinking.
(2) before pile sinking, the other end of drawing rope is put on the ground.
(3) adopt static pressure construction, measure the fixed stake of unwrapping wire position, pile-forming machine perching also lifts by crane prefabricated tubular pile, and is through pile press clamping oil cylinder that pile holder is tight, makes the piling oil cylinder stretch journey then, and pressure is applied in the stake, and stake is pressed into soil layer; After stretching the journey completion, unclamp the clamping oil cylinder, the backhaul of piling oil cylinder; Repeat above-mentioned action,, in the piling process, should conscientiously observe the relation of an embedded depth and pressure gauge reading, to judge the quality and the bearing capacity of stake until stake being pressed into the predetermined degree of depth.
(4) verticality of strict control pile tube, the perpendicularity deviation of stake must not surpass 0.5%, and guarantees pile sinking speed, notices preventing that drawing rope from breaking falls or embolism comes off; When treating that pile tube stake end reaches design elevation, stop piling, strain at some this moment and be in the drawing rope that connects embolism on the ground, make the embolism of filling pile tube sidewall consent come off;
(5) his usefulness is made in the water collection and treatment that utilizes pumping equipment to extract in the pile tube after a period of time afterwards in addition;
(6) carry out the piling construction of next root canal pile as stated above.

Claims (4)

1. jack decompression draining pile tube; Comprise: pile tube body (6) and pile cover; It is characterized in that; Be provided with on pile tube body (6) at least that delegation is provided with embolism (2) along the consent (3) of pile tube body axial distribution in consent (3), be connected with drawing rope (5) and drawing rope (5) extends the top until the pile tube body at the pipe of pile tube body at the end that is positioned at the pile tube inner body wall of embolism (2).
2. jack decompression draining pile tube according to claim 1; It is characterized in that; The central axis of consent (3) intersects or intersects with pile tube body central axis, and an end that is positioned at the pile tube inner body wall of consent (3) is higher than an end that is positioned at pile tube body outer wall of consent (3).
3. jack decompression draining pile tube according to claim 1 and 2 is characterized in that, is provided with siliceous leather sheath (1) in the outside of embolism (2).
4. the preparation technology of the said jack decompression of a claim 1 draining pile tube is characterized in that step is following:
Step 1: produce in factory normalization around the template of pile tube along the pile tube body shaft to reserving the perforation hollow hole of oblique 45 ° of holes as consent; And on template each weld rod iron (4) around connecting hollow hole, makes on several tether and the outer cover siliceous leather sheath, diameter again and equal to connect on the template hollow hole, length and radially leave the embolism that connects straight rod iron greater than template pipe shaft thickness, near the top;
Step 2: the reinforcing cage that processes is put into the template that has prepared, and the embolism that will tightly overlap siliceous leather sheath passes reinforcing cage and be inserted in the reservation hollow hole on the template, prop up inner formword and make embolism expose to template, drawing rope is pulled out along pile body in the pile tube inner formword; Then utilize rod iron (4) with embolism with steel wire lashing on template, and the concrete for preparing of cast carries out prestressed stretch-draw and centrifugal forming behind the matched moulds; After this carry out autoclave curing; Maintenance 2 days reaches the steel wire of cutting off the outer colligation of template after the intensity, uses the release agent demoulding; And the embolism that will expose pile body scabbles the pile cover of burn-oning along pile body.
CN201110123233.7A 2011-05-13 2011-05-13 Plug hole type pressure-reducing drainage pipe pile and preparation process thereof Active CN102277869B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110123233.7A CN102277869B (en) 2011-05-13 2011-05-13 Plug hole type pressure-reducing drainage pipe pile and preparation process thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110123233.7A CN102277869B (en) 2011-05-13 2011-05-13 Plug hole type pressure-reducing drainage pipe pile and preparation process thereof

Publications (2)

Publication Number Publication Date
CN102277869A CN102277869A (en) 2011-12-14
CN102277869B true CN102277869B (en) 2012-12-05

Family

ID=45103572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110123233.7A Active CN102277869B (en) 2011-05-13 2011-05-13 Plug hole type pressure-reducing drainage pipe pile and preparation process thereof

Country Status (1)

Country Link
CN (1) CN102277869B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103302743B (en) * 2013-05-30 2016-03-30 福建建华建材有限公司 A kind of centrifuging process improving inner wall strength of pipe pile
CN109914384A (en) * 2019-03-05 2019-06-21 天津城建大学 A kind of Novel pressure-reducing draining precast pile and construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2816130Y (en) * 2005-06-08 2006-09-13 曹析风 Hollow drainage prefabricated pile capable of largely increasing single-pile bearing capacity
CN101440619A (en) * 2008-07-02 2009-05-27 中冶交通工程技术有限公司 Seismic ecological bearing pile
CN201588206U (en) * 2009-11-12 2010-09-22 任再永 Water discharge pile pipe

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2692193B2 (en) * 1988-11-11 1997-12-17 住友金属工業株式会社 Liquefaction control pile
JPH11310917A (en) * 1998-04-28 1999-11-09 Nippon Steel Corp Steel pile sheet or steel pipe pile with drainage function

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2816130Y (en) * 2005-06-08 2006-09-13 曹析风 Hollow drainage prefabricated pile capable of largely increasing single-pile bearing capacity
CN101440619A (en) * 2008-07-02 2009-05-27 中冶交通工程技术有限公司 Seismic ecological bearing pile
CN201588206U (en) * 2009-11-12 2010-09-22 任再永 Water discharge pile pipe

Also Published As

Publication number Publication date
CN102277869A (en) 2011-12-14

Similar Documents

Publication Publication Date Title
CN112482359B (en) Carrier pile
CN101942832B (en) Full prestressed concrete integral solid square pile with steel pile tip and manufacturing method thereof
CN101302758B (en) Method for processing prestress square pile
CN102966101B (en) Prestressed concrete solid square pile and making method thereof
CN102828498B (en) Method for constructing gravel pile of hoop of immersed tube for reinforcing soft foundation
CN102926380A (en) Bridge cast-in-place pile chiseling-free pile head and construction method thereof
CN205088671U (en) Precast concrete drainage stake
CN109322319A (en) The bindiny mechanism of concrete precast pile and pile foundation support table
CN102277869B (en) Plug hole type pressure-reducing drainage pipe pile and preparation process thereof
CN208133235U (en) A kind of production mould of wind power generating set concrete tower
CN109989395B (en) Large storage tank filling pile assembled pile cap and construction method thereof
CN102261066B (en) Preparation process of self-adaptive pressure-reducing drainage pipe pile
CN210341897U (en) Novel prefabricated tubular pile structure
CN109083184A (en) A kind of prefabricated cushion cap of land sectional type and its production and installation method
CN209243750U (en) The bindiny mechanism of concrete precast pile and pile foundation support table
CN203007936U (en) Prestressed concrete solid square pile
CN210857194U (en) Cast-in-place reinforcement cage structure
CN202280057U (en) Integrated concrete pile tip
CN215406141U (en) Take canvas slip casting club-footed bored concrete pile structure
CN210216398U (en) Large-scale storage tank bored concrete pile assembled pile cap
CN105804058B (en) A kind of diaphram wall and its construction method
CN204780928U (en) Major diameter bored concrete pile concrete first set groundwater increment controlling means
CN201377177Y (en) Inside mould for forming reserved hole of concrete foundation
CN209722955U (en) A kind of filling pile cage of reinforcement
CN211143053U (en) Pretensioned prestressed concrete pipe pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HONGSHENG CONSTRUCTION INVEST GROUP CO., LTD.

Free format text: FORMER OWNER: NANJING UNIVERSITY OF TECHNOLOGY

Effective date: 20140804

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 210009 NANJING, JIANGSU PROVINCE TO: 330038 NANCHANG, JIANGXI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20140804

Address after: Zhonghang Plaza No. 330038 Jiangxi 1 Nanchang province Honggutan North Avenue 15 floor of Ganjiang River

Patentee after: HONGSHENG CONSTRUCTION INVESTMENT GROUP Co.,Ltd.

Address before: 210009 Zhongshan North Road, Jiangsu, No. 200,

Patentee before: Nanjing Tech University