CN102275216A - Production line of municipal administration products - Google Patents

Production line of municipal administration products Download PDF

Info

Publication number
CN102275216A
CN102275216A CN2010101988015A CN201010198801A CN102275216A CN 102275216 A CN102275216 A CN 102275216A CN 2010101988015 A CN2010101988015 A CN 2010101988015A CN 201010198801 A CN201010198801 A CN 201010198801A CN 102275216 A CN102275216 A CN 102275216A
Authority
CN
China
Prior art keywords
belt conveyor
mould
transported
supporting board
vibratory feed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010101988015A
Other languages
Chinese (zh)
Other versions
CN102275216B (en
Inventor
陈思源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201010198801 priority Critical patent/CN102275216B/en
Publication of CN102275216A publication Critical patent/CN102275216A/en
Application granted granted Critical
Publication of CN102275216B publication Critical patent/CN102275216B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Feeding Of Articles To Conveyors (AREA)
  • Press-Shaping Or Shaping Using Conveyers (AREA)

Abstract

The invention discloses a production line of municipal administration products, relating to a production line of building materials. The production line comprises a first vibration conveying device (1), a first belt conveyer (2), a horizontal stirrer (3), a feeding device (4), a second vibration conveying device (5), a maintenance pallet truck (6), a run way (7), a demolding device (8), a finished product pallet truck (9), a second belt conveyer (10) and a third belt conveyer (11). Due to the adoption of flow line production, the production line has the advantages of low workload, high production efficiency and more standard and fine product, solves the problems of high labor intensity, low efficiency, and the like of the traditional hand-crafting workshop production, also solves the problem that a product manufactured by extrusion molding is rough, and ensures that the municipal administration products achieve can be industrially produced in large scale.

Description

A kind of municipal production streamline
Technical field:
The present invention relates to a kind of production line of construction material, be specifically related to a kind of municipal production streamline.
Background technology:
Along with further going deep into of China's reform and opening-up, the national economy of China has obtained fast development steady in a long-term.The municipal administration infrastructure construction enters a new climax, and municipal product consumption is also increasing severely.Municipal production equipment in the past is:
One, extrusion modling: the material that will stir is inserted in the extruder by extrusion modling, can produce in batches, but the product of extrusion is more coarse, does not reach present urban construction requirement.
Two, vibrating forming: the material that will stir is inserted in the mould of plastics of making in advance, is put on the bumper at the mould that will fill with material and shakes, and makes the material vibrations in the mould closely knit, after the certain hour maintenance, with manually brick being taken out.Product is relatively finer and smoother, but the amount of labour is too big, and production efficiency is too low.
Summary of the invention:
The purpose of this invention is to provide a kind of municipal production streamline; it adopts streamline production; the amount of labour is little; the production efficiency height; problems such as product standard of comparison, exquisiteness have solved the labour intensity height that original handicraft workshop formula is produced, and efficient is low; solved the product problem of rough of extrusion modling, made municipal production industrialization, scale.
In order to solve the existing problem of background technology, the present invention is by the following technical solutions: it is by first vibratory feed, first belt conveyor, horizontal mixer, blanking device, second vibratory feed, the curing supporting board car, runway, stripper apparatus, the finished product supporting board cart, second belt conveyor and the 3rd belt conveyor are formed, the first vibratory feed both sides have been horizontally disposed with first belt conveyor, first belt conveyor, one side is provided with two horizontal mixers, the horizontal mixer lower end is provided with blanking device, blanking device is arranged on the upper end of first belt conveyor, the first belt conveyor two ends are provided with second vibratory feed, the first vibratory feed end is vertically arranged with second belt conveyor, the second belt conveyor both sides have been horizontally disposed with several runways, evenly be provided with several curing supporting board cars on the runway, the end of second belt conveyor is provided with stripper apparatus, the stripper apparatus rear side is vertically arranged with the 3rd belt conveyor, the 3rd belt conveyor both sides have been horizontally disposed with several runways, evenly are provided with several finished product supporting board carts on the runway.
Production procedure of the present invention is:
Mould is positioned on first belt conveyor or second vibratory feed carries, the material that horizontal mixer will stir is put into the blanking device that places first belt conveyor top, regulate the blanking amount of blanking device to carry speed, make mould fill with material, the mould that first belt conveyor will fill with material is transported on first vibratory feed, first vibratory feed will fill with material in closely knit the vibrations of the material in the mould mould vibrations are transported on second belt conveyor, to shake closely knit mould by second belt conveyor and be transported to curing supporting board car position, and be deposited into and carry out maintenance on the curing supporting board car.The good product turn-over of maintenance is positioned on second belt conveyor, be transported to by second belt conveyor product that maintenance is good and carry out the demoulding in the stripper apparatus, product after the demoulding is transported to finished product supporting board cart position together with mould by the 3rd belt conveyor, is deposited into the finished product supporting board cart and the mould stowed location is stacked.
The present invention adopts streamline production, and the amount of labour is little, the production efficiency height; problems such as product standard of comparison, exquisiteness have solved the labour intensity height that original handicraft workshop formula is produced, and efficient is low; solved the product problem of rough of extrusion modling, made municipal production industrialization, scale.
Description of drawings:
Fig. 1 is a structural representation of the present invention,
Fig. 2 is the structural representation of vibratory feed among the present invention,
Fig. 3 is the structural representation of blanking device among the present invention,
Fig. 4 is the structural representation of stripper apparatus among the present invention,
Fig. 5 is the structural representation of belt conveyor among the present invention.
The specific embodiment:
The specific embodiment one: with reference to Fig. 1, this specific embodiment is by the following technical solutions: it is by first vibratory feed 1, first belt conveyor 2, horizontal mixer 3, blanking device 4, second vibratory feed 5, curing supporting board car 6, runway 7, stripper apparatus 8, finished product supporting board cart 9, second belt conveyor 10 and the 3rd belt conveyor 11 are formed, first vibratory feed, 1 both sides have been horizontally disposed with first belt conveyor 2, first belt conveyor, 2 one sides are provided with two horizontal mixers 3, horizontal mixer 3 lower ends are provided with blanking device 4, blanking device 4 is arranged on the upper end of first belt conveyor 2, first belt conveyor, 2 two ends are provided with second vibratory feed 5, first vibratory feed, 1 end is vertically arranged with second belt conveyor 10, second belt conveyor, 10 both sides have been horizontally disposed with several runways 7, evenly be provided with several curing supporting board cars 6 on the runway 7, the end of second belt conveyor 10 is provided with stripper apparatus 8, stripper apparatus 8 rear sides are vertically arranged with the 3rd belt conveyor 11, the 3rd belt conveyor 11 both sides have been horizontally disposed with several runways 7, evenly are provided with several finished product supporting board carts 9 on the runway 7.
As Fig. 2, described vibratory feed is made up of vibrator 1-1, spring 1-2, oscillating plate 1-3 and frame 1-4, and oscillating plate 1-3 two ends are provided with vibrator 1-1, is provided with several springs 1-2 between oscillating plate 1-3 and the frame 1-4.
As Fig. 3, described blanking device 4 is made up of vibrator 4-1, spring 4-2, material-falling hopper 4-3, belt conveyor 4-4 and frame 4-5, vibrator 4-1 is arranged on the upper end of material-falling hopper 4-3, material-falling hopper 4-3 is arranged on the frame 4-5, be provided with spring 4-2 between material-falling hopper 4-3 and the frame 4-5, material-falling hopper 4-3 lower end is provided with belt conveyor 4-4.
As Fig. 4, described stripper apparatus 8 is made up of vibrator 8-1, screw mandrel 8-2, bearing 8-3, spring 8-4 and frame 8-5, both sides, vibrator 8-1 lower end are provided with the screw mandrel 8-2 that is connected with bearing 8-3, the lower end of screw mandrel 8-2 is provided with spring 8-4, and the lower end of spring 8-4 is provided with frame 8-5.
As Fig. 5, described belt conveyor is made up of belt feeder 10-1 and frame 10-2, and belt feeder 10-1 is arranged on the frame 10-2.
The flow process of this specific embodiment production true qualities product is:
Mould is positioned on first belt conveyor 2 carries, the material that horizontal mixer 3 will stir is put into the blanking device 4 that places first belt conveyor, 2 tops, regulate the blanking amount of blanking device 4 to carry speed, make mould fill with material, the mould that first belt conveyor 2 will fill with material is transported on first vibratory feed 1, first vibratory feed 1 will fill with material in closely knit the vibrations of the material in the mould mould vibrations are transported on second belt conveyor 10, to shake closely knit mould by second belt conveyor 10 and be transported to curing supporting board car 6 positions, and be deposited into and carry out maintenance on the curing supporting board car 6.The good product turn-over of maintenance is positioned on second belt conveyor 10, be transported to by second belt conveyor 10 product that maintenance is good and carry out the demoulding in the stripper apparatus 8, product after the demoulding is transported to finished product supporting board cart 9 positions together with mould by the 3rd belt conveyor 11, is deposited into the finished product supporting board cart and the mould stowed location is stacked.
The flow process that this specific embodiment is produced coloured prod is:
In mould, contain a certain amount of colour material that stirs, the mould of putting colored material well is placed on to shake on second vibratory feed 5 closely knit the and vibrations of colored material are transported on first belt conveyor 2, add underlying material once more by the blanking device 4 that places first belt conveyor, 2 tops, mould is filled with, the mould that first belt conveyor 2 will fill with material is transported to first vibratory feed 1 and shakes once more, when making the underlying material vibrations closely knit the mould vibrations are transported on second belt conveyor 10, to shake closely knit mould by second belt conveyor 10 and be transported to curing supporting board car 6 positions, and be deposited into and carry out maintenance on the curing supporting board car 6.The good product turn-over of maintenance is positioned on second belt conveyor 10, be transported to by second belt conveyor 10 product that maintenance is good and carry out the demoulding in the stripper apparatus 8, product after the demoulding is transported to finished product supporting board cart 9 positions together with mould by the 3rd belt conveyor 11, is deposited into the finished product supporting board cart and the mould stowed location is stacked.
This specific embodiment adopts streamline production, and the amount of labour is little, the production efficiency height; problems such as product standard of comparison, exquisiteness have solved the labour intensity height that original handicraft workshop formula is produced, and efficient is low; solved the product problem of rough of extrusion modling, made municipal production industrialization, scale.

Claims (7)

1. municipal production streamline, it is characterized in that it is by first vibratory feed (1), first belt conveyor (2), horizontal mixer (3), blanking device (4), second vibratory feed (5), curing supporting board car (6), runway (7), stripper apparatus (8), finished product supporting board cart (9), second belt conveyor (10) and the 3rd belt conveyor (11) are formed, first vibratory feed (1) both sides have been horizontally disposed with first belt conveyor (2), first belt conveyor (2) one sides are provided with two horizontal mixers (3), horizontal mixer (3) lower end is provided with blanking device (4), blanking device (4) is arranged on the upper end of first belt conveyor (2), first belt conveyor (2) two ends are provided with second vibratory feed (5), first vibratory feed (1) end is vertically arranged with second belt conveyor (10), second belt conveyor (10) both sides have been horizontally disposed with several runways (7), evenly be provided with several curing supporting board cars (6) on the runway (7), the end of second belt conveyor (10) is provided with stripper apparatus (8), stripper apparatus (8) rear side is vertically arranged with the 3rd belt conveyor (11), the 3rd belt conveyor (11) both sides have been horizontally disposed with several runways (7), evenly are provided with several finished product supporting board carts (9) on the runway (7).
2. a kind of municipal production streamline according to claim 1, the flow process that it is characterized in that production true qualities product is: mould is positioned on first belt conveyor (2) carries, the material that horizontal mixer (3) will stir is put into the blanking device (4) that places first belt conveyor (2) top, regulate the blanking amount of blanking device (4) to carry speed, make mould fill with material, the mould that first belt conveyor (2) will fill with material is transported on first vibratory feed (1), first vibratory feed (1) will fill with material in closely knit the vibrations of the material in the mould mould vibrations are transported on second belt conveyor (10), to shake closely knit mould by second belt conveyor (10) and be transported to curing supporting board car (6) position, and be deposited on the curing supporting board car (6) and carry out maintenance; The good product turn-over of maintenance is positioned on second belt conveyor (10), be transported in the stripper apparatus (8) by second belt conveyor (10) product that maintenance is good and carry out the demoulding, product after the demoulding is transported to finished product supporting board cart (9) position together with mould by the 3rd belt conveyor (11), is deposited into the finished product supporting board cart and the mould stowed location is stacked.
3. a kind of municipal production streamline according to claim 1, it is characterized in that the flow process of producing coloured prod is: in mould, contain a certain amount of colour material that stirs, the mould of putting colored material well is placed on to shake on second vibratory feed (5) the closely knit and vibrations of colored material are transported on first belt conveyor (2), add underlying material once more by the blanking device (4) that places first belt conveyor (2) top, mould is filled with, the mould that first belt conveyor (2) will fill with material is transported to first vibratory feed (1) and shakes once more, when making the underlying material vibrations closely knit the mould vibrations are transported on second belt conveyor (10), to shake closely knit mould by second belt conveyor (10) and be transported to curing supporting board car (6) position, and be deposited on the curing supporting board car (6) and carry out maintenance; The good product turn-over of maintenance is positioned on second belt conveyor (10), be transported in the stripper apparatus (8) by second belt conveyor (10) product that maintenance is good and carry out the demoulding, product after the demoulding is transported to finished product supporting board cart (9) position together with mould by the 3rd belt conveyor (11), is deposited into the finished product supporting board cart and the mould stowed location is stacked.
4. a kind of municipal production streamline according to claim 1, it is characterized in that described vibratory feed is made up of vibrator (1-1), spring (1-2), oscillating plate (1-3) and frame (1-4), oscillating plate (1-3) two ends are provided with vibrator (1-1), are provided with several springs (1-2) between oscillating plate (1-3) and the frame (1-4).
5. a kind of municipal production streamline according to claim 1, it is characterized in that described blanking device (4) is made up of vibrator (4-1), spring (4-2), material-falling hopper (4-3), belt conveyor (4-4) and frame (4-5), vibrator (4-1) is arranged on the upper end of material-falling hopper (4-3), material-falling hopper (4-3) is arranged on the frame (4-5), be provided with spring (4-2) between material-falling hopper (4-3) and the frame (4-5), material-falling hopper (4-3) lower end is provided with belt conveyor (4-4).
6. a kind of municipal production streamline according to claim 1, it is characterized in that described stripper apparatus (8) is made up of vibrator (8-1), screw mandrel (8-2), bearing (8-3), spring (8-4) and frame (8-5), vibrator (8-1) both sides, lower end are provided with the screw mandrel (8-2) that is connected with bearing (8-3), the lower end of screw mandrel (8-2) is provided with spring (8-4), and the lower end of spring (8-4) is provided with frame (8-5).
7. a kind of municipal production streamline according to claim 1 is characterized in that described belt conveyor is made up of belt feeder (10-1) and frame (10-2), and belt feeder (10-1) is arranged on the frame (10-2).
CN 201010198801 2010-06-12 2010-06-12 Production line of municipal administration products Expired - Fee Related CN102275216B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010198801 CN102275216B (en) 2010-06-12 2010-06-12 Production line of municipal administration products

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010198801 CN102275216B (en) 2010-06-12 2010-06-12 Production line of municipal administration products

Publications (2)

Publication Number Publication Date
CN102275216A true CN102275216A (en) 2011-12-14
CN102275216B CN102275216B (en) 2013-05-29

Family

ID=45101100

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010198801 Expired - Fee Related CN102275216B (en) 2010-06-12 2010-06-12 Production line of municipal administration products

Country Status (1)

Country Link
CN (1) CN102275216B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103287829A (en) * 2013-06-26 2013-09-11 江苏恒旭玻璃制品有限公司 Automatic conveying device of foam plastic forming machine
CN107380492A (en) * 2017-07-01 2017-11-24 湖北第二师范学院 Konjac facial mask blanking is shaken leveling device
CN108621295A (en) * 2017-03-18 2018-10-09 嘉兴市美畅塑业有限公司 Concrete casting production technique

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2079039A1 (en) * 1991-09-30 1993-03-31 Douglas W. Myers Production line equipment and related methods to manufacture large concrete panels, having integral end pilasters and artistic designs on both sides to be primarily used with others as a vehicle way sound barrier
CN1736678A (en) * 2005-09-09 2006-02-22 嵊州市宇通复合保温材料厂 Fireproof heat-insulating board production method and its mechanized production apparatus
CN1883906A (en) * 2005-06-23 2006-12-27 傅炳煌 Full automatic block production line
CN100999104A (en) * 2006-12-25 2007-07-18 山东大学 Mechanization production line of cement sand wich light wall board
CN101434088A (en) * 2008-12-15 2009-05-20 孙成建 Production line of plant fibre building elements
CN101637937A (en) * 2009-08-20 2010-02-03 山东鸿泰建设集团有限公司 Production technology of hanging posts
CN201442295U (en) * 2009-01-22 2010-04-28 北京瑞图科技发展有限公司 Pallet-free wet stacking block forming machine

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2079039A1 (en) * 1991-09-30 1993-03-31 Douglas W. Myers Production line equipment and related methods to manufacture large concrete panels, having integral end pilasters and artistic designs on both sides to be primarily used with others as a vehicle way sound barrier
CN1883906A (en) * 2005-06-23 2006-12-27 傅炳煌 Full automatic block production line
CN1736678A (en) * 2005-09-09 2006-02-22 嵊州市宇通复合保温材料厂 Fireproof heat-insulating board production method and its mechanized production apparatus
CN100999104A (en) * 2006-12-25 2007-07-18 山东大学 Mechanization production line of cement sand wich light wall board
CN101434088A (en) * 2008-12-15 2009-05-20 孙成建 Production line of plant fibre building elements
CN201442295U (en) * 2009-01-22 2010-04-28 北京瑞图科技发展有限公司 Pallet-free wet stacking block forming machine
CN101637937A (en) * 2009-08-20 2010-02-03 山东鸿泰建设集团有限公司 Production technology of hanging posts

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103287829A (en) * 2013-06-26 2013-09-11 江苏恒旭玻璃制品有限公司 Automatic conveying device of foam plastic forming machine
CN108621295A (en) * 2017-03-18 2018-10-09 嘉兴市美畅塑业有限公司 Concrete casting production technique
CN108621295B (en) * 2017-03-18 2019-11-15 嘉兴市美畅工程科技有限公司 Concrete casting production technique
CN107380492A (en) * 2017-07-01 2017-11-24 湖北第二师范学院 Konjac facial mask blanking is shaken leveling device

Also Published As

Publication number Publication date
CN102275216B (en) 2013-05-29

Similar Documents

Publication Publication Date Title
CN101456209B (en) Conveyer-belt type block molding device for continuous producing gypsum block
CN102275216B (en) Production line of municipal administration products
CN204935884U (en) A kind of line production system of artificial imitative stone product
CN105437355A (en) Dry-wet forming method and device for an artificial stone
CN2464523Y (en) Production line for mechanization continuous production of double-fibre gypsum board
CN112405820B (en) Special light concrete production device and process
CN201677385U (en) Fully-automatic decoration gypsum board forming production line
CN205799833U (en) A kind of equipment producing the special revetment brick of roadside
CN202162885U (en) Ordered material distribution truck of brick molding machine
CN102133801A (en) Automatic forming machine for construction wastes
CN210025744U (en) Building material regeneration non-fired brick material vibration extracting device
CN102241052A (en) Full-automatic molding production line for decorative gypsum board
CN101590663B (en) Novel gypsum ceiling board automatic production line
CN114055621A (en) Device and production process for producing water-permeable luminous concrete brick
CN201931572U (en) Combined-type mould casting workbench
CN209971036U (en) Forming and manufacturing equipment for three-dimensional color-pattern porcelain large plate
CN203460309U (en) Integrated automatic production equipment for decorative moldings
CN203045964U (en) Magnesia cement light wallboard spreader
CN208020468U (en) Desulfurization chemical industry powder recycles tinuous production
CN201693652U (en) Production equipment for ceramic tiles
CN102601846B (en) Automatic production equipment for ceramsite plate
CN201824447U (en) Die revolving type concrete product forming machine
CN201015888Y (en) Superimposed sheet former
CN103963154A (en) Line press
CN218314274U (en) Precast concrete stand former

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130529

Termination date: 20170612

CF01 Termination of patent right due to non-payment of annual fee