CN102253357B - Pulse collector for mass watt-hour meter - Google Patents

Pulse collector for mass watt-hour meter Download PDF

Info

Publication number
CN102253357B
CN102253357B CN 201110092650 CN201110092650A CN102253357B CN 102253357 B CN102253357 B CN 102253357B CN 201110092650 CN201110092650 CN 201110092650 CN 201110092650 A CN201110092650 A CN 201110092650A CN 102253357 B CN102253357 B CN 102253357B
Authority
CN
China
Prior art keywords
pulse
power supply
cpld
programmable logic
logic controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110092650
Other languages
Chinese (zh)
Other versions
CN102253357A (en
Inventor
陈维广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao iTechene Technologies Co ltd
Original Assignee
QINGDAO QIANCHENG ELECTRONICS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO QIANCHENG ELECTRONICS CO Ltd filed Critical QINGDAO QIANCHENG ELECTRONICS CO Ltd
Priority to CN 201110092650 priority Critical patent/CN102253357B/en
Publication of CN102253357A publication Critical patent/CN102253357A/en
Application granted granted Critical
Publication of CN102253357B publication Critical patent/CN102253357B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention belongs to the technical field of calibration of watt-hour meters, and relates to a pulse collector for a mass watt-hour meter. As for the pulse collector, the output of one end of a single-phase alternating-current power supply is communicated with an alternating-current isolation transformer, then electrically connected with a voltage-reducing and rectifying transformer, an LDO (low dropout output) linear power supply and a passive pulse collecting power outputting unit in sequence to output direct-current power, and finally connected with a single-phase watt-hour meter to supply power; the output end of the single-phase watt-hour meter is electrically connected with a photoelectric coupler so as to supply power for a programmable logic controller stably and telecommunicate with the programmable logic controller; the programmable logic controller is a main part for processing pulse and signals and is electrically connected with the LDO linear power supply, the photoelectric coupler, a resistance-capacitance reset circuit unit, an active crystal oscillator, an LED (light-emitting diode) indicating lamp and a debugging and programming interface; and the other end of the photoelectric coupler is connected with an RS485 serial port circuit and then butted with a PC (personal computer) used for processing data and information. The pulse collector for the mass watt-hour meter has the advantages of novel principle design, simple structure, safety and reliability, flexibility and convenience in operation and capability of increasing the production efficiency and the detection efficiency of the watt-hour meter.

Description

A kind of magnanimity electric energy meter pulse collection device
Technical field:
The invention belongs to the electrical energy meter calibration technical field, relate to a kind of magnanimity electric energy meter metrical pulse harvester, the pulse that is used to measure and gather the magnanimity electric energy meter, and can measure the measuring accuracy of judging electric energy meter automatically.
Background technology:
At present, generally the pulse collection device of Shi Yonging generally is to adopt single-chip microcomputer or other microcontroller acquisition process, because the restriction of resources such as single-chip microcomputer and the IO mouth of other microcontrollers own is difficult to accomplish the collection of magnanimity pulse, and the design cost higher volumes is bigger, electrical energy pulse acquisition testing in the time of can not being used for the electric energy meter batch process basically.Particularly existing traditional pulse collection technical scheme generally is to be core with the single-chip microcomputer, utilize the programmable Timer/counter of single-chip microcomputer, after single-chip microcomputer writes Timer to control word and count value, begin step-by-step counting from electric energy meter, regularly stop to gather and reading; A kind of scheme in addition is sampling eight road pulse signals, eight road pulse signals are connected on certain mouthful of single-chip microcomputer go up (as the p1 mouth), regularly read pulse signal on this mouthful with the twice of the highest frequency of pulse signal then, if the level variation has taken place in a certain position, this road count value just adds one, in like manner tens the tunnel also can handle equally; Though above two kinds of technical schemes can both realize the pulse collection of several roads to tens tunnel, are difficult to accomplish the collection of roads up to a hundred magnanimity pulse; In addition, existing these technique devices do not have the isolating and protecting measure yet, in case the alternating current and the pulse collection short-circuit of terminals, whole harvester just burns and scraps.End is got up, and existing electric energy meter pulse collection and metrological testing technology ubiquity the circuit theory complexity, the preparation cost height; the insulation blocking level is low, poor safety performance, and pulse collection quantity and scope are little; the accuracy of measuring is not high, is difficult to adapt to the shortcomings such as needs of modern electric energy meter development.
Summary of the invention:
The objective of the invention is to overcome the deficiency that existing single-chip microcomputer or other processors exist in magnanimity pulse collection measuring technique, seeking to design provides a kind of brand-new electric energy meter impulsive measurement acquisition technique device, the metrical pulse of measurement electric energy meter that can not only magnanimity, and can be easily and upper machine communication, the pulse data of gathering is carried out automatic gauge and analysis, and demonstrate measurement result accurately.
To achieve these goals, technical scheme of the present invention is to walk at existing electric energy meter that cabinet frame is mid-a magnanimity passive power pulse collection device, collection and data communication that passive power pulse collection device adopts 1-200 sheet programmable logic controller (PLC) (CPLD) to carry out the magnanimity pulse, realization is gathered multiplex pulse simultaneously by CPLD, and the quantity of calculating every road pulse in the time of setting, the data of gathering are passed to upper PC Computer Processing by the serial communication interface of design in the CPLD the inside to be judged, in the Acquisition Circuit of magnanimity pulse, be equipped with rc filter circuit that power supply output and pulse import and exchange isolating transformer, burn out harvester with the short circuit that prevents pulse collection terminal and alternating current terminal; When the electric energy meter passive electrical energy pulse collection of magnanimity was measured, primary processor adopted one or more pieces CPLD in the collecting device; The CPLD logical design of collecting device has 128 tunnel pulse acquisition circuit, and pulse input design has photoelectricity to isolate and active output, the expansion of pulse input magnanimity; The CPLD logical design of collecting device is shaped on the RS485 serial port circuit, and the magnanimity pulse data that collects is uploaded to PC computing machine machine by RS485 communication packing, measures automatically and judges detection; Design has AC-AC to exchange the isolating transformer circuit in the collecting device, with the weak electricity system of protection collecting device and the short circuit of strong power system; Its agent structure comprises single phase alternating current power supply, single-phase electric energy meter, resistance capacity filter, photoelectrical coupler, programmable logic controller (PLC) (CPLD), RS485 serial port circuit, PC computing machine, exchanges power supply output unit, resistance-capacitance type reset circuit unit, active crystal oscillator, LED light and the debugging programming interface of isolating transformer, step-down rectifier formula transformer, LDO linear power supply, passive acquisition pulse; Single phase alternating current power supply one end is exported and is exchanged the isolating transformer electric connection, again with step-down rectifier formula transformer, the power supply output unit of LDO linear power supply and passive acquisition pulse is electrically connected output DC source, back in proper order and is connected power supply with single-phase electric energy meter, the single-phase electric energy meter output terminal is electrically connected with photoelectrical coupler, the stable power-supplying and the telecommunications that are embodied as programmable logic controller (PLC) (CPLD) are communicated with, programmable logic controller (PLC) (CPLD) is the main element of pulse and signal Processing, respectively with the LDO linear power supply, photoelectrical coupler, resistance-capacitance type reset circuit unit, active crystal oscillator, LED light and debugging programming interface are electrically connected, and realize that electrical information is communicated with, handle and the demonstration effect; The other end of photoelectrical coupler is connected the back and docks with the PC computing machine of deal with data and information with the RS485 serial port circuit, realize that computing machine is handled automatically and the output result.
The present invention compared with prior art, can be in the electric energy meter batch production process easily magnanimity gather electrical energy pulse, and analyse and compare automatically and judge whether the electric energy meter metering is accurate, its principle design novelty, complete machine structure is simple, safe and reliable, manipulate nimblely, can effectively improve electric energy meter manufacturing enterprise detection efficiency.
Description of drawings:
Fig. 1 is the structural principle schematic block diagram of apparatus of the present invention, exchanges power supply output unit 12, resistance-capacitance type reset circuit unit 13, active crystal oscillator 14, LED light 15 and the CPLD debugging programming interface 16 of isolating transformer 9, step-down rectifier formula transformer 10, LDO linear power supply 11, passive acquisition pulse comprising resistance capacity filter 3, the photoelectrical coupler 4 of pulse, one or more pieces CPLD 5, RS485 serial ports photoelectrical coupler 6, RS485 serial port circuit 7, PC computing machine 8, the AC-AC of 220V single-phase alternating current 1, single-phase electric energy meter 2, pulse.
Embodiment:
Also in conjunction with the accompanying drawings the present invention is further described below by embodiment.
Embodiment:
The agent structure of present embodiment comprises single phase alternating current power supply 1, single-phase electric energy meter 2, resistance capacity filter 3, photoelectrical coupler 4, programmable logic controller (PLC) (CPLD) 5, photoelectrical coupler 6, RS485 serial port circuit 7, PC computing machine 8, the power supply output unit 12 that exchanges isolating transformer 9, step-down rectifier formula transformer 10, LDO linear power supply 11, passive acquisition pulse, resistance-capacitance type reset circuit unit 13, active crystal oscillator 14, LED light 15 and debugging programming interface 16; Single phase alternating current power supply 1 one ends output with exchange isolating transformer 9 electricity and communicate, again with step-down rectifier formula transformer 10, power supply output unit 12 orders of LDO linear power supply 11 and passive acquisition pulse are electrically connected output DC source, back and are connected power supply with single-phase electric energy meter 2, single-phase electric energy meter 2 output terminals are electrically connected with photoelectrical coupler 4, the stable power-supplying and the telecommunications that are embodied as programmable logic controller (PLC) (CPLD) 5 are communicated with, programmable logic controller (PLC) (CPLD) 5 is the main element of pulse and signal Processing, respectively with LDO linear power supply 11, photoelectrical coupler 6, resistance-capacitance type reset circuit unit 13, active crystal oscillator 14, LED light 15 and debugging programming interface 16 are electrically connected, and realize that electrical information is communicated with, handle and the demonstration effect; The other end of photoelectrical coupler 6 is connected the back and docks with the PC computing machine 8 of deal with data and information with RS485 serial port circuit 7, realize that computing machine is handled automatically and the output result.
The single phase alternating current power supply 1 of present embodiment is the output metrical pulse after single-phase electric energy meter 2 meterings, metrical pulse enters CPLD 5 collection calculating through 3 processing of EMC resistance capacity filter and photoelectrical coupler 4, the CPLD indoor design is shaped on serial port logic, the rs 232 serial interface signal of output image data is to serial ports photoelectrical coupler 6, rs 232 serial interface signal transfers the RS485 differential signal to through the chip I SL3152EIBZ of RS485 serial port circuit 7 again after photoelectricity is isolated, at last with the data of acquisition pulse through the RS485 communication, data upload to PC computing machine 8 is carried out analytical calculation handles and judge; Simultaneously, for the input end design of the step-down rectifier formula transformer 10 of harvester system power supply has AC-AC to exchange isolating transformer 9, strong and weak electricity short circuit with protection system, the 220V alternating current that exchanges isolating transformer 9 output isolation is behind step-down rectifier formula transformer 10 step-down rectifiers, export to the chip L7805CV and the R1131N331D of LDO linear power supply 11, respectively the working power 5V/3.3V of step-down output system; Another road direct current behind step-down rectifier formula transformer 10 step-down rectifiers is exported the needed working power 6.5V/2A direct current of passive pulse through the power supply output unit of passive acquisition pulse or the chip AP1501-K5LA of DC-DC Switching Power Supply 12.
Pulse collection signal in the present embodiment is received on the CPLD chip I pin, and the IO pin TXD of CPLD chip and RXD connect one road RS485 serial port circuit 7 and 8 communications of PC computing machine; The CPLD chip connects the working power R1131N331D of 3.3V, and the active crystal oscillator 14 of the work of 16MHz, the JTAG signal of programming logical program connect debugging programming interface 16 and be interface TMS/TCK/TDO/TDI; The pulse input signal of single-phase electric energy meter 2 links to each other with the IO pulse collection pin of the CPLD chip of CPLD5 behind resistance capacity filter 3 and photoelectrical coupler 4 optocoupler TLP781; The serial communication signal TXD1/RXD1 of CPLD chip output is connected with the conversion chip of RS485 serial port circuit 7 behind TLP781 photoelectrical coupler 6; After AC-AC exchanged isolating transformer 9, power supply output unit 12 rectifications of input step-down rectifier formula transformer 10 step-downs and LDO linear power supply 11 and passive acquisition pulse were the direct supply of the work of system to the alternating current of 20V by single phase alternating current power supply 1; The system reset circuit that resistance-capacitance type reset circuit unit 13 also has button to form by 4.7K resistance and 0.1uF ceramic condenser, the reseting pin RESET of connection CPLD5; Active crystal oscillator 14 is 16M-3.3V crystal oscillators of CPLD work, meets the clock pin CLOCK of CPLD; LED light 15 is 3.3V LEDs of CPLD duty, connects the common IO pin of CPLD.
Single phase alternating current power supply 1 in the present embodiment is resident or the industrial single phase alternating current power supply of 220V/50Hz, as the power supply of this device electric energy meter metering, for system provides working power; Single-phase electric energy meter 2 is single-phase electric energy meter metering electric flux and the pulse of output metering active electrical degree; The rc filter circuit that pulse resistance capacity filter 3 is made up of 1K resistance and 0.1uF ceramic condenser; Pulsed light electric coupler 4 is photoelectrical coupler TLP781; Programmable logic controller (PLC) (CPLD) the 5th, two CPLD processor LCMXO2280C-3T144 of harvester, working alone separately can infinite expanding, to realize the acquisition pulse of magnanimity; RS485 serial ports photoelectrical coupler 6 is photoelectrical coupler TLP781; RS485 serial port circuit 7 adopts RS485 serial port chip ISL3152EIBZ to form; PC computing machine 8 adopts PC computing machine conventional, that have data processing function; Exchanging isolating transformer 9 is that 1: 1 AC-AC of 220V 50Hz no-load voltage ratio exchanges isolating transformer; Step-down rectifier formula transformer 10 is step-down transformers of 220V 50Hz and through rectifier bridge SIZB60 output two-way 12V system direct supply; LDO linear power supply 11 is LDO chip L7805CV and R1131N331D; The power supply output unit 12 of passive acquisition pulse is DC-DC chip AP1501-K5LA; The system reset circuit that resistance-capacitance type reset circuit unit 13 also has button to form by 4.7K resistance and 0.1uF ceramic condenser; Active crystal oscillator 14 is 16M-3.3V crystal oscillators of CPLD work; LED light 15 is light emitting diodes of 3.3V, is used to refer to the duty of system; Debugging programming interface 16 is debugging programming jtag interfaces of CPLD.

Claims (1)

1. magnanimity electric energy meter pulse collection device, it is characterized in that walking at existing electric energy meter that cabinet frame is mid-this device, adopt 200 collection and data communications that programmable logic controller (PLC) CPLD carries out the magnanimity pulse, realization is gathered multiplex pulse simultaneously by programmable logic controller (PLC) CPLD, and the quantity of calculating every road pulse in the time of setting, the data of gathering are passed to upper PC Computer Processing by the serial communication interface of design in programmable logic controller (PLC) CPLD the inside to be judged, at the mid-power supply output unit that passive acquisition pulse is arranged of the Acquisition Circuit of magnanimity pulse, the resistance capacity filter of pulse input, AC-AC exchanges isolating transformer, burns out harvester with the short circuit that prevents pulse collection terminal and alternating current terminal; When magnanimity electric energy meter passive electrical energy pulse collection was measured, primary processor adopted 200 programmable logic controller (PLC) CPLD in the harvester; The programmable logic controller (PLC) CPLD logical design of harvester has 128 tunnel pulse acquisition circuit, and pulse input design has the power supply output unit of photoelectricity isolation and passive acquisition pulse, the expansion of pulse input magnanimity; The programmable logic controller (PLC) CPLD logical design of harvester has the RS485 serial port circuit, and the magnanimity pulse data that collects is uploaded to the PC computing machine by RS485 communication packing, measures automatically and judges detection; Design has AC-AC to exchange isolating transformer in the harvester, with the weak electricity system of protection harvester and the short circuit of strong power system; This device main body structure comprises that single phase alternating current power supply, single-phase electric energy meter, the resistance capacity filter of pulse input, photoelectrical coupler, programmable logic controller (PLC) CPLD, RS485 serial port circuit, PC computing machine, AC-AC exchange power supply output unit, resistance-capacitance type reset circuit unit, active crystal oscillator, LED light and the debugging programming interface of isolating transformer, step-down rectifier formula transformer, LDO linear power supply, passive acquisition pulse; The output of single phase alternating current power supply one end exchanges the isolating transformer electric connection with AC-AC, again with step-down rectifier formula transformer, the power supply output unit of LDO linear power supply and passive acquisition pulse is electrically connected output DC source, back in proper order and is connected power supply with single-phase electric energy meter, the single-phase electric energy meter output terminal is electrically connected with an end of photoelectrical coupler, the stable power-supplying and the telecommunications that are embodied as programmable logic controller (PLC) CPLD are communicated with, programmable logic controller (PLC) CPLD is the main element of pulse and signal Processing, respectively with the LDO linear power supply, photoelectrical coupler, resistance-capacitance type reset circuit unit, active crystal oscillator, LED light and debugging programming interface are electrically connected, and realize that electrical information is communicated with, handle and the demonstration effect; The other end of photoelectrical coupler is connected the back and docks with the PC computing machine of deal with data and information with the RS485 serial port circuit, realize that computing machine is handled automatically and the output result.
CN 201110092650 2011-04-01 2011-04-01 Pulse collector for mass watt-hour meter Active CN102253357B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110092650 CN102253357B (en) 2011-04-01 2011-04-01 Pulse collector for mass watt-hour meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110092650 CN102253357B (en) 2011-04-01 2011-04-01 Pulse collector for mass watt-hour meter

Publications (2)

Publication Number Publication Date
CN102253357A CN102253357A (en) 2011-11-23
CN102253357B true CN102253357B (en) 2013-07-31

Family

ID=44980723

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110092650 Active CN102253357B (en) 2011-04-01 2011-04-01 Pulse collector for mass watt-hour meter

Country Status (1)

Country Link
CN (1) CN102253357B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102879760B (en) * 2012-09-29 2014-09-17 郑州三晖电气股份有限公司 Method and device for checking errors of direct current electric energy meter by using standard alternating current electric energy meter
CN105785309B (en) * 2015-03-26 2019-01-15 上海斯同瑞电气科技有限公司 A kind of device and its setting method for realizing electric energy meter pulse width set
CN107290708B (en) * 2017-08-16 2019-09-06 广东电网有限责任公司揭阳供电局 A kind of electric energy meter exception Check System and implementation method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4167314B2 (en) * 1998-03-10 2008-10-15 株式会社金門製作所 Data collection device
CN100435107C (en) * 2006-02-11 2008-11-19 深圳市顶星数码网络技术有限公司 Electrifying timing sequence testing device and method thereof
CN201556200U (en) * 2009-12-02 2010-08-18 安徽省蓝光数码科技有限公司 Parallel port data acquisition unit

Also Published As

Publication number Publication date
CN102253357A (en) 2011-11-23

Similar Documents

Publication Publication Date Title
CN205354304U (en) A communication interface converter for a wide range of strapping table meter
CN102122139B (en) Distribution automation terminal and AC (Alternating Current) sampling channel expansion method thereof
CN103472432A (en) Intelligent substation electric energy measuring secondary circuit real load error detection device and method
CN102435838A (en) Basic electric quantity type energy-efficiency data collecting terminal
CN116148527B (en) Electronic electric energy meter transformation device capable of correcting errors
CN102305922A (en) On-load detection method and device for intelligent optical fiber electric energy meter in substation
CN205333845U (en) Online error testing arrangement of electric energy meter
CN102253357B (en) Pulse collector for mass watt-hour meter
CN103018551A (en) Single-phase intelligent electric energy meter with ZigBee communication module
CN102316171B (en) Large-consumer remote centralized meter reading interface device of power meter
CN201740813U (en) Electric energy metering and monitoring meter
CN202093161U (en) Mass electric energy meter pulse acquisition device
CN102436733A (en) Thermotechnical electric quantity type energy efficiency data collecting terminal
WO2014043839A1 (en) Distributed power generation dispersed state monitoring device
CN102645644B (en) Function test device of intelligent electric energy meter
CN202404227U (en) Function testing device for intelligent electric energy meters
CN201594099U (en) Multifunctional electric energy meter
CN203433104U (en) Real load error detector for secondary electric-energy metering loop of intelligent transformer station
CN204631098U (en) A kind of three-phase LED Multi-functional digital display electrical measuring meter
CN207686712U (en) A kind of oil well electrical parameter measuring device
CN202373130U (en) Thermal electric quantity type energy efficiency data acquisition terminal
CN102506932A (en) Thermodynamic type energy-efficiency data acquisition terminal
CN202304874U (en) Thermotechnical type energy efficiency data acquisition terminal
CN202904303U (en) Current and voltage real-time monitoring device of electric heater
CN204391901U (en) A kind of low-voltage circuit breaker intelligent controller based on CAN

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 266061 Shandong Province, Qingdao city Laoshan District Songling Road No. 169

Patentee after: QINGDAO ITECHENE TECHNOLOGIES Co.,Ltd.

Address before: 266061 Shandong Province, Qingdao city Laoshan District Songling Road No. 169

Patentee before: Qingdao Techen Electronic Technology Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A pulse acquisition device for mass electric energy meter

Effective date of registration: 20230224

Granted publication date: 20130731

Pledgee: China Construction Bank Corporation Qingdao Zhongshan Road sub branch

Pledgor: QINGDAO ITECHENE TECHNOLOGIES Co.,Ltd.

Registration number: Y2023370010022

PE01 Entry into force of the registration of the contract for pledge of patent right