CN203433104U - Real load error detector for secondary electric-energy metering loop of intelligent transformer station - Google Patents

Real load error detector for secondary electric-energy metering loop of intelligent transformer station Download PDF

Info

Publication number
CN203433104U
CN203433104U CN201320565363.0U CN201320565363U CN203433104U CN 203433104 U CN203433104 U CN 203433104U CN 201320565363 U CN201320565363 U CN 201320565363U CN 203433104 U CN203433104 U CN 203433104U
Authority
CN
China
Prior art keywords
electric energy
energy metering
intelligent substation
secondary circuit
real load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320565363.0U
Other languages
Chinese (zh)
Inventor
徐先勇
罗志坤
欧朝龙
张亮峰
万全
陈福胜
杨茂涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
State Grid Hunan Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
Hunan Xiangdian Test Research Institute Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd, Hunan Xiangdian Test Research Institute Co Ltd, State Grid Corp of China SGCC filed Critical Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
Priority to CN201320565363.0U priority Critical patent/CN203433104U/en
Application granted granted Critical
Publication of CN203433104U publication Critical patent/CN203433104U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

本实用新型公开了一种智能变电站电能计量二次回路实负荷误差检测装置,实负荷误差检测装置包括依次连接的数据采集电路、双口RAM、DSP处理器、单片机,智能变电站带电运行的传统电压、电流互感器二次输出实时电压、电流信号同时输入被检测电能计量二次回路和实负荷现场校验装置,同时电能计量二次回路中数字式电能表的电能量脉冲也输入到实负荷现场校验装置,把电能计量二次回路和实负荷现场校验装置计量的电能进行比较,得出误差,实现智能变电站电能计量二次回路实负荷整体检测。本实用新型解决了智能变电站带电运行时的电能计量二次回路实负荷整体检测的难题,检测装置具有较高的经济性、可靠性、安全性。

Figure 201320565363

The utility model discloses a real load error detection device for a secondary circuit of electric energy measurement in an intelligent substation. The real load error detection device includes a data acquisition circuit connected in sequence, a dual-port RAM, a DSP processor, a single-chip microcomputer, and a traditional voltage for live operation of the intelligent substation. , The secondary output of the current transformer real-time voltage and current signals are simultaneously input to the secondary circuit of the detected electric energy metering and the actual load on-site verification device, and at the same time the electric energy pulse of the digital electric energy meter in the secondary circuit of the electric energy metering is also input to the actual load site The calibration device compares the electric energy measured by the secondary circuit of electric energy measurement with the electric energy measured by the actual load on-site calibration device, and obtains the error, so as to realize the overall detection of the actual load of the secondary circuit of electric energy measurement in the smart substation. The utility model solves the problem of overall detection of the actual load of the secondary circuit of electric energy metering when the intelligent substation is running with electricity, and the detection device has high economy, reliability and safety.

Figure 201320565363

Description

智能变电站电能计量二次回路实负荷误差检测装置Intelligent substation electric energy metering secondary circuit actual load error detection device

技术领域 technical field

本实用新型涉及智能电网中智能变电站带负荷运行时的电能计量装置校验技术领域,特别智能变电站电能计量二次回路实负荷误差检测装置。  The utility model relates to the technical field of electric energy metering device verification when an intelligent substation is running with load in an intelligent grid, in particular to a real load error detection device for a secondary circuit of an electric energy metering secondary circuit of an intelligent substation. the

背景技术 Background technique

目前,中国智能电网已进入高速发展时期,国内也新建了很多各种电压等级的智能变电站,此时,与传统变电站相比智能变电站的电能计量模式已经发生了质的转变,电能计量二次回路的构成与工作方式也发生了变化。传统变电站中的电能计量系统由电磁式电流互感器、电磁式电压互感器、电容式电压互感器、电能表和二次连接电缆构成,电能计量二次回路主要由传输电压、电流模拟信号的二次电缆、传统式电能表构成。 At present, China's smart grid has entered a period of rapid development, and many new smart substations of various voltage levels have been newly built in China. At this time, compared with traditional substations, the power metering mode of smart substations has undergone a qualitative change. The secondary circuit of power metering The composition and working methods have also changed. The electric energy metering system in a traditional substation consists of electromagnetic current transformers, electromagnetic voltage transformers, capacitive voltage transformers, electric energy meters and secondary connecting cables. It consists of secondary cables and traditional electric energy meters.

智能变电站的电能计量主要有两种模式,第一种模式是为全数字化模式,从一次设备、二次设备及其传输回路所传输信号全为数字量。电子式电压互感器、电流互感器电气单元盒输出的数字信号经光纤分别传输至电压、电流合并单元,合并单元把数字信号传送至网络交换机。网络交换机把符合IEC61850-9-2LE通讯协议的数字信号通过光纤传送至数字电能表。这种模式虽然为高度数字化、智能化,但是由于电子式电压互感器、电流互感器长期运行的稳定性和可靠性有待检验,且故障率较高,于是另一种智能变电站电能计量模式出现了。第二种模式为模拟与数字相混合的形式,电压互感器为传统电磁式或者电容式、电流互感器为电磁式,传统互感器二次输出的电压、电流模拟信号通过电缆分别接入带模数转换器的电压、电流合并单元,合并单元输出符合IEC61850-9-2LE通讯协议的数字信号,并通过光纤传送到数字电能表,由数字电能表进行电能计量。本实用新型主要是针对智能变电站第二种电能计量模式进行实用新型创造。 There are two main modes of electric energy metering in smart substations. The first mode is an all-digital mode, and the signals transmitted from primary equipment, secondary equipment and their transmission circuits are all digital. The digital signals output by the electrical unit boxes of electronic voltage transformers and current transformers are respectively transmitted to the voltage and current merging units through optical fibers, and the merging unit transmits the digital signals to the network switch. The network switch transmits the digital signal conforming to the IEC61850-9-2LE communication protocol to the digital energy meter through the optical fiber. Although this mode is highly digitalized and intelligent, the long-term stability and reliability of electronic voltage transformers and current transformers have yet to be tested, and the failure rate is high, so another smart substation energy metering mode has emerged. . The second mode is a mixed form of analog and digital. The voltage transformer is a traditional electromagnetic or capacitive type, and the current transformer is an electromagnetic type. The voltage and current analog signals output by the traditional transformer are respectively connected to the belt mode through cables. The voltage and current merging unit of the digital converter, the merging unit outputs a digital signal conforming to the IEC61850-9-2LE communication protocol, and transmits it to the digital electric energy meter through the optical fiber, and the digital electric energy meter performs electric energy measurement. The utility model is mainly aimed at the creation of the utility model for the second electric energy metering mode of the intelligent substation.

因为变电站的电能计量模式发生了变化,所以电能计量二次回路的构成与工作方式也发生了变化。传统变电站的电能计量二次回路主要由传统电流/电压互感器二次信号传输电缆、常规式电能表构成;而智能变电站第二种电能计量模式的电能计量二次回路主要由带模数转换器的电压/电流合并单元、光纤和数字式电能表组成。整个电能计量二次回路的精确性对电量准确性具有很大影响,传统变电站电能计量二次回路可以通过测量实负荷情况下电压互感器二次压降及整个二次回路的二次负荷来判定其准确度等级是否满足规程规定,以保证电能计量的公平、公正。但是,智能变电站电能计量二次回路的结构和工作机理与传统变电站不同,传统变电站电能计量二次回路带负荷运行时的误差检测方法已经不再适用于智能变电站电能计量二次回路带负荷运行时的误差检测。目前,通过查阅国内外文献,还没发现有关于智能变电站电能计量二次回路实负荷整体误差检测方面的报道。  Because the electric energy metering mode of the substation has changed, the composition and working mode of the electric energy metering secondary circuit have also changed. The secondary circuit of electric energy metering in traditional substations is mainly composed of secondary signal transmission cables of traditional current/voltage transformers and conventional electric energy meters; while the secondary circuit of electric energy metering in the second electric energy metering mode of smart substations is mainly composed of analog-to-digital converters It is composed of voltage/current merging unit, optical fiber and digital electric energy meter. The accuracy of the entire electric energy metering secondary circuit has a great influence on the accuracy of the electric quantity. The traditional substation electric energy metering secondary circuit can be judged by measuring the secondary voltage drop of the voltage transformer under the condition of real load and the secondary load of the entire secondary circuit. Whether its accuracy level meets the regulations to ensure the fairness and justice of electric energy measurement. However, the structure and working mechanism of the secondary circuit of electric energy metering in smart substations are different from those of traditional substations. The error detection method of the secondary circuit of electric energy metering in traditional substations is no longer applicable when the secondary circuit of electric energy metering in smart substations is operating with load. error detection. At present, by consulting domestic and foreign literature, there is no report on the overall error detection of the actual load of the secondary circuit of the smart substation electric energy metering. the

发明内容 Contents of the invention

本实用新型所要解决的技术问题是,针对现有技术不足,提供一种智能变电站电能计量二次回路实负荷误差检测装置,满足智能变电站带电运行时电能计量二次回路实负荷整体误差检测的需求。 The technical problem to be solved by the utility model is to provide an intelligent substation electric energy metering secondary circuit actual load error detection device to meet the overall error detection of the electric energy metering secondary circuit actual load error detection when the intelligent substation is live. .

为解决上述技术问题,本实用新型所采用的技术方案是:一种智能变电站电能计量二次回路实负荷误差检测装置,包括依次连接的数据采集电路、双口RAM、DSP处理器、单片机,所述双口RAM与信号处理电路连接,所述信号处理电路连接光电脉冲接收模块;所述DSP处理器、单片机均与电源模块连接;所述数据采集电路与智能变电站电能计量二次回路的三相电压联合接线盒、三相电流联合接线盒连接;所述光电脉冲接收模块与智能变电站电能计量二次回路的数字式电能表连接。 In order to solve the above-mentioned technical problems, the technical solution adopted by the utility model is: a device for detecting actual load errors of the secondary circuit of electric energy metering in intelligent substations, including sequentially connected data acquisition circuits, dual-port RAM, DSP processors, and single-chip microcomputers. The dual-port RAM is connected to the signal processing circuit, and the signal processing circuit is connected to the photoelectric pulse receiving module; the DSP processor and the single-chip microcomputer are connected to the power supply module; The voltage joint junction box and the three-phase current joint junction box are connected; the photoelectric pulse receiving module is connected with the digital electric energy meter of the secondary circuit of the electric energy measurement of the intelligent substation.

作为优选方案,所述DSP处理器与外置存储器连接。 As a preferred solution, the DSP processor is connected with an external memory.

作为优选方案,所述单片机与键盘、液晶显示器、打印机、USB接口、网络接口连接。 As a preferred solution, the single-chip microcomputer is connected with a keyboard, a liquid crystal display, a printer, a USB interface, and a network interface.

作为优选方案,所述单片机通过通讯接口与上位机连接。 As a preferred solution, the single-chip microcomputer is connected with the upper computer through a communication interface.

作为优选方案,所述DSP处理器型号为TMS320F2812。 As a preferred solution, the model of the DSP processor is TMS320F2812.

作为优选方案,所述单片机型号为80C196。 As a preferred solution, the model of the single-chip microcomputer is 80C196.

本实用新型的实负荷误差检测方法为:电压合并单元将三相电压U aU bU c转换成FT3格式的数字报文,电流合并单元将三相电流I aI bI c转换成数字电流信号,电流合并单元将FT3格式的数字报文和数字电流信号转换成IEC61850-9-2LE格式报文,并通过光纤传输至网络交换机,再由网络交换机通过光纤把数字报文传送至数字式电能表,由数字式电能表计算出实际负荷情况下的电能量                                               

Figure DEST_PATH_IMAGE002
;实负荷现场校验装置利用从三相电压联合接线盒、三相电流联合接线盒处得到的三相电压、三相电流模拟量计算出实际运行时的电能
Figure DEST_PATH_IMAGE004
,即标准电能值;实负荷现场校验装置对
Figure 724438DEST_PATH_IMAGE004
Figure 641578DEST_PATH_IMAGE002
进行比较,计算出被检测电能计量二次回路的整体电能计量误差,完成对电能计量二次回路的整体误差检测。 The actual load error detection method of the utility model is as follows: the voltage merging unit converts the three-phase voltages U a , U b , U c into digital messages in FT3 format, and the current merging unit converts the three-phase currents I a , I b , I c Converted into digital current signal, the current merging unit converts the digital message and digital current signal in FT3 format into IEC61850-9-2LE format message, and transmits it to the network switch through optical fiber, and then the network switch transmits the digital message through optical fiber To the digital electric energy meter, the electric energy under the actual load condition is calculated by the digital electric energy meter
Figure DEST_PATH_IMAGE002
; The actual load on-site verification device uses the three-phase voltage and three-phase current analogs obtained from the three-phase voltage joint junction box and the three-phase current joint junction box to calculate the actual operating electric energy
Figure DEST_PATH_IMAGE004
, that is, the standard electric energy value; the actual load on-site calibration device is
Figure 724438DEST_PATH_IMAGE004
and
Figure 641578DEST_PATH_IMAGE002
By comparison, the overall electric energy measurement error of the detected electric energy metering secondary circuit is calculated, and the overall error detection of the electric energy metering secondary circuit is completed.

电能计量误差

Figure DEST_PATH_IMAGE006
的计算公式为: Energy metering error
Figure DEST_PATH_IMAGE006
The calculation formula is:

,

其中,

Figure DEST_PATH_IMAGE010
N为脉冲数,C为数字式电能表常数。 in,
Figure DEST_PATH_IMAGE010
, N is the number of pulses, and C is the constant of the digital electric energy meter.

与现有技术相比,本实用新型所具有的有益效果为:本实用新型的装置结构简单;本实用新型根据智能变电站电能计量二次回路的结构特点及实负荷下的工作方式,提出了实负荷下智能变电站电能计量二次回路整体误差检测装置。使用该装置,校验人员能够在与一次高压回路没有任何电气接触的情况下进行,并且还能够在一次设备不停电、二次设备正常带电工作的情况下进行。解决了智能变电站不停电情况下,电能计量二次回路带实际负荷进行整体检测及校验的难题,并且本实用新型的装置具有安全、高效等优点。 Compared with the prior art, the utility model has the beneficial effects as follows: the device structure of the utility model is simple; the utility model proposes a real An overall error detection device for the secondary circuit of electric energy metering in smart substations under load. Using this device, the calibration personnel can perform the calibration without any electrical contact with the primary high-voltage circuit, and can also perform the calibration without powering off the primary equipment and the normal live operation of the secondary equipment. It solves the problem of overall detection and verification of the secondary circuit of electric energy metering with actual load when the smart substation is not powered off, and the device of the utility model has the advantages of safety and high efficiency.

附图说明 Description of drawings

图1为本实用新型一实施例电能计量二次回路与实负荷现场校验装置结构示意图; Fig. 1 is a schematic diagram of the structure of the electric energy metering secondary circuit and the actual load on-site verification device according to an embodiment of the present invention;

图2为本实用新型一实施例实负荷现场校验装置结构示意图。 Fig. 2 is a schematic structural diagram of a real load on-site verification device according to an embodiment of the present invention.

具体实施方式 Detailed ways

如图1所示,智能变电站I母、II母带电运行,传统电磁式或者电容式电压互感器通过隔离开关QS与母线相连,其二次输出三相电压U aU bU c通过电缆经过空开接入三相电压联合接线盒。三相电压信号在电压联合接线盒处分为两路,一路送入带模数转换器的电压合并单元,另一路接入实负荷现场校验装置。传统电磁式电流互感器也通过隔离开关QS与母线相连,其二次输出三相电流I aI bI c直接通过电缆接入三相电流联合接线盒,然后接入带模数转换器的电流合并单元,同时在实负荷现场校验装置的电流输入端在电流联合接线盒处串联接入三相电流回路中。三相电压U aU bU c被电压合并单元转换成FT3格式的数字报文,经光纤传输至带模数转换器的电流合并单元。三相电流I aI bI c被电流合并单元转换成数字量,并且电流合并单元还把FT3格式的电压数字信号和数字电流信号转换成IEC61850-9-2LE格式报文,并通过光纤传输至网络交换机,再由网络交换机通过光纤把数字报文传送至数字式电能表,由数字式电能表计算出实负荷情况下的电能量

Figure 358999DEST_PATH_IMAGE002
。数字电能表计量的电能值
Figure 754208DEST_PATH_IMAGE002
不仅可以反映被试电压合并单元和电流合并单元的误差,还可以反映数字电能表本身的计量误差,因此,本实用新型提出的方法可以检测电能计量二次回路运行在实负荷工况下的整体误差。同时,实负荷现场校验装置使用由电压、电流联合接线盒处得到的三相电压、电流模拟量计算得出实际负荷的电能值,即标准电能值
Figure 568580DEST_PATH_IMAGE004
。数字式电能表的输出脉冲被传送到实负荷现场校验装置,并由实负荷现场校验装置把
Figure 577993DEST_PATH_IMAGE004
Figure 845027DEST_PATH_IMAGE002
进行比较,计算出电能计量二次回路实负荷下的有功、无功计量误差,完成对智能变电站带电运行时电能计量二次回路实负荷下的整体误差检测。误差计算公式为: As shown in Figure 1, bus I and bus II of the smart substation operate with live electricity, traditional electromagnetic or capacitive voltage transformers are connected to the busbars through the isolation switch QS, and their secondary output three-phase voltages U a , U b , U c pass through the cables Connect to the three-phase voltage joint junction box through the circuit breaker. The three-phase voltage signal is divided into two paths at the voltage joint junction box, one path is sent to the voltage merging unit with an analog-to-digital converter, and the other path is connected to the actual load on-site verification device. The traditional electromagnetic current transformer is also connected to the busbar through the isolating switch QS, and its secondary output three-phase current I a , I b , I c are directly connected to the three-phase current joint junction box through the cable, and then connected to the analog-to-digital converter At the same time, the current input terminal of the real load field verification device is connected in series with the three-phase current circuit at the current joint junction box. The three-phase voltages U a , U b , U c are converted into digital messages in FT3 format by the voltage merging unit, and then transmitted to the current merging unit with an analog-to-digital converter via optical fiber. The three-phase currents I a , I b , and I c are converted into digital quantities by the current merging unit, and the current merging unit also converts the voltage digital signal and digital current signal in FT3 format into IEC61850-9-2LE format messages, and transmits them through the optical fiber It is transmitted to the network switch, and then the network switch transmits the digital message to the digital electric energy meter through the optical fiber, and the digital electric energy meter calculates the electric energy under the real load condition
Figure 358999DEST_PATH_IMAGE002
. Electric energy value measured by digital electric energy meter
Figure 754208DEST_PATH_IMAGE002
It can not only reflect the error of the tested voltage combining unit and the current combining unit, but also reflect the measurement error of the digital electric energy meter itself. Therefore, the method proposed by the utility model can detect the overall performance of the secondary circuit of electric energy measurement under the actual load condition. error. At the same time, the actual load on-site verification device uses the three-phase voltage and current analog quantities obtained from the voltage and current joint junction box to calculate the actual load energy value, that is, the standard energy value
Figure 568580DEST_PATH_IMAGE004
. The output pulse of the digital electric energy meter is transmitted to the actual load on-site verification device, and the actual load on-site verification device
Figure 577993DEST_PATH_IMAGE004
and
Figure 845027DEST_PATH_IMAGE002
By comparison, the active and reactive power measurement errors under the real load of the secondary circuit of electric energy metering are calculated, and the overall error detection of the secondary circuit of electric energy metering under the real load of the smart substation is completed when the smart substation is running live. The error calculation formula is:

Figure 43927DEST_PATH_IMAGE008
     (1)
Figure 43927DEST_PATH_IMAGE008
(1)

                     (2) (2)

把(2)式带入(1)中,得出: Putting (2) into (1), we get:

Figure DEST_PATH_IMAGE012
    (3)
Figure DEST_PATH_IMAGE012
(3)

式(3)中N为脉冲数,C为数字式电能表常数。 In formula (3), N is the number of pulses, and C is the constant of the digital electric energy meter.

如图2所示,实负荷现场校验装置主要包括:数据采集电路(主芯片ADS1210)、双口RAM存储模块、信号处理电路(主要为RC滤波电路)、光电脉冲接收模块(主要由PNP管和电阻连接组成)、外置存储器、供电电源模块、液晶显示模块、键盘输入模块、通信模块、网络接口、USB接口、打印模块、DSP控制系统和单片机处理系统。DSP控制系统主要与双口RAM存储模块、外置存储器和单片机处理系统相连。单片机处理系统主要与液晶显示模块、键盘输入模块、通信模块、网络接口、USB接口、打印模块相连。DSP控制系统主要进行高精度的电能计算以及与单片机处理系统之间的信息、数据及命令传递。单片机处理系统除了接收由RS485/232通信模块相连的上位机发出的命令,还进行外围事件的处理。220V交流电接入供电电源模块被转换后为DSP控制系统和单片机处理系统提供工作电源。三相电压模拟量Ua、Ub、Uc和三相电流模拟量Ia、Ib、Ic经过数据采集电路采样后,存入双口RAM。光电脉冲模块接收来自数字电能表的脉冲,由信号处理电路处理后存入双口RAM。DSP控制系统发出读写命令取出双口RAM中的数据进行电能量及误差计算。与单片机相连的上位机主要完成误差检测的显示,以方便试验人员查看及记录。 As shown in Figure 2, the real-load on-site verification device mainly includes: data acquisition circuit (main chip ADS1210), dual-port RAM storage module, signal processing circuit (mainly RC filter circuit), photoelectric pulse receiving module (mainly composed of PNP tube and resistance connection), external memory, power supply module, liquid crystal display module, keyboard input module, communication module, network interface, USB interface, printing module, DSP control system and single-chip processing system. DSP control system is mainly connected with dual-port RAM storage module, external memory and single-chip processing system. The single-chip processing system is mainly connected with the liquid crystal display module, the keyboard input module, the communication module, the network interface, the USB interface and the printing module. The DSP control system mainly performs high-precision electric energy calculation and transfers information, data and commands with the single-chip processing system. In addition to receiving commands from the upper computer connected with the RS485/232 communication module, the single-chip processing system also processes peripheral events. The 220V AC power supply module is converted to provide working power for the DSP control system and the single-chip processing system. Three-phase voltage analog quantities Ua, Ub, Uc and three-phase current analog quantities Ia, Ib, Ic are stored in dual-port RAM after being sampled by the data acquisition circuit. The photoelectric pulse module receives the pulse from the digital electric energy meter, which is processed by the signal processing circuit and stored in the dual-port RAM. The DSP control system issues read and write commands to take out the data in the dual-port RAM for power energy and error calculation. The upper computer connected with the single-chip microcomputer mainly completes the display of error detection, which is convenient for the test personnel to view and record.

DSP控制系统的主控制芯片采用德州公司的TMS320F2812。 The main control chip of the DSP control system adopts TMS320F2812 of Dezhou Company.

单片机处理系统的主控制芯片采用英特尔公司的80C196。  The main control chip of the single-chip microcomputer processing system adopts 80C196 of Intel Corporation. the

Claims (6)

1. the real load error pick-up unit of an intelligent substation electric energy metering secondary, it is characterized in that, comprise the data acquisition circuit, dual port RAM, dsp processor, the single-chip microcomputer that connect successively, described dual port RAM is connected with signal processing circuit, and described signal processing circuit connects photoimpact receiver module; Described dsp processor, single-chip microcomputer are all connected with power module; Described data acquisition circuit is connected with three-phase voltage combined connection box, the three-phase current combined connection box of intelligent substation electric energy metering secondary; Described photoimpact receiver module is connected with the digital electric energy meter of intelligent substation electric energy metering secondary.
2. the real load error pick-up unit of intelligent substation electric energy metering secondary according to claim 1, is characterized in that, described dsp processor is connected with external memory.
3. the real load error pick-up unit of intelligent substation electric energy metering secondary according to claim 1, is characterized in that, described single-chip microcomputer is connected with keyboard, liquid crystal display, printer, USB interface, network interface.
4. the real load error pick-up unit of intelligent substation electric energy metering secondary according to claim 1, is characterized in that, described single-chip microcomputer is connected with host computer by communication interface.
5. the real load error pick-up unit of intelligent substation electric energy metering secondary according to claim 1, is characterized in that, described dsp processor model is TMS320F2812.
6. the real load error pick-up unit of intelligent substation electric energy metering secondary according to claim 1, is characterized in that, described single-chip microcomputer model is 80C196.
CN201320565363.0U 2013-09-12 2013-09-12 Real load error detector for secondary electric-energy metering loop of intelligent transformer station Expired - Lifetime CN203433104U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320565363.0U CN203433104U (en) 2013-09-12 2013-09-12 Real load error detector for secondary electric-energy metering loop of intelligent transformer station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320565363.0U CN203433104U (en) 2013-09-12 2013-09-12 Real load error detector for secondary electric-energy metering loop of intelligent transformer station

Publications (1)

Publication Number Publication Date
CN203433104U true CN203433104U (en) 2014-02-12

Family

ID=50062132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320565363.0U Expired - Lifetime CN203433104U (en) 2013-09-12 2013-09-12 Real load error detector for secondary electric-energy metering loop of intelligent transformer station

Country Status (1)

Country Link
CN (1) CN203433104U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103472432A (en) * 2013-09-12 2013-12-25 国家电网公司 Intelligent substation electric energy measuring secondary circuit real load error detection device and method
CN105866576A (en) * 2016-04-01 2016-08-17 国家电网公司 Simulation detection system of intelligent transformer station secondary-side electric energy metering error influence, and detection analysis method
CN106093563A (en) * 2016-05-27 2016-11-09 东莞市联洲知识产权运营管理有限公司 A substation secondary side electric energy measurement system and its measurement method
CN110196347A (en) * 2019-05-27 2019-09-03 国家电网有限公司 A kind of electrical energy measurement joint connecting terminal block

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103472432A (en) * 2013-09-12 2013-12-25 国家电网公司 Intelligent substation electric energy measuring secondary circuit real load error detection device and method
CN105866576A (en) * 2016-04-01 2016-08-17 国家电网公司 Simulation detection system of intelligent transformer station secondary-side electric energy metering error influence, and detection analysis method
CN106093563A (en) * 2016-05-27 2016-11-09 东莞市联洲知识产权运营管理有限公司 A substation secondary side electric energy measurement system and its measurement method
CN110196347A (en) * 2019-05-27 2019-09-03 国家电网有限公司 A kind of electrical energy measurement joint connecting terminal block

Similar Documents

Publication Publication Date Title
CN103472432A (en) Intelligent substation electric energy measuring secondary circuit real load error detection device and method
CN103149546B (en) The field integrated tester of a kind of portable electric energy measuring terminal
CN101958544B (en) System and method for calculating line loss rate of electric power distribution line
CN202210151U (en) System for remote checking and monitoring for electric energy metering device
CN104569902B (en) Digital type electric energy meter power consumption measuring device and method
CN102305922B (en) On-load detection method and device for intelligent optical fiber electric energy meter in substation
CN103472433A (en) Intelligent substation electric energy measuring secondary system virtual load error detection device and method
CN103592563A (en) Direct current system insulation on-line monitoring device
CN203445694U (en) An intelligent feeder remote terminal
CN203433104U (en) Real load error detector for secondary electric-energy metering loop of intelligent transformer station
CN102590610A (en) Intelligent integrated multifunctional electric energy meter and its control method for load
CN202057747U (en) Intelligent secondary circuit vector analyzer
CN101806831A (en) Intelligent substation electric energy meter
CN102928811A (en) Electric energy meter on-site detecting system based on optical fiber communication
CN207281270U (en) A kind of electronic transducer calibration instrument detecting system
CN105699932B (en) High-precision intelligent substation digital electric energy meter calibration device
CN203433105U (en) Virtual load error detector for secondary electric-energy metering system of intelligent transformer station
CN108345243A (en) The digitized measurement tests FT3 to IEC61850-9-2 protocol conversion apparatus
CN102645581B (en) Low-tension electricity metering device
CN201666918U (en) Smart substation energy meter
CN205374620U (en) Portable digital relay protection tester
CN215932001U (en) Voltage drop real-time test system for secondary circuit of voltage transformer
CN201955392U (en) Massive quantity power supply system for electric energy metering
CN110297162A (en) A kind of communication power grid detection system
CN202929197U (en) Watt-hour meter on-site detection system based on fiber-optic communication

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180719

Address after: 410004 398 new Shao Dong Road, Tianxin District, Changsha, Hunan

Co-patentee after: STATE GRID HUNAN ELECTRIC POWER COMPANY LIMITED ELECTRIC POWER Research Institute

Patentee after: STATE GRID HUNAN ELECTRIC POWER Co.,Ltd.

Co-patentee after: State Grid Corporation of China

Address before: 100033 West Chang'an Avenue, Xicheng District, Xicheng District, Beijing

Co-patentee before: STATE GRID HUNAN ELECTRIC POWER COMPANY Research Institute

Patentee before: State Grid Corporation of China

Co-patentee before: XIANG-ELECTRIC EXPERIMENT AND RESEARCH TECHNOLOGY COMPANY OF HUNAN PROVINCE

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140212