CN102253299A - 判断特高压直流双阀组电压分配不平均的方法 - Google Patents
判断特高压直流双阀组电压分配不平均的方法 Download PDFInfo
- Publication number
- CN102253299A CN102253299A CN2011100918062A CN201110091806A CN102253299A CN 102253299 A CN102253299 A CN 102253299A CN 2011100918062 A CN2011100918062 A CN 2011100918062A CN 201110091806 A CN201110091806 A CN 201110091806A CN 102253299 A CN102253299 A CN 102253299A
- Authority
- CN
- China
- Prior art keywords
- pos
- delay
- satisfy
- time
- protection system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Direct Current Feeding And Distribution (AREA)
Abstract
判断特高压直流双阀组电压分配不平均的方法,包括以下步骤:1)控制保护系统通过采集单元和数据总线读取高压换流变压器分接头档位位置TFH_POS、低压换流变压器分接头档位位置THL_POS;同时,获得控制保护系统本身产生的高压阀触发角度ALPHAH、低压阀触发角度ALPHAL;2)若满足条件|TFH_POS-THL_POS|>定值1或者 |ALPHAH-ALPHAL|>定值2 ,并且双阀组均解锁,并有延时,保护动作报警。本发明的有益效果在于,本发明引入两个不同判据,正确判断特高压直流双阀组电压分配的不平均。
Description
技术领域
本发明涉及判断特高压直流双阀组电压分配不平均的方法,和相关的继电保护装置。
背景技术
特高压直流输电系统由于具有巨大的输电容量的特点,越来越广泛地得到应用。特高压直流输电系统的核心是特高压直流输电控制保护系统(简称控制保护系统)。
特高压直流输电系统一般采用双阀组串联的方式,并且主要采用定电压的控制方式。定电压的控制方式是控制特高压直流输电系统的全阀组电压,即两个阀组上电压的总和。系统设计上要求两个阀组平均分配电压。控制保护系统中有控制逻辑实现两个阀组电压的平均分配。
控制保护系统由于某些原因,会出现两个阀组电压控制分配不平均的问题。两个阀组电压分配的不平均会使某一阀组承受过高的电压,从而容易导致阀组的损坏。提前报警十分必要。
通常,两个阀组所连接的换流变压器规格、型号和参数都是相同的。换流变压器副边电压的大小与换流变压器分接头档位的位置有密切的关系。阀组上电压的大小和如下物理量有关:交流网侧电压、换流变压器分接头位置、阀的触发角度。常规两个阀组共用同一个交流系统,如图1所示。两个阀组分别称为高压阀组和低压阀组。
描述时所采用的符号含义见图1。
图1 量值的含义说明:UDL指直流电压;TFH_POS、THL_POS分别指高压换流变压器分接头档位位置、低压换流变压器分接头档位位置;ALPHAH、ALPHAL分别指高压阀触发角度、低压阀触发角度;TH、TL分别指高压换流变压器、低压换流变压器;Uac指交流网侧电压。
目前没有判断特高压直流双阀组电压分配不平均的方法。
发明内容
本发明的目的是:提供一种判断特高压直流双阀组电压分配不平均的方法,并且能够可靠动作报警。
控制保护系统通过采集单元和数据总线读取高压换流变压器分接头档位位置、低压换流变压器分接头档位位置;同时,获得控制保护系统本身产生的高压阀触发角度、低压阀触发角度;利用判断特高压直流双阀组电压分配不平均的方法,发出动作报警。
判断特高压直流双阀组电压分配不平均的方法,其特征是
| TFH_POS - THL_POS| > 定值1 (1)
| ALPHAH - ALPHAL| > 定值2 (2)
式中,TFH_POS、THL_POS分别指高压换流变压器分接头档位位置、低压换流变压器分接头档位位置;ALPHAH、ALPHAL分别指高压阀触发角度、低压阀触发角度。
满足条件(1)或(2)后,以及满足双阀组均解锁,满足一定的延时,保护动作报警。
图2显示典型的识别特高压直流双阀组电压分配不平均的实现框图。图中,“与门”、“或门”分别是逻辑与运算、逻辑或运算;“延时1”、“延时2”、“延时3”可独立设置。
一般,特高压直流输电系统运行时,换流变压器分接头档位调节比较缓慢,属于慢调节;阀触发角度调节较快,属于快速调节。“延时1”的设置值通常大于“延时2”的设置值;“延时3”主要用于条件(1)或(2)可能衔接的防抖动处理。
本发明的有益效果在于,本发明引入两个不同判据,正确判断特高压直流双阀组电压分配的不平均。
附图说明
图1为本发明计算所使用量值的含义说明。
图2为本发明识别特高压直流双阀组电压分配不平均的实现框图。
具体实施方式
读取高压换流变压器分接头档位位置TFH_POS、低压换流变压器分接头档位位置THL_POS,以及高压阀触发角度ALPHAH、低压阀触发角度ALPHAL,计算(1) 式和(2)式。
读取高压阀组解锁标志和低压阀组解锁标志。
利用图2的实现框图,实现特高压直流双阀组电压分配的不平均的判别。
定值选择参考:“定值1”为2,“定值2”约5±0.5度。“延时1”约1±0.5分钟,“延时2”约4±0.5秒,“延时3”约80±5毫秒。
实施例1:某±800kV特高压直流输电工程,当前运行工况为:双极大地运行方式、直流电压极1为+800kV/极2为-800kV、直流电流双极均为4000A、功率为6400MW。高压换流变压器分接头档位位置TFH_POS为24、低压换流变压器分接头档位位置THL_POS为24,高压阀触发角度ALPHAH为15.01度、低压阀触发角度ALPHAL为15.02度。此时,需根据电网调度命令将功率降为3200MW。电站运行人员向控制保护系统发出功率降为3200MW指令。假设由于某种故障使得高压换流变压器分接头档位无法调节;这样,在功率下降过程中,高压换流变压器分接头档位位置始终保持为24。同时,在功率下降过程中,低压换流变压器分接头档位位置接受控制保护系统指令,逐档下降;先降为23,然后降为22。假设控制保护系统“定值1”设为2, “延时1”设为1.4分钟,“延时3”设为80毫秒。则,控制保护系统计算高/低压换流变压器分接头档位位置差,并与“定值1”比较,当低压换流变压器分接头档位位置降为22,之后1.4分钟又80毫秒,发出动作报警。提醒运行人员系统出现分接头档位位置不一致;或者控制保护系统自动停止继续进行功率下降操作。
实施例2:某±800kV特高压直流输电工程,当前运行工况为:双极大地运行方式、直流电压极1为+800kV/极2为-800kV、直流电流双极均为4000A、功率为6400MW。高压换流变压器分接头档位位置TFH_POS为24、低压换流变压器分接头档位位置THL_POS为24,高压阀触发角度ALPHAH为15.01度、低压阀触发角度ALPHAL为15.02度。此时,需根据电网调度命令将功率降为3200MW。电站运行人员向控制保护系统发出功率降为3200MW指令。在功率下降过程中,假设由于某种原因低压阀组控制保护系统调节紊乱,低压阀触发角度突变为5度;同时,高压阀组控制保护系统保持正常调节,高压阀触发角度在12.5至17.5度之间变化。假设控制保护系统“定值2”设为5.2度,“延时2” 设为4.5秒,“延时3” 设为80毫秒。则,控制保护系统计算高/低压阀触发角度差,并与“定值2”比较,当低压阀触发角度突变为5度,之后4.58秒,发出动作报警。提醒运行人员系统出现控制系统紊乱,阀组触发角度不一致;或者控制保护系统自动停止继续进行功率下降操作。
Claims (2)
1.判断特高压直流双阀组电压分配不平均的方法,其特征在于,包括以下步骤:
1)控制保护系统通过采集单元和数据总线读取高压换流变压器分接头档位位置TFH_POS、低压换流变压器分接头档位位置THL_POS;同时,获得控制保护系统本身产生的高压阀触发角度ALPHAH、低压阀触发角度ALPHAL;
2)若满足条件(1)或(2)后,
| TFH_POS - THL_POS| > 定值1 (1)
| ALPHAH - ALPHAL| > 定值2 (2)
并且双阀组均解锁,并有延时,保护动作报警。
2.根据权利要求1所述的判断特高压直流双阀组电压分配不平均的方法,其特征在于,所述延时为以下三个延时之一:
1)满足条件(1)以及满足双阀组均解锁之后的延时;
2)满足条件(2)以及满足双阀组均解锁之后的延时;
3)满足条件(1)以及满足双阀组均解锁,也满足条件(2)以及满足双阀组均解锁之后的延时。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100918062A CN102253299B (zh) | 2011-04-13 | 2011-04-13 | 判断特高压直流双阀组电压分配不平均的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100918062A CN102253299B (zh) | 2011-04-13 | 2011-04-13 | 判断特高压直流双阀组电压分配不平均的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102253299A true CN102253299A (zh) | 2011-11-23 |
CN102253299B CN102253299B (zh) | 2013-09-18 |
Family
ID=44980671
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011100918062A Active CN102253299B (zh) | 2011-04-13 | 2011-04-13 | 判断特高压直流双阀组电压分配不平均的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102253299B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104092208A (zh) * | 2014-06-25 | 2014-10-08 | 国家电网公司 | 一种直流输电工程双阀组并联运行的控制方法和装置 |
WO2016116057A1 (zh) * | 2015-01-21 | 2016-07-28 | 南京南瑞继保电气有限公司 | 一种高压直流输电串联阀组控制装置 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101741082A (zh) * | 2009-12-14 | 2010-06-16 | 南京南瑞继保电气有限公司 | 无站间通信条件下的特高压直流串联阀组退出方法 |
CN101814732A (zh) * | 2009-12-02 | 2010-08-25 | 南京南瑞继保电气有限公司 | 特高压直流输电系统双12脉动阀组协调控制方法 |
-
2011
- 2011-04-13 CN CN2011100918062A patent/CN102253299B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101814732A (zh) * | 2009-12-02 | 2010-08-25 | 南京南瑞继保电气有限公司 | 特高压直流输电系统双12脉动阀组协调控制方法 |
CN101741082A (zh) * | 2009-12-14 | 2010-06-16 | 南京南瑞继保电气有限公司 | 无站间通信条件下的特高压直流串联阀组退出方法 |
Non-Patent Citations (2)
Title |
---|
张文亮等: "±800kV/4 750A特高压直流换流阀宽频建模及电压分布特性研究", 《中国电机工程学报》 * |
王庆等: "±800kV直流输电系统双12脉动阀组平衡稳定运行及投退策略的仿真研究", 《电网技术》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104092208A (zh) * | 2014-06-25 | 2014-10-08 | 国家电网公司 | 一种直流输电工程双阀组并联运行的控制方法和装置 |
CN104092208B (zh) * | 2014-06-25 | 2016-07-06 | 国家电网公司 | 一种直流输电工程双阀组并联运行的控制方法和装置 |
WO2016116057A1 (zh) * | 2015-01-21 | 2016-07-28 | 南京南瑞继保电气有限公司 | 一种高压直流输电串联阀组控制装置 |
US10148091B2 (en) | 2015-01-21 | 2018-12-04 | Nr Electric Co., Ltd. | High voltage direct current power transmission series valve group control device |
RU2680819C2 (ru) * | 2015-01-21 | 2019-02-27 | Нр Электрик Ко., Лтд. | Устройство управления последовательными клапанами для передачи мощности постоянного тока высокого напряжения |
Also Published As
Publication number | Publication date |
---|---|
CN102253299B (zh) | 2013-09-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107681780B (zh) | 一种电网断面监视及转供策略智能生成系统及方法 | |
WO2014201989A1 (zh) | 分布式智能馈线自动化控制方法 | |
CN104518564A (zh) | 一种具有区域自投功能的备自投装置及备自投方法 | |
CN107394790B (zh) | 一种应对负荷脱网冲击并计及机组调节能力的电源及负荷紧急控制方法 | |
CN102253299B (zh) | 判断特高压直流双阀组电压分配不平均的方法 | |
CN104410165A (zh) | 一种微网间互联的方法及系统 | |
CN101969234B (zh) | 变电站自动化系统变压器负荷优化控制方法 | |
CN107181321A (zh) | 一种基于电网拓扑结构实现快速拉荷的方法 | |
CN110071499B (zh) | 一种快速判断配电网安全合环的方法和系统 | |
CN208273464U (zh) | 换流站换流变冷却器控制系统 | |
CN105576681A (zh) | 防止短路或断电的电力控制系统 | |
CN111581777A (zh) | 一种影响配电网故障恢复的转供电薄弱环量化识别方法 | |
CN107785921B (zh) | 基于柔性直流输电技术的城市电网分区互联运行调度方法 | |
CN103248120A (zh) | 一种调度主站不依赖事故总信号实现事故跳闸判断的方法 | |
CN114094594B (zh) | 一种变电站直流负荷分级控制方法、装置及终端设备 | |
CN207184025U (zh) | 直流电源全部消失后断路器紧急跳闸控制电路 | |
CN113471950B (zh) | 一种电力厂站用蓄电池组故障自愈系统及方法 | |
CN113098009B (zh) | 配电网30°角差系统不停电合环倒电方法 | |
CN103414247A (zh) | 多回直流输电系统的回控制权协调切换系统及切换方法 | |
CN104065096B (zh) | 一种利用直流输电降低终端变电站故障下全停风险的方法 | |
CN111199327B (zh) | 一种安全稳定控制策略的数据建模方法和数学模型 | |
CN113381503A (zh) | 一种采用移动电源提升配网台区供电可靠性的控制方法 | |
CN107046272B (zh) | 直流电源全部消失后断路器紧急跳闸控制电路及控制方法 | |
CN106329465B (zh) | 一种以零序电压为判据的零序保护方法和装置 | |
CN105158599B (zh) | 一种及时判断调度系统母线断电复电的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20171107 Address after: 211106 Jiangning City, Nanjing Province, the integrity of the road No. 19, Co-patentee after: NARI Technology Development Co., Ltd. Patentee after: State Grid Electric Power Research Insititute Address before: Nan Shui Road Gulou District of Nanjing city of Jiangsu Province, No. 8 210003 Co-patentee before: Nanjing Nari Co., Ltd. Patentee before: State Grid Electric Power Research Insititute |
|
TR01 | Transfer of patent right |