CN102252809A - Method for diagnosing state of flow path shaft seal system of steam turbine - Google Patents

Method for diagnosing state of flow path shaft seal system of steam turbine Download PDF

Info

Publication number
CN102252809A
CN102252809A CN2011101589132A CN201110158913A CN102252809A CN 102252809 A CN102252809 A CN 102252809A CN 2011101589132 A CN2011101589132 A CN 2011101589132A CN 201110158913 A CN201110158913 A CN 201110158913A CN 102252809 A CN102252809 A CN 102252809A
Authority
CN
China
Prior art keywords
steam turbine
steam
operating mode
seal system
flow path
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101589132A
Other languages
Chinese (zh)
Inventor
陈洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG HONGAO ELECTRIC POWER TECHNOLOGY Co Ltd
Original Assignee
SHANDONG HONGAO ELECTRIC POWER TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG HONGAO ELECTRIC POWER TECHNOLOGY Co Ltd filed Critical SHANDONG HONGAO ELECTRIC POWER TECHNOLOGY Co Ltd
Priority to CN2011101589132A priority Critical patent/CN102252809A/en
Publication of CN102252809A publication Critical patent/CN102252809A/en
Pending legal-status Critical Current

Links

Abstract

The invention belongs to the field of the economic operation analysis of a steam turbine and particularly discloses a method for diagnosing the state of a flow path shaft seal system of the steam turbine. The method disclosed by the invention makes up the inconvenience of the existing measuring computing method which is carried out through tests, does not need to increase measuring points and measuring instruments according to the existing measuring point system at present, carries out computation through the changes of parameters and grasps the change quantity after a computer group is operated for a period of time, thereby diagnosing the sudden change conditions of the shaft seal system of the steam turbine. The method disclosed by the invention has the advantages of simplicity in design, easiness in measurement, high accuracy and timely feedback, makes up the inconvenience of measuring computation which is carried out through the tests, is economic and effective and is suitable for wide popularization and application.

Description

A kind of method of diagnosing Turbine Flow Path gland seal system state
(1) technical field
The invention belongs to steam turbine economic operation analysis field, particularly a kind of method of diagnosing Turbine Flow Path gland seal system state.
(2) background technology
Along with in the world with the attention of the energy-saving and cost-reducing work of China Team, in electricity power enterprise's cost of electricity-generating day by day under the elevated pressure, more and more enterprises begins to pay attention to improving the unit operation economy, reduce cost of electricity-generating, wherein influence Steam Turbine economy bigger and be steam loss, comprise shaft gland steam leakage and flow passage component steam loss.The method that the result of performance test that steam loss is in the past determined to be simple is measured by orifice plate determines, but is actually and can calculates by the present measurement parameter of power plant.
(3) summary of the invention
The present invention provides a kind of method simple, diagnosis precise diagnosis Turbine Flow Path gland seal system state of measuring in order to remedy the deficiencies in the prior art.
The present invention is achieved through the following technical solutions:
A kind of method of diagnosing Turbine Flow Path gland seal system state is characterized in that:
(1) utilize existing measuring point of power plant and instrument, the corresponding operating mode of certification test when choosing thermal Equilibrium Design figure operating mode or unit and putting into operation is the contrast operating mode;
(2) pressure of the governing stage pressure of measuring according to existing measuring point and each bleed off passage is determined the current working of present unit operation;
(3) characteristics that are directly proportional with flow at pressure before the steam turbine intergrade level, utilize the pressure of the section of drawing gas respectively to calculate the steam loss of flow passage component, compare with the data of corresponding operating mode, know the variation of steam loss, the sudden change situation of diagnosis steam turbine gland system.
The present invention has remedied existing not convenient property of carrying out the meter algorithm by test, according to present existing measuring point system of power plant, do not need to increase measuring point and surveying instrument, variation by parameter is calculated, grasp the variable quantity of computer set after operation a period of time, diagnose the sudden change situation of steam turbine gland system.
The present invention is mainly used in the ruuning situation of the Changing Pattern diagnosis steam turbine gland system that utilizes the shaft gland steam leakage that calculates.
The calculating of the steam loss of flow passage component of the present invention is finished by computing machine is online, monitors the size of shaft gland steam leakage in real time.
Simplicity of design of the present invention is measured easily, the accuracy height, and feedback has in time remedied the not convenient property of measuring calculating by test, and economical and effective is suitable for wide popularization and application.
(4) embodiment
Embodiment:
(1) utilizes existing measuring point of power plant and instrument, the corresponding operating mode of certification test when choosing thermal Equilibrium Design figure operating mode or unit and putting into operation is the contrast operating mode, relate to the calculating in the high pressure cylinder, must choose identical pitch and open number operating mode operating mode as a comparison, relate to the calculating in the low pressure (LP) cylinder, the most last this formula of two-stage is inapplicable;
(2) pressure of the governing stage pressure of measuring according to existing measuring point and each bleed off passage is determined the current working of present unit operation;
(3) characteristics that are directly proportional with flow at pressure before the steam turbine intergrade level, utilize the pressure of the section of drawing gas respectively to calculate the air leakage of flow passage component, compare with the data of corresponding operating mode, know the variation of air leakage, the sudden change situation of diagnosis steam turbine gland system.
Calculate and calculate (high pressure cylinder with complexity is an example) as follows:
Figure 2011101589132100002DEST_PATH_IMAGE001
Wherein:
P 1, G 0, G L, G 1--steam loss and was taken out flow before one the under-contrast operating mode taken out pressure, main steam flow amount, high pressure cylinder;
P 11, G 01, G 11--one the under-current working taken out pressure, main steam flow amount and is taken out flow;
G L1--steam loss before the-high pressure cylinder.
This computation process can be finished by computing machine is online, can monitor the size of shaft gland steam leakage in real time, and steam turbine gland system is carried out condition diagnosing.

Claims (2)

1. method of diagnosing Turbine Flow Path gland seal system state is characterized in that:
(1) utilize existing measuring point of power plant and instrument, the corresponding operating mode of certification test when choosing thermal Equilibrium Design figure operating mode or unit and putting into operation is the contrast operating mode;
(2) pressure of the governing stage pressure of measuring according to existing measuring point and each bleed off passage is determined the current working of present unit operation;
(3) characteristics that are directly proportional with flow at pressure before the steam turbine intergrade level, utilize the pressure of the section of drawing gas respectively to calculate the air leakage of flow passage component, compare with the data of corresponding operating mode, know the variation of steam loss, the sudden change situation of diagnosis steam turbine gland system.
2. the method for diagnosis Turbine Flow Path gland seal system state according to claim 1 is characterized in that: the calculating of the steam loss of flow passage component is finished by computing machine is online, monitors the size of shaft gland steam leakage in real time.
CN2011101589132A 2011-06-14 2011-06-14 Method for diagnosing state of flow path shaft seal system of steam turbine Pending CN102252809A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101589132A CN102252809A (en) 2011-06-14 2011-06-14 Method for diagnosing state of flow path shaft seal system of steam turbine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101589132A CN102252809A (en) 2011-06-14 2011-06-14 Method for diagnosing state of flow path shaft seal system of steam turbine

Publications (1)

Publication Number Publication Date
CN102252809A true CN102252809A (en) 2011-11-23

Family

ID=44980206

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101589132A Pending CN102252809A (en) 2011-06-14 2011-06-14 Method for diagnosing state of flow path shaft seal system of steam turbine

Country Status (1)

Country Link
CN (1) CN102252809A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102494895A (en) * 2011-11-29 2012-06-13 河北省电力建设调整试验所 Analyzing method for energy saving and optimization of steam turbine set of power station
CN102798502A (en) * 2012-08-15 2012-11-28 广东电网公司电力科学研究院 Method for acquiring air leakage of steam turbine shaft seal system
CN103900819A (en) * 2014-03-27 2014-07-02 华电国际电力股份有限公司山东分公司 Method for testing and evaluating energy conservation effect of modified steam seal of flow passage part of steam turbine unit

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11218002A (en) * 1998-02-03 1999-08-10 Hitachi Ltd Steam leakage detector
CN1952590A (en) * 2006-11-10 2007-04-25 东北电力大学 On-line monitoring method for variation of through-flow gap of steam turbine
US20110038712A1 (en) * 2009-08-17 2011-02-17 General Electric Company System and method for measuring efficiency and leakage in a steam turbine
CN102004460A (en) * 2010-11-24 2011-04-06 东北电力大学 Online monitoring method for fouling degree of flow passage of steam turbine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11218002A (en) * 1998-02-03 1999-08-10 Hitachi Ltd Steam leakage detector
CN1952590A (en) * 2006-11-10 2007-04-25 东北电力大学 On-line monitoring method for variation of through-flow gap of steam turbine
US20110038712A1 (en) * 2009-08-17 2011-02-17 General Electric Company System and method for measuring efficiency and leakage in a steam turbine
CN102004460A (en) * 2010-11-24 2011-04-06 东北电力大学 Online monitoring method for fouling degree of flow passage of steam turbine

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
卢承斌: "汽轮机高压缸内部漏汽的试验分析与处理", 《江苏电机工程》 *
梁建: "基于软测量的汽轮机漏汽故障诊断", 《工程科技Ⅱ辑》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102494895A (en) * 2011-11-29 2012-06-13 河北省电力建设调整试验所 Analyzing method for energy saving and optimization of steam turbine set of power station
CN102494895B (en) * 2011-11-29 2014-12-10 河北省电力建设调整试验所 Analyzing method for energy saving and optimization of steam turbine set of power station
CN102798502A (en) * 2012-08-15 2012-11-28 广东电网公司电力科学研究院 Method for acquiring air leakage of steam turbine shaft seal system
CN103900819A (en) * 2014-03-27 2014-07-02 华电国际电力股份有限公司山东分公司 Method for testing and evaluating energy conservation effect of modified steam seal of flow passage part of steam turbine unit

Similar Documents

Publication Publication Date Title
CN110717219A (en) Method and device for acquiring inlet flow of compressor in complete state of aircraft engine
CN106837676B (en) Energy-saving comprehensive control device and control method for small hydroelectric generating set
CN104808168A (en) Rapid electric energy meter verification method based on segmented current technology
CN110080833B (en) Method for evaluating frequency modulation capability of high-speed governing valve of steam turbine for improving peak shaving of unit
CN108119318A (en) Wind turbine technological transformation effect of optimization appraisal procedure and its system based on unit wind measuring system
CN102749156B (en) Method for detecting exhaust enthalpy of turbine
CN109785187B (en) Method for correcting power supply coal consumption detection data of generator set
CN101995337A (en) System and method for testing acceleration performance of turbocharger
CN103925155A (en) Self-adaptive detection method for abnormal wind turbine output power
CN103487218A (en) Condenser vacuum leakproofness detecting system and method
US20120078567A1 (en) Combustion reference temperature estimation
CN104361236A (en) Evaluation method for health condition of electric power equipment
CN108020285A (en) The detection method and operation control system of a kind of oil consumption of diesel engine
CN107103167A (en) For the DEH speed-regulating functions diagnostic method and system of removal of load operating mode
CN102252809A (en) Method for diagnosing state of flow path shaft seal system of steam turbine
CN103745414A (en) Online scoring method for performance of gas-steam combined circulating power generation unit
CN102904518A (en) Synchronous generator q shaft parameter on-line identification method
CN205138794U (en) Simulation gas turbine compressor import adjustable guide vane hydraulic pressure governing system device
CN103217292B (en) The method of real-time of generating set heat-economy figure and monitoring system
CN113107675A (en) Method for determining temperature before turbine of core machine based on power balance
CN105740559A (en) Real-time energy efficiency optimization method for combustion gas turbine
CN109973159A (en) Determine the method and apparatus and machine readable storage medium of turbine low pressure cylinder flow
CN203551286U (en) An engine air path testing apparatus
CN108590784A (en) A kind of steam turbine running on the lower load rotor local thermal stress unevenness monitoring method
CN108375402B (en) Online measurement system for overflow of hydropower station water turbine based on shunt sampling method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20111123