CN102251533A - Spiral ribbed steel pipe concrete pre-pressed composite oblique pile foundation and construction method - Google Patents

Spiral ribbed steel pipe concrete pre-pressed composite oblique pile foundation and construction method Download PDF

Info

Publication number
CN102251533A
CN102251533A CN 201110122584 CN201110122584A CN102251533A CN 102251533 A CN102251533 A CN 102251533A CN 201110122584 CN201110122584 CN 201110122584 CN 201110122584 A CN201110122584 A CN 201110122584A CN 102251533 A CN102251533 A CN 102251533A
Authority
CN
China
Prior art keywords
spiral fin
steel pipe
steel tube
prefabricating plate
precompressed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201110122584
Other languages
Chinese (zh)
Other versions
CN102251533B (en
Inventor
白福波
刘界鹏
张煜
王洪兴
刘志伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Institute of Technology
Original Assignee
Harbin Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Institute of Technology filed Critical Harbin Institute of Technology
Priority to CN201110122584A priority Critical patent/CN102251533B/en
Publication of CN102251533A publication Critical patent/CN102251533A/en
Application granted granted Critical
Publication of CN102251533B publication Critical patent/CN102251533B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a spiral ribbed steel pipe concrete pre-pressed composite oblique pile foundation and a construction method, and relates to a composite oblique pile foundation and a construction method. The invention solves the problems that the consumption of a bearing material for the conventional vertical group pile foundation is high, the conventional oblique construction drilling perfusion pile is difficult to implement and the quality of a pile body cannot be ensured. Each spiral ribbed steel pipe is obliquely drilled into the soil through a through hole at the corresponding position of a pre-pressing plate, a plurality of transverse H-shaped steels are fixedly arranged on the outer surface of the pre-pressing plate, two transverse H-shaped steels are arranged in parallel at two sides of the spiral ribbed steel pipes of each row, and a plurality of guniting holes are uniformly machined on the wall of each spiral ribbed steel pipe drilled into the soil. The method comprises the following steps of: 1, performing preservative treatment; 2, sequentially and obliquely drilling the spiral ribbed steel pipes into the soil; 3, arranging the pre-pressing plate; 4, arranging the transverse H-shaped steels, and tensioning the spiral ribbed steel pipes; 5, injecting pressure cement paste; and 6, pouring concrete, the strength grade of which is not less than C30. The pile foundation is applied to soft foundation soil of cohesive soil and sandy soil under building and bridge foundation abutments.

Description

Compound taper pile base of helix rib steel pipe concrete precompressed and job practices
Technical field
Invention relates to compound taper pile base of a kind of precompressed and job practices.
Background technology
Structure often have very big horizontal applied force to import in the foundation soil on the underground basis of public building, railroad bridge, when the ground soil layer is cohesive soil or sandy soil, vertical clump of piles base bears horizontal applied force under the existing pile foundation employing steel reinforced concrete cushion cap, when the vertical pile of application is subjected to horizontal thrust, stake diameter 0.4~0.8m, because the horizontal applied force that pile foundation is born only for 1/tens of vertical compression bearing capacity, causes the loading material consumption of existing vertical clump of piles base big; Existing oblique construction drill is irritated the piling performance difficulty, and pile quality can't guarantee.
Summary of the invention
The present invention irritates the piling performance difficulty for the big and existing oblique construction drill of the loading material consumption that solves existing vertical clump of piles base, and the problem that pile quality can't guarantee provides compound taper pile base of a kind of helix rib steel pipe concrete precompressed and job practices.
The present invention solves the problems of the technologies described above the technical scheme of taking to be:
The compound taper pile base of helix rib steel pipe concrete of the present invention precompressed is by prefabricating plate, a plurality of i iron and a plurality of spiral fin steel tube are formed, described prefabricating plate is pressed on the inclined-plane of the soil body, the thickness direction of described prefabricating plate upper edge prefabricating plate is processed with a plurality of through holes of arranging by matrix, the quantity of through hole is provided with the quantity of spiral fin steel tube is consistent, each spiral fin steel tube tilts to pierce in the soil body through the through hole of relevant position on the prefabricating plate, described a plurality of i iron is packed on the external surface of prefabricating plate, the both sides of every row's spiral fin steel tube are arranged with two i iron in parallel, pierce and uniformly on the tube wall of each spiral fin steel tube in the soil body be processed with a plurality of gunniting holes, in each spiral fin steel tube, irritate press water mud is arranged, press water mud is injected in the soil body by each gunniting hole, angle between each spiral fin steel tube and the horizontal plane is 5~85 °, and the pipe diameter of described spiral fin steel tube is 102~180mm.
The job practices of the compound taper pile base of helix rib steel pipe concrete of the present invention precompressed realizes according to following steps:
Step 1, each spiral fin steel tube is done preservative treatment, ooze on the surface of each spiral fin steel tube and be coated with one deck anticorrisive agent;
Step 2, each spiral fin steel tube is tilted to pierce in the soil body successively, guarantee to be arranged in parallel between the spiral fin steel tube;
Step 3, prefabricating plate is pressed on the inclined-plane of the soil body, the stretch-draw end of each spiral fin steel tube is passed prefabricating plate;
Step 4, with a plurality of i iron secured in parallel on the external surface of prefabricating plate, the stretch-draw steel pipe applies constant precompression to i iron, the precompression value is got steel pipe tensile strength design load, stretch-draw end to a plurality of spiral fin steel tubes carries out tensioning fixation successively again, repeat tensioning fixation and hold till lotus tends towards stability soil body compression, lay down anchor lock and i iron;
Step 5, sealing steel pipe stretch-draw termination, from stretch-draw end injection pressure cement paste, the pressure limit of press water mud is 3~6Mpa with each spiral fin steel tube;
Step 6, the stretch-draw end with each spiral fin steel tube pours into the concrete that strength grade is not less than C30 at last.
The invention has the beneficial effects as follows:
The compound taper pile base of helix rib steel pipe concrete of the present invention precompressed adopts spiral fin steel tube to tilt to pierce in the soil body, realized that the compound taper pile base of helix rib steel pipe concrete precompressed bears horizontal applied force, contrasted by horizontal thrust with the vertical pile of existing application, a conversion stake diameter only was 0.24m when equal stake was long, and concrete material consumption of the present invention only is 1/12nd of existing vertical pile foundation; Rolled steel dosage is saved and is reached 35%;
The job practices of the compound taper pile base of helix rib steel pipe concrete of the present invention precompressed is implemented convenient, has guaranteed the quality of pile body.
Description of drawings
Fig. 1 is that the overall structure master of the compound taper pile base of helix rib steel pipe concrete of the present invention precompressed looks schematic diagram, Fig. 2 be the I of Fig. 1 to view, Fig. 3 is the overall structure schematic diagram of spiral fin steel tube, Fig. 4 is that the I of Fig. 2 is to view (laying down i iron).
The specific embodiment
The specific embodiment one: shown in Fig. 1~3, the compound taper pile base of helix rib steel pipe concrete precompressed of present embodiment is by prefabricating plate 1, a plurality of i iron 2 and a plurality of spiral fin steel tube 3 are formed, described prefabricating plate 1 is pressed on the inclined-plane of the soil body 4, the thickness direction of described prefabricating plate 1 upper edge prefabricating plate 1 is processed with a plurality of through hole 1-1 that arrange by matrix, the consistent setting of quantity of the quantity of through hole 1-1 and spiral fin steel tube 3, each spiral fin steel tube 3 tilts to pierce in the soil body 4 through the through hole 1-1 of relevant position on the prefabricating plate 1, described a plurality of i iron 2 is packed on the external surface of prefabricating plate 1, the both sides of every row's spiral fin steel tube 3 are arranged with two i iron 2 in parallel, pierce and uniformly on the tube wall of each spiral fin steel tube 3 in the soil body 4 be processed with a plurality of gunniting hole 3-3, in each spiral fin steel tube 3, irritate press water mud 5 is arranged, press water mud 5 is injected in the soil body 4 by each gunniting hole 3-3, angle α between each spiral fin steel tube 3 and the horizontal plane is 5~85 °, and the pipe diameter d of described spiral fin steel tube 3 is 102~180mm.
Described prefabricating plate is the steel concrete prefabricating plate.
The diameter of through hole 1-1 is D on the prefabricating plate 1, and spiral fin steel tube 3 is not less than 50mm with the space of through hole 1-1; The interval S of two spiral fin steel tubes 3 is not less than 7d.
The specific embodiment two: as shown in figures 1 and 3, present embodiment spiral fin steel tube 3 is made of steel pipe main body 3-1 and a plurality of helical blade 3-2, and a plurality of helical blade 3-2 are uniform to be packed on the outer wall of steel pipe main body 3-1.So design, it is compacted to carry out tension and compression to the soil body 4 by a plurality of helical blade 3-2 shearing diffusion transmission.Other compositions and annexation are identical with the specific embodiment one.
The specific embodiment three: as shown in figures 1 and 3, the thickness t of present embodiment helical blade 3-2 is 5mm, and between adjacent two helical blade 3-2 is 200mm apart from n.So design is convenient to spiral fin steel tube 3 and is pierced the soil body 4.Other composition and annexation are identical with the specific embodiment two.
The specific embodiment four: as shown in figures 1 and 3, the diameter phi of the gunniting hole 3-3 of present embodiment is 9mm.So design can pour into cement paste by gunniting hole 3-3 in the soil body 4, irritates the space that pulls of real helical blade 3-2 and stake end.Other compositions and annexation are identical with the specific embodiment one, two or three.
The specific embodiment five: as shown in Figure 1, the thickness h of the described prefabricating plate 1 of present embodiment is 150~300mm.So design, can guarantee the rigidity of prefabricating plate.Other compositions and annexation are identical with the specific embodiment four.
The specific embodiment six: as shown in Figure 3, present embodiment has the length L 1 of helix rib steel pipeline section of helical blade 3-2, and not have the ratio of length L 2 of the lengths of steel pipes of helical blade 3-2 be 3: 1 with being positioned at the soil body 4.So design has spiral ribs can hinder the prefabricating plate displacement for fear of the L2 section of spiral fin steel tube 3, and the space must irritate real between the steel pipe L2 section and the soil body when being pressed into cement paste.Other compositions and annexation are identical with the specific embodiment two, three or five.
The specific embodiment seven: shown in Fig. 1~4, the step of the job practices of the compound taper pile base of helix rib steel pipe concrete precompressed of present embodiment is as follows:
Step 1, each spiral fin steel tube 3 is done preservative treatment, ooze on the surface of each spiral fin steel tube 3 and be coated with one deck anticorrisive agent;
Step 2, each spiral fin steel tube 3 is tilted to pierce in the soil body 4 successively, guarantee to be arranged in parallel between the spiral fin steel tube 3;
Step 3, prefabricating plate 1 is pressed on the inclined-plane of the soil body 4, the stretch-draw end of each spiral fin steel tube 3 is passed prefabricating plate 1;
Step 4, with a plurality of i iron 2 secured in parallel on the external surface of prefabricating plate 1,3 pairs of i iron 2 of stretch-draw steel pipe apply constant precompression, the precompression value is got steel pipe tensile strength design load, stretch-draw end to a plurality of spiral fin steel tubes 3 carries out tensioning fixation successively again, repeat tensioning fixation and hold till lotus tends towards stability the soil body 4 compressions, lay down anchor lock and i iron;
Step 5, sealing steel pipe stretch-draw termination, from stretch-draw end injection pressure cement paste 5, the pressure limit of press water mud 5 is 3~6Mpa with each spiral fin steel tube 3;
Step 6, the stretch-draw end with each spiral fin steel tube 3 pours into the concrete that strength grade is not less than C30 at last.
Prefabricating plate 1 can be used as the bed course plate that connects the structure base foundation;
But step 5 and step 6 blocked operation.
The specific embodiment eight: between prefabricating plate 1 and i iron 2 the steel plate cushion block is set in the present embodiment step 4, the thickness of steel plate cushion block is 10~20mm.So operation, the soil body 4 when applying precompression in the middle of two spiral fin steel tubes of the preferential compression of meeting 3.

Claims (8)

1. the compound taper pile base of helix rib steel pipe concrete precompressed, it is characterized in that: described compound taper pile base is by prefabricating plate (1), a plurality of i iron (2) and a plurality of spiral fin steel tube (3) are formed, described prefabricating plate (1) is pressed on the inclined-plane of the soil body (4), the thickness direction of described prefabricating plate (1) upper edge prefabricating plate (1) is processed with a plurality of through holes (1-1) of arranging by matrix, the consistent setting of quantity of the quantity of through hole (1-1) and spiral fin steel tube (3), the through hole (1-1) that each spiral fin steel tube (3) is gone up the relevant position through prefabricating plate (1) tilts to pierce in the soil body (4), described a plurality of i iron (2) is packed on the external surface of prefabricating plate (1), the both sides of every row's spiral fin steel tube (3) are arranged with two i iron (2) in parallel, pierce the uniform a plurality of gunniting holes (3-3) that are processed with on the tube wall of each spiral fin steel tube (3) in the soil body (4), in each spiral fin steel tube (3), irritate press water mud (5) is arranged, press water mud (5) is injected in the soil body (4) by each gunniting hole (3-3), angle (α) between each spiral fin steel tube (3) and the horizontal plane is 5~85 °, and the pipe diameter (d) of described spiral fin steel tube (3) is 102~180mm.
2. the compound taper pile base of helix rib steel pipe concrete according to claim 1 precompressed, it is characterized in that: spiral fin steel tube (3) is made of steel pipe main body (3-1) and a plurality of helical blade (3-2), and a plurality of helical blades (3-2) are uniform to be packed on the outer wall of steel pipe main body (3-1).
3. the compound taper pile base of helix rib steel pipe concrete according to claim 2 precompressed is characterized in that: the thickness (t) of helical blade (3-2) is 5mm, and the distance (n) between adjacent two helical blades (3-2) is 200mm.
4. according to claim 1, the compound taper pile base of 2 or 3 described helix rib steel pipe concrete precompressed, it is characterized in that: the diameter (φ) of gunniting hole (3-3) is 9mm.
5. the compound taper pile base of helix rib steel pipe concrete according to claim 4 precompressed is characterized in that: the thickness (h) of described prefabricating plate (1) is 150~300mm.
6. according to claim 2, the compound taper pile base of 3 or 5 described helix rib steel pipe concrete precompressed, it is characterized in that: not have the ratio of length (L2) of the lengths of steel pipes of helical blade (3-2) be 3: 1 with being positioned at the soil body (4) to have the length (L1) of helix rib steel pipeline section of helical blade (3-2).
7. the job practices of the compound taper pile base of the described helix rib steel pipe concrete of arbitrary claim precompressed in the claim 1~7 is characterized in that the step of job practices of the compound taper pile base of helix rib steel pipe concrete precompressed is as follows:
Step 1, each spiral fin steel tube (3) is done preservative treatment, ooze on the surface of each spiral fin steel tube (3) and be coated with one deck anticorrisive agent;
Step 2, each spiral fin steel tube (3) is tilted to pierce in the soil body (4) successively, guarantee to be arranged in parallel between the spiral fin steel tube (3);
Step 3, prefabricating plate (1) is pressed on the inclined-plane of the soil body (4), the stretch-draw end of each spiral fin steel tube (3) is passed prefabricating plate (1);
Step 4, with a plurality of i iron (2) secured in parallel on the external surface of prefabricating plate (1), stretch-draw steel pipe (3) applies constant precompression to i iron (2), the precompression value is got steel pipe tensile strength design load, stretch-draw end to a plurality of spiral fin steel tubes (3) carries out tensioning fixation successively again, repeat tensioning fixation and hold till lotus tends towards stability the soil body (4) compression, lay down anchor lock and i iron (2);
Step 5, sealing steel pipe stretch-draw termination, from stretch-draw end injection pressure cement paste (5), the pressure limit of press water mud (5) is 3~6Mpa with each spiral fin steel tube (3);
Step 6, the stretch-draw end with each spiral fin steel tube (3) pours into the concrete that strength grade is not less than C30 at last.
8. the job practices of the compound taper pile base of helix rib steel pipe concrete according to claim 7 precompressed is characterized in that between prefabricating plate (1) and i iron (2) the steel plate cushion block being set in the step 4, and the thickness of steel plate cushion block is 10~20mm.
CN201110122584A 2011-05-12 2011-05-12 Spiral ribbed steel pipe concrete pre-pressed composite oblique pile foundation and construction method Expired - Fee Related CN102251533B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110122584A CN102251533B (en) 2011-05-12 2011-05-12 Spiral ribbed steel pipe concrete pre-pressed composite oblique pile foundation and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110122584A CN102251533B (en) 2011-05-12 2011-05-12 Spiral ribbed steel pipe concrete pre-pressed composite oblique pile foundation and construction method

Publications (2)

Publication Number Publication Date
CN102251533A true CN102251533A (en) 2011-11-23
CN102251533B CN102251533B (en) 2012-10-03

Family

ID=44979077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110122584A Expired - Fee Related CN102251533B (en) 2011-05-12 2011-05-12 Spiral ribbed steel pipe concrete pre-pressed composite oblique pile foundation and construction method

Country Status (1)

Country Link
CN (1) CN102251533B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225299A (en) * 2013-03-29 2013-07-31 南通中技桩业有限公司 Built-in anticorrosion structure for prestressing hollow square pile
CN105970921A (en) * 2016-07-08 2016-09-28 上海长凯岩土工程有限公司 Integrated construction method for oblique steel pipe and cemented soil stress body
CN109811771A (en) * 2019-01-16 2019-05-28 北京建材地质工程有限公司 Make the simple and easy method not bent when anchor bar steel waist rail tensioning
CN114357581A (en) * 2022-01-04 2022-04-15 合肥市市政设计研究总院有限公司 Displacement limit control-based pile group design analysis method for resisting large horizontal thrust

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003041580A (en) * 2001-07-30 2003-02-13 Toyota Motor Corp Soil improving pile body and foundation structure for house using the same
CN2622392Y (en) * 2003-05-19 2004-06-30 上海禧龙工程安装有限公司 Hollow high strength anchor-bolt grouting anchorage piece
JP2006348526A (en) * 2005-06-14 2006-12-28 Railway Technical Res Inst Composite pile foundation structure and pile foundation type support method of structure
CN201826869U (en) * 2010-10-16 2011-05-11 山东科技大学 Soft rock roadway anchored steel pipe concrete anti-floor heave device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003041580A (en) * 2001-07-30 2003-02-13 Toyota Motor Corp Soil improving pile body and foundation structure for house using the same
CN2622392Y (en) * 2003-05-19 2004-06-30 上海禧龙工程安装有限公司 Hollow high strength anchor-bolt grouting anchorage piece
JP2006348526A (en) * 2005-06-14 2006-12-28 Railway Technical Res Inst Composite pile foundation structure and pile foundation type support method of structure
CN201826869U (en) * 2010-10-16 2011-05-11 山东科技大学 Soft rock roadway anchored steel pipe concrete anti-floor heave device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225299A (en) * 2013-03-29 2013-07-31 南通中技桩业有限公司 Built-in anticorrosion structure for prestressing hollow square pile
CN105970921A (en) * 2016-07-08 2016-09-28 上海长凯岩土工程有限公司 Integrated construction method for oblique steel pipe and cemented soil stress body
CN105970921B (en) * 2016-07-08 2018-05-11 上海长凯岩土工程有限公司 A kind of integral construction method of oblique steel pipe soil cement beaer
CN109811771A (en) * 2019-01-16 2019-05-28 北京建材地质工程有限公司 Make the simple and easy method not bent when anchor bar steel waist rail tensioning
CN109811771B (en) * 2019-01-16 2020-09-01 北京建材地质工程有限公司 Simple method for preventing anchor rod steel waist beam from bending during tensioning
CN114357581A (en) * 2022-01-04 2022-04-15 合肥市市政设计研究总院有限公司 Displacement limit control-based pile group design analysis method for resisting large horizontal thrust
CN114357581B (en) * 2022-01-04 2024-03-19 合肥市市政设计研究总院有限公司 Pile group design analysis method for resisting large horizontal thrust based on displacement limit control

Also Published As

Publication number Publication date
CN102251533B (en) 2012-10-03

Similar Documents

Publication Publication Date Title
CN110939456B (en) High-stress roadway combined ring body beam supporting structure and construction method thereof
CN102828509B (en) Joint grouting method from bottom and side of prestressed pipe pile
CN201722685U (en) No-adhesive prestress and pile side rear grouting punching pile structure
CN105201514B (en) A kind of water-bearing stratum shaft wall structure and construction method
CN101581152A (en) Method for reinforcing concrete column by expanding section of coated concrete-filled steel tube (CFST)
CN201661009U (en) Concrete-filled square steel tubular column
CN102251533B (en) Spiral ribbed steel pipe concrete pre-pressed composite oblique pile foundation and construction method
CN104631432B (en) Flexible supporting system for prestress anchor supporting plate of sheet-pile retaining wall and construction method thereof
CN201883701U (en) Coated concrete-filled steel tubular concrete column reinforcement structure
CN102864777A (en) Fast prestress anchor stock structure and construction method
CN104790394A (en) Pressure anchor cable structure with prefabricated anchor head and construction method of pressure anchor cable structure
CN102900446A (en) Step-by-step strengthening method by anchoring and forming hole in downward sleeve of cracking medium
CN101560775A (en) Composite soil nailing wall structure
CN201033872Y (en) Slip casting type anchor bar
CN201962665U (en) Pile and baffle combination type retaining wall
CN106677162A (en) Stiff composite precast sheet pile envelope structure
CN101289857A (en) Sublevel grouting process for prestressed anchor rod and grouting device thereof
CN113123373A (en) Pressure-bearing uplift pile with rear-inserted unbonded steel strand U-shaped pipe and construction method thereof
CN202882968U (en) Multi-anchoring-point anchor rod without resin
CN102235017B (en) Lateral force resisting method for soft soil foundation building
CN212772306U (en) Device for improving vertical compression-resistant bearing capacity of steel pipe anchor rod static pressure pile
CN212612665U (en) Anti-floating anchor rod rigid anchor backing plate capable of applying ultrahigh prestress
CN201395791Y (en) PHC tubular pile for broaching and grouting in soft soil region
CN103938626B (en) A kind of post jacking pressure type anchor rod and its construction method
CN106759266A (en) Combination reinforcement diaphragm wall and its construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20111123

Assignee: BUILDING DESIGN Research Institute HARBIN INSTITUTE OF TECHNOLOGY

Assignor: Harbin Institute of Technology

Contract record no.: 2015230000041

Denomination of invention: Spiral ribbed steel pipe concrete pre-pressed composite oblique pile foundation and construction method

Granted publication date: 20121003

License type: Exclusive License

Record date: 20150505

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121003