CN102230670A - Straw particle warm air blower set - Google Patents

Straw particle warm air blower set Download PDF

Info

Publication number
CN102230670A
CN102230670A CN2011101545524A CN201110154552A CN102230670A CN 102230670 A CN102230670 A CN 102230670A CN 2011101545524 A CN2011101545524 A CN 2011101545524A CN 201110154552 A CN201110154552 A CN 201110154552A CN 102230670 A CN102230670 A CN 102230670A
Authority
CN
China
Prior art keywords
assembly
fire grate
distribution plenum
combustion
double action
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101545524A
Other languages
Chinese (zh)
Other versions
CN102230670B (en
Inventor
王学斌
李家勤
张延林
林春光
汪会玲
王再科
朱富俊
高新
孙磊
王义扩
仁思军
徐继玲
高召锦
李广忠
王文付
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG DUOLE HEATING EQUIPMENT CO Ltd
Original Assignee
SHANDONG DUOLE HEATING EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG DUOLE HEATING EQUIPMENT CO Ltd filed Critical SHANDONG DUOLE HEATING EQUIPMENT CO Ltd
Priority to CN 201110154552 priority Critical patent/CN102230670B/en
Publication of CN102230670A publication Critical patent/CN102230670A/en
Application granted granted Critical
Publication of CN102230670B publication Critical patent/CN102230670B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Solid-Fuel Combustion (AREA)

Abstract

The invention discloses a straw particle warm air blower set which integrates a boiler burning a straw-class biomass particle fuel and heat dissipation tail end equipment and is convenient to use. The straw particle warm air blower set comprises a straw-class biomass particle boiler assembly, wherein the straw-class biomass particle boiler assembly is provided with a fan heat dissipation assembly and a hot water circulation assembly; the shell of the straw-class biomass particle boiler assembly is provided with a microcomputer control assembly; a fuel tank is fixedly connected in the shell of the straw-class biomass particle boiler assembly; the upper cover of the fuel tank is provided with a fuel tank cover; the lower part of the fuel tank is provided with a feeding assembly; an ash residue bucket is arranged below the biomass particle burner; a combustion chamber is arranged above the fire outlet of the biomass particle burner; an expansion tank is installed on the upper part of the interior of the shell; and the biomass particle burner comprises a combustion chamber assembly and a preheating air distribution chamber assembly.

Description

Stalk particle warm braw unit
Technical field
The present invention relates to a kind of unit, relate in particular to a kind of stalk particle warm braw unit.
Background technology
The boiler that biological particles is utilized has the research and development that much have effect now, has also produced a lot of outstanding technical schemes.Zhenyang, Liyang City gas-fired equipment manufacturing company as the Decree of Patent Office of China in 2009; The biomass granule fuel combustion heat-exchange boiler that Beijing Suyang Huanneng Technology Co., Ltd. declares.Granted publication number: CN201269623, number of patent application 200820041497.1.It has adopted feed system, air feed system, burner independently that combustion system made up.Burner is a lower feeding, can effectively use the biomass granule fuel of wooden class, but in utilization, still have deficiency to the stalk biomass granular fuel, this boiler is difficult to the technical problem of the biomass granule fuel slagging scorification of solution stalk class, and need connecting pipe and heat dissipation equipment separately when needing heating, use trouble.
Summary of the invention
The boiler that the purpose of this invention is to provide a kind of burning straw biolobic material granular fuel is combined into one with the heat radiation end-equipment, stalk particle warm braw unit easy to use.
For achieving the above object, the technical solution used in the present invention is: a kind of stalk particle warm braw unit, comprise stalk biomass particle boiler components, it is characterized in that: on the described stalk biomass particle boiler components blower fan radiating subassembly and hot water circuit assembly are installed, on the housing of stalk biomass particle boiler components the microcomputerized control assembly is installed, be fixedly connected with the fuel hopper that has through hole in the housing of stalk biomass particle boiler components, the fuel hopper is fixedlyed connected with the inner surface of the upper plate of housing, be stamped the hopper lid on the fuel hopper, the bottom of fuel hopper is equipped with feeding material component, the below design of fuel hopper has the biological particles burner, the biological particles burner is connected by tube connector with the fuel hopper, the biological particles burner communicates with the fuel hopper, the design of biological particles burner below has grey slag bucket, the crater top design combuster of biological particles burner, form heat-exchanging water tank between combustor outer casing and the housing, top in the housing is equipped with expansion tank, expansion tank is positioned at fuel hopper one side, water level signal spot check probing head is installed in the expansion tank, design has the heat exchange fire tube in the housing, be fixedly connected with the deashing assembly in the heat exchange fire tube, be connected with the deashing pull bar on the deashing assembly, the deashing pull bar is positioned at hull outside, heat exchange fire tube below is an expansion chamber, hull outside is equipped with air-introduced machine, air-introduced machine is corresponding with the sedimentation expansion chamber, the exit of air-introduced machine is equipped with cigarette temperature detection signal probe, the boiler hot-water exit is equipped with the water temperature signal detection probe, the biological particles burner comprises combustion-chamber assembly and preheating distribution plenum assembly, combustion-chamber assembly and the welding of preheating distribution plenum assembly, combustion-chamber assembly and preheating distribution plenum assembly communicate, the front end of combustion-chamber assembly upwards has crater, the Front-end Design of combustion-chamber assembly has the fire grate support plate, have the hole on the combustion-chamber assembly base plate, the ash-removing plate assembly is installed on the combustion-chamber assembly base plate, and the ash-removing plate assembly comprises ash-removing plate, has the ash-removing plate ash leakage hole on the ash-removing plate, the rear end of ash-removing plate is fixedly connected with handle, be fixedly connected with removable fixed grate in the combustion-chamber assembly, lay toward double action fire grate group removable fixed grate on removable fixed grate and the fire grate support plate, the fire grate support plate, form grey chamber toward double action fire grate group and combustion-chamber assembly base plate, the fire grate support plate, removable fixed grate and on double action fire grate group, all have the fire grate ash leakage hole, comprise fire grate toward double action fire grate assembly, the fixedly connected connection steel in the bottom of the rear end of one of them fire grate connects steel and is fixedly connected with connecting plate, the top of connecting plate is fixedly connected with fire grate, the rear end of connecting plate is fixedly connected with toward the double action bar, and design has guide frame in the preheating distribution plenum assembly upward opening, preheating distribution plenum assembly, guide frame is divided into guide frame and following guide frame, on the preheating distribution plenum assembly charging interface is installed, the charging interface is corresponding with the opening on the preheating distribution plenum assembly, and preheating distribution plenum assembly upper design has siphunculus, be stamped the inspection cover cap on the siphunculus, the past double action bar of pusher plate hole and past double action fire grate assembly is housed in the preheating distribution plenum assembly, and the scraping wings assembly comprises scraping wings, has the pusher plate hole on the scraping wings, the scraping wings rear end is fixedly connected with toward the double action bar, the scraping wings assembly be arranged in down guide frame toward the double action bar, two rear ends toward the double action bars connect by Connection Block, are connected with crankshaft connecting rod system on the Connection Block, the end of crankshaft connecting rod system is connected with the decelerator motor, preheating distribution plenum assembly is equipped with air blast and hot wind ignition device outward, and air blast is corresponding with the front end lower openings of preheating distribution plenum assembly, and water level signal spot check probing head is installed in the expansion tank, the water temperature signal detection probe is installed in the boiler hot-water exit, cigarette temperature detection signal probe is installed in the chimney meatus draught fan exit, crankshaft connecting rod system comprises eccentric wheel, eccentric shaft and connecting rod, connecting rod is connected with connecting rod base by bearing pin, and the joint cross-section of preheating distribution plenum assembly and preheating distribution plenum assembly is provided with a plurality of secondary air holes, and a side of charging interface has sees the material window.
In this structure, the upper design of the opposite side of housing 9 has surface cooler 2, surface cooler 2 upper ends are connected with drainpipe 1, the design of surface cooler 2 belows has low noise axial fan 5, the low noise axial fan 5 outer blower fan radiating subassemblies 6 that are with, blower fan radiating subassembly 6 lower ends are connected with circulating pump 8, are connected with water pipe on the circulating pump 8, and water pipe is connected with stalk biomass particle boiler components 3.
Advantageous effect of the present invention is: because this structure of the present invention, so this invention can not only use wooden biolobic material granular fuel under controllable state, and can be at burning straw-like biomass granular fuel under the controllable state, and do not need connecting pipe and heat dissipation equipment separately, directly placing needs the room of heating to heat with the warm braw form again.
Description of drawings
Fig. 1 removes front view behind the housing for the present invention;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is the left view of Fig. 1;
Fig. 4 is the A-A profile of Fig. 1;
Fig. 5 is the B-B profile of Fig. 2;
Fig. 6 is the front view of the stalk biomass particle boiler components among Fig. 1;
Fig. 7 is the rearview of Fig. 6;
Fig. 8 is the vertical view of Fig. 6;
Fig. 9 is the structural representation of biological particles burner among Fig. 1;
Figure 10 is the structural representation of the circulatory system of the present invention.
In the accompanying drawing: 1, blast pipe; 2, surface cooler; 3, stalk biomass particle boiler components; 4, microcomputerized control assembly; 5, low noise axial fan; 6, blower fan radiating subassembly; 7, hot water circuit assembly; 8, circulating pump; 9, housing; 10, biological particles burner; 11, feeding material component; 12, fuel hopper; 13, water level signal spot check probing head; 14, deashing assembly; 15, air-introduced machine; 16, crater; 17, fire grate support plate; 18, ash-removing plate; 19, ash-removing plate ash leakage hole; 20, fire grate ash leakage hole; 21, toward double action fire grate assembly; 22, connect steel; 23, removable fixed grate; 24, connecting plate; 25, ash-removing plate assembly; 26, toward the double action bar; 27, pusher plate hole; 28, handle; 29, guide frame; 30, inspection opening block; 31, connecting rod base; 32, see the material window; 33, charging interface; 34, secondary air hole; 35, water temperature signal detection probe; 36, deashing pull bar; 37, cigarette temperature detection signal probe; 38, expansion tank; 39, combustion-chamber assembly; 40, preheating distribution plenum assembly; 41, air blast; 42, decelerator motor; 43, eccentric shaft; 44, eccentric shaft; 45, connecting rod; 46, bearing pin; 47, hot wind ignition device.
The specific embodiment
The invention will be further described below in conjunction with the drawings and specific embodiments:
The present invention such as Fig. 1,2,3,4,5,6,7,8,9, shown in 10, a kind of stalk particle warm braw unit, comprise stalk biomass particle boiler components 3, blower fan radiating subassembly 6 and hot water circuit assembly 7 are installed on the stalk biomass particle boiler components 3, on the housing of stalk biomass particle boiler components 3 microcomputerized control assembly 4 is installed, be fixedly connected with the fuel hopper 12 that has through hole in the housing 9 of stalk biomass particle boiler components 3, fuel hopper 12 is fixedlyed connected with the inner surface of the upper plate of housing, be stamped the hopper lid on the fuel hopper 12, the bottom of fuel hopper 12 is equipped with feeding material component 11, the below design of fuel hopper 12 has biological particles burner 10, biological particles burner 10 and fuel hopper 12 are connected by tube connector, biological particles burner 10 communicates with fuel hopper 12, the design of biological particles burner 10 belows has grey slag bucket, the crater 16 tops design combuster of biological particles burner 10, form heat-exchanging water tank between combustor outer casing and the housing, top in the housing is equipped with expansion tank 38, expansion tank 38 is positioned at fuel hopper 12 1 sides, water level signal spot check probing 13 is installed in the expansion tank 38, design has the heat exchange fire tube in the housing, be fixedly connected with deashing assembly 14 in the heat exchange fire tube, be connected with deashing pull bar 36 on the deashing assembly 14, deashing pull bar 36 is positioned at hull outside, heat exchange fire tube below is an expansion chamber, hull outside is equipped with air-introduced machine 15, air-introduced machine 15 is corresponding with the sedimentation expansion chamber, the exit of air-introduced machine is equipped with cigarette temperature detection signal probe 37, the boiler hot-water exit is equipped with water temperature signal detection probe 35, biological particles burner 10 comprises combustion-chamber assembly 39 and preheating distribution plenum assembly 40, combustion-chamber assembly 39 and 40 welding of preheating distribution plenum assembly, combustion-chamber assembly 39 and preheating distribution plenum assembly 40 communicate, the front end of combustion-chamber assembly 39 upwards has crater 16, the Front-end Design of combustion-chamber assembly 39 has fire grate support plate 17, have the hole on combustion-chamber assembly 39 base plates, on combustion-chamber assembly 39 base plates ash-removing plate assembly 25 is installed, ash-removing plate assembly 25 comprises ash-removing plate 18, has ash-removing plate ash leakage hole 19 on the ash-removing plate 18, the rear end of ash-removing plate 18 is fixedly connected with handle 28, be fixedly connected with removable fixed grate 23 in the combustion-chamber assembly 39, lay toward double action fire grate group 21 removable fixed grate 23 on removable fixed grate 23 and the fire grate support plate 17, the fire grate support plate, form grey chamber toward double action fire grate group 21 and combustion-chamber assembly 39 base plates, fire grate support plate 17, removable fixed grate 23 and on double action fire grate group 21, all have fire grate ash leakage hole 20, comprise fire grate toward double action fire grate assembly 21, the fixedly connected connection steel 22 in the bottom of the rear end of one of them fire grate connects steel 22 and is fixedly connected with connecting plate 24, the top of connecting plate 24 is fixedly connected with fire grate, the rear end of connecting plate 24 is fixedly connected with toward double action bar 26, preheating distribution plenum assembly 40 upward openings, and design has guide frame 29 in the preheating distribution plenum assembly 40, guide frame 29 is divided into guide frame and following guide frame, on the preheating distribution plenum assembly 40 charging interface 33 is installed, charging interface 33 is corresponding with the opening on the preheating distribution plenum assembly 40, and preheating distribution plenum assembly 40 upper design have siphunculus, be stamped inspection cover cap 30 on the siphunculus, the past double action bar 20 of pusher plate hole 27 and past double action fire grate assembly 21 is housed in the preheating distribution plenum assembly 40, and the scraping wings assembly comprises scraping wings, has pusher plate hole 27 on the scraping wings, the scraping wings rear end is fixedly connected with toward double action bar 26, the scraping wings assembly be arranged in down guide frame toward double action bar 26, two rear ends toward double action bars 26 connect by Connection Block, are connected with crankshaft connecting rod system on the Connection Block, the end of crankshaft connecting rod system is connected with decelerator motor 42, preheating distribution plenum assembly 40 is outer to be equipped with air blast 41 and hot wind ignition device 47, and air blast 41 is corresponding with the front end lower openings of preheating distribution plenum assembly 40, and water level signal spot check probing 13 is installed in the expansion tank 38, water temperature signal detection probe 35 is installed in the boiler hot-water exit, cigarette temperature detection signal probe 37 is installed in the chimney meatus draught fan exit, crankshaft connecting rod system comprises eccentric wheel 43, eccentric shaft 44 and connecting rod 45, connecting rod 45 is connected with connecting rod base 31 by bearing pin 46, and the joint cross-section of preheating distribution plenum assembly 40 and preheating distribution plenum assembly 40 is provided with a plurality of secondary air holes 34, and a side of charging interface 33 has sees material window 32; In the present embodiment, the upper design of the opposite side of housing 9 has surface cooler 2, surface cooler 2 upper ends are connected with drainpipe 1, the design of surface cooler 2 belows has low noise axial fan 5, the low noise axial fan 5 outer blower fan radiating subassemblies 6 that are with, blower fan radiating subassembly 6 lower ends are connected with circulating pump 8, are connected with water pipe on the circulating pump 8, and water pipe is connected with stalk biomass particle boiler components 3.
Biomass granule fuel is stored in the fuel hopper 12, the bottom of fuel hopper 12 is equipped with feeding material component 11, feeding material component 11 is the screw feeding assembly, when stalk biomass particle boiler components 3 starts operation, fuel leans on the screw feeding component transfer to the tube connector mouth of pipe, fuel enters in the biological particles burner 10 that is contained in stalk biomass particle boiler components 3 fronts by gravity by tube connector, this moment, the hot wind ignition device began fuel heating igniting, treat that fuel enters preheating distribution plenum inner chamber when a certain amount of, is under the driving of power source toward double action fire grate assembly and coupled crankshaft connecting rod system at controlled reductor motor, the fuel after lighting is back and forth pushed simultaneously the after-flame lime-ash also back and forth released biological particles burner 10 and fall in the grey slag bucket.Also under slave mode, start air feed at air blast in the action of double action fire grate assembly, most of wind enters the fire grate of combustion chamber down for fuel combustion by main air feed mouth, the hot blast of another part by in the interlayer on combustion-chamber assembly both sides and top thereof, heating, a plurality of secondary air holes 34 air feeds that connect with it make biological particles burner 10 reach best combustion efficiency; The flame that burning produces enters another combustion chamber by a combustion chamber and burns away, and the high-temperature flue gas that burning produces enters the heat exchange fire tube that spiral flow deflector is installed through the heat exchanging water pipe, through expansion chamber, discharges outside the body of heater through air-introduced machine 16.
The boiler water supply mouth passes through feed pipe; Circulating pump; Surface cooler; And return pipe is connected the hot water cyclesystem of formation warm braw unit with boiler blow-down water.
Microcomputer control system mainly is made up of each device drives signal of each monitoring point of detection signal and the work of control warm braw unit;
A: the input detection signal is divided into: be connected on the signal monitoring point of the cigarette temperature detection probe of chimney meatus draught fan outlet as the burner ignition procedure, with the start and stop of control point firearm.Be connected on hot water temperature's probe of boiler hot-water outlet, the detection signal of circulating pump start and stop detection signal and boiler overheat warning blowing out is provided; Be located at the blower fan start stop signal of the coolant-temperature gage probe control table cooler in the surface cooler; The water level detecting probe that is located in the expansion tank detects high water level in the demonstration boiler expansion water tank. middle water level. and low water level signal, warning blowing out during low water level; The bin full detection probe detects bin full information, and when treating that hopper lacks material, micro computer sends and lacks material warning message and shutdown.
B: device drives control power is divided into hopper fuel and carries reducing motor, fire grate reducing motor, air blast, igniter, air-introduced machine, circulating pump, centrifugal blower.Above power-equipment is subjected to micro computer setting program institute to set control respectively, realizes the stable continuous service of warm braw unit under controllable state.

Claims (2)

1. stalk particle warm braw unit, comprise stalk biomass particle boiler components (3), it is characterized in that: blower fan radiating subassembly (6) and hot water circuit assembly (7) are installed on the described stalk biomass particle boiler components (3), microcomputerized control assembly (4) is installed on the housing of stalk biomass particle boiler components (3), be fixedly connected with the fuel hopper (12) that has through hole in the housing (9) of stalk biomass particle boiler components (3), fuel hopper (12) is fixedlyed connected with the inner surface of the upper plate of housing, be stamped the hopper lid on the fuel hopper (12), the bottom of fuel hopper (12) is equipped with feeding material component (11), the below design of fuel hopper (12) has biological particles burner (10), biological particles burner (10) is connected by tube connector with fuel hopper (12), biological particles burner (10) communicates with fuel hopper (12), the design of biological particles burner (10) below has grey slag bucket, crater (16) the top design combuster of biological particles burner (10), form heat-exchanging water tank between combustor outer casing and the housing, top in the housing is equipped with expansion tank (38), expansion tank (38) is positioned at fuel hopper (12) one sides, water level signal spot check probing head (13) is installed in the expansion tank (38), design has the heat exchange fire tube in the housing, be fixedly connected with deashing assembly (14) in the heat exchange fire tube, be connected with deashing pull bar (36) on the deashing assembly (14), deashing pull bar (36) is positioned at hull outside, heat exchange fire tube below is an expansion chamber, hull outside is equipped with air-introduced machine (15), air-introduced machine (15) is corresponding with the sedimentation expansion chamber, the exit of air-introduced machine is equipped with cigarette temperature detection signal probe (37), the boiler hot-water exit is equipped with water temperature signal detection probe (35), biological particles burner (10) comprises combustion-chamber assembly (39) and preheating distribution plenum assembly (40), combustion-chamber assembly (39) and preheating distribution plenum assembly (40) welding, combustion-chamber assembly (39) and preheating distribution plenum assembly (40) communicate, the front end of combustion-chamber assembly (39) upwards has crater (16), the Front-end Design of combustion-chamber assembly (39) has fire grate support plate (17), have the hole on combustion-chamber assembly (39) base plate, on combustion-chamber assembly (39) base plate ash-removing plate assembly (25) is installed, ash-removing plate assembly (25) comprises ash-removing plate (18), have ash-removing plate ash leakage hole (19) on the ash-removing plate (18), the rear end of ash-removing plate (18) is fixedly connected with handle (28), is fixedly connected with removable fixed grate (23) in the combustion-chamber assembly (39), lay on removable fixed grate (23) and the fire grate support plate (17) toward double action fire grate group (21), removable fixed grate (23), the fire grate support plate, form grey chamber, fire grate support plate (17) toward double action fire grate group (21) and combustion-chamber assembly (39) base plate, removable fixed grate (23) and all have fire grate ash leakage hole (20) on double action fire grate group (21) comprises fire grate toward double action fire grate assembly (21), the fixedly connected connection steel in the bottom of the rear end of one of them fire grate (22), connect steel (22) and be fixedly connected with connecting plate (24), the top of connecting plate (24) is fixedly connected with fire grate, and the rear end of connecting plate (24) is fixedly connected with toward double action bar (26), preheating distribution plenum assembly (40) upward opening, design has guide frame (29), guide frame (29) to be divided into guide frame and following guide frame in the preheating distribution plenum assembly (40), and charging interface (33) is installed on the preheating distribution plenum assembly (40), charging interface (33) is corresponding with the opening on the preheating distribution plenum assembly (40), preheating distribution plenum assembly (40) upper design has siphunculus, is stamped inspection cover cap (30) on the siphunculus, and the past double action bar (20) of pusher plate hole (27) and past double action fire grate assembly (21) is housed in the preheating distribution plenum assembly (40), the scraping wings assembly comprises scraping wings, have pusher plate hole (27) on the scraping wings, the scraping wings rear end is fixedly connected with toward double action bar (26), the scraping wings assembly be arranged in time guide frame toward double action bar (26), two rear ends toward double action bar (26) connect by Connection Block, be connected with crankshaft connecting rod system on the Connection Block, the end of crankshaft connecting rod system is connected with decelerator motor (42), outer air blast (41) and the hot wind ignition device (47) of being equipped with of preheating distribution plenum assembly (40), air blast (41) is corresponding with the front end lower openings of preheating distribution plenum assembly (40), water level signal spot check probing head (13) is installed in the expansion tank (38), water temperature signal detection probe (35) is installed in the boiler hot-water exit, cigarette temperature detection signal probe (37) is installed in the chimney meatus draught fan exit, and crankshaft connecting rod system comprises eccentric wheel (43), eccentric shaft (44) and connecting rod (45), connecting rod (45) is connected with connecting rod base (31) by bearing pin (46), the joint cross-section of preheating distribution plenum assembly (40) and preheating distribution plenum assembly (40) is provided with a plurality of secondary air holes (34), and a side of charging interface (33) has sees material window (32).
2. stalk particle warm braw unit according to claim 1, it is characterized in that: the upper design of the opposite side of described housing (9) has surface cooler (2), surface cooler (2) upper end is connected with drainpipe (1), the design of surface cooler (2) below has low noise axial fan (5), the outer blower fan radiating subassembly (6) that is with of low noise axial fan (5), blower fan radiating subassembly (6) lower end is connected with circulating pump (8), circulating pump is connected with water pipe on (8), and water pipe is connected with stalk biomass particle boiler components (3).
CN 201110154552 2011-05-27 2011-05-27 Straw particle warm air blower set Expired - Fee Related CN102230670B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110154552 CN102230670B (en) 2011-05-27 2011-05-27 Straw particle warm air blower set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110154552 CN102230670B (en) 2011-05-27 2011-05-27 Straw particle warm air blower set

Publications (2)

Publication Number Publication Date
CN102230670A true CN102230670A (en) 2011-11-02
CN102230670B CN102230670B (en) 2013-06-05

Family

ID=44843265

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110154552 Expired - Fee Related CN102230670B (en) 2011-05-27 2011-05-27 Straw particle warm air blower set

Country Status (1)

Country Link
CN (1) CN102230670B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104235830A (en) * 2013-06-14 2014-12-24 山东多乐采暖设备有限责任公司 Intelligent boiler for burning biomass particles
CN106524493A (en) * 2016-12-28 2017-03-22 黑龙江省能源环境研究院 Small domestic biomass fuel heating boiler
CN107702088A (en) * 2017-10-31 2018-02-16 清华大学 A kind of heating stove of biomass burning shaped fuel

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201269623Y (en) * 2008-08-30 2009-07-08 溧阳市正阳燃气设备制造有限公司 Biomass particle combustion and heat exchange boiler
CN202145050U (en) * 2011-05-27 2012-02-15 山东多乐采暖设备有限责任公司 Straw granule heater unit

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201269623Y (en) * 2008-08-30 2009-07-08 溧阳市正阳燃气设备制造有限公司 Biomass particle combustion and heat exchange boiler
CN202145050U (en) * 2011-05-27 2012-02-15 山东多乐采暖设备有限责任公司 Straw granule heater unit

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104235830A (en) * 2013-06-14 2014-12-24 山东多乐采暖设备有限责任公司 Intelligent boiler for burning biomass particles
CN106524493A (en) * 2016-12-28 2017-03-22 黑龙江省能源环境研究院 Small domestic biomass fuel heating boiler
CN107702088A (en) * 2017-10-31 2018-02-16 清华大学 A kind of heating stove of biomass burning shaped fuel

Also Published As

Publication number Publication date
CN102230670B (en) 2013-06-05

Similar Documents

Publication Publication Date Title
CN102721169A (en) Automatic biofuel-combustion multipurpose furnace
CN102287920B (en) Straw granule boiler
CN201262420Y (en) Horizontal stalk boiler
CN102230670B (en) Straw particle warm air blower set
CN101324345A (en) Biomass semi-gasification heating and cooking high-efficiency energy-saving stove
CN104819570A (en) Modular hot-water hot-blast stove capable of using both gas fuel and liquid fuel
CN202145050U (en) Straw granule heater unit
CN202141198U (en) Straw particle boiler
CN202630369U (en) Full automatic biomass fuel hot water boiler
CN202419637U (en) Secondary-combustion smokeless boiler
JP2006242539A (en) Biomass fuel combustion device
CN202141037U (en) Biomass straw particle burner
CN202757254U (en) Novel biomass reverse-burning type hot water boiler
CN201237344Y (en) Environment-protection energy-saving normal pressure water-heating boiler for converting coal into coal gas
CN2533428Y (en) Heat pipe biomass particle fuel hot air heating furnace
CN104235830A (en) Intelligent boiler for burning biomass particles
CN205690667U (en) A kind of fully automatic integral biological particles water heater
CN102261646B (en) Biomass straw pellet combustor
KR101358790B1 (en) Using wood pellet steam boiler
CN113339846B (en) Heating structure of heating furnace and heating furnace
CN220038420U (en) Integrated horizontal steam generator
CN212362101U (en) Electromagnetic automatic slag-discharging air return furnace
CN212362099U (en) Hydraulic automatic slag-discharging air return furnace
CN212362098U (en) Crawler-type automatic slag-discharging air return furnace
CN212362100U (en) Cam type automatic slag discharging air return furnace

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant