CN102226826A - 双输入pss的实验方法 - Google Patents

双输入pss的实验方法 Download PDF

Info

Publication number
CN102226826A
CN102226826A CN2011100741414A CN201110074141A CN102226826A CN 102226826 A CN102226826 A CN 102226826A CN 2011100741414 A CN2011100741414 A CN 2011100741414A CN 201110074141 A CN201110074141 A CN 201110074141A CN 102226826 A CN102226826 A CN 102226826A
Authority
CN
China
Prior art keywords
pss
input signal
channel
passage
effect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100741414A
Other languages
English (en)
Other versions
CN102226826B (zh
Inventor
许其品
许其质
徐蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NARI Group Corp
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Original Assignee
Nari Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nari Technology Co Ltd filed Critical Nari Technology Co Ltd
Priority to CN 201110074141 priority Critical patent/CN102226826B/zh
Publication of CN102226826A publication Critical patent/CN102226826A/zh
Application granted granted Critical
Publication of CN102226826B publication Critical patent/CN102226826B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种双输入PSS的实验方法,包括第一通道输入信号和第二通道输入信号,第一通道输入信号为机械角速度的信号,第二通道输入信号为电气功率输入信号,其特征在于,包括以下步骤:1)屏蔽第二通道,并通过修改斜坡函数通带的方法,验证第一通道输入信号对抑制电网低频振荡的作用;2)屏蔽第一通道,并通过修改斜坡函数通带的方法,验证第二通道输入信号对抑制电网低频振荡的作用。本发明通过屏蔽其中一个通道的实验方法,能够有效地检验双输入PSS能否在PSS作用的全频段范围内发挥抑制低频振荡,提高电网稳定性。

Description

双输入PSS的实验方法
技术领域
本发明涉及发电机励磁系统的辅助功能电力系统稳定器(PSS)的实验方法,特别是对双输入PSS效果验证的实验方法,属于网源协调技术领域。
背景技术
随着电力系统规模的不断扩大和新技术的陆续应用,全国电力系统联网的逐步展开、超高压远距离输电线路的投运及普遍使用可控硅整流方式的快速励磁系统的应用,使得励磁系统的增益变大,时间常数大为减小,降低了系统的阻尼,电气联系较弱的电网系统甚至出现负阻尼,电力系统低频振荡发生的频率呈上升趋势。
为了提高电力系统的动态稳定性,重要措施之一就是采用在电力系统励磁调节器上附加电力系统稳定器PSS的附加励磁控制方案。PSS的作用就是在励磁电压调节器中引入附加信号,产生一个正阻尼转矩,克服原励磁电压调节器产生的负阻尼转矩作用,以此实现对振荡的抑制。
下面对PSS发展过程中几种主流模型作简单介绍。
以电气功率Pe为输入的PSS1A/1B模型很大程度上解决了低频振荡问题,其优点为相位容易补偿:-Pe信号超前转速信号90°,刚好补偿了自并励励磁系统的相位滞后。其缺点是带来了副作用即“反调”,在仅考虑抑制电网的有功功率低频振荡而不存在反调时,该模型凭借其概念清晰,所需的电气功率易测量,参数易整定,相位易补偿等优点很大程度上解决了低频振荡问题,成为PSS模型的不二选择。
为了抑制反调,引入了机械角速度ω的测量,但由于在PSS需要起作用的频段范围内存在ω测量噪声的问题难以解决,因此以电气功率和机械角速度作为双输入的PSS2A/2B模型应运而生,此模型将较高频段的ω衰减,不让它起作用,以滤除ω测量噪声的影响。
对于双输入PSS,在斜坡函数截止频率以上频段,斜坡函数的输出很小,起作用的主要为电气功率通道,此时的模型等效为PSS1A/1B;在斜坡函数截止频率一下频段,由于理想的斜坡函数增益为1,相移接近于零,因此电气功率通过KS3经过斜坡函数在加速功率叠加点基本抵消,此时起作用的主要为机械角速度ω。
采用双输入PSS的目的主要是抑制电网低频振荡,同时在快速调节机组有功功率时能够起到抑制反调的效果,以防止发电机机端电压大幅度升高或者降低。
但在实际采用双输入PSS的过程中,不能验证双输入PSS中第一通道输入信号机械角速度信号在电网发生低频振荡时是否能够起到抑制电网低频振荡效果。
发明内容
本发明要解决技术问题是:克服现有双输入PSS实验方法不能全范围内验证PSS作用的效果,特别是不能验证双输入PSS中第一通道输入信号机械角速度信号在电网发生低频振荡时是否能够起到抑制电网低频振荡效果。
为了解决以上技术问题,本发明提供一种双输入PSS的实验方法,包括第一通道输入信号和第二通道输入信号,第一通道输入信号为机械角速度的信号,第二通道输入信号为电气功率输入信号,其特征在于,包括以下步骤:
1)屏蔽第二通道,并通过修改斜坡函数通带的方法,验证第一通道输入信号对抑制电网低频振荡的作用;
2)屏蔽第一通道,并通过修改斜坡函数通带的方法,验证第二通道输入信号对抑制电网低频振荡的作用。
前述的双输入PSS的实验方法,其特征在于,在所述步骤1)中,具体包括以下步骤:
11)第一通道实验时,保证PSS第二通道不发挥作用,第一通道的输入信号加入后进行发电机机端电压的阶跃实验,激起发电机输出有关功率的振荡;
12)对比PSS是否投入的两种工况,检验PSS对抑制发电机本机振荡的效果;
13)在励磁调节器的电压叠加点加入正弦扰动信号,分别在PSS投入和退出两种情况下测量发电机输出的有功功率波动情况,确定两种工况下的阻尼比,确认PSS的作用效果。
在所述步骤13)中,所述正弦扰动信号的频率范围为0.2HZ~2.5HZ,不同频率点的间隔为:
在0.1HZ~0.6HZ的低频段,频率间隔为0.1HZ;
在0.6HZ以上的频段,频率间隔为0.2HZ。
前述的双输入PSS的实验方法,其特征在于,在所述步骤2)中,包括以下步骤:
21)第二通道实验时,保证PSS第一通道不发挥作用;
22)进行发电机机端电压的阶跃实验,对比是否投入PSS的两种工况,检验PSS对抑制发电机本机振荡的效果;
23)在励磁调节器的电压叠加点加入合适频率的正弦扰动信号,测量发电机输出的有功功率分别在PSS投入和退出两种情况下的波动情况,确定两种工况下的阻尼比,来确认PSS的作用效果。
本发明的核心是通过修改斜坡函数通带的宽度,屏蔽有功功率通道的输出,仅保留机械角速度通道的输入。通过发电机机端电压的阶跃和在励磁调节器电压叠加点加入PSS作用范围内的各种频率的扰动信号,比较PSS投入和退出两种情况下发电机输出的有关功率变化情况,并计算比较两种情况下的阻尼比,来评判PSS抑制低频振荡的效果。屏蔽其中一个通道的实验方法,能够有效地检验双输入PSS能否在PSS作用的全频段范围内发挥抑制低频振荡,提高电网稳定性。
附图说明
图1为现有双输入PSS实验方法原理图;
图2为本发明双输入PSS实验方法原理图;
图3为双输入PSS模型图。
具体实施方式
下面结合附图对本发明作进一步的说明。
本实施例的双输入PSS的实验方法,其基于如图2所示的一种通过屏蔽通道配合修改斜坡函数通带的方法而实现,所述实验方法中,屏蔽其中一个通道的实验方法,可以有效地检验双输入PSS能否在PSS作用的全频段范围内发挥抑制低频振荡,提高电网稳定性的方法。实验方法包括第一通道实验和第二通道实验两部分:
第一通道实验方法如下:断开第二通道的输出或者将第二通道的增益置零,保证PSS只有第一通道发挥作用,通过修改斜坡函数的通带,让第一通道输入信号——机械角速度的信号能够在发电机本机振荡的频率通过,同时能够滤除机械角速度测量带来的噪声,避免可能产生的扭振,然后通过修改发电机励磁调节器的电压给定值,进行发电机机端电压的阶跃实验,通过发电机机端电压的变化,激起发电机输出有关功率的振荡,通常由于发电机本身有足够的阻尼,由于发电机机端电压的变化引起的发电机输出有功功率的变化会很快被衰减,此时通过是否投入PSS的两种工况的对比,可以检验PSS对抑制发电机本机振荡的效果。
然后在励磁调节器的电压叠加点加入低于发电机本机振荡频率到PSS应该发挥作用的频率范围内(标准规定为0.2HZ~2.5HZ)的各种频率(不同频率点的间隔根据现场需要进行,一般在0.1HZ~0.6HZ的低频段,频率间隔为0.1HZ,在0.6HZ以上的频段,频率间隔为0.2HZ)正弦扰动信号,测量发电机输出的有功功率分别在PSS投入和退出两种情况下的波动情况,确定两种工况下的阻尼比,来确认PSS的作用效果。
第二通道实验方法如下:断开第一通道的输出或者将第一通道的增益置零,保证PSS只有第二通道发挥作用,然后通过修改发电机励磁调节器的电压给定值,进行发电机机端电压的阶跃实验,通过发电机机端电压的变化,激起发电机输出有关功率的振荡,通常由于发电机本身有足够的阻尼,由于发电机机端电压的变化引起的发电机输出有功功率的变化会很快被衰减,此时通过是否投入PSS的两种工况的对比,可以检验PSS对抑制发电机本机振荡的效果。
然后在励磁调节器的电压叠加点加入PSS应该发挥作用的频率范围内(标准规定为0.2HZ~2.5HZ)的各种频率(不同频率点的间隔根据现场需要进行,一般在0.1HZ~0.6HZ的低频段,频率间隔为0.1HZ,在0.6HZ以上的频段,频率间隔为0.2HZ)的正弦扰动信号,测量发电机输出的有功功率分别在PSS投入和退出两种情况下的波动情况,确定两种工况下的阻尼比,来确认PSS的作用效果。
除上述实施例外,本发明还可以有其他实施方式。凡采用等同替换或等效变换形成的技术方案,均落在本发明要求的保护范围。

Claims (5)

1.一种双输入PSS的实验方法,包括第一通道输入信号和第二通道输入信号,第一通道输入信号为机械角速度的信号,第二通道输入信号为电气功率输入信号,其特征在于,包括以下步骤:
1)屏蔽第二通道,并通过修改斜坡函数通带的方法,验证第一通道输入信号对抑制电网低频振荡的作用;
2)屏蔽第一通道,并通过修改斜坡函数通带的方法,验证第二通道输入信号对抑制电网低频振荡的作用。
2.根据权利要求1所述的双输入PSS的实验方法,其特征在于,在所述步骤1)中,具体包括以下步骤:
11)第一通道实验时,保证PSS第二通道不发挥作用,第一通道的输入信号加入后进行发电机机端电压的阶跃实验,激起发电机输出有关功率的振荡;
12)对比PSS是否投入的两种工况,检验PSS对抑制发电机本机振荡的效果;
13)在励磁调节器的电压叠加点加入正弦扰动信号,分别在PSS投入和退出两种情况下测量发电机输出的有功功率波动情况,确定两种工况下的阻尼比,确认PSS的作用效果。
3.根据权利要求1所述的双输入PSS的实验方法,其特征在于,在所述步骤2)中,包括以下步骤:
21)第二通道实验时,保证PSS第一通道不发挥作用;
22)进行发电机机端电压的阶跃实验,对比是否投入PSS的两种工况,检验PSS对抑制发电机本机振荡的效果;
23)在励磁调节器的电压叠加点加入正弦扰动信号,测量发电机输出的有功功率分别在PSS投入和退出两种情况下的波动情况,确定两种工况下的阻尼比,来确认PSS的作用效果。
4.根据权利要求2所述的双输入PSS的实验方法,其特征在于,在所述步骤13)中,所述正弦扰动信号的频率范围为0.2HZ~2.5HZ,不同频率点的间隔为:
在0.1HZ~0.6HZ的低频段,频率间隔为0.1HZ;
在0.6HZ以上的频段,频率间隔为0.2HZ。
5.根据权利要求3所述的双输入PSS的实验方法,其特征在于,在所述步骤23)中,所述正弦扰动信号的频率范围为0.2HZ~2.5HZ,不同频率点的间隔为:
在0.1HZ~0.6HZ的低频段,频率间隔为0.1HZ;
在0.6HZ以上的频段,频率间隔为0.2HZ。
CN 201110074141 2011-03-25 2011-03-25 双输入pss的实验方法 Active CN102226826B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110074141 CN102226826B (zh) 2011-03-25 2011-03-25 双输入pss的实验方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110074141 CN102226826B (zh) 2011-03-25 2011-03-25 双输入pss的实验方法

Publications (2)

Publication Number Publication Date
CN102226826A true CN102226826A (zh) 2011-10-26
CN102226826B CN102226826B (zh) 2013-04-10

Family

ID=44807810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110074141 Active CN102226826B (zh) 2011-03-25 2011-03-25 双输入pss的实验方法

Country Status (1)

Country Link
CN (1) CN102226826B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102928697A (zh) * 2012-10-19 2013-02-13 广东电网公司电力科学研究院 励磁调节器pss2a模型低频段阻尼检测方法及系统
CN103684158A (zh) * 2013-11-06 2014-03-26 广州擎天实业有限公司 一种基于pss投切的同步发电机励磁控制方法
CN104460655A (zh) * 2014-11-07 2015-03-25 南京英纳瑞电气有限公司 发电机励磁控制系统的频响检测和参数优化分析方法及系统
CN109768557A (zh) * 2019-03-29 2019-05-17 云南电网有限责任公司电力科学研究院 一种电力系统稳定器的阻尼效果验证方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5977731A (en) * 1998-07-31 1999-11-02 Mitsubishi Denki Kabushiki Kaisha Power system stabilizer and power system stabilization method
US20070120424A1 (en) * 2003-08-01 2007-05-31 Ansaldo Energia S.P.A. Compensator device for stabilising the power of alternators in electrical power generating plants
CN101119094A (zh) * 2007-07-19 2008-02-06 清华大学 基于频域测试的非线性电力系统稳定器参数整定方法
CN101420129A (zh) * 2008-12-17 2009-04-29 中国电力科学研究院 一种加速功率型电力系统稳定器

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5977731A (en) * 1998-07-31 1999-11-02 Mitsubishi Denki Kabushiki Kaisha Power system stabilizer and power system stabilization method
US20070120424A1 (en) * 2003-08-01 2007-05-31 Ansaldo Energia S.P.A. Compensator device for stabilising the power of alternators in electrical power generating plants
CN101119094A (zh) * 2007-07-19 2008-02-06 清华大学 基于频域测试的非线性电力系统稳定器参数整定方法
CN101420129A (zh) * 2008-12-17 2009-04-29 中国电力科学研究院 一种加速功率型电力系统稳定器

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨立强等: "加速功率型电力系统稳定器的研制", 《电网技术》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102928697A (zh) * 2012-10-19 2013-02-13 广东电网公司电力科学研究院 励磁调节器pss2a模型低频段阻尼检测方法及系统
CN102928697B (zh) * 2012-10-19 2015-03-18 广东电网公司电力科学研究院 励磁调节器pss2a模型低频段阻尼检测方法及系统
CN103684158A (zh) * 2013-11-06 2014-03-26 广州擎天实业有限公司 一种基于pss投切的同步发电机励磁控制方法
CN103684158B (zh) * 2013-11-06 2016-10-26 广州擎天实业有限公司 一种基于pss投切的同步发电机励磁控制方法
CN104460655A (zh) * 2014-11-07 2015-03-25 南京英纳瑞电气有限公司 发电机励磁控制系统的频响检测和参数优化分析方法及系统
CN109768557A (zh) * 2019-03-29 2019-05-17 云南电网有限责任公司电力科学研究院 一种电力系统稳定器的阻尼效果验证方法

Also Published As

Publication number Publication date
CN102226826B (zh) 2013-04-10

Similar Documents

Publication Publication Date Title
CN103346580B (zh) 一种双馈风力发电机组次同步振荡的抑制方法
US20140246914A1 (en) Sub-Synchronous Oscillation Damping By Shunt Facts Apparatus
CN105098769B (zh) 一种能够抑制次同步谐振的发电系统中旁路阻尼滤波器的参数整定方法
CN102226826B (zh) 双输入pss的实验方法
CN104167749B (zh) 一种配电网三相不平衡电压抑制方法
CN104934992A (zh) 一种基于锁相环误差的次同步振荡抑制装置及方法
CN103259472B (zh) 大型发电机组次同步振荡的反振荡自适应抑制系统
Zhou et al. Mitigation of subsynchronous oscillation in a VSC-HVDC connected offshore wind farm integrated to grid
CN104993501A (zh) 一种励磁调节器抑制低频振荡性能的在线评估方法
CN102638052A (zh) 基于输入信号等值的加速功率型pss参数整定方法
CN105990841B (zh) 谐振注入型配电线路三相不平衡过电压抑制装置
CN102790403B (zh) 一种多台statcom阻尼控制器的设计方法
CN107579529A (zh) 一种基于并网变换器锁相环优化的同步机次同步抑制方法
CN105305471B (zh) 配电网柔性接地装置控制系统及其参数设计方法
CN102570950B (zh) 一种发电机机端次同步阻尼控制系统及次同步阻尼控制方法
CN102651550A (zh) 基于可控串补附加阻抗偏差控制的次同步振荡抑制方法
CN108199394B (zh) 风电机组的次同步振荡抑制方法及装置
CN207472983U (zh) 一种基于prbs扰动注入的电网阻抗在线辨识装置
CN107623336A (zh) 基于hvdc整流侧变换器优化同步机次同步振荡的方法和装置
CN102109576B (zh) 利用次同步振荡抑制装置激发发电机组次同步振荡的方法
CN106786670B (zh) 基于谐波注入的无互连线孤岛微电网频率无静差控制方法
CN111308207A (zh) 一种针对单相交流系统的dq阻抗测量方法
Shao et al. Medium-frequency and sub-synchronous oscillation analysis of direct-drive wind farms connected to the parallel-compensated AC grid
CN104377714A (zh) 一种基于svg的电网低频振荡的补偿方法
CN107591824A (zh) 一种电力系统稳定器模型阻尼优化方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NARI NANJING CONTROL SYSTEM LTD.

Effective date: 20141204

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 210059 NANJING, JIANGSU PROVINCE TO: 210061 NANJING, JIANGSU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20141204

Address after: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20

Patentee after: NARI Technology Development Co., Ltd.

Patentee after: SGCC NARI Nanjing Control System Co., Ltd.

Address before: High road high tech Zone of Nanjing City, Jiangsu Province, No. 20 210059

Patentee before: NARI Technology Development Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171221

Address after: 211106 Jiangning City, Nanjing Province, the integrity of the road No. 19,

Co-patentee after: SGCC NARI Nanjing Control System Co., Ltd.

Patentee after: NARI Technology Development Co., Ltd.

Co-patentee after: NARI Group Co. Ltd.

Address before: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20

Co-patentee before: SGCC NARI Nanjing Control System Co., Ltd.

Patentee before: NARI Technology Development Co., Ltd.