CN102222973B - 用于大型风力发电机组变桨控制器的直流电源装置 - Google Patents

用于大型风力发电机组变桨控制器的直流电源装置 Download PDF

Info

Publication number
CN102222973B
CN102222973B CN 201110158980 CN201110158980A CN102222973B CN 102222973 B CN102222973 B CN 102222973B CN 201110158980 CN201110158980 CN 201110158980 CN 201110158980 A CN201110158980 A CN 201110158980A CN 102222973 B CN102222973 B CN 102222973B
Authority
CN
China
Prior art keywords
power supply
phase
oar
fuse
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110158980
Other languages
English (en)
Other versions
CN102222973A (zh
Inventor
周腊吾
韩兵
彭建国
汤彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Shiyou Electric Public Co ltd
Original Assignee
Xiangtan Shitong Electrical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiangtan Shitong Electrical Co Ltd filed Critical Xiangtan Shitong Electrical Co Ltd
Priority to CN 201110158980 priority Critical patent/CN102222973B/zh
Publication of CN102222973A publication Critical patent/CN102222973A/zh
Application granted granted Critical
Publication of CN102222973B publication Critical patent/CN102222973B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control Of Eletrric Generators (AREA)

Abstract

本发明涉及电源装置,特别是一种用于大型风力发电机组变桨控制器的直流电源装置。它采用一路交流与一路直流的两路输入,可自动完成两路输入的主备自动切换和互锁,交流优先,在紧急情况下,将启动直流输入。本直流电源系统采用了先进的双重环路设计,极好地利用了开关管的开关特性,大大地降低了开关器件的工作应力,使该电源具有优良的动态特性和良好的自我保护功能,并能有效地承受短路电流的冲击,效率高、损耗小、电路可靠,同时噪声也大大减小。由于采用可拆卸式安装方式,便于灵活扩容模块和更换模块。

Description

用于大型风力发电机组变桨控制器的直流电源装置
技术领域
本实用新型涉及电源装置,特别是一种用于大型风力发电机组变桨控制器的直流电源装置。
背景技术
风力发电机组的控制系统是风力发电机组的大脑,不仅承担了风电机组的安全运行的任务,最主要的是通过适当的控制方法及控制策略实现最大风能捕获。变桨距是合理控制桨叶节距角,在额定风速以下运行时,与变速恒频技术结合能够最大限度地获取能量;在额定风速以上运行时,能够得到稳定的功率输出。而变桨控制器直流电源装置是其中的关键部分之一,可以说变桨控制器直流电源装置的设计研究是变桨距系统的基础条件。开展变桨距直流电源装置研究,对于整个变桨控制系统具有重要意义,有利于整个风力发电机组主控制器安全稳定运行。
实用新型内容
本实用新型的目的在于提供一种适用于复杂情况的大型风力发电机组变桨控制器的直流电源装置,进一步提高系统运行的可靠性和稳定性,降低发电成本并且有效地保护风力发电机组。
本实用新型的目的是通过如下途径实现的:1.一种用于大型风力发电机组变桨控制器的直流电源装置,该直流电源装置由可相互切换的一组交流供电装置与一组直流供电装置构成;所述的交流供电装置是主电源的交流电通过负荷开关接三相交流测量继电器,三相交流测量继电器分别接PLC及三相AC/DC开关电源, 三相AC/DC开关电源通过熔断器给变桨驱动柜和PLC供电;所述的直流供电装置是采用后备电池输出经二极管接至单相DC/DC开关电源,单相DC/DC开关电源接PLC后接微型断路器,再接若干个熔断器分别给紧急变桨装置供电;所述的三相交流测量继电器测量电压状态并将信号传至PLC,PLC控制单相DC/DC开关电源中的冗余模块启闭直流供电装置。
更进一步的,所述的变桨驱动柜由三个变桨继电逻辑控制器构成,4个熔断器分别给三个变桨继电逻辑控制器和PLC供电;其中,1号熔断器给PLC进行供电;2号熔断器主要给1号正常工况桨叶的变桨继电逻辑控制器、1号刹车及油脂泵系统供电;3号熔断器主要给2号正常工况桨叶的变桨继电逻辑控制器、2号刹车供电;4号熔断器主要给3号正常工况桨叶的变桨继电逻辑控制器、3号刹车及超速继电器供电。
更进一步的,所述的紧急变桨装置由电源监控器和三个紧急收桨装置构成,4个熔断器给紧急变桨装置供电;其中,5号熔断器给紧急收桨1区和4号刹车供电;6号熔断器给紧急收桨2区和5号刹车供电;7号熔断器给紧急收桨3区和6号刹车供电;熔断器8给三相电源监控器进行供电。
更进一步的,所述的交流电电压为400V。
更进一步的,所述的单相DC/DC开关电源由逆变模块、开关量监控模块、降压变压器、整流模块、低通滤波器、电压电流采集模块、保护电路及冗余模块连接构成。
更进一步的,所述的单相DC/DC开关电源为 20A的电源。
本实用新型用于大型风力发电机组变桨控制器的直流电源装置,它采用一路交流与一路直流的两路输入,可自动完成两路输入的主备自动切换和互锁,交流优先,在紧急情况下,将启动直流输入。直流电源装置先进的模块设计使得整个系统具有体积很小,又能提供足够的功率驱动,满足整个变桨控制器24V直流电源的要求,同时符合变桨控制器紧凑的安装特征。在正常供电情况下,采用三相AC/DC开关电源对PLC和三个变桨继电逻辑控制器进行供电;在紧急情况下,采用单相DC/DC开关电源对电源监控器和三个紧急收桨装置进行供电。本直流电源装置采用了先进的双重环路设计,极好地利用了开关管的开关特性,大大地降低了开关器件的工作应力,使该电源具有优良的动态特性和良好的自我保护功能,并能有效地承受短路电流的冲击,效率高,损耗小,电路可靠,同时噪声也大大减小。由于采用可拆卸式安装方式,便于灵活扩容模块和更换模块。
相对于现今风力发电机组变桨控制器的直流电源装置,本实用新型有以下优点:
1.结构简单,模块化程度高,易于检查和维护。
2.独特的均流技术,使系统在小负载情况下也具有良好的均流性。
3.采用了无损缓冲及有源嵌位电路,极好地利用了开关管的开关特性,大大地降低了开关器件的工作应力,使电源的可靠性和效率大大提高,开关噪声大大降低,并能有效地承受短路电流的冲击。
4.具有过流、过压、短路保护功能。
5.独特的PLC控制管理模块及保护功能。
6.交流输入范围宽。
7.效率高。
附图说明
下面结合附图对本实用新型作进一步详细说明: 
图1为本实用新型结构示意图;
图2单相DC/DC开关电源7的结构示意图。
图中:交流电1、负荷开关2、测量继电器3,三相AC/DC开关电源4, 变桨控制柜5、熔断器6、单相DC/DC开关电源7、微型断路器8、二极管9、后备电池10、紧急变桨装置11、PLC 12、逆变模块13、监控模块14、降压变压器15、整流模块16、低通滤波器17、电压电流采集模块18、保护电路19。
具体实施方式
如图1、图2所示,本实用新型用于大型风力发电机组变桨控制器的直流电源装置,该直流电源装置由可相互切换的一组交流供电装置与一组直流供电装置构成。
所述的交流供电装置是主电源的交流电1通过负荷开关2接三相交流测量继电器3,三相交流测量继电器3分别接PLC12及三相AC/DC开关电源4, 三相AC/DC开关电源4通过熔断器6给变桨驱动柜5和PLC12供电;
在正常供电情况下,主电源上400V的交流电1首先通过三相交流测量继电器3检测交流电1的电压和相序,给PLC12信号,之后通过负荷开关2进入三相AC/DC开关电源4,将转换后的24V直流电通过熔断器6给变桨控制柜5供电。所述的变桨驱动柜5由三个变桨继电逻辑控制器构成,4个熔断器6分别给三个变桨继电逻辑控制器和PLC12供电;其中,1号熔断器给PLC进行供电;2号熔断器主要给1号正常工况桨叶的变桨继电逻辑控制器、1号刹车及油脂泵系统供电;3号熔断器主要给2号正常工况桨叶的变桨继电逻辑控制器、2号刹车供电;4号熔断器主要给3号正常工况桨叶的变桨继电逻辑控制器、3号刹车及超速继电器供电。
所述的直流供电装置是采用后备电池10输出经二极管9接至单相DC/DC开关电源7,单相DC/DC开关电源7接PLC12后接微型断路器8,再接若干个熔断器6分别给紧急变桨装置11供电;
在紧急境况下,三相交流测量继电器3报错,给PLC12紧急信号,此时PLC12给冗余模块信号,启动后备电池10即三组288V电池供电,通过20A的单相DC/DC开关电源7,变成24V直流电,通过微型断路器8后,接熔断器6给紧急变桨装置11的各个控制部分供电。所述的紧急变桨装置11由电源监控器和三个紧急收桨装置构成,4个熔断器6给紧急变桨装置11供电;其中,5号熔断器给紧急收桨1区和4号刹车供电;6号熔断器给紧急收桨2区和5号刹车供电;7号熔断器给紧急收桨3区和6号刹车供电;熔断器8给三相电源监控器进行供电。
整个供电过程由PLC12监控,主要包括:电源模块的通讯;分时采集模拟量,每次采集4路;对采集的模拟量根据量程进行计算得出显示值,显示电源模块的工作状态并判断报警;微调值计算,显示值微调,并做负值消除;故障和报警;数字量的采集,故障判断。
所述的三相交流测量继电器3测量电压状态并将信号传至PLC12,PLC12控制单相DC/DC开关电源7中的冗余模块启闭直流供电装置。它可自动完成两路输入的主备自动切换和互锁,交流优先,在紧急情况下,则启动直流输入。
所述的单相DC/DC开关电源7由逆变模块13、监控模块14、降压变压器15、整流模块16、低通滤波器17、电压电流采集模块18、保护电路19及冗余模块连接构成。逆变模块13完成DC/AC变换,将直流电转换成交流电后,供给开关量监控模块14和降压变压器15。开关量监控模块14主要用来执行保护电路的动作。降压变压器15的功能主要是对逆变后的交流电进行降压,再将降压后的交流电送入整流模块。整流模块16的作用就是完成AC/DC变换,将来自降压变压器的交流电整流成24V直流电。低通滤波器17的作用就是滤调24V直流电中的谐波。电压电流采样模块18的作用就是采集输出24V直流电的电压和电流信号,送入保护电路。保护电路19主要功能就是处理由电压电流采样模块采集回来的电流和电压信号,根据电源功率的最大要求保护整个单向电源系统,当采集到的功率大于保护设置的值,则系统启动开关量监控模块,切断电源,排除故障。
所述的单相DC/DC开关电源选择 20A的电源,过载能力为30A,由于紧急工况最大负载为3个刹车,起动电流小于2.5A×3=7.5A, 6个直流接触器起动电流小于1.2A×6=7.2A, 中间继电器线圈0.5W电流约20mA,所有中间继电器都起动,电流小于0.3A, 则总电流小于15A。选择20A的DC/DC开关电源裕度为25%,所以单相20A电源(过载能力30A)满足使用要求。

Claims (6)

1.一种用于大型风力发电机组变桨控制器的直流电源装置,其特征在于:
该直流电源装置由可相互切换的一组交流供电装置与一组直流供电装置构成;
所述的交流供电装置是主电源的交流电(1)通过负荷开关(2)接三相交流测量继电器(3),三相交流测量继电器(3)分别接PLC(12)及三相AC/DC开关电源(4), 三相AC/DC开关电源(4)通过熔断器(6)给变桨驱动柜(5)和PLC(12)供电;
所述的直流供电装置是采用后备电池(10)输出经二极管(9)接至单相DC/DC开关电源(7),单相DC/DC开关电源(7)接PLC(12)后接微型断路器(8),再接若干个熔断器(6)分别给紧急变桨装置(11)供电;
所述的三相交流测量继电器(3)测量电压状态并将信号传至PLC(12),PLC(12)控制单相DC/DC开关电源(7)中的冗余模块启闭直流供电装置。
2.根据权利要求1所述的用于大型风力发电机组变桨控制器的直流电源装置,其特征在于:所述的变桨驱动柜(5)由三个变桨继电逻辑控制器构成,4个熔断器(6)分别给三个变桨继电逻辑控制器和PLC(12)供电;
其中,1号熔断器给PLC进行供电;2号熔断器主要给1号正常工况桨叶的变桨继电逻辑控制器、1号刹车及油脂泵系统供电;3号熔断器主要给2号正常工况桨叶的变桨继电逻辑控制器、2号刹车供电;4号熔断器主要给3号正常工况桨叶的变桨继电逻辑控制器、3号刹车及超速继电器供电。
3.根据权利要求1所述的用于大型风力发电机组变桨控制器的直流电源装置,其特征在于:所述的紧急变桨装置(11)由电源监控器和三个紧急收桨装置构成,4个熔断器(6)给紧急变桨装置(11)供电;
其中,5号熔断器给紧急收桨1区和4号刹车供电;6号熔断器给紧急收桨2区和5号刹车供电;7号熔断器给紧急收桨3区和6号刹车供电;熔断器8给三相电源监控器进行供电。
4.根据权利要求1所述的用于大型风力发电机组变桨控制器的直流电源装置,其特征在于:所述的交流电(10)电压为400V。
5.根据权利要求1所述的用于大型风力发电机组变桨控制器的直流电源装置,其特征在于:所述的单相DC/DC开关电源(7)由逆变模块(13)、开关量监控模块(14)、降压变压器(15)、整流模块(16)、低通滤波器(17)、电压电流采集模块(18)、保护电路(19)及冗余模块连接构成。
6.根据权利要求1或5所述的用于大型风力发电机组变桨控制器的直流电源装置,其特征在于:所述的单相DC/DC开关电源(7)为 20A的电源。
CN 201110158980 2011-06-14 2011-06-14 用于大型风力发电机组变桨控制器的直流电源装置 Active CN102222973B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110158980 CN102222973B (zh) 2011-06-14 2011-06-14 用于大型风力发电机组变桨控制器的直流电源装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110158980 CN102222973B (zh) 2011-06-14 2011-06-14 用于大型风力发电机组变桨控制器的直流电源装置

Publications (2)

Publication Number Publication Date
CN102222973A CN102222973A (zh) 2011-10-19
CN102222973B true CN102222973B (zh) 2013-04-17

Family

ID=44779433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110158980 Active CN102222973B (zh) 2011-06-14 2011-06-14 用于大型风力发电机组变桨控制器的直流电源装置

Country Status (1)

Country Link
CN (1) CN102222973B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013060013A1 (en) * 2011-10-28 2013-05-02 General Electric Company Blade pitch system for a wind turbine generator and method of operating the same
CN102830365B (zh) * 2012-09-12 2015-04-01 国电联合动力技术有限公司 兆瓦级风力发电机组变桨系统电池自动测试方法及系统
CN103410661B (zh) * 2013-07-12 2015-11-11 湖南世优电气股份有限公司 一种交流变桨距控制系统的收桨装置
CN106468242B (zh) * 2015-08-21 2019-05-14 上海昱章电气成套设备有限公司 风电变桨系统的安全链及风电变桨系统
CN105406736B (zh) * 2015-12-24 2018-11-09 益阳橡胶塑料机械集团有限公司 密炼机用plc的电源电路及抗干扰方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1836102A (zh) * 2003-08-15 2006-09-20 再生动力系统股份公司 带有一个转子叶片调整装置的风能设备
CN101624969A (zh) * 2009-08-04 2010-01-13 清华大学 一种用于风力发电变桨的冗余控制系统及方法
CN101964539A (zh) * 2010-08-14 2011-02-02 东方电气集团东方汽轮机有限公司 一种风力发电机变桨系统继电保护装置
CN202127280U (zh) * 2011-06-14 2012-01-25 湘潭世通电气有限公司 用于大型风力发电机组变桨控制器的直流电源装置

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10327344A1 (de) * 2003-06-16 2005-01-27 Repower Systems Ag Windenergieanlage
JP4773850B2 (ja) * 2006-03-08 2011-09-14 三菱重工業株式会社 風力発電システム、及び風力発電システムの非常用電力供給方法
WO2007132303A1 (en) * 2006-05-13 2007-11-22 Clipper Windpower Technology, Inc. Wind turbine system with ac servo motor rotor blade pitch control, using super-capacitor energy storage
SE534544C2 (sv) * 2009-08-24 2011-09-27 Ge Wind Energy Norway As Kontrollsystem för vindturbin

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1836102A (zh) * 2003-08-15 2006-09-20 再生动力系统股份公司 带有一个转子叶片调整装置的风能设备
CN101624969A (zh) * 2009-08-04 2010-01-13 清华大学 一种用于风力发电变桨的冗余控制系统及方法
CN101964539A (zh) * 2010-08-14 2011-02-02 东方电气集团东方汽轮机有限公司 一种风力发电机变桨系统继电保护装置
CN202127280U (zh) * 2011-06-14 2012-01-25 湘潭世通电气有限公司 用于大型风力发电机组变桨控制器的直流电源装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
兆瓦级风力发电电伺服独立变桨控制系统的设计;阎卓 等;《电力传动》;20100630;第40卷(第6期);8-11 *
阎卓 等.兆瓦级风力发电电伺服独立变桨控制系统的设计.《电力传动》.2010,第40卷(第6期),8-11.

Also Published As

Publication number Publication date
CN102222973A (zh) 2011-10-19

Similar Documents

Publication Publication Date Title
CN201247964Y (zh) 变桨距系统电源
CN102983587B (zh) 具有超速保护的风力发电系统及其操作方法
CN204663764U (zh) 一种应用超级电容的风力发电变桨控制系统
EP2876769B1 (en) System and method for operating a power generation system within a power storage/discharge mode or a dynamic brake mode
CN102223125B (zh) 一种电网电压故障时风电机组不间断运行控制方法及装置
JP5626563B2 (ja) 電力システム
CN102132486B (zh) 风力发电装置
CN102222973B (zh) 用于大型风力发电机组变桨控制器的直流电源装置
KR101718387B1 (ko) 디젤 발전기 연계형 에너지 저장 시스템 및 그 연계 방법
US20120056425A1 (en) Stand alone operation system for use with utility grade synchronous wind turbine generators
CN101262145A (zh) 连接到电网的不间断电源
KR20130126961A (ko) 저 전압 라이드 스루용 인텔리전트 전력 제어 유닛 및 그의 애플리케이션
WO2018200511A1 (en) Energy storage system for doubly fed induction generator
CN202127280U (zh) 用于大型风力发电机组变桨控制器的直流电源装置
CN101550906A (zh) 直流电机变桨距系统及其控制方法
CN201953562U (zh) 一种风力发电机变桨距控制系统
CN110138012A (zh) 一种风电机组高电压穿越控制方法、装置及设备
WO2018200516A1 (en) Method of operating a wind turbine system including an energy storage system
CN202405799U (zh) 一种基于直流母线的风电独立电网系统
CN203707801U (zh) 一种节能型强动力定位能力船舶混合电力推进系统
CN102790406A (zh) 具备可靠低电压穿越能力的双馈变流器
CN102723733A (zh) 智能风力发电控制装置
CN102263502A (zh) 大功率风电变流器储能电容充电电路
CN201966629U (zh) 低电压穿越智能功率控制单元
CN202906484U (zh) 具备可靠低电压穿越能力的双馈变流器

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20111019

Assignee: Xiangtan Shiyou Electrical Co.,Ltd.

Assignor: Xiangtan Shine Top Electricity Co.,Ltd.

Contract record no.: 2013430000065

Denomination of invention: Direct-current power supply device for variable-propeller controller of large wind motor

Granted publication date: 20130417

License type: Exclusive License

Record date: 20130514

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
ASS Succession or assignment of patent right

Owner name: HUNAN SHIYOU ELECTRIC CO., LTD.

Free format text: FORMER OWNER: XIANGTAN SHITONG ELECTRICAL CO. LTD.

Effective date: 20140421

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140421

Address after: 411104 Torch Innovation and Pioneer Park, hi tech Zone, Hunan, Xiangtan

Patentee after: HUNAN SHIYOU ELECTRIC PUBLIC Co.,Ltd.

Address before: 411104 Hunan Province, Xiangtan city Yuetang District Shuangma Industrial Park Chutian Road No. 8

Patentee before: Xiangtan Shine Top Electricity Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: DC power supply device for pitch controller of large wind turbine

Effective date of registration: 20211224

Granted publication date: 20130417

Pledgee: China Everbright Bank Co.,Ltd. Xiangtan sub branch

Pledgor: HUNAN SHIYOU ELECTRIC PUBLIC Co.,Ltd.

Registration number: Y2021430000099

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230511

Granted publication date: 20130417

Pledgee: China Everbright Bank Co.,Ltd. Xiangtan sub branch

Pledgor: HUNAN SHIYOU ELECTRIC PUBLIC Co.,Ltd.

Registration number: Y2021430000099

PC01 Cancellation of the registration of the contract for pledge of patent right