CN102214919B - 一种静态安全分析设备越限辅助决策方法 - Google Patents
一种静态安全分析设备越限辅助决策方法 Download PDFInfo
- Publication number
- CN102214919B CN102214919B CN 201110152923 CN201110152923A CN102214919B CN 102214919 B CN102214919 B CN 102214919B CN 201110152923 CN201110152923 CN 201110152923 CN 201110152923 A CN201110152923 A CN 201110152923A CN 102214919 B CN102214919 B CN 102214919B
- Authority
- CN
- China
- Prior art keywords
- sensitivity
- branch road
- limit
- cut
- generator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110152923 CN102214919B (zh) | 2011-06-08 | 2011-06-08 | 一种静态安全分析设备越限辅助决策方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110152923 CN102214919B (zh) | 2011-06-08 | 2011-06-08 | 一种静态安全分析设备越限辅助决策方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102214919A CN102214919A (zh) | 2011-10-12 |
CN102214919B true CN102214919B (zh) | 2013-05-15 |
Family
ID=44746094
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110152923 Active CN102214919B (zh) | 2011-06-08 | 2011-06-08 | 一种静态安全分析设备越限辅助决策方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102214919B (zh) |
Families Citing this family (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102638036B (zh) * | 2012-03-12 | 2015-04-08 | 中国电力科学研究院 | 一种用于计划安全校核的快速支路过载辅助决策方法 |
CN102738791B (zh) * | 2012-06-12 | 2014-07-23 | 中国电力科学研究院 | 一种基于拓扑比较的在线静态安全分析方法 |
CN102855381B (zh) * | 2012-07-10 | 2015-07-08 | 国电南瑞科技股份有限公司 | 应用于相继故障的基于分布因子的快速潮流计算方法 |
CN103020853B (zh) * | 2012-11-29 | 2014-04-30 | 中国电力科学研究院 | 一种短期交易计划安全校核的方法 |
CN103208049B (zh) * | 2013-04-25 | 2016-10-05 | 国家电网公司 | 异常告警快速事故分析方法及系统 |
CN104392083B (zh) * | 2014-07-18 | 2018-05-18 | 国家电网公司 | 一种基于全网拓朴的停电风险与可靠性分析方法 |
CN105356496B (zh) * | 2014-08-18 | 2018-11-27 | 国家电网公司 | 一种考虑安全约束的实时发电计划编制方法 |
CN106469908B (zh) * | 2015-08-19 | 2019-03-15 | 中国电力科学研究院 | 一种多故障协调的静态安全综合辅助决策方法 |
CN105678460B (zh) * | 2016-01-08 | 2019-04-05 | 云南电力调度控制中心 | 雷电灾害与设备过载及断面越限的关联度分析方法 |
CN106451463B (zh) * | 2016-11-09 | 2019-03-29 | 广东电网有限责任公司珠海供电局 | 一种分析环网系统中热稳断面的方法和装置 |
CN106651655B (zh) * | 2016-12-26 | 2020-06-09 | 国网山东省电力公司泰安供电公司 | 静态安全辅助决策的选取方法及装置 |
CN108808661B (zh) * | 2018-06-07 | 2021-07-13 | 国电南瑞科技股份有限公司 | 考虑交叉跨越和输电通道的多重故障静态安全分析方法 |
CN109873428B (zh) * | 2019-04-10 | 2022-06-14 | 国家电网公司华中分部 | 一种面向大电网的多断面功率控制方法和系统 |
CN110661265B (zh) * | 2019-09-19 | 2023-03-28 | 吉林大学 | 一种基于支路开断分布因子的安全约束最优潮流计算方法 |
CN111614129B (zh) * | 2020-06-05 | 2021-09-07 | 中国电力科学研究院有限公司 | 一种电网稳定断面控制的分析与决策方法及系统 |
CN112290547B (zh) * | 2020-10-30 | 2022-08-19 | 国网福建省电力有限公司 | 一种基于网络重构的输电网线路潮流越限求解方法及设备 |
CN112421636A (zh) * | 2020-10-31 | 2021-02-26 | 国网河南省电力公司漯河供电公司 | 一种计算电力系统注入转移分布因子的方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3825171B2 (ja) * | 1998-04-06 | 2006-09-20 | 関西電力株式会社 | 配電系統制御システム |
CN101232183A (zh) * | 2008-01-24 | 2008-07-30 | 清华大学 | 一种应用于电网在线调度决策的极限传输功率的评估方法 |
CN101895116A (zh) * | 2010-07-16 | 2010-11-24 | 国电南瑞科技股份有限公司 | 基于分布因子的在线可用输电能力计算方法 |
CN101917001A (zh) * | 2010-07-13 | 2010-12-15 | 东北电力大学 | 一种用于电力系统在线静态安全分析的故障排序方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3343709B2 (ja) * | 1995-08-23 | 2002-11-11 | 松下電器産業株式会社 | 電力系統解析装置 |
-
2011
- 2011-06-08 CN CN 201110152923 patent/CN102214919B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3825171B2 (ja) * | 1998-04-06 | 2006-09-20 | 関西電力株式会社 | 配電系統制御システム |
CN101232183A (zh) * | 2008-01-24 | 2008-07-30 | 清华大学 | 一种应用于电网在线调度决策的极限传输功率的评估方法 |
CN101917001A (zh) * | 2010-07-13 | 2010-12-15 | 东北电力大学 | 一种用于电力系统在线静态安全分析的故障排序方法 |
CN101895116A (zh) * | 2010-07-16 | 2010-11-24 | 国电南瑞科技股份有限公司 | 基于分布因子的在线可用输电能力计算方法 |
Non-Patent Citations (2)
Title |
---|
JP特开9-65572A 1997.03.07 |
JP特许3825171B2 2006.09.20 |
Also Published As
Publication number | Publication date |
---|---|
CN102214919A (zh) | 2011-10-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102214919B (zh) | 一种静态安全分析设备越限辅助决策方法 | |
Karimi et al. | A new centralized adaptive underfrequency load shedding controller for microgrids based on a distribution state estimator | |
CN102854415B (zh) | 一种区域电网线路雷击闪络风险评估方法 | |
Yan et al. | The combined effects of high penetration of wind and PV on power system frequency response | |
Broderick et al. | Time series power flow analysis for distribution connected PV generation. | |
Yan et al. | Impacts of residential photovoltaic power fluctuation on on-load tap changer operation and a solution using DSTATCOM | |
CN106469908A (zh) | 一种多故障协调的静态安全综合辅助决策方法 | |
JP4616206B2 (ja) | 電力系統安定度判定方法及び装置 | |
CN104156769A (zh) | 电力系统脆弱性评估方法 | |
KR102341522B1 (ko) | 조절가능한 로컬 네트워크 변압기를 사용하여 로컬 네트워크의 안정성을 제어하는 디바이스 및 방법 | |
CN102593829A (zh) | 计及关键支路的输电断面确定方法与装置 | |
Rahimi et al. | Effect of communication time-delay attacks on the performance of automatic generation control | |
Kabir et al. | A dynamic-adaptive load shedding methodology to improve frequency resilience of power systems | |
CN103440401A (zh) | 提高电网输电能力的紧急控制措施风险量化评估方法 | |
CN102222890A (zh) | 一种计及恶劣天气因素的复杂电网连锁故障分析方法 | |
Souxes et al. | Effect of stochasticity on voltage stability support provided by wind farms: Application to the Hellenic interconnected system | |
CN104268410A (zh) | 一种连锁故障多阶段动态博弈防御方法 | |
CN102982230A (zh) | 一种基于节点阻抗灵敏度的短路电流超标辅助决策方法 | |
CN104078956A (zh) | 适用于含分布式电源的配电网的自适应电流速断保护方法 | |
CN104156879A (zh) | 基于风险评估的电力系统防控方法 | |
CN103560497B (zh) | 一种基于电网拓扑调整的短路电流限制方法 | |
CN105375453B (zh) | 一种基于连锁故障破坏程度指标的紧急控制方法 | |
Dorosti et al. | An adaptive protection coordination scheme for microgrids with optimum PV resources | |
Bianco et al. | Enel Distribuzione projects for renewable energy sources integration in distribution grid | |
CN102880172A (zh) | 安全稳定控制装置控制策略实时校核方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: NARI NANJING CONTROL SYSTEM LTD. Effective date: 20141205 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20141205 Address after: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20 Patentee after: NARI Technology Development Co., Ltd. Patentee after: SGCC NARI Nanjing Control System Co., Ltd. Address before: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20 Patentee before: NARI Technology Development Co., Ltd. |