CN102205929A - High and low gantry crane formed by steel tube upright post for hoisting long-span T beam - Google Patents
High and low gantry crane formed by steel tube upright post for hoisting long-span T beam Download PDFInfo
- Publication number
- CN102205929A CN102205929A CN201110080512XA CN201110080512A CN102205929A CN 102205929 A CN102205929 A CN 102205929A CN 201110080512X A CN201110080512X A CN 201110080512XA CN 201110080512 A CN201110080512 A CN 201110080512A CN 102205929 A CN102205929 A CN 102205929A
- Authority
- CN
- China
- Prior art keywords
- gantry crane
- low
- upright posts
- column
- end upright
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention relates to a high and low gantry crane formed by a steel tube upright post for hoisting a long-span T beam. The high and low gantry crane consists of high-end upright posts, low-end upright posts and a load bearing beam. The high and low gantry crane is characterized in that: the high-end upright posts which are arranged on pier cover beams and are provided with two same arms are fixed on fixing bolts in the middle of two cover beams respectively; the low-end upright posts which are positioned under a bridge and are provided with two same arms are fixed with a reinforced concrete foundation on the ground through bolts respectively; the low-end upright posts with the two identical arms are spliced into trusses by using standard steel tubes, and a plurality of groups of steel tube trusses are assembled into the low-end upright posts serving as main arms; the top ends of the two same high-end upright posts and the two same low-end upright posts are provided with the load bearing beam and a crown block system; and the stability of the two same high-end upright posts and the two same low-end upright posts is ensured by wind-resistant ropes. The gantry crane has a light structure and high processing speed, is convenient to transport, reduces the labor intensity of aloft workers, shortens the splicing time to a great extent, realizes the function of full assembly which can only be realized by span pier gantry cranes, and saves 50 percent of materials compared with the span pier gantry cranes. The high and low gantry crane has the advantages of high efficiency, high safety and environment friendliness.
Description
Technical field
The present invention relates to during beam bridge builds, be used to finish stride greatly footpath T beam from ground to the bridge on the height gantry crane that adopts of vertical transport task, exactly be the height gantry crane that a kind of steel pipe post that is used for striding greatly footpath T beam lifting constitutes.
Background technology
Extensive propelling along with China's traffic infrastructure construction, the design of striding footpath, long distance, continuous bridge greatly progressively increases, and the addressing of these bridges, nearly all can be undeveloped in those traffic, the place deep in the mountains that road is rugged, road condition can not carry out big part goods and materials transportation fully, more can not bear design length at 40-50 rice, the transportation heavy burden of the large span T beam that weight is more than 100 ton, bear the unit in charge of construction of bridge construction in these locations, bearing the important task that the construction period is short, execution conditions are limited, construction task is heavy.Therefore, unit in charge of construction can only suit measures to local conditions because of ground, and it is beam prefabricated that T is carried out in addressing on the spot, finish T beam prefabricated after, how efficient, safety, carry out the lifting of beam slab to environmental protection, be a very crucial technical matters, and the gantry crane technology is to carry out the preferred option that the T beam lifts.
At present, in beam bridge was built, the lifting of T beam adopted the gantry crane technology very general, and this structure develops from " striding the pier gauntry crane ", can save some materials, thereby be subjected to the extensive employing of a lot of units in charge of construction; The early stage pillar construction form that occurs has: concrete column, omnipotent roofbolt column, tower crane type upright of frame etc.; The shortcoming of these pillar construction forms is, the engineering time is long, construction benefit is low, operating technique is unstable, need a large amount of personnel to carry out aloft work for a long time in the work progress, and safety misadventure takes place easily, is unfavorable for extensively promoting the use of.
Summary of the invention
The objective of the invention is to: the height gantry crane that provides a kind of steel pipe post that is used for striding greatly directly T beam lifting to constitute, this gantry crane structure is light, process velocity fast, be convenient to transportation, realization is transferred to the conception that the lifting equipment factory produces with the on-site consolidation time, reduce steeplejack's labour intensity, shorten assembling duration significantly, improve the work effect; High-end column is placed on the bent cap, realized striding the full width installation function that the pier gantry crane could be realized, also economize 50% material, speed of application is performed to the limit, reach the purpose of efficient, economy, safety, environmental protection than striding pier gantry crane joint.
The objective of the invention is to realize by the enforcement following technical proposals:
The height gantry crane that a kind of steel pipe post that is used for striding greatly directly T beam lifting constitutes, high and low end column, the load-bearing crossbeam identical by two product constitute, it is characterized in that: place the identical high-end column of two limbs on the bridge pier bent cap, constitute cube rod by fabricated universal steel members, be separately fixed on the middle bolt of rear end plate of two bent caps, the bottom point of connection of this cube rod is provided with the omnipotent bar working joint that can be assembled into the inclined-plane inverted triangle; Be positioned at the identical low side column of two limbs under the bridge, place on the ground in two bent cap outsides, reserve enough T beam rooms for promotion between its inboard and the bent cap outside, fix with bolt and ground-surface reinforced concrete foundation respectively, the low side column that two limbs are identical adopts the standard steel pipe to be assembled into truss respectively, organizes steel pipe truss more and is assembled into the low side column limb of deciding, in place by the crane direct mount, all form by bolted connection; The top of the high and low end column that two product are identical is installed load-bearing crossbeam, lifting rope respectively, do odds and ends winch and Overhead travelling crane system, is connected with high and low end column by " U-shaped " bolt; Wind resistance rope upper end is connected to the identical high and low end column top of two product, and the lower end is separately fixed at ground-surface appropriate location, the gantry crane outside.
Additional technical feature:
1), places the high-end column that constitutes cube rod on the bridge pier bent cap by fabricated universal steel members, in that being installed, this gantry crane inboard one collapses under the operating mode of 1-6 T beam of bridge, by the working joint on the fabricated universal steel members, the cube rod bottom is assembled into interior inclined-plane del column, interior inclined-plane and vertical pillars form 25.6-27.6 degree angle, with the position of 7-10 T beam transverse translation to 1-6 T beam.2), place the high-end column that constitutes cube rod on the bridge pier bent cap by fabricated universal steel members, after the two 7-10 T beams that collapse bridge of finishing the gantry crane outside lift, need collapse the 7-10 T beam transverse translation of bridge to the operating mode of 1-6 T beam with two, the cube rod that fabricated universal steel members constitutes need be fixed on the mounted T beam, by the working joint on the fabricated universal steel members, del inclined-plane, cube rod bottom column is assembled into outer oblique angle, outer inclined-plane and vertical pillars form 54-56 degree angle, install in the full width of finishing all T beams.
Advantage of the present invention is:
The height gantry crane that a kind of steel pipe post that is used for striding greatly directly T beam lifting constitutes, this gantry crane structure is light, process velocity fast, be convenient to transportation, the conception of lifting equipment factory is transferred to the on-site consolidation time in realization, reduce steeplejack's labour intensity, shorten assembling duration significantly, improve the work effect; High-end column is placed on the bent cap, realized striding the full width installation function that the pier gantry crane could be realized, also save 50% material, speed of application is performed to the limit, have the advantage of efficient, economy, safety, environmental protection than striding the pier gantry crane.
Description of drawings
The truss front view that Fig. 1 is assembled into for the standard steel tube column that amplifies;
The low side column front view that Fig. 2 is assembled into for the many groups steel pipe truss that amplifies;
Fig. 3 is for preparing to install the basic birds-eye view of one group of build-up type height gantry crane;
Fig. 4 is single product height gantry crane lateral plan of installation;
Fig. 5 is single product height gantry crane front view of installation;
Fig. 6 is one group of high-end gantry crane front view of installation;
Fig. 7 is one group of high-end gantry crane front view of upside-down triangle shape in the inboard of the bottom of high-end column becomes;
Fig. 8 is one group of high-end gantry crane front view that the outside of the bottom of high-end column becomes outer upside-down triangle shape;
Fig. 9 finishes one group of high-end gantry crane front view that all T beam full widths are installed.
Mark among the figure: 1 truss that is assembled into for the standard steel tube column that amplifies, the 2 low side columns that are assembled into for the many groups steel pipe truss that amplifies, 3 is the high-end column that is assembled into by fabricated universal steel members, 4 is high-end, the load-bearing crossbeam that install on low side column top, 5 are the lifting rope on the load-bearing crossbeam, do odds and ends winch and Overhead travelling crane system, 6 is high-end for stablizing gantry crane, the wind resistance rope of low side column, 7 is the bent cap on the bridge pier, 8 is the T beam on the bent cap, 9 is low side column and ground-surface reinforced concrete foundation, 10 is the bolt of rear end plate of high-end column on the bridge pier bent cap, and 11 is T beam room for promotion, and 12 is the inboard inverted triangle of the bottom of high-end column, interior inclined-plane and vertical pillars form 25.6-27.6 degree angle, 13 is the outside inverted triangle of the bottom of high-end column, and outer inclined-plane and vertical pillars form 54-56 degree angle, and 14 is the working joint on the fabricated universal steel members.
The specific embodiment
Embodiment 1: the A type height gantry crane that a kind of steel pipe post that is used for striding greatly directly T beam lifting constitutes
The height gantry crane that a kind of steel pipe post that is used for striding greatly directly T beam lifting constitutes, high and low end column, the load-bearing crossbeam identical by two product constitute, it is characterized in that: place the identical high-end column 3 of two limbs on the bridge pier bent cap, constitute cube rod by fabricated universal steel members, be separately fixed on the bolt of rear end plate 10 of two bent caps, 7 centres, the bottom point of connection of this cube rod is provided with the omnipotent bar working joint 14 that can be assembled into the inclined-plane inverted triangle; Be positioned at the identical low side column 2 of two limbs under the bridge, place on the ground in two bent cap outsides, reserve enough T beam rooms for promotion 11 between its inboard and the bent cap outside, fixing with bolt and ground-surface reinforced concrete foundation 9 respectively, the low side column 2 that two limbs are identical adopts the standard steel pipe to be assembled into truss 1 respectively, organizes steel pipe truss more and is assembled into low side column 2 limb of deciding, in place by the crane direct mount, all form by bolted connection; The top of the high and low end column that two product are identical is installed load-bearing crossbeam 4, lifting rope respectively, do odds and ends winch and Overhead travelling crane system 5, is connected with high and low end column by " U-shaped " bolt; Wind resistance rope 6 upper ends are connected to the identical high and low end column top of two product, and the lower end is separately fixed at ground-surface appropriate location, the gantry crane outside.
Because the identical high-end column 3 of two limbs places respectively on two bent caps 7 of bridge pier, has taken the installation site of T beam 8, gantry crane lifts by crane extraneous 1-6 T beam and can not put in place by direct mount, just can't realize that the full width of T beam 8 is installed; If the position of mobile gantry crane is built whole height gantry crane again, need waste great amount of manpower and material resources, financial resources and the time, unit in charge of construction is caused very big loss.
The present invention passes through the working joint 14 on the fabricated universal steel members of the bottom of high-end column, structural change is carried out in the bottom that is opposite to the identical high-end column 3 of two limbs on two bent caps 7, abdicate the position of the side travel of T beam 8, just can finish the full width of 1-10 T beam and install.
Embodiment 2: the Type B height gantry crane that a kind of steel pipe post that is used for striding greatly directly T beam lifting constitutes
This type height gantry crane and embodiment 1 structure are basic identical, difference is only placing the high-end column 3 that is made of cube rod on the bridge pier bent cap 7 fabricated universal steel members, in that being installed, this gantry crane inboard one collapses under the operating mode of 1-6 T beam of bridge, by the working joint on the fabricated universal steel members 14, the cube rod bottom is assembled into interior inclined-plane del column, interior inclined-plane and vertical pillars form 25.6-27.6 degree angle 12, with the position of 7-10 T beam transverse translation to 1-6 T beam.
Embodiment 3: the C type height gantry crane that a kind of steel pipe post that is used for striding greatly directly T beam lifting constitutes
This type height gantry crane and embodiment 1 structure are basic identical, difference only is to place the high-end column 3 that is made of cube rod on the bridge pier bent cap 7 fabricated universal steel members, after the two 7-10 T beams that collapse bridge of finishing the gantry crane outside lift, need collapse the 7-10 T beam transverse translation of bridge to the operating mode of 1-6 T beam with two, the cube rod that fabricated universal steel members constitutes need be fixed on the mounted T beam 8, by the working joint on the fabricated universal steel members 14, del inclined-plane, cube rod bottom column is assembled into outer oblique angle, outer inclined-plane and vertical pillars form 54-56 degree angle 13, install in the full width of finishing all T beams 8.
Claims (3)
1. height gantry crane that the steel pipe post that is used for striding greatly footpath T beam lifting constitutes, high and low end column, the load-bearing crossbeam identical by two product constitute, it is characterized in that: place the identical high-end column (3) of two limbs on the bridge pier bent cap, constitute cube rod by fabricated universal steel members, be separately fixed on the middle bolt of rear end plate (10) of two bent caps (7), the bottom point of connection of this cube rod is provided with the omnipotent bar working joint (14) that can be assembled into the inclined-plane inverted triangle; Be positioned at the identical low side column (2) of two limbs under the bridge, place on the ground in two bent cap outsides, reserve enough T beam rooms for promotion (11) between its inboard and the bent cap outside, use bolt and ground-surface reinforced concrete foundation (9) fixing respectively, the low side column (2) that two limbs are identical adopts the standard steel pipe to be assembled into truss (1) respectively, organizes steel pipe truss more and is assembled into low side column (2) limb of deciding, in place by the crane direct mount, all form by bolted connection; The top of the high and low end column that two product are identical is installed load-bearing crossbeam (4), lifting rope respectively, do odds and ends winch and Overhead travelling crane system (5), is connected with high and low end column by " U-shaped " bolt; Wind resistance rope (6) upper end is connected to the identical high and low end column top of two product, and the lower end is separately fixed at ground-surface appropriate location, the gantry crane outside.
2. according to the described a kind of height gantry crane that is used for striding greatly the steel pipe post formation of directly T beam lifting of claim 1, it is characterized in that: place bridge pier bent cap (7) to go up the high-end column (3) that constitutes cube rod by fabricated universal steel members, in that being installed, this gantry crane inboard one collapses under the operating mode of 1-6 T beam of bridge, by the working joint on the fabricated universal steel members (14), the cube rod bottom is assembled into interior inclined-plane del column, interior inclined-plane and vertical pillars form 25.6-27.6 degree angle (12), with the position of 7-10 T beam transverse translation to 1-6 T beam.
3. according to the described a kind of height gantry crane that is used for striding greatly the steel pipe post formation of directly T beam lifting of claim 1, it is characterized in that: place bridge pier bent cap (7) to go up the high-end column (3) that constitutes cube rod by fabricated universal steel members, after the two 7-10 T beams that collapse bridge of finishing the gantry crane outside lift, need collapse the 7-10 T beam transverse translation of bridge to the operating mode of 1-6 T beam with two, the cube rod that fabricated universal steel members constitutes need be fixed on the mounted T beam (8), by the working joint on the fabricated universal steel members (14), del inclined-plane, cube rod bottom column is assembled into outer oblique angle, outer inclined-plane and vertical pillars form 54-56 degree angle (13), install in the full width of finishing all T beams (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110080512XA CN102205929A (en) | 2011-03-31 | 2011-03-31 | High and low gantry crane formed by steel tube upright post for hoisting long-span T beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110080512XA CN102205929A (en) | 2011-03-31 | 2011-03-31 | High and low gantry crane formed by steel tube upright post for hoisting long-span T beam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102205929A true CN102205929A (en) | 2011-10-05 |
Family
ID=44695036
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110080512XA Pending CN102205929A (en) | 2011-03-31 | 2011-03-31 | High and low gantry crane formed by steel tube upright post for hoisting long-span T beam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102205929A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102943440A (en) * | 2012-11-06 | 2013-02-27 | 天津二十冶建设有限公司 | Method for constructing bridges |
CN109024306A (en) * | 2018-07-31 | 2018-12-18 | 中国铁建大桥工程局集团有限公司 | Mountain terrain place Gao Dun rides pier formula door frame bridge lifting construction method |
CN110331672A (en) * | 2019-08-14 | 2019-10-15 | 中交一公局第一工程有限公司 | Across the pier bale handle holder device in bridge side position and its simple and fast construction method |
CN114635362A (en) * | 2022-03-23 | 2022-06-17 | 保利长大工程有限公司 | Cantilever type beam lifting station for beam slab erection and method for hoisting beam lifting station to bridge |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2287621Y (en) * | 1997-03-14 | 1998-08-12 | 陈林 | Telescopic tower crane |
CN2417156Y (en) * | 2000-05-01 | 2001-01-31 | 丁桂秋 | Folding type crane |
CN201236115Y (en) * | 2008-07-10 | 2009-05-13 | 彭洪 | Material hanging-paving machine for civil architecture |
CN201961992U (en) * | 2011-03-31 | 2011-09-07 | 四川川交路桥有限责任公司 | High-low gantry crane which is used for hoisting T beam with large span and formed by steel tube stand columns |
-
2011
- 2011-03-31 CN CN201110080512XA patent/CN102205929A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2287621Y (en) * | 1997-03-14 | 1998-08-12 | 陈林 | Telescopic tower crane |
CN2417156Y (en) * | 2000-05-01 | 2001-01-31 | 丁桂秋 | Folding type crane |
CN201236115Y (en) * | 2008-07-10 | 2009-05-13 | 彭洪 | Material hanging-paving machine for civil architecture |
CN201961992U (en) * | 2011-03-31 | 2011-09-07 | 四川川交路桥有限责任公司 | High-low gantry crane which is used for hoisting T beam with large span and formed by steel tube stand columns |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102943440A (en) * | 2012-11-06 | 2013-02-27 | 天津二十冶建设有限公司 | Method for constructing bridges |
CN109024306A (en) * | 2018-07-31 | 2018-12-18 | 中国铁建大桥工程局集团有限公司 | Mountain terrain place Gao Dun rides pier formula door frame bridge lifting construction method |
CN110331672A (en) * | 2019-08-14 | 2019-10-15 | 中交一公局第一工程有限公司 | Across the pier bale handle holder device in bridge side position and its simple and fast construction method |
CN114635362A (en) * | 2022-03-23 | 2022-06-17 | 保利长大工程有限公司 | Cantilever type beam lifting station for beam slab erection and method for hoisting beam lifting station to bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109183629B (en) | Large cantilever bent cap prefabrication and assembly method | |
JP5047680B2 (en) | Construction method of continuous viaduct | |
CN100543235C (en) | The method and system of erecting steel trusses by stay cable auxiliary complete cantilever | |
CN103422441A (en) | Perforating method for erecting long-span highway box girders by using DJ180 bridge erecting machine | |
CN201106155Y (en) | Inclined guy cable auxiliary full cantaliver crane trussed steel beam device | |
CN110656570A (en) | Telescopic pedestrian bridge, construction device and construction method | |
CN101481903B (en) | Method for constructing hilly region rope-suspension bridge main beam by span cable supported crane assembling | |
CN102205929A (en) | High and low gantry crane formed by steel tube upright post for hoisting long-span T beam | |
CN114808747A (en) | Multifunctional bridge girder erection machine and bridge girder erection construction method | |
CN215210544U (en) | Bridge curtain board construction protection device for existing tramcar crossing highway | |
CN212315371U (en) | Cable installation lifting device for cable-stayed bridge | |
CN201961992U (en) | High-low gantry crane which is used for hoisting T beam with large span and formed by steel tube stand columns | |
CN203716044U (en) | Low bearing or middle bearing cable arch combined structural bridge | |
CN210827111U (en) | Environment-friendly down self-propelled steel trestle structure | |
CN204126297U (en) | A kind of temporary support of steel truss roof | |
CN111851307A (en) | Large-span prefabricated assembly type corrugated web combined box girder transportation frame construction method | |
CN209338005U (en) | A kind of mobile height leg gantry crane of erecting beam construction | |
CN115961549A (en) | Rear-feeding beam type erection construction method for large-tonnage whole-section steel beam of cable-stayed bridge | |
CN201647844U (en) | Beam lifting station without abutments | |
CN212357995U (en) | Movable type section-assembled box girder transverse steel bundle tensioning working platform | |
CN213653207U (en) | Protection device at bottom of public road bridge roof beam anticollision wall construction pocket | |
CN211815605U (en) | Construction device for pile column type pier tie beam and capping beam | |
CN210368664U (en) | Wide-body bridge girder erection machine | |
CN203923923U (en) | High pier steel truss girder sets up gate-type lifting station | |
CN106906756A (en) | Can Fast Installation remove maintenance operation platform and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20111005 |