CN102190254A - Hoisting method for equipment installation in in-between hollow space of multilayer concrete platforms - Google Patents

Hoisting method for equipment installation in in-between hollow space of multilayer concrete platforms Download PDF

Info

Publication number
CN102190254A
CN102190254A CN2010101167598A CN201010116759A CN102190254A CN 102190254 A CN102190254 A CN 102190254A CN 2010101167598 A CN2010101167598 A CN 2010101167598A CN 201010116759 A CN201010116759 A CN 201010116759A CN 102190254 A CN102190254 A CN 102190254A
Authority
CN
China
Prior art keywords
equipment
hands
hoist
crane
concrete platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010101167598A
Other languages
Chinese (zh)
Other versions
CN102190254B (en
Inventor
熊永祥
张涛
熊利桂
杨文勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201010116759.8A priority Critical patent/CN102190254B/en
Publication of CN102190254A publication Critical patent/CN102190254A/en
Application granted granted Critical
Publication of CN102190254B publication Critical patent/CN102190254B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

Provided is a hoisting method for equipment installation in in-between hollow space of multilayer concrete platforms. The method is characterized in that: it comprises the following steps: (a) arranging a plurality of hoisting apertures above in-between hollow space; (b) using a crane to hoist equipment individually; (c) using hand-drive blocks (A, B) and the crane to lift the equipment together; (d) using hand-drive blocks (A,B,C,D) to lift the equipment and placing the equipment in position. According to the hoisting method for equipment installation in in-between hollow space of multilayer concrete platforms provided in the invention, equipment can be hoisted and placed in in-between hollow space of multilayer concrete platforms simply, fast and safely, the safety of operators is effectively guaranteed, and crane equipment and surrounding facilities can be prevent from damaging owing to collision.

Description

Be positioned at the hanging method of the equipment installation in position of multi-layer concrete platform hollow sandwich
Technical field
The present invention relates to a kind of hanging method of mechanical equipment, specifically, is a kind of hanging method that is positioned at the equipment installation in position of multi-layer concrete platform hollow sandwich.
Background technology
In order to save land resources, compress floor area, the industrial production line unit equipment often adopts the multilayer of compact to arrange.As the metal foil winding pickling line in the metallurgy industry, galvanized wire, tinned wire etc., because of technological process needs the machine group length about more than 1,000 meters, but after being designed to compact arrangement, take up an area of length and have only hundreds of rice, equipment divides two to three layers of installation to solid space, so just make that the installation space place is narrow and small, equipment hoisting and in place extremely difficult, and have a strong impact on workmen and device security.
Therefore the hanging method of known equipment installation in position exists above-mentioned all inconvenience and problem.
Summary of the invention
Purpose of the present invention, be to propose a kind of easy, make the hanging method of the equipment installation in position that is positioned at multi-layer concrete platform hollow sandwich fast, safely.
For achieving the above object, technical solution of the present invention is:
A kind of construction method that is positioned at the equipment installation in position of multi-layer concrete platform hollow sandwich is characterized in that may further comprise the steps:
A) on the concrete platform above the hollow sandwich, hole for hoist is set
Weight and hoisting point position according to described equipment, some holes for hoist are set on the concrete platform above the described hollow sandwich, pass each described hole for hoist respectively with steel rope, end at the steel rope above the hole for hoist is anchored at I-beam section on the described platform, and the other end of the steel rope below hole for hoist is in order to hang a manual cucurbit;
B) with the independent lifting appliance of crane
One crane is provided, hooks two suspension centres of equipment as steel rope, and hook two suspension centres in addition of equipment, described equipment is winched to the concrete platform of described hollow sandwich with ordinary steel rope with length-adjustable bottle gouard moved by hands;
C) two bottle gouards moved by hands and crane lift equipment jointly
With setting in advance the two manual cucurbits of replacing the original crane under the stressing conditions aloft in the manual cucurbit of two below the described hole for hoist, two manual cucurbits of described original crane are withdrawn from stress system, form two manual cucurbit relays of hole for hoist below, two manual cucurbits and the crane of reaching the hole for hoist below lift equipment jointly, continue two manual cucurbits of pulling hole for hoist below then, oblique traction, dilatory equipment enter in the hollow sandwich of concrete platform, reach the end position of hoist lifting hook near described concrete platform;
D) it is in place that the bottle gouard moved by hands of four hole for hoist belows lifts equipment
Again with the same method of step c) with two manual cucurbit relays below the previous hole for hoist of the two manual cucurbits displacements in addition of hole for hoist below, and replace the steel rope of crane suspension centre again with described two manual cucurbits by the previous hole for hoist below under the displacement, after the manual cucurbit of two below the previous hole for hoist is stressed, unclamp the suspension hook of crane, bottle gouard moved by hands by four hole for hoist belows lifts equipment jointly to design attitude, and it is in place to fall equipment then.
The hanging method that is positioned at the equipment installation in position of multi-layer concrete platform hollow sandwich of the present invention can also be further achieved by the following technical measures.
Aforesaid method, the diameter that hole for hoist is set on the concrete platform above the hollow sandwich of wherein said step a) is 100mm.
Aforesaid method, wherein, it is to reserve the steel pipe hole when constructing concrete platform that hole for hoist is set on the concrete platform of described step a) above hollow sandwich, or the boring on concrete platform, but boring need be obtained designing unit's agreement, and can not bore disconnected steel bar stress.
Aforesaid method, wherein said step b) is a wheel crane with the crane of the independent lifting appliance of crane, or shop traveller.
After adopting technique scheme, the hanging method that is positioned at the equipment installation in position of multi-layer concrete platform hollow sandwich of the present invention has the following advantages:
1, make the equipment that is positioned at multi-layer concrete platform intermediate course can be easy, fast, hoisted in position safely;
2, ensure operator safety effectively;
3, protect the equipment that hung and peripheral facilities not by damage.
Description of drawings
Fig. 1 is the structural representation of the multi-layer concrete platform hollow sandwich of the embodiment of the invention;
Fig. 2 is the scheme drawing with the independent lifting appliance of crane of the embodiment of the invention;
The scheme drawing that Fig. 3 lifts equipment jointly for two bottle gouards moved by hands and the crane of the embodiment of the invention;
Fig. 4 lifts equipment scheme drawing in place for four bottle gouards moved by hands of the embodiment of the invention.
Among the figure: 1 concrete platform, 2 hollow sandwich platforms, 3 equipment, 4 driving steel wire ropes, A, B, C, D hole for hoist, A ', B ', C ', D ' bottle gouard moved by hands, A ", B " bottle gouard moved by hands, M, N, O, P equipment suspension centre, β steel rope angle.
The specific embodiment
Below in conjunction with embodiment and accompanying drawing thereof the present invention is illustrated further.
The hanging method that is arranged in the equipment installation in position of multi-layer concrete platform hollow sandwich of the present invention is successfully used at Baosteel acid-washing stainless steel unit, not only shifting to an earlier date two weeks according to the duration node finishes, the more important thing is the safety that has guaranteed all devices, peripheral facilities and personnel, none collision.
Shanghai Baosteel corrosion-resistant steel cold belt annealing and pickling unit mostly is import equipment greatly, more than 3200 ton of total equipment wherein has 16 complete equipments to be arranged in three layers of flat-bed second layer of cement concrete, and the space is extremely narrow, one of them distinguishing feature is exactly that the production line multilayer distributes, the technological process line always reaches 1134m, takes the compact multilayer to arrange, takes up an area of to be compressed to 414m, divide three layers of layout, wherein three layers of platform absolute altitude is 11.400 meters, 6.380 meters of interlayer platform absolute altitudes, 4.52 meters of floor heights.
The construction method that is positioned at the equipment installation in position of multi-layer concrete platform hollow sandwich of the present invention is characterized in that may further comprise the steps:
A) on the concrete platform above the hollow sandwich, hole for hoist is set
Now see also Fig. 1, Fig. 1 is the structural representation of the multi-layer concrete platform hollow sandwich of the embodiment of the invention.As shown in the figure, weight and hoisting point position according to described equipment, described four hole for hoist (A are set on the concrete platform above the described hollow sandwich, B, C, D), when being the construction concrete platform, described four holes for hoist reserve (imbedding steel sleeve), the diameter of four holes for hoist is 100mm, passes each described hole for hoist respectively with steel rope, is anchored on the described platform with I-beam section at an end of the steel rope above the hole for hoist, the other end of the steel rope below hole for hoist in order to hang a manual cucurbit (A ', B ', C ', D ');
B) with the independent lifting appliance of crane
One shop traveller is provided, and with length-adjustable bottle gouard moved by hands (A "; B ") hook the suspension centre (O of equipment as steel rope, P), and the suspension centre (M that hooks equipment with ordinary steel rope, N), steel rope had angle β when crane lifted by crane alone, described equipment was winched to the concrete platform of described hollow sandwich;
C) bottle gouard moved by hands (A ', B ') lifts equipment jointly with crane
With setting in advance at described hole for hoist (A, B) Xia Fang bottle gouard moved by hands (A ', B ') replace bottle gouard moved by hands under the stressing conditions aloft (A "; B "), when steel rope is aloft replaced, first two bottle gouards moved by hands with pre-hung in the hole for hoist under the platform (A ', B '), hook the suspension centre (O that is replaced, P), then by two operating personals respectively slowly the pulling make two bottle gouards moved by hands (A ', B ') stressed increase gradually, simultaneously other two operating personals slowly spur respectively the cucurbit of being replaced (A "; B ") it is stressedly reduced gradually, four cucurbits spur synchronously, all stressed up to cucurbit (A ', B '), cucurbit (A ", B ") no longer stressed, described bottle gouard moved by hands (A "; B ") withdraw from stress system, form bottle gouard moved by hands (A ', B ') relay, reach bottle gouard moved by hands (A ', B ') lifts equipment jointly with crane, pull on then and start cucurbit (A ', B '), oblique traction, dilatory equipment enters in the hollow sandwich of concrete platform, reaches the end position of hoist lifting hook near described concrete platform;
D) bottle gouard moved by hands (A ', B ', C ', the D ') equipment that lifts is in place
Use again with the same method of step c) with bottle gouard moved by hands (C ', D ') displacement bottle gouard moved by hands (A ', B ') relay, and with described by the displacement under bottle gouard moved by hands (A ', B ') replace again the crane suspension centre (M, steel rope N), bottle gouard moved by hands (A ', B ') unclamps the suspension hook of crane after stressed, by 4 bottle gouards moved by hands (A ', B ', C ', D ') lift equipment jointly to design attitude, it is in place to fall equipment then.
Above embodiment is only for the usefulness that the present invention is described, but not limitation of the present invention, person skilled in the relevant technique under the situation that does not break away from the spirit and scope of the present invention, can also be made various conversion or variation.Therefore, all technical schemes that are equal to also should belong to category of the present invention, should be limited by each claim.

Claims (4)

1. construction method that is positioned at the equipment installation in position of multi-layer concrete platform hollow sandwich is characterized in that may further comprise the steps:
A) on the concrete platform above the hollow sandwich, hole for hoist is set
Weight and hoisting point position according to described equipment, some hole for hoist (A are set on the concrete platform above the described hollow sandwich, B, C, D), pass each described hole for hoist respectively with steel rope, end at the steel rope above the hole for hoist is anchored at I-beam section on the described platform, the other end of the steel rope below hole for hoist in order to hang a manual cucurbit (A ', B ', C ', D ');
B) with the independent lifting appliance of crane
One crane is provided, with length-adjustable bottle gouard moved by hands (A ", B ") as steel rope hook equipment suspension centre (O, P), and (M N), winches to described equipment the concrete platform of described hollow sandwich to hook the suspension centre of equipment with ordinary steel rope;
C) bottle gouard moved by hands (A ', B ') lifts equipment jointly with crane
With setting in advance at described hole for hoist (A, B) Xia Fang bottle gouard moved by hands (A ', B ') replace bottle gouard moved by hands under the stressing conditions aloft (A "; B "), described bottle gouard moved by hands (A "; B ") withdraw from stress system, the formation bottle gouard moved by hands (A ', B ') relay is reached bottle gouard moved by hands (A ', B ') and is lifted equipment jointly with crane, pull on then start cucurbit (A ', B '), oblique traction, dilatory equipment enter in the hollow sandwich of concrete platform, reach the end position of hoist lifting hook near described concrete platform;
D) bottle gouard moved by hands (A ', B ', C ', the D ') equipment that lifts is in place
Again with the same method of step c) with bottle gouard moved by hands (C ', D ') displacement bottle gouard moved by hands (A ', B ') relay, and with described by the displacement under bottle gouard moved by hands (A ', B ') replace again the crane suspension centre (M, steel rope N), bottle gouard moved by hands (A ', B ') unclamps the suspension hook of crane after stressed, by four bottle gouards moved by hands (A ', B ', C ', D ') lift equipment jointly to design attitude, it is in place to fall equipment then.
2. the construction method that is positioned at the equipment installation in position of multi-layer concrete platform hollow sandwich according to claim 1 is characterized in that, described step a) on the concrete platform above the hollow sandwich, be provided with hole for hoist (A, B, C, diameter D) is 100mm.
3. the construction method that is positioned at the equipment installation in position of multi-layer concrete platform hollow sandwich according to claim 1, it is characterized in that, described step a) is provided with hole for hoist (A on the concrete platform above the hollow sandwich, B, C, reserve the steel pipe hole when D) being the construction concrete platform, or the boring on concrete platform.
4. the construction method that is positioned at the equipment installation in position of multi-layer concrete platform hollow sandwich according to claim 1 is characterized in that described step b) is a wheel crane with the crane of the independent lifting appliance of crane, or shop traveller.
CN201010116759.8A 2010-03-03 2010-03-03 Hoisting method for equipment installation in in-between hollow space of multilayer concrete platforms Active CN102190254B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010116759.8A CN102190254B (en) 2010-03-03 2010-03-03 Hoisting method for equipment installation in in-between hollow space of multilayer concrete platforms

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010116759.8A CN102190254B (en) 2010-03-03 2010-03-03 Hoisting method for equipment installation in in-between hollow space of multilayer concrete platforms

Publications (2)

Publication Number Publication Date
CN102190254A true CN102190254A (en) 2011-09-21
CN102190254B CN102190254B (en) 2014-10-01

Family

ID=44599276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010116759.8A Active CN102190254B (en) 2010-03-03 2010-03-03 Hoisting method for equipment installation in in-between hollow space of multilayer concrete platforms

Country Status (1)

Country Link
CN (1) CN102190254B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103663217A (en) * 2013-09-12 2014-03-26 浙江东冠通信技术股份有限公司 Communication tower equipment hoisting method
CN104030176A (en) * 2014-05-30 2014-09-10 中建七局安装工程有限公司 Balance beam for lifting platform truss and lifting method thereof
CN104818858A (en) * 2015-04-22 2015-08-05 中国十七冶集团有限公司 Indoor heavy electric cabinet lifting method
CN105804087A (en) * 2016-03-11 2016-07-27 上海十三冶建设有限公司 Installation method for steel structure below large deep foundation pit supporting beam
CN106185599A (en) * 2016-08-30 2016-12-07 大唐黄岛发电有限责任公司 A kind of electromotor hydrogen-cooled device maintenance special purpose device
CN109160421A (en) * 2018-08-24 2019-01-08 中船第九设计研究院工程有限公司 A kind of integral hoisting system of mobile shelter
CN110817723A (en) * 2019-11-15 2020-02-21 上海东鼎钢结构有限公司 Method and device for installing heat exchanger of automobile test wind tunnel
CN110817690A (en) * 2018-08-07 2020-02-21 上海公路桥梁(集团)有限公司 Transmission and hoisting method
CN111039192A (en) * 2019-11-01 2020-04-21 广东省源天工程有限公司 Method for hoisting mechanical equipment by adopting aerial relay
CN112110336A (en) * 2020-09-21 2020-12-22 中国建筑第八工程局有限公司 Device for mounting steel beam on floor and construction method thereof
CN113526369A (en) * 2021-06-29 2021-10-22 中国电建集团山东电力建设第一工程有限公司 Multi-machine matching hoisting method for ultra-long starting separator of boiler
CN115092845A (en) * 2022-06-15 2022-09-23 中建三局安装工程有限公司 Method for hoisting equipment
CN115258906A (en) * 2022-09-28 2022-11-01 中化二建集团有限公司 Condenser hoisting method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1021106A (en) * 1964-03-13 1966-02-23 Leon Foulquier Load-handling tackle for a lifting device
DE1759904A1 (en) * 1968-06-20 1971-07-22 Huennebeck Gmbh Movable formwork table for shuttering building ceilings
FR2209382A5 (en) * 1972-12-05 1974-06-28 Outinord Sa Ets
FR2253901A1 (en) * 1975-01-03 1975-07-04 Compensation Ste Gle Method of transferring shuttering - involves using three axle carriage not pivoting when lifted by slings
CN201276399Y (en) * 2008-09-11 2009-07-22 上海市安装工程有限公司 Apparatus hoisting mechanism for tall building floor non-steel platform
CN101635490A (en) * 2009-07-17 2010-01-27 中冶实久建设有限公司 Supporting and regulating device for installation in position of main motor stator and method for installing main motor stator by using same

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1021106A (en) * 1964-03-13 1966-02-23 Leon Foulquier Load-handling tackle for a lifting device
DE1759904A1 (en) * 1968-06-20 1971-07-22 Huennebeck Gmbh Movable formwork table for shuttering building ceilings
FR2209382A5 (en) * 1972-12-05 1974-06-28 Outinord Sa Ets
FR2253901A1 (en) * 1975-01-03 1975-07-04 Compensation Ste Gle Method of transferring shuttering - involves using three axle carriage not pivoting when lifted by slings
CN201276399Y (en) * 2008-09-11 2009-07-22 上海市安装工程有限公司 Apparatus hoisting mechanism for tall building floor non-steel platform
CN101635490A (en) * 2009-07-17 2010-01-27 中冶实久建设有限公司 Supporting and regulating device for installation in position of main motor stator and method for installing main motor stator by using same

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103663217A (en) * 2013-09-12 2014-03-26 浙江东冠通信技术股份有限公司 Communication tower equipment hoisting method
CN104030176A (en) * 2014-05-30 2014-09-10 中建七局安装工程有限公司 Balance beam for lifting platform truss and lifting method thereof
CN104030176B (en) * 2014-05-30 2016-06-29 中建七局安装工程有限公司 The equalizer bar of hoisting platform truss and hanging method thereof
CN104818858A (en) * 2015-04-22 2015-08-05 中国十七冶集团有限公司 Indoor heavy electric cabinet lifting method
CN105804087A (en) * 2016-03-11 2016-07-27 上海十三冶建设有限公司 Installation method for steel structure below large deep foundation pit supporting beam
CN106185599A (en) * 2016-08-30 2016-12-07 大唐黄岛发电有限责任公司 A kind of electromotor hydrogen-cooled device maintenance special purpose device
CN106185599B (en) * 2016-08-30 2017-11-24 大唐黄岛发电有限责任公司 A kind of hydrogen-cooled device maintenance special purpose device of generator
CN110817690A (en) * 2018-08-07 2020-02-21 上海公路桥梁(集团)有限公司 Transmission and hoisting method
CN109160421B (en) * 2018-08-24 2020-04-28 中船第九设计研究院工程有限公司 Integral hoisting system for movable wind and rain shed
CN109160421A (en) * 2018-08-24 2019-01-08 中船第九设计研究院工程有限公司 A kind of integral hoisting system of mobile shelter
CN111039192A (en) * 2019-11-01 2020-04-21 广东省源天工程有限公司 Method for hoisting mechanical equipment by adopting aerial relay
CN110817723A (en) * 2019-11-15 2020-02-21 上海东鼎钢结构有限公司 Method and device for installing heat exchanger of automobile test wind tunnel
CN112110336A (en) * 2020-09-21 2020-12-22 中国建筑第八工程局有限公司 Device for mounting steel beam on floor and construction method thereof
CN112110336B (en) * 2020-09-21 2022-11-25 中国建筑第八工程局有限公司 Device for mounting steel beam on floor and construction method thereof
CN113526369A (en) * 2021-06-29 2021-10-22 中国电建集团山东电力建设第一工程有限公司 Multi-machine matching hoisting method for ultra-long starting separator of boiler
CN113526369B (en) * 2021-06-29 2022-12-09 中国电建集团山东电力建设第一工程有限公司 Multi-machine matching hoisting method for ultra-long starting separator of boiler
CN115092845A (en) * 2022-06-15 2022-09-23 中建三局安装工程有限公司 Method for hoisting equipment
CN115258906A (en) * 2022-09-28 2022-11-01 中化二建集团有限公司 Condenser hoisting method
CN115258906B (en) * 2022-09-28 2022-12-02 中化二建集团有限公司 Condenser hoisting method

Also Published As

Publication number Publication date
CN102190254B (en) 2014-10-01

Similar Documents

Publication Publication Date Title
CN102190254B (en) Hoisting method for equipment installation in in-between hollow space of multilayer concrete platforms
CN103979383B (en) Building operation multiple layer up-down plateform system
CN103266192B (en) Hoisting method for replacing cooling wall in overhauling of blast furnace
CN102306979B (en) Core pulling and threading method for overhauling of large motor
CN113137054A (en) Method for setting inverted hoisting power equipment in attached lifting scaffold
CN107502690A (en) A kind of point of device and replacing options with integral replacing last furnace shell
CN206538126U (en) The large-scale overweight equipment handling constructing device of Super High
CN102030270B (en) Auxiliary tool and method for replacing wire rope of bridge crane
CN102049335A (en) Installation and construction method of large-sized ball mill
CN101284626A (en) Additional weight hoisting method
CN104818858A (en) Indoor heavy electric cabinet lifting method
CN204958963U (en) Jacking device that converter trunnion ring was changed
CN103288002A (en) Simple combination portal upper-air heavy-article hoisting device
CN103086276A (en) Construction method for hoisting bridge type crane in high-rise well tower type building
CN203284126U (en) Simple composite gantry high-altitude weight hoisting device
CN105735629A (en) Lifting device for building-attached lifting scaffold
CN204057758U (en) A kind of hoisting device for overhaul of the equipments in large height industrial building
CN110760634A (en) Blast furnace shell installation method
CN106429869A (en) Horizontal heavy equipment aerial mounting device and mounting method
JP2013036287A (en) Device and method for lifting floor unit
CN215755931U (en) Large transformer hoisting equipment in factory building
KR101730764B1 (en) Construction method of curved girder using balancing lift tool
CN205170161U (en) Precast beam board framework of steel reinforcement hoist
CN213447178U (en) Simple device convenient for replacing cooling wall of blast furnace
CN212769534U (en) Rotatable simple and easy hoist device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant