CN102183230A - An anchoring device of a datum mark in a boring - Google Patents

An anchoring device of a datum mark in a boring Download PDF

Info

Publication number
CN102183230A
CN102183230A CN 201010608508 CN201010608508A CN102183230A CN 102183230 A CN102183230 A CN 102183230A CN 201010608508 CN201010608508 CN 201010608508 CN 201010608508 A CN201010608508 A CN 201010608508A CN 102183230 A CN102183230 A CN 102183230A
Authority
CN
China
Prior art keywords
pvc sleeve
sleeve pipe
pipe
boring
catch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010608508
Other languages
Chinese (zh)
Other versions
CN102183230B (en
Inventor
姚爱军
杜修力
赵强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Technology
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CN2010106085081A priority Critical patent/CN102183230B/en
Publication of CN102183230A publication Critical patent/CN102183230A/en
Application granted granted Critical
Publication of CN102183230B publication Critical patent/CN102183230B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses an anchoring device of a datum mark in a boring. The anchoring device of a datum mark in a boring, which belongs to the testing technical field of geotechnical engineering, is used for detection of displacement or deformation of rock-soil body such as ground pit, side slope and the like. The anchoring device includes a guiding ball 1, a chute 2, a PVC (Polyvinyl chloride) sleeve 3, a support arm 4, an inner tube 5, a separation blade 6, a pin 7, a traction steel wire 8, and a screw 9. The anchoring device has advantages of convenient installation, good stability in anchoring datum marks, easy acquisition of manufacture material, and low cost.

Description

Reference point anchor in a kind of boring
Technical field
The invention discloses reference point anchor in a kind of boring, belong to the Geotechnical Engineering technical field of measurement and test, be used for the displacement or the deformation monitoring of rock soil mass such as foundation ditch or side slope.
Background technology
In the Geotechnical Engineering measuring technology, the displacement of engineerings such as foundation ditch, side slope or deformation monitoring are common engineering projects.At present, technology commonly used is the tiltmeter test, is reference point with the earth formation deep point, calculates the distortion situation at each position of deviational survey pipe.Perhaps, adopting total powerstation to carry out ground deformation and measure, is reference point with certain point away from engineering rock mass, carries out long-term observation.Wherein, the reference point setting of tiltmeter is comparatively complicated, needs sometimes to pour into a mould with pile body; Being provided with of ground deformation datum marks such as total powerstation is simple, but only can satisfy the surface displacement or the deformation monitoring of rock soil mass
Summary of the invention
Reference point anchor in this technology is promptly holed is mainly used in foundation ditch or slope ground displacement body or deformation monitoring, and this anchor has made up the reference point of draw-wire displacement sensor in the stratum, to ensure the accuracy of displacement or deformation measurement data.Carry out the position of displacement or deformation monitoring at needs, adopt Luoyang Spade to form the boring of certain depth, prefabricated anchor is sent into the hole at the bottom of, the stretch-draw grouting behind shaft or drift lining can form the reference point that is fixed well.
The present invention adopts following technical scheme:
Reference point anchor in a kind of boring, comprise SDeflector 1, chute 2, PVC sleeve pipe 3; Support arm 4, interior pipe 5, catch 6, pin 7, traction steel wire 8, screw 9 is characterized in that: SDeflector 1 is connected with interior pipe 5, and outside the pipe 5, on the pipe 5, the other end was fixed on the PVC sleeve pipe 3 by the circle hoop in support arm 4 one ends were fixed in by the circle hoop in PVC sleeve pipe 3 was placed in.Interior pipe 5 has chute 2 near ends of SDeflectors, and PVC sleeve pipe 3 can slide at interior pipe chute 2 places.Catch 6 is positioned on the PVC sleeve pipe 3, catch 6 upper edge PVC sleeve pipes 3 axially grooved, and two screws 9 radially are fixed on it on PVC sleeve pipe, and are longitudinally-slidable, and catch 6 has traction steel wire 8 away from SDeflector 1 one ends system.Traction steel wire 8 passes by chute 2, pipe 5 in entering, and draw hell and be used for tractive.Pin 7 is positioned at 6 times close SDeflector 1 sides of catch, in the hole that insertion PVC sleeve pipe 3 and interior pipe 5 overlap PVC sleeve pipe 3 is fixed on the interior pipe 5, and the pin heelpiece has spring.
The using method of reference point anchor is as follows in a kind of the boring: after excavation is portalled, at the bottom of this device sent into the hole, the tension traction steel wire, catch endwisely slips along the PVC sleeve pipe, pin ejects, along sliding away from the guiding pommel, traction drives support arm and struts the PVC sleeve pipe along interior pipe, can strengthen the stable of reference point.Traction steel wire in being located in the pipe is fixed on the catch of anchor, under the protection of interior pipe, is connected with the rock soil mass surface probe, plays the effect of slotted line bar.
Compare with existing reference point anchor, the present invention can obtain following beneficial effect:
(1) device simple installation, the reference point steadiness is better;
(2) construction material obtains easily, and is with low cost.
Description of drawings
Fig. 1 forms synoptic diagram for reference point anchor in the boring;
Fig. 2 installs for reference point anchor in the boring and uses synoptic diagram;
Fig. 3 is reference point anchor support arm collapsed state structural drawing in the boring;
Fig. 4 is reference point anchor support arm softened state structural drawing in the boring;
Fig. 5 is reference point anchor sectional view in the boring;
Among the figure: 1, SDeflector, 2, chute, 3, the PVC sleeve pipe, 4, support arm, 5, interior pipe, 6, catch, 7, pin, 8, traction steel wire, 9, screw.
Embodiment
Be illustrated in figure 1 as in the boring reference point anchor and form synoptic diagram, comprise SDeflector 1, chute 2, PVC sleeve pipe 3; Support arm 4, interior pipe 5, catch 6, pin 7, traction steel wire 8, screw 9 is characterized in that: SDeflector 1 is connected with interior pipe 5, and outside the pipe 5, on the pipe 5, the other end was fixed on the PVC sleeve pipe 3 by the circle hoop in support arm 4 one ends were fixed in by the circle hoop in PVC sleeve pipe 3 was placed in.Interior pipe 5 has chute 2 near ends of SDeflectors, and PVC sleeve pipe 3 can slide at interior pipe chute 2 places.As shown in Figure 5, catch 6 is positioned on the PVC sleeve pipe 3, catch 6 upper edge PVC sleeve pipes 3 axially grooved, and two screws 9 radially are fixed on it on PVC sleeve pipe, and are longitudinally-slidable, and catch 6 has traction steel wire 8 away from SDeflector 1 one ends system.Traction steel wire 8 passes by chute 2, pipe 5 in entering, and draw hell and be used for tractive.Pin 7 is positioned at 6 times close SDeflector 1 sides of catch, in the hole that insertion PVC sleeve pipe 3 and interior pipe overlap PVC sleeve pipe 3 is fixed on the interior pipe 5, and the pin heelpiece has spring.
As shown in Figure 2, for reference point anchor in the hole of certain building foundation pit hole wall displacement monitoring engineering application example is installed.
Main implementation step is:
(1) adopt Luoyang Spade, nearly level (general about 10 °) is drawn and is dug boring, bore diameter 140mm, hole depth 15m.
(2) surface dust in the cleaning boring is standby.
(3) at ground assembling anchor, will penetrate traction steel wire in the pipe in the PVC, segmentation and anchor connect, and successively anchor are sent in the hole.
(4) after anchor is delivered at the bottom of the hole, the tension traction steel wire, pin ejects, and the PVC sleeve pipe is in free movement state, and strutted by traction drive support arm, and support arm is stuck on the hole wall.
(5) configuration cement grout, and at hole-bottom slurry-injection, the about 2m of slip casting segment length.
(6) maintenance is after 24 hours, and setting completed on schedule for the hole base.
Be illustrated in figure 3 as reference point anchor support arm collapsed state structural drawing in the boring of completing steps (3) back; Figure 4 shows that reference point anchor support arm softened state structural drawing in the boring of completing steps (4) back.

Claims (1)

1. reference point anchor in the boring, comprise SDeflector (1), chute (2), PVC sleeve pipe (3), support arm (4), interior pipe (5), catch (6), pin (7), traction steel wire (8), screw (9), it is characterized in that: SDeflector (1) is connected with interior pipe (5), PVC sleeve pipe (3) is placed in outside the interior pipe (5), support arm (4) one ends are fixed on the interior pipe (5) by the circle hoop, and the other end is fixed on the PVC sleeve pipe (3) by the circle hoop; Interior pipe (5) has chute (2) near an end of SDeflector, and PVC sleeve pipe (3) can be located to slide at interior pipe chute (2); Catch (6) is positioned on the PVC sleeve pipe (3), catch (6) upper edge PVC sleeve pipe (3) axially grooved, and two screws (9) radially are fixed on it on PVC sleeve pipe, and are longitudinally-slidable, and catch (6) has traction steel wire (8) away from SDeflector (1) one end system; Traction steel wire 8 passes by chute (2), enters interior pipe (5), and draws hell and be used for tractive; Pin (7) is positioned at close SDeflector (1) side under the catch (6), in the hole that insertion PVC sleeve pipe (3) and interior pipe (5) overlap PVC sleeve pipe (3) is fixed on the interior pipe (5), and pin (7) heelpiece has spring.
CN2010106085081A 2010-12-27 2010-12-27 An anchoring device of a datum mark in a boring Expired - Fee Related CN102183230B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010106085081A CN102183230B (en) 2010-12-27 2010-12-27 An anchoring device of a datum mark in a boring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010106085081A CN102183230B (en) 2010-12-27 2010-12-27 An anchoring device of a datum mark in a boring

Publications (2)

Publication Number Publication Date
CN102183230A true CN102183230A (en) 2011-09-14
CN102183230B CN102183230B (en) 2012-06-27

Family

ID=44569478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010106085081A Expired - Fee Related CN102183230B (en) 2010-12-27 2010-12-27 An anchoring device of a datum mark in a boring

Country Status (1)

Country Link
CN (1) CN102183230B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104792298A (en) * 2015-04-27 2015-07-22 北京工业大学 Embedded concrete strainometer
CN108507708A (en) * 2018-03-30 2018-09-07 西安科技大学 A kind of drilling in coal and rock stress measurement device and its measurement method
CN109029320A (en) * 2018-08-07 2018-12-18 安徽恒信建设工程管理有限公司 A kind of foundation pit displacement automatic monitoring system
CN110031894A (en) * 2019-04-26 2019-07-19 山东大学 A kind of tunnel seismic wave method advance geologic prediction sensor anchors installation casing automatically

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2337523Y (en) * 1998-08-04 1999-09-08 湛江市建筑工程集团公司深圳分公司 Aperture tester
CN1584245A (en) * 2004-06-03 2005-02-23 陆观宏 Roofbolt constructing method in civil engineering
US20050247488A1 (en) * 2004-03-17 2005-11-10 Mock Philip W Roller link toggle gripper and downhole tractor
CN2769847Y (en) * 2004-12-23 2006-04-05 北京中阔科技有限责任公司 Aperture detecting device
CN101071062A (en) * 2007-06-08 2007-11-14 中国矿业大学(北京) Deep-well drilling rock movement observation device and its rock movement surveying point mounting method
US20070272418A1 (en) * 2006-05-23 2007-11-29 Pierre Yves Corre Casing apparatus and method for casing or reparing a well, borehole, or conduit
CN202039804U (en) * 2010-12-27 2011-11-16 北京工业大学 An anchor device for a datum point in a drill hole

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2337523Y (en) * 1998-08-04 1999-09-08 湛江市建筑工程集团公司深圳分公司 Aperture tester
US20050247488A1 (en) * 2004-03-17 2005-11-10 Mock Philip W Roller link toggle gripper and downhole tractor
CN1584245A (en) * 2004-06-03 2005-02-23 陆观宏 Roofbolt constructing method in civil engineering
CN2769847Y (en) * 2004-12-23 2006-04-05 北京中阔科技有限责任公司 Aperture detecting device
US20070272418A1 (en) * 2006-05-23 2007-11-29 Pierre Yves Corre Casing apparatus and method for casing or reparing a well, borehole, or conduit
CN101071062A (en) * 2007-06-08 2007-11-14 中国矿业大学(北京) Deep-well drilling rock movement observation device and its rock movement surveying point mounting method
CN202039804U (en) * 2010-12-27 2011-11-16 北京工业大学 An anchor device for a datum point in a drill hole

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《工业建筑 增刊》 20071231 詹界东等 国内预应力CFRP筋(索)锚具的研发现状 第136-139页 1 , 2 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104792298A (en) * 2015-04-27 2015-07-22 北京工业大学 Embedded concrete strainometer
CN108507708A (en) * 2018-03-30 2018-09-07 西安科技大学 A kind of drilling in coal and rock stress measurement device and its measurement method
CN108507708B (en) * 2018-03-30 2020-10-23 西安科技大学 Coal rock drilling stress measuring device and measuring method thereof
CN109029320A (en) * 2018-08-07 2018-12-18 安徽恒信建设工程管理有限公司 A kind of foundation pit displacement automatic monitoring system
CN110031894A (en) * 2019-04-26 2019-07-19 山东大学 A kind of tunnel seismic wave method advance geologic prediction sensor anchors installation casing automatically
CN110031894B (en) * 2019-04-26 2021-04-13 山东大学 Automatic anchoring installation sleeve for advanced geological prediction sensor by tunnel seismic wave method

Also Published As

Publication number Publication date
CN102183230B (en) 2012-06-27

Similar Documents

Publication Publication Date Title
CN102162234B (en) Device and method for monitoring surface displacement of rock-soil body in real time
CN102995615B (en) A kind of method of real-time for underground deep layer land movement
CN102878893B (en) Landslide depth displacement monitoring system and method
CN105019485B (en) A kind of excavation of foundation pit dead load test on pile foundation detection method
CN108413928A (en) A kind of soil body delaminating deposition amount monitoring system
CN204421889U (en) Ground layering perpendicular displacement monitoring device
CN104596405B (en) Rain dirty pipe deforming contact real-time monitoring device and method on ground
CN102183230B (en) An anchoring device of a datum mark in a boring
CN109709308A (en) One kind adopting water type ground fissure physical model test device and test method
CN102808429B (en) Pile foundation soaking load test method based on creep-strain separation
CN103966993B (en) Body frost heaving pick-up unit and detection body frost heaving metering method
CN106643649B (en) Device and method for measuring deep settlement and pore water pressure of soil body
CN102797268B (en) Installation method for testing tube used for testing internal force of pre-stress tubular pile with slide micrometer
CN204924522U (en) A moment of torsion detection device for revolving dig rig unit head
CN203021982U (en) Underground deep soil displacement real-time monitor system
CN202925575U (en) Pre-buried structure for core-drilling detection of foundation pile
CN202073083U (en) Real-time monitoring device for surface displacement of rock soil body
CN202039804U (en) An anchor device for a datum point in a drill hole
CN107063178B (en) Concrete leveling markstone with displacement sensor and elevation observation and calculation method thereof
CN102278975B (en) Non-contact soft soil large deformation displacement meter
CN201526309U (en) Underground hydrological observation hole
CN103851984A (en) Multipoint displacement meter capable of artificial measurement, electric measurement or remote measurement and mounting and application method
CN114016489A (en) Datum point fixing device for settlement monitoring
CN204000823U (en) A kind of earth pressure gauge ejects erector
CN203657778U (en) Multipoint separation layer value monitoring and measuring device of roadway surrounding rock body

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120627

Termination date: 20121227