CN102182459A - 一种柔性掩护支架采煤法双翼工作面剩余三角煤回采方法 - Google Patents

一种柔性掩护支架采煤法双翼工作面剩余三角煤回采方法 Download PDF

Info

Publication number
CN102182459A
CN102182459A CN2011100809648A CN201110080964A CN102182459A CN 102182459 A CN102182459 A CN 102182459A CN 2011100809648 A CN2011100809648 A CN 2011100809648A CN 201110080964 A CN201110080964 A CN 201110080964A CN 102182459 A CN102182459 A CN 102182459A
Authority
CN
China
Prior art keywords
coal
face
shield support
return
former
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100809648A
Other languages
English (en)
Other versions
CN102182459B (zh
Inventor
秦云文
李正军
符明华
陈建国
陈功明
熊佰林
刘富安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN HUAYINGSHAN COAL CO Ltd LIZIYA SOUTH COAL MINE
Original Assignee
SICHUAN HUAYINGSHAN COAL CO Ltd LIZIYA SOUTH COAL MINE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN HUAYINGSHAN COAL CO Ltd LIZIYA SOUTH COAL MINE filed Critical SICHUAN HUAYINGSHAN COAL CO Ltd LIZIYA SOUTH COAL MINE
Priority to CN 201110080964 priority Critical patent/CN102182459B/zh
Publication of CN102182459A publication Critical patent/CN102182459A/zh
Application granted granted Critical
Publication of CN102182459B publication Critical patent/CN102182459B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

本发明公开了一种柔性掩护支架采煤法双翼工作面剩余三角煤回采方法,包括以下步骤:a、停止采煤作业;b、废弃集中回风石门;c、连接掩护支架;d、建立回风系统;e、回采;f、回拆掩护支架。本发明能有效的减少矿井煤炭资源的浪费,提高煤炭回收率,每个三角煤回收煤炭约6500吨以上,创造经济价值390万元。

Description

一种柔性掩护支架采煤法双翼工作面剩余三角煤回采方法
技术领域
本发明涉及一种采煤方法,特别涉及一种柔性掩护支架采煤法双翼工作面剩余三角煤回采方法。
背景技术
采用柔性掩护支架采煤方法以来,一般工作面的布置均采用对拉式相向而采,每个区段两个相向而采的工作面回采完以后,均遗留下三角煤没有回采,在掩护支架回拆完毕和巷道支架回拆完毕后,该三角煤的煤炭资源就白白浪费无法回采,按煤厚1.8米、工作面长度90米计算,每一个三角煤丢失的煤炭储量约6500吨,价值约390万元。
发明内容
本发明的目的就是针对现有技术的不足,提供一种能安全回采三角煤,减少了煤炭资源浪费的柔性掩护支架采煤法双翼工作面剩余三角煤回采方法。
为实现上述目的,本发明采用如下技术方案:
一种柔性掩护支架采煤法双翼工作面剩余三角煤回采方法,其特征在于包括以下步骤:
a、停止采煤作业
当右翼采煤工作面采煤至距离集中回风石门还有5米时,即到达右翼采止线时,停止采煤作业,保留该工作面的掩护支架,保留由运输机巷、集中回风石门、运输石门、采区煤仓构成的原采煤工作面的运输通道;节约了因新开凿运输通道和回风通道的施工量,提高了经济效益。
b、废弃集中回风石门
当与右翼采煤工作面相向的左冀采煤工作面采煤至距离集中回风石门还有5米时,即到达左冀采止线时,停止采煤作业,废弃集中回风石门;
c、连接掩护支架
将右翼采煤工作面和左冀采煤工作面的掩护支架连接在一起,以左冀采煤工作面作为回采工作面,以原右翼采煤工作面作为新的回风通道;当回采三角煤时,就不需要在工作面上端安装掩护支架,减少了设备和材料的投入,节省了人工费,提高了经济效益;
d、建立回风系统
在原运输机巷与已形成的下一区段回风巷之间开凿回风联络巷,使原运输机巷与下一区段回风巷连通,形成新的回风系统,并调整好新的回风系统,使新的回风系统畅通;充分利用了原有巷道和回风系统作为新回风系统,节约了成本;
e、回采
调整好通风系统后,按原柔性掩护支架采煤法左冀采煤工作面回采煤炭,并将回采的煤炭下到原运输机巷,通过集中进风、运输石门用运输机运至采区煤仓;充分利用了原有实施、设备,降低了成本,提高了经济效益。
f、回拆掩护支架
随着左冀采煤工作面的不断沿工作面走向推进,右翼采煤工作面的掩护支架逐渐被拉到左冀采煤工作面,在运输机巷按原柔性掩护支架采煤法回拆掩护支架,直至回采完该双翼工作面剩余三角煤。减少了原柔性掩护支架采煤法需在工作面上安装掩护支架的工序,节约了成本;
优选的,在所述步骤c中,将两翼工作面掩护支架的连接钢绳由20M替换为6米长,钢绳的搭接长度为2米,搭接处至少使用7付绳卡搭接钢绳,不用压板压实,一根6米长的钢绳连接绳卡不得少于14付,将两个工作面的掩护支架9连接在一起,同时在掩护支架的后背铺设双层金属锚网。将连接钢绳20米替换为6米长,在运输机巷回拆掩护支架时更为方便,在掩护支架的后背铺设双层金属锚网能有效防止小块矸石从掩护支架缝隙掉漏,提高了操作人员的安全性。
优选的,所述步骤d中,在回风联络巷与集中进风、运输石门之间设有风门。便于人员、材料通过和调节风量。
本发明一种柔性掩护支架采煤法双翼工作面剩余三角煤回采方法的有益效果是,该技术改进后,能有效的减少矿井煤炭资源的浪费,提高煤炭回收率,每个三角煤回收煤炭约6500吨以上,创造经济价值390万元。
附图说明
图1是本发明柔性掩护支架采煤法双翼工作面至采止线时示意图;
图2是本发明双翼工作面至采止线时通风系统示意图;
图3是本发明柔性掩护支架三角采煤法立面布置示意图;
图4是本发明柔性掩护支架三角采煤法通风系统示意图;
图5是本发明回拆掩护支架的钢绳的搭接示意图。
具体实施方式
下面结合附图对本发明作进一步的说明,但并不因此将本发明限制在所述的实施例范围之中。
参见图1、图2、图3、图4、图5,一种柔性掩护支架采煤法双翼工作面剩余三角煤回采方法,其特征在于包括以下步骤:
a、停止采煤作业
当右翼采煤工作面1采煤至距离集中回风石门3还有5米时,即到达右翼采止线时,停止采煤作业,保留该工作面的掩护支架9,保留由运输机巷4、集中回风石门3、运输石门7、采区煤仓8构成的原采煤工作面1的运输通道;
b、废弃集中回风石门
当与右翼采煤工作面1相向的左冀采煤工作面2采煤至距离集中回风石门3还有5米时,即到达左冀采止线时,停止采煤作业,废弃集中回风石门3;
c、连接掩护支架
将右翼采煤工作面1和左冀采煤工作面2的掩护支架9将两翼工作面掩护支架9的连接钢绳10由20米替换为6米长,钢绳的搭接长度为2米,搭接处至少使用7付绳卡搭接钢绳,不用压板压实,一根6M长的钢绳连接绳卡不得少于14付,将两个工作面的掩护支架连接在一起,同时在掩护支架的后背铺设双层金属锚网,以左冀采煤工作面2作为回采工作面,以原右翼采煤工作面1作为新的回风通道;
d、建立回风系统
在原运输机巷4与已形成的下一区段回风巷5之间开凿回风联络巷6,使原运输机巷4与下一区段回风巷5连通,形成新的回风系统,并调整好新的回风系统,使新的回风系统畅通;在回风联络巷6与集中进风、运输石门7之间还设有风门11;
e、回采
调整好通风系统后,按原柔性掩护支架采煤法左冀采煤工作面2回采煤炭,并将回采的煤炭下到原运输机巷4,通过集中进风、运输石门7用运输机运至采区煤仓8;
f、回拆掩护支架
随着左冀采煤工作面2的不断沿工作面走向推进,右翼采煤工作面1的掩护支架9逐渐被拉到左冀采煤工作面2,在运输机巷4按原柔性掩护支架采煤法回拆掩护支架,直至回采完该双翼工作面剩余三角煤。
所述步骤d中,在回风联络巷6与集中进风、运输石门7之间设有风门11。
虽然结合附图描述了本发明的实施方式,但本领域的普通技术人员可以在所附权利要求的范围内做出各种变形或修改。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。

Claims (3)

1.一种柔性掩护支架采煤法双翼工作面剩余三角煤回采方法,其特征在于包括以下步骤:
a)、停止采煤作业
当右翼采煤工作面(1)采煤至距离集中回风石门(3)还有5米时,即到达右翼采止线时,停止采煤作业,保留该工作面的掩护支架(9),保留由运输机巷(4)、集中回风石门(3)、运输石门(7)、采区煤仓(8)构成的原采煤工作面(1)的运输通道;
b)、废弃集中回风石门
当与右翼采煤工作面(1)相向的左冀采煤工作面(2)采煤至距离集中回风石门(3)还有5米时,即到达左冀采止线时,停止采煤作业,废弃集中回风石门(3);
c)、连接掩护支架
将右翼采煤工作面(1)和左冀采煤工作面(2)的掩护支架(9)连接在一起,以左冀采煤工作面(2)作为回采工作面,以原右翼采煤工作面(1)作为新的回风通道;
d)、建立回风系统
在原运输机巷(4)与已形成的下一区段回风巷(5)之间开凿回风联络巷(6),使原运输机巷(4)与下一区段回风巷(5)连通,形成新的回风系统,并调整好新的回风系统,使新的回风系统畅通;
e)、回采
调整好通风系统后,按原柔性掩护支架采煤法左冀采煤工作面(2)回采煤炭,并将回采的煤炭下到原运输机巷(4),通过集中进风、运输石门(7)用运输机运至采区煤仓(8);
f)、回拆掩护支架
随着左冀采煤工作面(2)的不断沿工作面走向推进,右翼采煤工作面(1)的掩护支架(9)逐渐被拉到左冀采煤工作面(2),在运输机巷(4)按原柔性掩护支架采煤法回拆掩护支架,直至回采完该双翼工作面剩余三角煤。
2.根据权利要求1所述的柔性掩护支架采煤法双翼工作面剩余三角煤回采方法,其特征在于:在所述步骤c中,将两翼工作面掩护支架(9)的连接钢绳(10)由20米替换为6米长,钢绳的搭接长度为2米,搭接处至少使用7付绳卡搭接钢绳,将两个工作面的掩护支架连接在一起,同时在掩护支架(9)的后背铺设双层金属锚网。
3.根据权利要求1所述的柔性掩护支架采煤法双翼工作面剩余三角煤回采方法,其特征在于:所述步骤d中,在回风联络巷(6)与集中进风、运输石门(7)之间设有风门(11)。
CN 201110080964 2011-04-01 2011-04-01 一种柔性掩护支架采煤法双翼工作面剩余三角煤回采方法 Expired - Fee Related CN102182459B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110080964 CN102182459B (zh) 2011-04-01 2011-04-01 一种柔性掩护支架采煤法双翼工作面剩余三角煤回采方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110080964 CN102182459B (zh) 2011-04-01 2011-04-01 一种柔性掩护支架采煤法双翼工作面剩余三角煤回采方法

Publications (2)

Publication Number Publication Date
CN102182459A true CN102182459A (zh) 2011-09-14
CN102182459B CN102182459B (zh) 2013-05-08

Family

ID=44568737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110080964 Expired - Fee Related CN102182459B (zh) 2011-04-01 2011-04-01 一种柔性掩护支架采煤法双翼工作面剩余三角煤回采方法

Country Status (1)

Country Link
CN (1) CN102182459B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103967492A (zh) * 2014-04-14 2014-08-06 山西晋城无烟煤矿业集团有限责任公司 一种直角三角形边角煤柱回收方法
CN110295902A (zh) * 2019-06-14 2019-10-01 龙口矿业集团有限公司 一种煤与油页岩同采工作面撤面架后敷设风筒布的方法
CN111622759A (zh) * 2020-06-03 2020-09-04 中煤能源研究院有限责任公司 一种双巷条带式三角煤开采方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5265941A (en) * 1992-08-20 1993-11-30 Tamrock World Corporation, N.V. Underground mining system and method for developing longwall panel
US20020096934A1 (en) * 2001-01-23 2002-07-25 Cutting Edge Technology Pty Ltd Mining machine and method of mining
CN1657745A (zh) * 2005-03-03 2005-08-24 开滦(集团)有限责任公司 急倾斜厚煤层的采煤方法
CN101025085A (zh) * 2007-03-28 2007-08-29 闫振东 一种煤矿井下复采回采煤的方法
CN101302931A (zh) * 2008-06-25 2008-11-12 闫振东 一种仓房采煤后的复采和边角煤回采的方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5265941A (en) * 1992-08-20 1993-11-30 Tamrock World Corporation, N.V. Underground mining system and method for developing longwall panel
US20020096934A1 (en) * 2001-01-23 2002-07-25 Cutting Edge Technology Pty Ltd Mining machine and method of mining
CN1657745A (zh) * 2005-03-03 2005-08-24 开滦(集团)有限责任公司 急倾斜厚煤层的采煤方法
CN101025085A (zh) * 2007-03-28 2007-08-29 闫振东 一种煤矿井下复采回采煤的方法
CN101302931A (zh) * 2008-06-25 2008-11-12 闫振东 一种仓房采煤后的复采和边角煤回采的方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
戴炳旺: "双层柔性掩护支架采煤法在厚煤层开采中的运用", 《江西煤炭科技》, no. 01, 15 February 2011 (2011-02-15), pages 30 - 31 *
李俊斌: "掩护支架采煤法若干技术问题探讨", 《煤炭工程》, no. 07, 20 July 2004 (2004-07-20), pages 23 - 25 *
马增续等: "回收三角煤增加回采率在新立矿中的应用", 《西部探矿工程》, no. 11, 25 November 2006 (2006-11-25), pages 61 - 62 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103967492A (zh) * 2014-04-14 2014-08-06 山西晋城无烟煤矿业集团有限责任公司 一种直角三角形边角煤柱回收方法
CN110295902A (zh) * 2019-06-14 2019-10-01 龙口矿业集团有限公司 一种煤与油页岩同采工作面撤面架后敷设风筒布的方法
CN111622759A (zh) * 2020-06-03 2020-09-04 中煤能源研究院有限责任公司 一种双巷条带式三角煤开采方法

Also Published As

Publication number Publication date
CN102182459B (zh) 2013-05-08

Similar Documents

Publication Publication Date Title
CN107387084B (zh) 一种沿空留巷减少切顶深度的施工方法
CN101769158B (zh) 掘护锚一体化成套设备
WO2021219130A1 (zh) 煤与瓦斯突出矿井110工法开采的立体通风方法及系统
CN105298496B (zh) 设置预留工作面煤柱的全采全充采煤方法
CN103104260B (zh) 复杂地质条件下综—机对拉面采煤方法
CN104912557A (zh) 高效薄煤层成套采煤设备及采煤方法
CN110700831A (zh) 一种智能开采条件下的煤矿生产系统
CN104373126A (zh) 一种钻采法矸石充填方法及设备
US11994027B2 (en) Dendritic reverse underground mining method for thin coal seam at end slope of strip mine
CN104653182A (zh) 一种含厚夹矸煤层煤矸分采的采煤方法
CN111946345A (zh) 特厚硬煤下分层的综放回采方法
CN104196554A (zh) 一种采煤工作面u-u型通风方法及通风系统
US20210254465A1 (en) Method for radially mining open-pit end slope pressed coal
CN102877848B (zh) 采煤与矸石胶结条带充填同步进行方法
CN102865082A (zh) 煤矿t型巷道直角拐弯快速施工方法
CN102182459B (zh) 一种柔性掩护支架采煤法双翼工作面剩余三角煤回采方法
CN108590754A (zh) 一种单斜煤层采区集中泄水巷布置方法
CN108412531A (zh) 一种急倾斜厚煤层综采放顶煤的z型回风设备及方法
CN104329117B (zh) 一种综合机械化充填采煤切眼设备安装方法
CN105240012A (zh) 一种实现煤柱同采的f型区段采煤方法
CN105240016A (zh) 缓倾斜薄层状玉石矿矿块切割条带拖曳充填采矿方法
CN205036376U (zh) 一种井工煤矿巷邦无人工作面
CN111997614B (zh) 前进式综采工作面绕行薄煤带的方法
CN201599055U (zh) 井下用煤炭装载输送复合装置
CN101338675A (zh) 露天矿边帮下压覆有益矿物露井联合开采方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130508