CN102182205B - A kind of construction process for single-pile wind turbine foundation in intertidal zone - Google Patents

A kind of construction process for single-pile wind turbine foundation in intertidal zone Download PDF

Info

Publication number
CN102182205B
CN102182205B CN201110128780.4A CN201110128780A CN102182205B CN 102182205 B CN102182205 B CN 102182205B CN 201110128780 A CN201110128780 A CN 201110128780A CN 102182205 B CN102182205 B CN 102182205B
Authority
CN
China
Prior art keywords
pile
foundation
hammer
ship
verticality
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110128780.4A
Other languages
Chinese (zh)
Other versions
CN102182205A (en
Inventor
张钢
高宏飙
张乐平
陈强
李泽
张海生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU LONGYUAN ZHENHUA MARINE ENGINEERING CO LTD
Jiangsu Marine Longyuan Wind Power Generation Co Ltd
Original Assignee
JIANGSU LONGYUAN ZHENHUA MARINE ENGINEERING CO LTD
Jiangsu Marine Longyuan Wind Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU LONGYUAN ZHENHUA MARINE ENGINEERING CO LTD, Jiangsu Marine Longyuan Wind Power Generation Co Ltd filed Critical JIANGSU LONGYUAN ZHENHUA MARINE ENGINEERING CO LTD
Priority to CN201110128780.4A priority Critical patent/CN102182205B/en
Publication of CN102182205A publication Critical patent/CN102182205A/en
Application granted granted Critical
Publication of CN102182205B publication Critical patent/CN102182205B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Wind Motors (AREA)

Abstract

The invention discloses a kind of construction process for single-pile wind turbine foundation in intertidal zone, it comprises the following steps: station keeping ship, cargo ship and crane ship are dragged to appointed place by high water time; Crane ship to be cast anchor location; Foundation pile level is lifted; By foundation pile staking out; Foundation columns is sent into pile gripper; Adjustment foundation pile verticality; Foundation pile is drowned oneself; Verticality checks, if do not met, re-starts foundation pile and drowns oneself; Remove suspension centre; Pile hammer, hammer are sling; Start hydraulic impact hammer dynamical system; Jump bit is beaten; Verticality checks, if verticality does not meet, then adjusts jump bit and beats; Impact pile sinking; Absolute altitude, degree of pouring into are measured, if absolute altitude, degree of pouring into do not meet, then the step of pile sinking is impacted in adjustment; Stop hammer; Crane ship unloads.The present invention has following beneficial effect: solve region, intertidal zone blower foundation construction effective operation time short, the problem that construction efficiency is low, greatly reduces construction cost.

Description

A kind of construction process for single-pile wind turbine foundation in intertidal zone
Technical field
The present invention relates to blower foundation construction technology, particularly relate to a kind of construction process for single-pile wind turbine foundation in intertidal zone.
Background technology
Intertidal zone is between the high and low tidal level of spring tide, the area being submerged with tiding and exposing.According to preresearch estimates, intertidal zone annual mean wind speed can reach 67 meter per seconds, therefore possesses utilizable wind energy in intertidal zone.For intertidal belt wind electric engineering, it is mainly concerned with the construction of blower foundation and how installs blower fan.
For blower foundation construction technology, there are two kinds of techniques at present.One is single pile blower foundation construction technology, and another kind is pile type foundation construction technology.For single pile blower foundation construction technology, intertidal zone fan basis single pile construction technology has following different compared with conventional construction technique: adopt the steel pipe pile of diameter greatly between 4.5-5.5 rice as blower foundation in intertidal zone; And conventional blower basis all adopts 1.2-2 rice diameter steel pipe pile.The way of the supporting diesel hammer of the pile driving barge adopted in conventional blower foundation construction or hydraulic hammer, shipping draft is comparatively dark, and in intertidal zone, construction efficiency is low.
Therefore, need to provide a kind of construction process for single-pile wind turbine foundation in intertidal zone to solve the problem.
Summary of the invention
In order to solve this problem, the invention discloses a kind of construction process for single-pile wind turbine foundation in intertidal zone, described construction technology comprises the following steps:
(1) station keeping ship, cargo ship and crane ship are dragged to appointed place by high water time;
(2) crane ship to be cast anchor location;
(3) foundation pile level is lifted;
(4) by foundation pile staking out;
(5) foundation columns is sent into pile gripper;
(6) foundation pile verticality is adjusted;
(7) foundation pile is drowned oneself;
(8) verticality inspection, if do not met, re-starts foundation pile and drowns oneself;
(9) suspension centre is removed;
(10) pile hammer, hammer are sling;
(11) hydraulic impact hammer dynamical system is started;
(12) jump bit is beaten;
(13) verticality inspection, if verticality does not meet, then adjusts jump bit and beats;
(14) pile sinking is impacted;
(15) absolute altitude, degree of pouring into are measured, if absolute altitude, degree of pouring into do not meet, then the step of pile sinking is impacted in adjustment;
(16) hammer is stopped;
(17) crane ship unloads.
Preferably, above-mentioned steps (4) is further comprising the steps:
Wire rope is connected on pile body;
Gib head is slowly raised, receives luffing simultaneously, rotate crane barge, control pile body and reverse;
When close on sling time, rotate crane barge to set-up positions;
Pile body is sling.
The present invention has following beneficial effect: solve region, intertidal zone blower foundation construction effective operation time short, the problem that construction efficiency is low, greatly reduces construction cost.
In summary of the invention part, introduce the concept of a series of reduced form, this will further describe in detailed description of the invention part.Content part of the present invention does not also mean that the key feature and essential features that will attempt to limit technical scheme required for protection, does not more mean that the protection domain attempting to determine technical scheme required for protection.
Below in conjunction with accompanying drawing, describe advantages and features of the invention in detail.
Accompanying drawing explanation
Fig. 1 is the flow chart of construction process for single-pile wind turbine foundation in intertidal zone according to an embodiment of the invention;
Fig. 2 is the location schematic diagram of crane ship;
Fig. 3 is schematic diagram foundation pile being winched to beach face;
Fig. 4 shows and rotates foundation pile with the schematic diagram preparing staking out;
Fig. 5 a-5d shows the procedure chart of staking out;
Fig. 6 is schematic diagram foundation pile being hung in pile gripper;
Fig. 7 is the schematic diagram that piling hammers stake top.
Detailed description of the invention
In the following description, a large amount of concrete details is given to provide more thorough understanding of the invention.But, it will be apparent to one skilled in the art that the present invention can be implemented without the need to these details one or more.In other example, in order to avoid obscuring with the present invention, technical characteristics more well known in the art are not described.
In order to thoroughly understand the present invention, by following description, detailed structure is proposed.Obviously, execution of the present invention is not limited to the specific details that those skilled in the art has the knack of.Preferred embodiment of the present invention is described in detail as follows, but except these are described in detail, the present invention can also have other embodiments.
Below in conjunction with accompanying drawing, embodiments of the invention are described in detail.
With reference to figure 1, it is the flow chart of construction process for single-pile wind turbine foundation in intertidal zone according to an embodiment of the invention.Construction process for single-pile wind turbine foundation in intertidal zone of the present invention comprises the following steps:
(1) station keeping ship, cargo ship and crane ship are dragged to appointed place by high water time;
(2) crane ship to be cast anchor location;
(3) foundation pile level is lifted, such as, lifted by the loop wheel machine on wherein ship;
(4) by foundation pile staking out;
(5) foundation columns is sent into pile gripper, this pile gripper is arranged on station keeping ship;
(6) foundation pile verticality is adjusted;
(7) foundation pile is drowned oneself;
(8) verticality inspection, if do not met, re-starts foundation pile and drowns oneself;
(9) suspension centre is removed;
(10) pile hammer, hammer are sling;
(11) hydraulic impact hammer dynamical system is started;
(12) jump bit is beaten;
(13) verticality inspection, if verticality does not meet, then adjusts jump bit and beats;
(14) pile sinking is impacted;
(15) absolute altitude, degree of pouring into are measured, if absolute altitude, degree of pouring into do not meet, then the step of pile sinking is impacted in adjustment;
(16) hammer is stopped;
(17) crane ship unloads.
With reference to figure 2, it is the location schematic diagram of crane ship.Illustrated therein is cargo ship 100, the foundation pile 110 on cargo ship 100, crane ship 200, the loop wheel machine 210 on crane ship 200, station keeping ship 300, the pile gripper 310 on station keeping ship 300.
Fig. 3 is schematic diagram foundation pile being winched to beach face.As can be seen from the figure, the foundation pile 110 on cargo ship 100 is winched to beach face by the loop wheel machine 210 on crane ship 200.
Fig. 4 shows and rotates foundation pile to prepare staking out.13 degree are rotated to prepare staking out after foundation pile being hung beach face.
Fig. 5 a-5d shows the procedure chart of staking out.In fig 5 a, wire rope is connected on pile body; In Fig. 5 b, gib head is slowly raised, receive luffing simultaneously, rotate crane barge, control pile body and reverse; In fig. 5 c, when close on sling time, rotate crane barge to set-up positions; In figure 5d, pile body is sling.
Fig. 6 is schematic diagram foundation pile being hung in pile gripper.
Fig. 7 is the schematic diagram that piling hammers stake top.Illustrated therein is hydraulic impact hammer 400.
The present invention has following beneficial effect: solve region, intertidal zone blower foundation construction effective operation time short, the problem that construction efficiency is low, greatly reduces construction cost.
The present invention is illustrated by above-described embodiment, but should be understood that, above-described embodiment just for the object of illustrating and illustrate, and is not intended to the present invention to be limited in described scope of embodiments.In addition it will be appreciated by persons skilled in the art that the present invention is not limited to above-described embodiment, more kinds of variants and modifications can also be made according to instruction of the present invention, within these variants and modifications all drop on the present invention's scope required for protection.Protection scope of the present invention defined by the appended claims and equivalent scope thereof.

Claims (1)

1. a construction process for single-pile wind turbine foundation in intertidal zone, is characterized in that, described construction technology comprises the following steps:
(1) station keeping ship, cargo ship and crane ship are dragged to appointed place by high water time;
(2) crane ship to be cast anchor location;
(3) foundation pile level is lifted;
(4) by foundation pile staking out;
(5) foundation columns is sent into pile gripper;
(6) foundation pile verticality is adjusted;
(7) foundation pile is drowned oneself;
(8) verticality inspection, if do not met, re-starts foundation pile and drowns oneself;
(9) suspension centre is removed;
(10) pile hammer, hammer are sling;
(11) hydraulic impact hammer dynamical system is started;
(12) jump bit is beaten;
(13) verticality inspection, if verticality does not meet, then adjusts jump bit and beats;
(14) pile sinking is impacted;
(15) absolute altitude, degree of pouring into are measured, if absolute altitude, degree of pouring into do not meet, then the step of pile sinking is impacted in adjustment;
(16) hammer is stopped;
(17) crane ship unloads;
Described step (4) is further comprising the steps:
Wire rope is connected on pile body;
Gib head is slowly raised, receives luffing simultaneously, rotate crane barge, control pile body and reverse;
When close on sling time, rotate crane barge to set-up positions;
Pile body is sling.
CN201110128780.4A 2011-05-18 2011-05-18 A kind of construction process for single-pile wind turbine foundation in intertidal zone Active CN102182205B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110128780.4A CN102182205B (en) 2011-05-18 2011-05-18 A kind of construction process for single-pile wind turbine foundation in intertidal zone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110128780.4A CN102182205B (en) 2011-05-18 2011-05-18 A kind of construction process for single-pile wind turbine foundation in intertidal zone

Publications (2)

Publication Number Publication Date
CN102182205A CN102182205A (en) 2011-09-14
CN102182205B true CN102182205B (en) 2015-09-02

Family

ID=44568482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110128780.4A Active CN102182205B (en) 2011-05-18 2011-05-18 A kind of construction process for single-pile wind turbine foundation in intertidal zone

Country Status (1)

Country Link
CN (1) CN102182205B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425167B (en) * 2011-11-25 2013-10-30 天津港航工程有限公司 Pile sinking method for driving large-diameter steel pipe pile in intertidal zone
CN103183108A (en) * 2011-12-30 2013-07-03 上海振华重工(集团)股份有限公司 Ocean wind power mounting ship
CN103183109A (en) * 2011-12-30 2013-07-03 上海振华重工(集团)股份有限公司 Ocean wind power mounting platform
CN102587378B (en) * 2012-03-26 2014-04-16 江苏龙源振华海洋工程有限公司 Perpendicularity error correction technique for hydraulic impact driving of single pipe pile on sea intertidal zone
CN103215956B (en) * 2013-04-03 2015-04-22 江苏龙源振华海洋工程有限公司 Multi-pile pile gripper and multi-pile guide pipe frame foundation construction method for shallow wind power farm
CN103661827A (en) * 2013-12-27 2014-03-26 天津港航工程有限公司 Installation system and construction method of wind turbine assembly in sea intertidal zone
CN104727336A (en) * 2015-03-09 2015-06-24 江苏龙源振华海洋工程有限公司 Construction method of large single-pipe pile foundation of shallow-sea wind power plant
CN105064427B (en) * 2015-07-15 2017-03-01 三一重型能源装备有限公司 A kind of offshore wind turbine and its levelling device
CN105649080A (en) * 2015-12-31 2016-06-08 中交第三航务工程局有限公司宁波分公司 Single-pile pile sinking method
CN107217681A (en) * 2017-06-26 2017-09-29 中国水电建设集团如东新能源有限公司 A kind of intertidal zone fan platform construction method
CN108797589B (en) * 2018-06-08 2020-05-19 江苏海上龙源风力发电有限公司 Energy-gathered blasting demolition process for offshore wind power steel structure single-pile foundation in intertidal zone
CN109208596A (en) * 2018-11-06 2019-01-15 江苏龙源振华海洋工程有限公司 One word of one kind turns over technique
CN112982399A (en) * 2021-02-05 2021-06-18 保利长大工程有限公司 Pile sinking construction method for fixed-arm type frame crane ship

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101538844A (en) * 2009-04-21 2009-09-23 江苏东电新能源科技工程有限公司 Construction method for building large-scale offshore wind farm with depth more than 2m
CN101768978A (en) * 2010-01-29 2010-07-07 天津大学 At-sea wind generation unit foundation formed by barrel type foundation and mooring rope anchor
CN101778757A (en) * 2008-08-28 2010-07-14 三菱重工业株式会社 Construction method and construction rig of floating wind turbine generator
CN101812849A (en) * 2010-04-02 2010-08-25 中国海洋石油总公司 Offshore single-pile base structure and installation method thereof
JP4575061B2 (en) * 2004-07-23 2010-11-04 第一建設機工株式会社 Construction method for offshore wind power generation facilities

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4575061B2 (en) * 2004-07-23 2010-11-04 第一建設機工株式会社 Construction method for offshore wind power generation facilities
CN101778757A (en) * 2008-08-28 2010-07-14 三菱重工业株式会社 Construction method and construction rig of floating wind turbine generator
CN101538844A (en) * 2009-04-21 2009-09-23 江苏东电新能源科技工程有限公司 Construction method for building large-scale offshore wind farm with depth more than 2m
CN101768978A (en) * 2010-01-29 2010-07-07 天津大学 At-sea wind generation unit foundation formed by barrel type foundation and mooring rope anchor
CN101812849A (en) * 2010-04-02 2010-08-25 中国海洋石油总公司 Offshore single-pile base structure and installation method thereof

Also Published As

Publication number Publication date
CN102182205A (en) 2011-09-14

Similar Documents

Publication Publication Date Title
CN102182205B (en) A kind of construction process for single-pile wind turbine foundation in intertidal zone
JP4575061B2 (en) Construction method for offshore wind power generation facilities
CN101538844B (en) Construction method for building large-scale offshore wind farm with depth more than 2m
CN111493006B (en) Device for preventing basic scour by utilizing fishing net in offshore wind farm
CN105836062B (en) Open side type platform wind generator
CN205917727U (en) Marine fan of implanted inlays rock single pile basis
JP2003293938A (en) Construction method of wind power generating device
KR20130123040A (en) A cap for protecting foundation scouring for offshore wind turbine
CN111469993A (en) Self-installation floating type fan foundation anchored by bucket foundation and self-installation method
CN101565091A (en) Installation equipment of above-water wind generator and construction method thereof
CN211646450U (en) Offshore wind power single pile-wing plate-rockfill composite foundation
CN103981867A (en) Piling limiting frame for intertidal zone offshore wind power foundation pile sinking and construction method thereof
JP3230883U (en) Combined single pile foundation structure for offshore wind power generation
CN102041813A (en) Offshore wind generator single pile base structure with stabilizer fin
CN205917719U (en) Marine anemometer tower of multi -bucket negative -pressure barrel formula
CN113279425A (en) Offshore wind power single-pile composite novel cylindrical foundation with wings and construction method thereof
CN201713827U (en) Fan base structure of offshore wind power station
CN108951593A (en) Offshore wind turbine installation system and installation method based on four barrels of jacket composite foundations
CN103195080B (en) Towing method for gravity foundation
CN107795438B (en) A kind of construction method of assistance platform
CN201915419U (en) Single-pile foundation structure with stabilizing wings for offshore wind turbine
CN103088801A (en) One-step integral installation platform for offshore wind turbine and pile foundation
CN202832993U (en) Intertidal zone large-capacity wind generating set hoisting system
CN105443311B (en) It is fixed on water-bed tidal current energy generating equipment
CN204226097U (en) Be fixed on water-bed tidal current energy generating equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant