CN102182186B - 水冲助沉系统及施工技术方法 - Google Patents
水冲助沉系统及施工技术方法 Download PDFInfo
- Publication number
- CN102182186B CN102182186B CN2011101091273A CN201110109127A CN102182186B CN 102182186 B CN102182186 B CN 102182186B CN 2011101091273 A CN2011101091273 A CN 2011101091273A CN 201110109127 A CN201110109127 A CN 201110109127A CN 102182186 B CN102182186 B CN 102182186B
- Authority
- CN
- China
- Prior art keywords
- water
- pile
- stake
- sinking
- pile body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
一种水冲助沉施工系统,在预制桩桩身内预埋有两根射水管一根空气管,两根射水管进水端连接快速接头再连接双台水泵,在桩身侧壁有三个外排孔与桩芯连通;桩尖为用钢板焊成的漏斗形的钢桩尖;桩尖处两根射水管沿桩轴线方向直冲。本发明的效果是:桩身预留三个直径70mm的外排孔与桩芯连通,缩短内排泥浆通道的有效长度,以利排水排砂;水、气管预埋于砼中,不用拨出管,进水、进气端采用内丝90°弯头,以便与快速接头连接,接头采用了快速接头,拆接迅速,有效的避免了每根桩安装拆卸水管气管的工序,操作简单,成本较低,提高了沉桩效率。
Description
技术领域
本发明系统属于高桩码头桩基新型沉桩工艺,特别是预应力混凝土方桩在沉桩过程中遇到密实砂层或密实夹层难以穿透的情况,使用的水冲助沉系统及施工技术方法。
技术背景
水冲助沉工艺在我国已有广泛的应用。水冲沉桩按冲排方式可分为外冲外排,内冲外排和内冲内排,实心桩只能采用外冲外排,空心桩或管桩一般采用内冲外排和内冲内排。目前国内采用内冲内排的方式中,多数是将水管和气管在沉桩前放入钢筋砼方桩空芯中。通过替打预留的U型槽将水管和气管引出桩芯,通过软管与水泵和空压机相连。打桩前要安装水管、气管,工序繁琐,工艺复杂,且每打一根都要安装拆卸一次,成本高,效率低,在工期短、工程量大的工程中很难被采用。
发明内容
本发明工艺解决的技术问题是:提供一种水冲助沉施工系统和施工方法,在原水冲助沉施工工艺的基础上加以改进,使其能够快速进行接拆管操作,满足工期要求,提高施工效率,在穿透硬层过程中能较好的保证桩的完整性,在保证桩基承载力的同时保证桩能够较顺利的穿过硬层,穿过硬层后拆管,并锤击至设计标高。此工艺与原水冲助沉工艺相比操作工序简单,操作简便,可操作性较好,节约了成本。
本发明的技术方法是:
一种水冲助沉施工系统,其特征在于:预制桩的桩身内预埋有两根射水管,一根空气管,两根射水管进水端,空气管进气端均装有内丝90°弯头,内丝90°弯头连接快速接头;两个射水管进水端的快速接头个连接双台水泵,双台水泵各自有压力表和调节水压阀门;在桩身侧壁有3个直径70mm外排孔与桩芯连通;桩尖为用钢板焊成的漏斗形的钢桩尖;桩尖处两根射水管沿桩轴线方向直冲。
在桩身侧壁上的三个不同断面上开设有直径70mm外排孔,外排孔与桩空心腔相连通。
射水管进水端的快速接头连接高压软管,高压软管连接双台水泵。
漏斗形的桩尖是钢板焊成的空心钢桩尖,桩尖四壁中央各有一个镂空的圆孔。
桩尖两根射水管方向与钢桩靴平行并以桩不相邻两条斜边所成的面对称。
所述的水冲助沉施工技术方法:
在水冲时根据压力表的压力来调节水的压力。
1)方桩预制时预埋水、气管,进水进气端采用内丝90°弯头;
2)供水、气设备的选用并组装成供水、气船;
3)打桩船、运桩方驳及供水、气船驻位;
4)打桩船靠近运桩方驳,起重人员锁扣;
5)打桩船双钩吊桩,平移到海面,副钩向下移动,当桩倾斜一定角度后,副钩与主钩同时起吊使桩身入龙口,当桩身直立后,完成桩入替打;
6)2主钩吊桩入龙口,同时测量定位:
7)桩利用自身重量下沉,当桩尖接近泥面时,开启水泵及风泵,调节水泵水压为0.1-0.2MPa,风压为0.1-0.2Mpa;
8)桩自沉后开始压锤,水泵水压调至0.2Mpa;
9)下沉初期,要适当降低水压,通过观察喷射出的泥浆情况,使桩徐徐下沉,边沉桩边校正桩位,下沉至一定深度,待桩身稳定后,逐步加大水压至0.4-0.5Mpa,或辅以锤击,加速桩的下沉,此时,如下沉过快,应逐渐降低水压,或停止锤击,调整下沉速度,切勿突然停止水、风,以免泥堵塞水、风管;
10)在整个沉桩过程中,应根据土质、下沉速度和排泥量等情况,适时调整水压和风压和水量和风量;
11)达到设计要求水冲停止标高时,停止水冲,拆除水管、气管,继续锤击,直到设计标高;
12)记录锤击沉桩记录;
13)停锤,沉桩结束。
本发明效果是:
在桩预制过程中桩身侧壁中不同高度预留三个直径70mm的外排孔,缩短内排泥浆通道的有效长度,以利排水排砂;关键是水、气管预埋于砼中,不用拨出管,接头采用了快速接头,拆接迅速,有效的避免了每根桩安装拆卸水管气管的工序,在保证桩基承载力的同时保证桩能够较顺利的穿过硬层,操作简单,节约了成本,提高了沉桩效率。
通过使用快速接头连接桩身预埋水(风)管,在桩尖处双射水管直冲,加上风举作用将泥沙通过桩侧壁开口排除使桩能够在保证其完整性及强度的情况下顺利穿过硬层。水冲桩的预制为满足水冲工艺的要求,在桩身侧壁预留三个DN70排泥孔,桩身砼中预埋了两根DN50射水管和1根DN20空气管,使用快速接头连接,桩尖为漏斗形的钢桩尖,用钢板焊成,桩空心与桩尖连通,水冲后通过桩空心进行排泥。
附图说明
图1是水冲桩预埋管示意图;
图2是水冲桩预埋管断面放大图;
图3是射水系统示意图;
图4.1是预埋管相连接的快速接头结构主视图;
图4.2是预埋管相连接的快速接头结构侧视图;
图5.1是水冲桩桩尖结构图;
图5.2是水冲桩桩尖尖部结构图;
图6是水冲桩水装置图;
图7是水冲桩气管装置图。
具体实施方式
如图1、2、3所示一种新型水冲助沉施工技术装置,与传统水冲助沉工艺装置相比其特点在于:桩在预制过程中,桩身1内预埋了两根射水管2(参见图6),一根供气管3(参见图7),在桩身侧壁预留三个直径70mm外排孔4;在连接水管气管时采用快速接头5(参见图4.1、4.2)连接;桩尖为漏斗形的钢桩尖6(参见图5.1、5.2),用钢板焊成;桩尖处两根水管方向为对冲;供给两根射水管的双水泵7各自配有压力表8和调节阀9,双水泵同进调节水压。
进一步具体说明:预应力桩在预制过程中预埋了两根射水管,一根供气管,进水、进气端采用内丝90°弯头以便与快速接头连接。
在桩身侧壁不同高度预留三个直径70mm外排孔,与桩空心腔相连通。
连接射水管进水端的快速接头连接高压软管10,高压软管连接双台水泵。
双水泵分别设置压力表,在水冲时根据压力表压力同时调节水压。
供气管连接快速接头,快速接头连接气管,再连接风泵空气压缩机11。气管上有压力表12。
桩尖是漏斗形钢板焊成的空心钢桩尖,桩尖四壁中央各有一个镂空的圆孔13。
桩尖两根射水管方向为与钢桩靴平行并以桩不相邻两条斜边所成的面对称。
具体施工要求和水冲助沉施工技术方法;
1)在方桩预制时预埋水、气管,进水进气端采用内丝90°弯头。
2)供水的水泵和供气的风泵空气压缩机设备的选用并组装成供水、气船。
3)打桩船、运桩方驳及供水、气船驻位;
4)打桩船靠近运桩方驳,起重人员锁扣;
5)打桩船双钩吊桩,平移到海面,副钩向下移动,当桩倾斜一定角度后,副钩与主钩同时起吊使桩身入龙口,当桩身直立后,完成桩入替打;
6)两主钩吊桩入龙口,同时测量定位;
7)桩利用自身重量下沉,当桩尖接近泥面时,开启水泵及风泵空气压缩,调节水泵水压为0.1-0.2MPa,风压为0.1-0.2Mpa;
8)桩自沉后开始压锤,水泵水压调至0.2Mpa;
9)下沉初期,要适当降低水压,通过观察喷射出的泥浆情况,使桩徐徐下沉,边沉桩边校正桩位,下沉至一定深度,待桩身稳定后,逐步加大水压至0.4-0.5Mpa,或辅以锤击,加速桩的下沉,此时,如下沉过快,应逐渐降低水压,或停止锤击,调整下沉速度,切勿突然停止水(风),以免泥堵塞水(风)管。
10)在整个沉桩过程中,应根据土质、下沉速度和排泥量等情况,适时调整水、风压和水、风量。
11)达到设计要求水冲停止标高时,停止水冲。拆除水管、气管,继续锤击,直到设计标高。
12)记录锤击沉桩记录。
13)停锤,沉桩结束。
Claims (6)
1.一种水冲助沉施工系统,其特征在于:预制桩的桩身内预埋有两根水管,一根气管,两根水管进水端,气管进气端均装有内丝90°弯头,内丝90°弯头连接快速接头;两个水管进水端的快速接头各连接双台水泵,双台水泵各自有压力表和调节水压阀门;在桩身侧壁有三个直径70mm外排孔与桩芯连通;桩尖为用钢板焊成的漏斗形的钢桩尖;桩尖处两根水管沿桩轴线方向直冲。
2.根据权利要求1所述水冲助沉施工系统,其特征在于:在桩身侧壁上的三个不同断面上开设有直径70mm外排孔,外排孔与桩空心腔相连通。
3.根据权利要求1所述的水冲助沉施工系统,其特征在于:水管进水端的快速接头连接高压软管,高压软管连接双台水泵。
4.根据权利要求1所述的水冲助沉施工系统,其特征在于:漏斗形的桩尖是钢板焊成的空心钢桩尖,桩尖四壁中央各有一个镂空的圆孔。
5.根据权利要求1所述的水冲助沉施工系统的技术方法,其特征在于:在水冲时根据压力表的压力来调节水的压力。
6.根据权利要求5所述的水冲助沉施工系统的技术方法,其特征在于:
1)方桩预制时预埋水管、气管,进水进气端采用内丝90°弯头;
2)供水、气设备的选用并组装成供水、气船;
3)打桩船、运桩方驳及供水、气船驻位;
4)打桩船靠近运桩方驳,起重人员锁扣;
5)打桩船双钩吊桩,平移到海面,副钩向下移动,当桩倾斜一定角度后,副钩与主钩同时起吊使桩身入龙口,当桩身直立后,完成桩入替打;
6)两主钩吊桩入龙口,同时测量定位;
7)桩利用自身重量下沉,当桩尖接近泥面时,开启水泵及风泵,调节水泵水压为0.1-0.2MPa,风压为0.1-0.2Mpa;
8)桩自沉后开始压锤,水泵水压调至0.2Mpa;
9)下沉初期,要适当降低水压,通过观察喷射出的泥浆情况,使桩徐徐下沉,边沉桩边校正桩位,下沉至一定深度,待桩身稳定后,逐步加大水压至0.4-0.5Mpa,或辅以锤击,加速桩的下沉,此时,如下沉过快,应逐渐降低水压,或停止锤击,调整下沉速度,切勿突然停止水、风,以免泥堵塞水、气管;
10)在整个沉桩过程中,应根据土质、下沉速度和排泥量情况,适时调整水压和风压和水量和风量;
11)达到设计要求水冲停止标高时,停止水冲,拆除水管、气管,继续锤击,直到设计标高;
12)记录锤击沉桩记录;
13)停锤,沉桩结束。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011101091273A CN102182186B (zh) | 2011-04-28 | 2011-04-28 | 水冲助沉系统及施工技术方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011101091273A CN102182186B (zh) | 2011-04-28 | 2011-04-28 | 水冲助沉系统及施工技术方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102182186A CN102182186A (zh) | 2011-09-14 |
CN102182186B true CN102182186B (zh) | 2012-12-12 |
Family
ID=44568463
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011101091273A Active CN102182186B (zh) | 2011-04-28 | 2011-04-28 | 水冲助沉系统及施工技术方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102182186B (zh) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104005731A (zh) * | 2014-06-13 | 2014-08-27 | 哈尔滨工程大学 | 海洋废弃设施排泥装置 |
CN104153369B (zh) * | 2014-07-11 | 2016-04-13 | 华北水利水电大学 | 淤泥或软基中的柱桩施工装置 |
CN105386452A (zh) * | 2015-10-16 | 2016-03-09 | 上海市基础工程集团有限公司 | 沉井高压水助沉的施工方法 |
CN105297755A (zh) * | 2015-10-16 | 2016-02-03 | 上海市基础工程集团有限公司 | 沉井高压水助沉的施工设备 |
CN106284309A (zh) * | 2016-10-18 | 2017-01-04 | 山东宏旭建设有限公司 | 射水管、 应用该射水管的桩板以及桩板进入地层的方法 |
CN113202098B (zh) * | 2021-05-14 | 2023-02-24 | 山东中铁路桥工程有限公司 | 一种专用于中密、密实砂卵石地质的射水沉桩系统 |
CN113373928B (zh) * | 2021-06-02 | 2022-08-26 | 国网湖北省电力有限公司襄阳供电公司 | 一种可矫正倾斜的沉浸式加固桩湿地安装装置 |
CN117569742A (zh) * | 2024-01-16 | 2024-02-20 | 浙江省第一水电建设集团股份有限公司 | 一种预冲孔气刀装置及钢管桩打设方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2088450A (en) * | 1980-11-19 | 1982-06-09 | Nevo Alex | Grouting piles |
CN1605684A (zh) * | 2004-11-09 | 2005-04-13 | 李毓锦 | 新型phc桩及水冲气举静压沉桩法 |
CN2828145Y (zh) * | 2005-10-19 | 2006-10-18 | 吴金水 | 新型水冲气举辅助静压沉桩冲水设备 |
CN2828146Y (zh) * | 2005-06-15 | 2006-10-18 | 吴金水 | 水冲气举沉桩施工设备 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007309072A (ja) * | 2006-05-22 | 2007-11-29 | Chowa Kogyo Kk | 杭打用の水ジェット装置 |
JP2009185579A (ja) * | 2008-02-08 | 2009-08-20 | Suimei Grout Corp | 鋼管矢板の継手内部における土砂の排出方法 |
-
2011
- 2011-04-28 CN CN2011101091273A patent/CN102182186B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2088450A (en) * | 1980-11-19 | 1982-06-09 | Nevo Alex | Grouting piles |
CN1605684A (zh) * | 2004-11-09 | 2005-04-13 | 李毓锦 | 新型phc桩及水冲气举静压沉桩法 |
CN2828146Y (zh) * | 2005-06-15 | 2006-10-18 | 吴金水 | 水冲气举沉桩施工设备 |
CN2828145Y (zh) * | 2005-10-19 | 2006-10-18 | 吴金水 | 新型水冲气举辅助静压沉桩冲水设备 |
Non-Patent Citations (2)
Title |
---|
JP特开2007-309072A 2007.11.29 |
JP特开2009-185579A 2009.08.20 |
Also Published As
Publication number | Publication date |
---|---|
CN102182186A (zh) | 2011-09-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102182186B (zh) | 水冲助沉系统及施工技术方法 | |
CN102383431B (zh) | 中掘预应力离心管桩沉桩装置及其沉桩法 | |
CN206768813U (zh) | 后注浆预应力管桩 | |
CN104234055A (zh) | 一种预制桩后注浆装置及其工艺 | |
CN104652436A (zh) | 钢套管振动取土或高压注水松土拔桩施工方法 | |
CN110106872A (zh) | 一种超厚淤泥区长护筒冲孔灌注桩施工方法 | |
CN106836213A (zh) | 后注浆预应力空心方桩及其施工工艺 | |
CN104988915A (zh) | 一种可拆卸钢护筒装置及水下联系梁预制安装方法 | |
CN201826302U (zh) | 用于大直径现浇薄壁混凝土复合桩的成孔器 | |
CN104975612A (zh) | 水上沉井施工新工艺 | |
CN103088820A (zh) | 水力自激振荡射流振动沉桩装置及沉桩工艺 | |
CN201172820Y (zh) | 带润滑的活瓣桩尖灌注排桩模管 | |
CN101457522B (zh) | 长螺旋支盘桩的施工方法 | |
CN203533005U (zh) | 预应力钢混复合型压力顶管 | |
CN201891113U (zh) | 高压射水沉放空心管桩装置 | |
CN206800379U (zh) | 后注浆预应力空心方桩 | |
CN103132511A (zh) | 静压沉管扩底灌注桩的成桩方法及成桩装置 | |
CN206486896U (zh) | 高压旋喷桩现场返浆收集装置 | |
CN206486890U (zh) | 混凝土圆筒结构 | |
CN212270943U (zh) | 一种预制拼装式钢砼组合支撑桩 | |
CN100434595C (zh) | 钻孔泵灌大流动砼指环桩的成桩方法及成桩装置 | |
CN106351211A (zh) | 混凝土大圆筒结构及其冲水下沉的施工方法 | |
CN201196300Y (zh) | 预制圆柱形钢筋骨架混凝土管廊 | |
CN211171960U (zh) | 一种复杂地层抗浮锚杆的进排气注浆管路系统 | |
CN103911986A (zh) | 一种组合复打钢管桩的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |