CN102153022A - Propelled hydraulic cable carrying crane - Google Patents

Propelled hydraulic cable carrying crane Download PDF

Info

Publication number
CN102153022A
CN102153022A CN2011100897348A CN201110089734A CN102153022A CN 102153022 A CN102153022 A CN 102153022A CN 2011100897348 A CN2011100897348 A CN 2011100897348A CN 201110089734 A CN201110089734 A CN 201110089734A CN 102153022 A CN102153022 A CN 102153022A
Authority
CN
China
Prior art keywords
main couple
walking
shoulder pole
deck unit
erection gantry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011100897348A
Other languages
Chinese (zh)
Inventor
黄松和
卢伟
杨如刚
赵慧娟
龙勇
张文桂
任锦江
赵巍
胡年孙
冯岳元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Sichuan Road and Bridge Group Co Ltd
Original Assignee
Southwest Jiaotong University
Sichuan Road and Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University, Sichuan Road and Bridge Group Co Ltd filed Critical Southwest Jiaotong University
Priority to CN2011100897348A priority Critical patent/CN102153022A/en
Publication of CN102153022A publication Critical patent/CN102153022A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a propelled hydraulic cable carrying crane which comprises a power system, a control system and a mechanical executing mechanism, wherein the mechanical executing mechanism mainly comprises a main truss (100), walking type propelling systems (210 and 220) installed at both ends of the main truss, two sets of hydraulic lifting systems (310 and 320) installed on the main truss and a shoulder pole beam (400); the main truss and the shoulder pole beam both adopt length changeable structures; and the hydraulic lifting systems (310 and 320) comprise synchronous stepping continuous lifting jacks and continuous lifting steel strands (510 and 520). The whole crane realizes walking type propelling on a cable by controlling actions of a walking frame and a sliding end beam so as to alternately bear and alternately walk without additional traction equipment and manual disassembly, assembly and conveying of accessories at high altitude, such as clamping cables, hoops, and the like, and the invention has the advantages of high walking speed, high sliding resistance and high safety.

Description

Self-propelled hydraulic pressure deck unit erection gantry
Technical field
The present invention relates to a kind of suspension bridge mechanized construction equipment deck unit erection gantry, particularly a kind of realization deck unit erection gantry of walking voluntarily that can be on main rope of suspension bridge.
Background technology
Along with the fast development of Chinese national economy, the construction scale and the speed of striding suspension bridge of growing up of km level constantly increases, as the complete machine performance of the deck unit erection gantry of girder of suspension bridge lifting specialized equipment particularly on the cable walking manner demand urgently improving.The existing running gear that mainly contains winch formula, hydraulic pressure lift formula deck unit erection gantry of China adopts walking of set of wheels formula or all-hydraulic walking all can not realize walking voluntarily on cable, all need the traction of winch, equipment such as traction jack etc. moving on the cable and manually to carry, dismantle, install auxiliary such as folder cable anchor ear in the high-altitude repeatedly and finish complete machine fixing on main push-towing rope, cause cost to increase claim for eot like this and have danger.
Summary of the invention
Above shortcoming in view of prior art, the purpose of this invention is to provide a kind of self-propelled hydraulic pressure deck unit erection gantry, make it to overcome the deficiency of prior art, the realization deck unit erection gantry just can realize that self walks on the cable under the condition that need not auxiliaries such as extra tractor equipment and the dismounting of artificial high-altitude fortune folder cable anchor ear.
The objective of the invention is to realize by following means.
Self-propelled hydraulic pressure deck unit erection gantry, formed by power system, control system and mechanical actuating mechanism, described mechanical actuating mechanism mainly by main couple (100), be installed in the main couple two ends walking voluntarily system (210 and 220), be installed in the cover of two on main couple hydraulic lift system (310 and 320), shoulder pole girder (400) constitutes; Main couple and shoulder pole girder all adopt the variable-length structure; Described hydraulic lift system (310 and 320) is made up of continuous lifting jack (311), steel strand guides (312), the steel strand (510) that return rope device (313) and be connected shoulder pole girder.Adopt aforesaid way, the present invention has following advantage:
1) need not extra tractor equipment and the dismounting of artificial high-altitude and transport walking voluntarily on realization such as the auxiliary that presss from both sides the cable anchor ear cable.
2) guarantee under the prerequisite of complete machine structure safety, only change few parts and just lift applicable to the suspension bridge steel case beam in different cables footpath.
3) guarantee to adapt to by the described interlude of changing different length under the prerequisite of complete machine structure safety the suspension bridge of different main push-towing rope spacings.
4) the deck unit erection gantry master control system can be to walking walking that system, hydraulic lift system etc. carry out manually voluntarily, automatic guidance is realized deck unit erection gantry optional position on main push-towing rope and fixed point lifting.
In sum, self-propelled deck unit erection gantry of the present invention has on the cable walking, advantages such as the speed of travel is fast, adaptive capacity is strong, anti-slide performance is strong, safety height voluntarily, applicable to setting up of different suspension bridges.
Description of drawings
Fig. 1 is the running condition figure of self-propelled hydraulic pressure deck unit erection gantry unit lifting steel case beam of the present invention;
Fig. 2 is a self-propelled hydraulic pressure deck unit erection gantry main couple structural representation of the present invention;
Fig. 3 is a self-propelled hydraulic pressure deck unit erection gantry shoulder pole girder structural representation of the present invention;
Fig. 4 is a self-propelled hydraulic pressure deck unit erection gantry hydraulic lift system structural representation of the present invention;
Fig. 5 is a self-propelled hydraulic pressure deck unit erection gantry mounting structure scheme drawing of the present invention;
Fig. 6 is the walking location diagram after the system displacement voluntarily among Fig. 5.
The specific embodiment
Below in conjunction with drawings and Examples structure of the present invention is described further.
As shown in Figure 1, the present invention mainly by main couple 100, be installed in the main couple two ends two cover walkings voluntarily system 210 and 220, be installed in mechanics that two on main couple cover hydraulic lift system 310 and 320, shoulder pole girder 400 form and power system and control system and form.Among the figure 010 with 020 for the parallel main push-towing rope that sets up, 000 for waiting to hang steel case beam.Walking system 210 and 220 is supported on the main push-towing rope, and main couple and two walking systems are hinged, like this complete machine just can by walking voluntarily system on main push-towing rope, move.
Main couple and shoulder pole girder all adopt the variable-length structure, shown in Figure 2: main couple 100 is by interlude 110 and place the insertion section 120 and 130 of interlude to constitute slidably, after the distance of the cable between two main push-towing ropes is determined, the removable section of inserting also adopts conventional mode that the section of insertion and interlude are fixed, with the main couple length that obtains to match with decided cable distance.
Same situation and purposes also are fit to the design of shoulder pole girder, as seen from Figure 3, shoulder pole girder 400 by intermediate beam 410 and place slidably the intermediate beam termination end carriage 420 and 430 constitute, end carriage 420 is inserted in the intermediate beam, can be according to the extension elongation of cable, and by usual manner fixed end beam and intermediate beam apart from the control end carriage.
Two cover hydraulic lift systems 310 and 320 are arranged on the main couple two ends, adopt synchronous stepping to promote jack continuously.Fig. 4 is the External view of hydraulic lift system, and elevator system is made up of the steel strand 510 of continuous lifting jack 311, steel strand guides 312, time rope device 313 and connection shoulder pole girder continuously.Suspender on the described hydraulic lift system connects with described shoulder pole girder 400 by bearing pin.Shoulder pole girder is provided with hanger, respectively with the suspender on the described hydraulic lift system, wait that the suspension centre that hangs steel case beam is connected.
The installation that can be seen self-propelled hydraulic pressure deck unit erection gantry main couple of the present invention and walking system by Fig. 5 concerns that main couple 100, walking be system 210 voluntarily, main push-towing rope 010.In the present embodiment, walking system 210 is made of supporting leg 211 and 212, slip end carriage (213), walker 214, walker top is hinged by adapter shaft 215 and deck unit erection gantry main couple 100, and the walker bottom is supported on the main push-towing rope 010 by automatic folder cable device 216 and 217; Walker links to each other by walking oil cylinder 218 with the slip end carriage and can move on the slip end carriage.Fig. 6 is the site plan after once moving.
Embodiment described here is in order to help reader understanding's principle of the present invention, should to be understood that the protection domain of inventing is not limited to such special statement and embodiment.Everyly make various possible being equal to according to foregoing description and replace or change, all be considered to belong to the protection domain of claim of the present invention.

Claims (4)

1. self-propelled hydraulic pressure deck unit erection gantry, formed by power system, control system and mechanical actuating mechanism, be it is characterized in that: described mechanical actuating mechanism mainly by main couple (100), be installed in the main couple two ends walking voluntarily system (210), be installed in the cover of two on main couple hydraulic lift system (310 and 320), shoulder pole girder (400) constitutes; Main couple and shoulder pole girder all adopt the variable-length structure; Described hydraulic lift system (310 and 320)) promotes jack continuously and promote steel strand (510 and 520) formation continuously by synchronous stepping.
2. the self-propelled hydraulic pressure deck unit erection gantry according to claim 1, it is characterized in that: described walking system (210) is made of supporting leg (211) and (212), slip end carriage (213), walker (214), walker top is hinged by adapter shaft (215) and deck unit erection gantry main couple (100), and the walker bottom is supported on the main push-towing rope (010) by pressing from both sides cable device (216) and (217) automatically; Walker links to each other by walking oil cylinder (218) with the slip end carriage and can move on the slip end carriage.
3. the self-propelled hydraulic pressure deck unit erection gantry according to claim 1 is characterized in that: described main couple variable-length structure is: main couple is by interlude (110) and place the insertion section (120 and 130) of interlude to constitute slidably.
4. the self-propelled hydraulic pressure deck unit erection gantry according to claim 1 is characterized in that: described shoulder pole girder variable-length structure is: shoulder pole girder is by intermediate beam (410) and place the end carriage (420 and 430) of intermediate beam termination to constitute slidably.
CN2011100897348A 2011-04-11 2011-04-11 Propelled hydraulic cable carrying crane Pending CN102153022A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100897348A CN102153022A (en) 2011-04-11 2011-04-11 Propelled hydraulic cable carrying crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100897348A CN102153022A (en) 2011-04-11 2011-04-11 Propelled hydraulic cable carrying crane

Publications (1)

Publication Number Publication Date
CN102153022A true CN102153022A (en) 2011-08-17

Family

ID=44434762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100897348A Pending CN102153022A (en) 2011-04-11 2011-04-11 Propelled hydraulic cable carrying crane

Country Status (1)

Country Link
CN (1) CN102153022A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061262A (en) * 2011-10-19 2013-04-24 中交第一公路工程局有限公司 Cable-crossing crane and application method thereof
CN103224198A (en) * 2013-05-21 2013-07-31 中铁九桥工程有限公司 Hydraulic travelling-pedrail type cable crane capable of travelling with load
CN103434932A (en) * 2013-09-03 2013-12-11 太原重工股份有限公司 Multifunctional jacklift
CN103790114A (en) * 2014-01-28 2014-05-14 柳州欧维姆机械股份有限公司 Hydraulic dragging and idler wheel walking combination cable carrying crane and walking method thereof
CN104609299A (en) * 2015-01-28 2015-05-13 中国能源建设集团安徽电力建设第一工程有限公司 Fully-hydraulic structured bearing device with plurality of support arms
CN104627896A (en) * 2015-01-13 2015-05-20 中交武汉港湾工程设计研究院有限公司 Active steel strand rope winding device
CN105002831A (en) * 2015-08-13 2015-10-28 贵州路桥集团有限公司 Wheel-rail type loading and traveling cable crane
CN106638327A (en) * 2017-01-21 2017-05-10 广西大学 Electric self-lifting beam transporting trolley for erecting suspension bridge girder
CN110626957A (en) * 2019-09-29 2019-12-31 中铁大桥局集团第六工程有限公司 Method for installing cable crane
CN110844801A (en) * 2019-11-12 2020-02-28 湖南路桥建设集团有限责任公司 Split type cable carrying crane for erecting main beam of suspension bridge
CN111498707A (en) * 2020-04-27 2020-08-07 张婷婷 Cable carrying crane combining hoisting and walking
CN114232497A (en) * 2021-12-31 2022-03-25 中建桥梁有限公司 Large-scale cable carries quick-witted counter-force pre-compaction device of crane

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09184113A (en) * 1995-12-29 1997-07-15 Kitagawa Iron Works Co Ltd Hoisting apparatus and moving method thereof
CN200992687Y (en) * 2006-12-30 2007-12-19 中交第二公路工程局有限公司 Slingdevice for suspension bridge steel box beam mounting
CN101481903A (en) * 2009-01-19 2009-07-15 华东交通大学 Method for constructing hilly region rope-suspension bridge main beam by span cable supported crane assembling

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09184113A (en) * 1995-12-29 1997-07-15 Kitagawa Iron Works Co Ltd Hoisting apparatus and moving method thereof
CN200992687Y (en) * 2006-12-30 2007-12-19 中交第二公路工程局有限公司 Slingdevice for suspension bridge steel box beam mounting
CN101481903A (en) * 2009-01-19 2009-07-15 华东交通大学 Method for constructing hilly region rope-suspension bridge main beam by span cable supported crane assembling

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《公路》 20050131 张腾 润扬大桥施工专用设备的开发研制 , 第1期 *
《机械》 20110331 林刚等 缆载吊机主桁架的强度及稳定性分析 第38卷, 第3期 *
闫友联等: "特大跨径悬索桥全液压跨缆吊机设计研究", 《中国公路学会2004年学术年会论文集》 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061262B (en) * 2011-10-19 2016-02-24 中交第一公路工程局有限公司 A kind of deck erection gantry and application process thereof
CN103061262A (en) * 2011-10-19 2013-04-24 中交第一公路工程局有限公司 Cable-crossing crane and application method thereof
CN103224198A (en) * 2013-05-21 2013-07-31 中铁九桥工程有限公司 Hydraulic travelling-pedrail type cable crane capable of travelling with load
CN103434932A (en) * 2013-09-03 2013-12-11 太原重工股份有限公司 Multifunctional jacklift
CN103790114A (en) * 2014-01-28 2014-05-14 柳州欧维姆机械股份有限公司 Hydraulic dragging and idler wheel walking combination cable carrying crane and walking method thereof
CN104627896A (en) * 2015-01-13 2015-05-20 中交武汉港湾工程设计研究院有限公司 Active steel strand rope winding device
CN104627896B (en) * 2015-01-13 2017-04-12 中交武汉港湾工程设计研究院有限公司 Active steel strand rope winding device
CN104609299A (en) * 2015-01-28 2015-05-13 中国能源建设集团安徽电力建设第一工程有限公司 Fully-hydraulic structured bearing device with plurality of support arms
CN105002831A (en) * 2015-08-13 2015-10-28 贵州路桥集团有限公司 Wheel-rail type loading and traveling cable crane
CN106638327A (en) * 2017-01-21 2017-05-10 广西大学 Electric self-lifting beam transporting trolley for erecting suspension bridge girder
CN106638327B (en) * 2017-01-21 2019-01-08 广西大学 Electric self-lifting beam transporting trolley for erecting suspension bridge girder
CN110626957A (en) * 2019-09-29 2019-12-31 中铁大桥局集团第六工程有限公司 Method for installing cable crane
CN110844801A (en) * 2019-11-12 2020-02-28 湖南路桥建设集团有限责任公司 Split type cable carrying crane for erecting main beam of suspension bridge
CN110844801B (en) * 2019-11-12 2020-12-18 湖南路桥建设集团有限责任公司 Split type cable carrying crane for erecting main beam of suspension bridge
CN111498707A (en) * 2020-04-27 2020-08-07 张婷婷 Cable carrying crane combining hoisting and walking
CN114232497A (en) * 2021-12-31 2022-03-25 中建桥梁有限公司 Large-scale cable carries quick-witted counter-force pre-compaction device of crane

Similar Documents

Publication Publication Date Title
CN102153022A (en) Propelled hydraulic cable carrying crane
CN202766975U (en) Novel deck erection crane
CN101462672B (en) Big elevating capacity and big elevating height hoisting crane
CN201338911Y (en) Lifting cane with large lifting capacity and great lifting height
CN103790114B (en) Hydraulic haulage and roller are walked the deck unit erection gantry and traveling method thereof that combine
CN101537976B (en) Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof
CN102154987B (en) On-cable walking-type self-walking system
CN102251465B (en) Suspension bridge with bearing cable having X-shaped curve
CN101559905A (en) Deck unit erection gantry
CN201376848Y (en) Large-scale double-tower automatic-elevation hoisting equipment
CN101929126B (en) Self-help hoisting mechanism of low-position cantilever walking type bridge erection machine
CN100354477C (en) Swing-construction method for mounting dual-hoist at land-shoul beam section for steel box girder suspension bridge
CN101481903B (en) Method for constructing hilly region rope-suspension bridge main beam by span cable supported crane assembling
CN202323704U (en) Lifting mechanism of bridge inspection working vehicle
CN110205948A (en) A kind of expanded letter Bridge Erector and its erection method
CN104746432B (en) The feasible bridge guidance tape in plate-beam transports installs car
CN202465099U (en) Single-girder partial hanging gantry crane
CN101787677B (en) Method for erecting girder of suspension bridge by double-hoisting hydraulic NC (numerical control) cable crane
CN111395195A (en) Operation hanging basket for bolted connection of steel-concrete composite beam segments based on bridge girder erection machine
CN217350492U (en) Novel lifting device for bridge deck installation
CN201292509Y (en) Suspension bridge main girder construction segment conveying facilities
CN201362571Y (en) Equipment of cross beam for hoisting arch-first and girder-late tied bars arch bridge
CN113235460B (en) Prefabricated segment swinging method for bridge cantilever assembly
CN210368664U (en) Wide-body bridge girder erection machine
CN202098985U (en) Multi-stage hoisting device of cable crane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110817