CN102149122A - Method, device and system for testing base station - Google Patents

Method, device and system for testing base station Download PDF

Info

Publication number
CN102149122A
CN102149122A CN2011100825087A CN201110082508A CN102149122A CN 102149122 A CN102149122 A CN 102149122A CN 2011100825087 A CN2011100825087 A CN 2011100825087A CN 201110082508 A CN201110082508 A CN 201110082508A CN 102149122 A CN102149122 A CN 102149122A
Authority
CN
China
Prior art keywords
test
base station
station equipment
test data
testing apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011100825087A
Other languages
Chinese (zh)
Inventor
兰志华
杨波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Mobile Communications Equipment Co Ltd
Original Assignee
Datang Mobile Communications Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Mobile Communications Equipment Co Ltd filed Critical Datang Mobile Communications Equipment Co Ltd
Priority to CN2011100825087A priority Critical patent/CN102149122A/en
Publication of CN102149122A publication Critical patent/CN102149122A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a method, device and system for testing a base station, which are used for avoiding the execution efficiency of the whole production flow from being influenced due to misoperation in a test process. The method comprises the steps as follows: a redesigned automated base station test system is adopted to test base station equipment, wherein at least two test devices are deployed in the base station test system; when the base station equipment passes through each test position on a test production line, the corresponding test devices read written test data in the tested base station, and when test devices determine that the base station is not tested or pass the test of the former test device in accordance with the read test data, the base station equipment is subjected to the test of an existing post; and corresponding test data are generated in accordance with the test results and the generated test data are written in the base station equipment. Thus, according to the invention, bad influences caused by the manual misoperation can be avoided in the test process, and the execution efficiency of the whole production flow is improved.

Description

A kind of method, Apparatus and system that is used for base station testing
Technical field
The present invention relates to the communications field, particularly a kind of Apparatus and system that is used for base station testing.
Background technology
At present, the production process of the base station product among the TD-SCDMA (Time Division-Synchronous Code Division Multiple Access, TD SDMA) comprises: the making sheet process, mount process, single-board testing, final assembly, the test of Base Band Unit host function, the calibration of Remote Radio Unit main frame and a series of links such as functional test, Remote Radio Unit main frame burn-in test and system testing.Each link all has inseparable getting in touch with the link of its front and back, so the quality that previous link is finished will directly have influence on the implementation effect of next link.For example, because producers' carelessness, the single-board testing link not after tested the integrated circuit board or the integrated circuit board of test crash directly be assembled to and flow into the system test link in the complete machine again, need open cabinet after in system test, pinpointing the problems and carry out fault location, again the fault integrated circuit board is back in the preceding road production process and keep in repair again and test.In the batch production process of up to ten thousand equipment, analogue will take place inevitably.If do not supervised and control, this problem will badly influence production efficiency.
In view of this, provide following two kinds of solutions under the prior art:
A, by producers' hand filling flow process folk prescription formula
Adopt this mode, each base station equipment of producing can subsidiary a production procedure be controlled single in the whole production flow process, producers fill in according to the requirement on it after finishing this post work, and the operating personnel in next post will instruct operation according to the record on the flow process list.Detect or inspect by random samples by the quality personnel at last.
Yet, adopt option A, there is following problem:
(1) producers are pre-job must carry out a large amount of trainings to it, grasps for the single filling method of flow process control to make it.In case some execution link changes in process of production, must carry out secondary even repeatedly training to producers;
(2) flow process control singly all will be along with product be transmitted, is filled in, is revised in the whole production flow process, and therefore problem such as will occur wearing and tearing, lose inevitably.And in a single day above-mentioned condition appears, the current state of product can't be reviewed;
(3), there are differences for the statement the possibility of result of same problem because producers' quality difference; And the mode of hand filling may be beyond recognition owing to the individual persons careless handwriting makes other people.Bring unnecessary trouble below all can for the operation in follow-up post;
(4) because whole process is single all by filling in by hand, the result is clear inadequately, is not easy to the quality personnel and carries out the final detection of dispatching from the factory;
(5) owing to be manual work, can't guarantee can occur the problem that individual persons is faked in implementation process, for example find in the product test that a certain index is defective, Direct Mark is passed through on flow process is single, causes underproof product to flow into the outfield.
B, the control of flow process label
Adopt this mode, can prepare some labels at each production station in advance, these labels will be contained all known case, as test event, failure cause etc., producers can be attached on the assigned address of integrated circuit board or cabinet according to the label of actual test result with correspondence, and follow-up post will be carried out operation on this basis.Detect or inspect by random samples by the quality personnel at last.
The scheme b scheme a that compares has some improvement, but still has following problem:
(1) reduced pre-job training, but when carrying out link generation change, flow process control personnel need revise involved label, and still must give training producers producers;
(2) flow process still exists in the whole production flow process and to be transmitted, to fill in, revise, and then appearance such as weares and teares, loses at problem;
(3) misunderstanding that causes because of the difference that execution result is described can not appear;
(4) be convenient to the quality personnel and carry out the final detection of dispatching from the factory;
(5) same because manual work can't guarantee can occur the problem that individual persons is faked in implementation process.
In sum, the production test flow process of existing base station equipment can be because such scheme a and scheme b in the base station equipment large-scale production process, be easy to have influence on because of the error that occurs on the single flow process efficient of whole production flow process.
Summary of the invention
The invention provides a kind of Apparatus and system that is used for base station testing, in order to avoid in testing process, influencing the execution efficient of whole production flow process owing to operate miss.
Concrete technical scheme provided by the invention is as follows:
A kind of base station test method comprises:
Testing apparatus reads the test data that has write from tested base station equipment;
When described testing apparatus determines that according to the test data that reads described base station equipment is not tested by the last time after tested or, described base station equipment is worked as Pretesting;
Described testing apparatus generates corresponding test data according to test result, and the test data that generates is write in the described base station equipment.
A kind of testing apparatus comprises:
The I/O processing unit is used for reading the test data that has write from tested base station equipment, and the test data that this testing apparatus is generated writes in the described base station equipment;
Test cell, be connected with described I/O processing unit, when being used for determining described base station equipment after tested or by last test, described base station equipment being worked as Pretesting, and generate corresponding test data according to test result according to the test data that the I/O processing unit reads.
A kind of base station testing system, comprise at least two in order to base station equipment is carried out the testing apparatus of production test, wherein, any testing apparatus is used for reading the test data that has write from tested base station equipment, and determine that according to the test data that reads described base station equipment is not after tested or during the test by a last testing apparatus, described base station equipment is worked as Pretesting, and generate corresponding test data, and the test data that generates is write described base station equipment according to test result.
In the embodiment of the invention, adopt the base station testing system of the automation of redesign that base station equipment is tested, should dispose at least two testing apparatuss in this base station testing system, base station equipment is every through a test post on the test streamline, corresponding testing device just reads the test data that has write from tested base station equipment, and determine that according to the test data that reads base station equipment is not after tested or during the test by a last testing apparatus, this base station equipment is carried out the test in current post, and generate corresponding test data, and the test data that generates is write base station equipment according to test result.Like this, just effectively avoid in testing process the harmful effect that brings owing to the manual operation error, improved the execution efficient of whole production flow process.
Description of drawings
Fig. 1 is a base station testing system architectural framework schematic diagram in the embodiment of the invention;
Fig. 2 is testing apparatus functional structure first schematic diagram in the embodiment of the invention;
Fig. 3 is testing apparatus functional structure second schematic diagram in the embodiment of the invention;
Fig. 4 is a base station testing flow chart in the embodiment of the invention.
Embodiment
Avoid in testing process, influencing the execution efficient of whole production flow process, the invention provides a kind of base station testing Apparatus and system owing to operate miss.In the practical application, should dispose at least two testing apparatuss in the base station testing system, consult shown in Figure 1, in the present embodiment, to dispose five testing apparatuss is that example describes, this five station server is respectively applied for base station equipment is carried out single-board testing, functional test before complete machine is aging, burn-in test, aging back functional test of complete machine and system testing, be called five test posies, base station equipment is every through a test post on the test streamline, corresponding testing device just reads the test data that has write from tested base station equipment, and determine that according to the test data that reads base station equipment is not after tested or during the test by a last testing apparatus, this base station equipment is carried out the test in current post, and generate corresponding test data, and the test data that generates is write base station equipment according to test result.
Further, testing apparatus can also be preserved the test data that reads, and the test data that generates according to test result is preserved; And the test data of preserving is presented, and report to background server, or/and, the bookkeeping indication that background server issues received.
Wherein, testing apparatus is worked as Pretesting to described base station equipment, if when determining described base station equipment by test according to test result, then directly generate and be used for the test data that characterization test passes through, if when determining described base station equipment not by test according to test result, to not carry out step-by-step by test items corresponding parameters value and be used for the unsanctioned test data of characterization test with the generation of operation back, this point will describe in detail in subsequent embodiment.
In the present embodiment, so-called base station equipment can be the single part equipment that is used to be assembled into the base station, as, veneer, also can be the whole set equipment after assembling is finished, and sees the tested object in each test post and decides, and does not repeat them here.
Consulting shown in Figure 2ly, is example with any testing apparatus, should comprise I/O control unit 200 and test cell 201 in the testing apparatus at least, wherein
I/O processing unit 200 is used for the test data that write from reading of tested base station equipment, and with the test data that this testing apparatus generates write described in;
Preferable, in the present embodiment, the interface that I/O processing unit 200 externally provides by base station equipment (as network interface, serial ports etc.) is read, is write the idle address in its memory (as E2PROM, flash etc.) or operation such as modification, distinguish or the different in process of production state of judgement base station equipment, to reach the purpose of it being carried out the automatic flow monitoring.
Test cell 201, be connected with the I/O processing unit, when being used for determining base station equipment after tested or by last test, base station equipment being carried out the test in current post, and generate corresponding test data according to test result according to the test data that the I/O processing unit reads;
As shown in Figure 2, further can comprise memory cell 202 in the testing apparatus, be connected with test cell 201, be used to preserve the test data that the I/O processing unit reads with I/O processing unit 200, and the test data of described test cell generation.
So-called test data promptly can be to be used for flow process control label, also can be the fault label, and the implication of these two kinds of labels will describe in detail in subsequent embodiment.
In the present embodiment, the test data that testing apparatus reads from base station equipment and writes to base station equipment, it is the label that the test cell 201 in the testing apparatus is provided with in the memory of tested base station equipment by the I/O processing unit, be divided into two kinds, be called flow process control label and faulty tag.For example, in E2PROM, test cell 201 is chosen the memory address of 0xAF address as flow process control label, chooses the memory address of 0xBF address as faulty tag, and its value by default all is 0xFF.
At first, introduce flow process control label.Consult shown in the table 1, all there is the value of flow process control label corresponding behind the correct execution test operation in each test post.
For example, the test cell 201 of testing apparatus that is used for carrying out single-board testing is before carrying out test, whether the value that reads the 0xAF address in the memory of base station equipment earlier is 0xFF, if, base station equipment then is described not after tested, then it is begun to carry out single-board testing, and in successful execution behind the single-board testing, the value 0xFE that is used to represent to test successful flow process control label of correspondence is write the 0xAF address of base station equipment as test data, otherwise.The expression base station equipment will be reprocessed and be tested again not by being worked as Pretesting; Equally, be used for carrying out complete machine aging before the test cell 201 of testing apparatus of functional test before carrying out test, whether the value that reads the 0xAF address in the memory of base station equipment earlier is 0xFE, if, illustrate that then base station equipment passed through single-board testing, then, begin to carry out the aging preceding functional test of complete machine, and in successful execution complete machine aging before after the functional test, the value 0xFC that is used to represent to test successful flow process control label of correspondence is write the 0xAF address of complete machine as test data, otherwise, illustrate that base station equipment is not by the aging preceding functional test of complete machine, this base station equipment will be carried out fault location, maintenance ..., and analogize, carry out the complete machine burn-in test subsequently successively, aging back functional test of complete machine and system testing, the value of writing of flow process control label can not be referring to table 1 in each test link, be after test data that the test cell 201 in the testing apparatus that uses in link of each test all writes down according to base station equipment 0xAF address determines that previous step is tested successfully, carry out the test in current post again, and after the successful execution test, the test data that record is new in the 0xAF address is used for test next time.
Table 1
Figure BDA0000053501210000061
Figure BDA0000053501210000071
Secondly, introduce faulty tag.The value of corresponding faulty tag behind each all wrong execution test operation in test post.If the test operation failure, then flow process control label can not be modified, but according to by test items corresponding parameters value faulty tag not being rewritten.
For example, consult shown in the table 2, with the single-board testing is example, and single-board testing has five test events, is respectively transmitting gain (TxGain) receiving gain (RxGain), Adjacent Channel Leakage Power Ratio (ACPR), error vector magnitude (EVM) and receiving sensitivity (RSL).Whether passing through by specifying bit to mark (bit position of band underscore in the table 2) of each test event, as shown in table 2,1 expression is passed through, 0 expression failure.Remaining 3bit (3 of highest order bits in the table 2) uses when giving in the future the extend testing project in advance, if all test is passed through, keep default value constant in the 0xBF address of the memory of base station equipment, do not pass through project if there is test, then test cell 201 parameter value that will test not the expression failure cause by the project correspondence carries out writing the 0xBF address after step-by-step and the operation, as, if only the ACPR test crash is arranged, then in the 0xBF address, write 0xFB; If EVM and two test crashs of RXGain are arranged, then in the 0xBF address, write 0xF5, promptly carry out step-by-step and operate the result that the back obtains with 0xF7 and 0xFD, ... by that analogy, after all can adopting the corresponding parameters value to carry out step-by-step and operate after the project testing failure arbitrarily, write the 0xBF address of memory in the base station equipment as faulty tag.After the veneer that breaks down turned back to veneer maintenance post, system can locate and maintenance time thereby significantly reduced according to the faulty tag information indicating maintenance personal's failure cause and the solution that store in the veneer.
Table 2
Unsanctioned test event 16 systems are represented 2 systems are represented
TxGain 0xFE 1111,1110
RxGain 0xFD 1111,1101
ACPR 0xFB 1111,1011
EVM 0xF7 1111,0111
RSL 0xEF 1110,1111
Consult shown in Figure 3ly, in the embodiment of the invention, may further include in any testing apparatus:
User interface section 203 is connected with test cell 201, is used to present current post and carries out the test data (can be flow process control label, also can be the fault label) that test operation produces
And, can further include in any testing apparatus:
Network Transmission control unit 204 is connected with memory cell 202, is used for test data is reported to background server, or/and, receive the bookkeeping indication that background server issues.
Report to the test data of background server, can be used as journal file and in time preserve, use during for administrative staff's follow-up maintenance base station testing system; And administrative staff in time issue bookkeeping indication by background server, with the testing process and the associative operation of control base station testing system.
Based on technique scheme, to consult shown in Figure 4ly, in the embodiment of the invention, the detailed process that base station testing system is tested base station equipment is as follows:
Step 1: write default value 0xFF in the flow process control in veneer to be tested.
Step 2: beginning fill order board test, if by test, then execution in step 4; If by test, then execution in step 3.
Step 3: read the faulty tag of veneer, and fault is positioned maintenance, then, return step 2.
Step 4: in flow process control label, write 0xFE.
Step 5: will carry out final assembly by the veneer of test.
Step 6: carry out the aging preceding functional test of complete machine reading flow process control label before, if value is 0xFE, then execution in step 7; If value is not 0xFE, then execution in step 3.
Step 7: carry out the aging preceding functional test of complete machine, if, then carry out step 10 by test; If by test, then execution in step 8.
Step 8: the read failure label also carries out fault location, then, and execution in step 9.
Step 9; The veneer that breaks down is changed in start, then, returns step 5.
Step 10: in flow process control label, write 0xFC.
Step 11: carry out the preceding reading flow process control label of complete machine burn-in test, if value is 0xFC, then execution in step 14; If value is not 0xFC, then execution in step 12.
Step 12: judge whether to exist fault according to faulty tag, if then execution in step 8; Otherwise, execution in step 13.
Step 13: return corresponding test post according to flow process control label and test again.
Step 14: carry out the complete machine burn-in test, if by test, then execution in step 15; If by test, then execution in step 8.
Step 15: in flow process control label, write 0xF8.
Step 16: carry out the aging back functional test of complete machine reading flow process control label before, if value is 0xF8, then execution in step 19; Otherwise, execution in step 17.
Step 17: judge whether to exist fault according to faulty tag, if then execution in step 8; Otherwise execution in step 18.
Step 18: return corresponding test post according to flow process control label and test again.
Step 19: carry out the aging back functional test of complete machine, if by test, then execution in step 20; Otherwise, execution in step 8.
Step 20: in flow process control label, write 0xF0.
Step 21: reading flow process control label before the executive system test, if value is 0xF0, then execution in step 24; If value is not 0xF0, then execution in step 22.
Step 22: judge whether to exist fault according to faulty tag, if then execution in step 8; Otherwise, execution in step 23.
Step 23: return corresponding test post according to flow process control label and test again.
Step 24: the executive system test, if by test, then execution in step 25; If by test, then execution in step 8.
Step 25: in flow process control label, write 0xE0.
Step 26: carry out end and detect examination, judge whether flow process control label is 0xE0, if then execution in step 28; Otherwise, execution in step 27.
Step 27: confirm that inspection is not passed through eventually, return corresponding production station.
Step 28: confirm that inspection is passed through eventually.
So far, the performed whole testing processs of base station testing system leave it at that.
In the present embodiment, adopt the base station testing system of the automation of redesign that base station equipment is tested, should dispose at least two testing apparatuss in this base station testing system, base station equipment is every through a test post on the test streamline, corresponding testing device just reads the test data that has write from tested base station equipment, and determine that according to the test data that reads base station equipment is not after tested or during the test by a last testing apparatus, this base station equipment is carried out the test in current post, and generate corresponding test data, and the test data that generates is write base station equipment according to test result.Like this, just effectively avoid in testing process the harmful effect that brings owing to the manual operation error, improved the execution efficient of whole production flow process.Be specially:
(1) because base station testing system is noted its execution result under each link automatically in the memory of base station equipment, need not carry out the Fault Identification training to producers, because base station testing system can carry out automatic record for the change of carrying out link in the production process, need not carry out secondary even repeatedly training to producers, also need not flow process control personnel's intervention;
(2) because flow process control label is stored in the memory of base station equipment, therefore problem such as can not occur wearing and tearing, lose in the whole production flow process.Aborning and base station equipment enter any stage of using in the outfield and can inquire about its state easily;
(3) the whole production testing process need not producers and quality personnel's intervention, and system can the objective execution result of noting product in each link truly.Be convenient to the fault location and the maintenance of base station equipment on the one hand; Stopped the problem that false retrieval, omission and individual persons are faked in the production procedure on the other hand, guaranteed that every product that dispatches from the factory all passes through complete, strict testing process;
(4) the whole checking functions of base station testing system is convenient to the quality personnel and is carried out final dispatching from the factory and detect and sampling observation.
Further, the application program that base station testing system among the present invention uses uses C Plus Plus to write, and be packaged into the dynamic link library form, and externally providing and read, write the interface of controlling label and faulty tag with modification process, convenient test program for each link in producing calls.The corresponding relation of test event and tag addresses is stored in the database, and password is set, and is open to producers, on the one hand, prevented that effectively individual persons malice from distorting the behavior of test result, guaranteed fairness, the objectivity of test result; On the other hand, when the engineer need make amendment, increase and decrease or add new failure modes and solution test event, can directly open database and operate, needn't the update routine code, improved the efficient of testing software upgrading on the production line greatly.
Obviously, those skilled in the art can carry out various changes and modification to the present invention and not break away from the spirit and scope of the present invention.Like this, if of the present invention these are revised and modification belongs within the scope of claim of the present invention and equivalent technologies thereof, then the present invention also is intended to comprise these changes and modification interior.

Claims (14)

1. a base station test method is characterized in that, comprising:
Testing apparatus reads the test data that has write from tested base station equipment;
When described testing apparatus determines that according to the test data that reads described base station equipment is not tested by the last time after tested or, described base station equipment is worked as Pretesting;
Described testing apparatus generates corresponding test data according to test result, and the test data that generates is write in the described base station equipment.
2. the method for claim 1 is characterized in that, described testing apparatus is preserved the test data that reads, and the test data that generates according to test result is preserved.
3. method as claimed in claim 2 is characterized in that, the test data that described testing apparatus is preserved presents.
4. method as claimed in claim 2 is characterized in that, described testing apparatus reports to background server with the test data of preserving, or/and, receive the bookkeeping indication that background server issues.
5. as each described method of claim 1-4, it is characterized in that described testing apparatus is worked as Pretesting to described base station equipment, comprising:
Described base station equipment is carried out single-board testing, the aging preceding functional test of complete machine, burn-in test, the aging back functional test of complete machine or system testing.
6. as each described method of claim 1-4, it is characterized in that described testing apparatus generates corresponding test data according to test result, comprising:
When determining described base station equipment by test according to test result, directly generation is used for the test data that characterization test passes through;
When determining that according to test result described base station equipment is not passed through test, will not carry out step-by-step and be used for the unsanctioned test data of characterization test with the generation of operation back by test items corresponding parameters value.
7. a testing apparatus is characterized in that, comprising:
The I/O processing unit is used for reading the test data that has write from tested base station equipment, and the test data that this testing apparatus is generated writes in the described base station equipment;
Test cell, be connected with described I/O processing unit, when being used for determining described base station equipment after tested or by last test, described base station equipment being worked as Pretesting, and generate corresponding test data according to test result according to the test data that the I/O processing unit reads.
8. testing apparatus as claimed in claim 7 is characterized in that, described testing apparatus further comprises:
Memory cell is connected with described test cell with described I/O processing unit, is used to preserve the test data that the I/O processing unit reads, and preserves the test data that described test cell generates according to test result.
9. testing apparatus as claimed in claim 8 is characterized in that, described testing apparatus further comprises:
User interface section is connected with described test cell, is used to present the test data of preservation.
10. testing apparatus as claimed in claim 8 is characterized in that, described testing apparatus further comprises:
The Network Transmission control unit is connected with described memory cell, and the test data that is used for preserving reports to background server, or/and, receive the bookkeeping indication that background server issues.
11. as each described testing apparatus of claim 7-10, it is characterized in that, when described test cell generates test data according to test result, comprising:
When determining described base station equipment by test according to test result, directly generation is used for the test data that characterization test passes through;
When determining that according to test result described base station equipment is not passed through test, will not carry out step-by-step and be used for the unsanctioned test data of characterization test with the generation of operation back by test items corresponding parameters value.
12. testing apparatus as claimed in claim 11 is characterized in that, described test cell carries out current test to described base station equipment and comprises:
Described base station equipment is carried out single-board testing, the aging preceding functional test of complete machine, burn-in test, the aging back functional test of complete machine or system testing.
13. base station testing system, comprise at least two in order to base station equipment is carried out the testing apparatus of production test, it is characterized in that, any testing apparatus is used for reading the test data that has write from tested base station equipment, and determine that according to the test data that reads described base station equipment is not after tested or during the test by a last testing apparatus, described base station equipment is worked as Pretesting, and generate corresponding test data, and the test data that generates is write described base station equipment according to test result.
14. base station testing system as claimed in claim 13 is characterized in that, described base station testing system comprises five testing apparatuss, is respectively applied for single-board testing, the aging preceding functional test of complete machine, burn-in test, the aging back functional test of complete machine and system testing.
CN2011100825087A 2011-04-01 2011-04-01 Method, device and system for testing base station Pending CN102149122A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100825087A CN102149122A (en) 2011-04-01 2011-04-01 Method, device and system for testing base station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100825087A CN102149122A (en) 2011-04-01 2011-04-01 Method, device and system for testing base station

Publications (1)

Publication Number Publication Date
CN102149122A true CN102149122A (en) 2011-08-10

Family

ID=44423055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100825087A Pending CN102149122A (en) 2011-04-01 2011-04-01 Method, device and system for testing base station

Country Status (1)

Country Link
CN (1) CN102149122A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104244312A (en) * 2014-09-29 2014-12-24 上海原动力通信科技有限公司 Multi-item test method for RRU (remote radio unit) base station
CN113589762A (en) * 2020-04-30 2021-11-02 致伸科技股份有限公司 External hanging type production auxiliary management and control system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1485740A (en) * 2002-09-23 2004-03-31 上海贝尔有限公司 General purpose testing arrangement for embedded module and subsystem based on host machine platform
CN1490945A (en) * 2002-10-18 2004-04-21 华为技术有限公司 Communication facility performance testing method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1485740A (en) * 2002-09-23 2004-03-31 上海贝尔有限公司 General purpose testing arrangement for embedded module and subsystem based on host machine platform
CN1490945A (en) * 2002-10-18 2004-04-21 华为技术有限公司 Communication facility performance testing method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104244312A (en) * 2014-09-29 2014-12-24 上海原动力通信科技有限公司 Multi-item test method for RRU (remote radio unit) base station
CN104244312B (en) * 2014-09-29 2017-10-13 上海原动力通信科技有限公司 A kind of entry method of testing for RRU base stations
CN113589762A (en) * 2020-04-30 2021-11-02 致伸科技股份有限公司 External hanging type production auxiliary management and control system

Similar Documents

Publication Publication Date Title
CN107193730A (en) A kind of interface test method of automation
CN108268023B (en) Remote fault diagnosis method and system for rail transit platform door
CN109656205B (en) Defective product control method and device, electronic device and readable storage medium
CN111444051B (en) Whole machine yield testing method and system for product
CN107291063A (en) Diagnostic device and diagnostic method for the operation of monitoring technology facility
CN109495165B (en) OTDR test method based on industrial Internet platform
CN106771693A (en) Aging Auto-Test System and method
CN107966648B (en) A kind of embedded failure diagnosis method based on correlation matrix
CN108626845A (en) Air conditioner controller test and test result tracing method, device and system
CN111330871B (en) Quality classification method and device
CN102149122A (en) Method, device and system for testing base station
CN110554956B (en) BDMS automatic test method
CN110704252A (en) Automatic testing device and testing method based on cloud dynamic management
CN104678292B (en) A kind of complex programmable logic device (CPLD) test method and device
CN113779857A (en) Method and system for intelligent fault diagnosis center of tested aging device
CN115599576A (en) Method for verifying patching algorithm, electronic equipment and storage medium
CN116244188A (en) Automatic test method and system for interface isolation control
CN115934513A (en) Demand analysis and test design adaptation method, device, equipment and medium
CN109783263B (en) Method and system for processing aging test fault of server
CN108763063B (en) Software defect detection method without defect labeling data
Wen-Hong et al. The software quality evaluation method based on software testing
CN113806593A (en) Communication abnormity detection method and device for wind power plant and plant controller
CN109374038A (en) A kind of changed test method of the nuclear safe level instrument control product based on application model machine
CN105446857A (en) Fault diagnosis method and system
CN117571742B (en) Method and device for realizing chip quality inspection based on artificial intelligence

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110810