CN102134846A - 布置在山体内部的地下式船闸 - Google Patents

布置在山体内部的地下式船闸 Download PDF

Info

Publication number
CN102134846A
CN102134846A CN201110048428XA CN201110048428A CN102134846A CN 102134846 A CN102134846 A CN 102134846A CN 201110048428X A CN201110048428X A CN 201110048428XA CN 201110048428 A CN201110048428 A CN 201110048428A CN 102134846 A CN102134846 A CN 102134846A
Authority
CN
China
Prior art keywords
downstream
upstream
lock
valve well
shiplock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201110048428XA
Other languages
English (en)
Other versions
CN102134846B (zh
Inventor
钮新强
童迪
吴俊东
李洪斌
周述达
郑立平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang Design Group Co.,Ltd.
Original Assignee
Changjiang Water Resources Commission Changjiang Institute Of Survey Planning Design And Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changjiang Water Resources Commission Changjiang Institute Of Survey Planning Design And Research filed Critical Changjiang Water Resources Commission Changjiang Institute Of Survey Planning Design And Research
Priority to CN201110048428XA priority Critical patent/CN102134846B/zh
Publication of CN102134846A publication Critical patent/CN102134846A/zh
Application granted granted Critical
Publication of CN102134846B publication Critical patent/CN102134846B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Landscapes

  • Barrages (AREA)
  • Revetment (AREA)

Abstract

布置在山体内部地下式船闸,它包括连接船闸主体段(3)的上游引航道(2)和下游引航道(4),船闸主体段(3)由上闸首(20)、闸室(22)和下闸首(21)组成,在船闸上闸首(20)设有上游挡水门槽(6),在上游挡水门槽(6)后设有上游工作门(7),在船闸下闸首(21)设有下游工作门(8),下游工作门(8)后设有下游检修门槽(15),船闸采用钢筋混凝土衬砌结构。本发明在高山狭谷地区的水利水电枢纽上修建船闸时,通过洞挖代替明挖,较多地节省船闸的工程量、造价;配合修建大坝,改善上、下游河道的通航条件,为河道向上游拓展通航里程,发展山区的水运交通,提供了美好的前景。

Description

布置在山体内部的地下式船闸
技术领域
本发明涉及一种船闸,更具体地说它是一种布置在山体内部的地下式船闸。它将船闸的主体建筑物布置在山体内部,为全衬砌钢筋混凝土结构。
背景技术
对于河床狭窄、两岸山体高陡的枢纽坝址,根据布置需要,当船闸线路位于河岸高陡山体部位时,主体结构需要深切开挖山体修建,闸槽两侧形成高陡开挖边坡,为了保证开挖边坡的长期稳定,满足船闸安全运行要求,边坡加固支护的设计和施工技术难度大、工程量及造价均较高,对于大型船闸,这种工程施工,少则上亿,多则几亿,甚至更多。
在水电建设日益向河道上游推进的情况下,山区河流的枢纽建设经常会遇到坝址河床狭窄、两岸山体高陡的地形。在这些坝址进行枢纽的总体布置时,河床宽度往往会被泄洪建筑物所占据,使船闸无法在河床中进行布置。
因此,发明一种新的船闸布置,适应河床狭窄、两岸山体高陡的枢纽坝址的总布置,克服工程施工技术难度大、工程量及造价均较高的缺点,是一项极具意义的工作。
发明内容
本发明的目的在于克服上述现有背景技术的不足之处,而提供一种布置在山体内部的地下式船闸。它能较大幅度地减少开挖量,不会形成人工高陡边坡,同时也减少了对高陡边坡的支护费用,结构布局简单合理。
地下式船闸是指在船闸顶部通航净空以上的岩体,有足够的覆盖厚度,岩石的成洞条件较好时,充分利用岩体的自稳条件,采用洞挖,将船闸的主体建筑物布置在山体内部的船闸。
地下式船闸的闸首、闸室及输水系统结构,可以采用与洞挖后的岩面相结合的衬砌式结构。
本发明的目的是通过如下措施来达到的:布置在山体内部的地下式船闸,其特征在于它包括连接船闸主体段的上游引航道和下游引航道,位于山体内的船闸主体段,船闸主体段由上闸首、闸室和下闸首组成,在上游引航道和下游引航道设有上游导航墙和下游导航墙,在船闸上闸首设有上游挡水门槽,在上游挡水门槽后设有上游工作门,在船闸下闸首设有下游工作门,下游工作门后设有下游检修门槽;在船闸主体段的两侧设有输水主廊道,输水主廊道连通闸室底板内的输水支廊道,所述船闸采用钢筋混凝土衬砌结构。
在上述技术方案中,在所述上游引航道的两侧设有上游引航道开挖边坡,在所述下游引航道的两侧设有下游引航道开挖边坡。
在上述技术方案中,在所述输水主廊道的上游布置有上游工作阀门井,上游工作阀门井的上游设有第一检修阀门井,工作阀门井的下游还设有第二检修阀门井。
在上述技术方案中,在所述的输水主廊道的下游布置有工作阀门井,所述下游工作阀门井的上游设有第三检修阀门井,工作阀门井的下游还设有第四检修阀门井。
在本发明中上游导航墙上标上游校核洪水位,上游最高通航水位,上游最低通航水位。下游导航墙上标下游最高通航水位,下游最低通航水位。
本发明地下式船闸目前尚无应用的实例,也未见相关的研究,地下式船闸是一种新型的船闸布置型式,包括:上下闸首、闸室、输水系统均为钢筋混凝土衬砌结构,充分利用墙后岩体与混凝土衬砌墙联合受力,共同承受结构外荷载,在高水位工况下,利用墙后岩体的支承作用以抵抗闸门推力、内水压力等荷载;在完建、检修工况下,利用锚杆将衬砌体与岩体联成整体,共同承受渗压力等荷载。
在相同的地形、地质条件下,地下式船闸与明挖式船闸相比,可更大程度地节省石方开挖和支护工程量,相应地获得更大的经济效益。
附图说明
图1为本发明地下式船闸的纵剖面图。
图2为本发明地下式船闸的平面布置图。
图3为本发明地下式船闸的上闸首横剖面图(A-A剖)。
图4为本发明地下式船闸的下闸首横剖面图(B-B剖)。
图5为本发明地下式船闸闸室的横剖面图(C-C剖)。
图6为本发明地下式船闸闸室的横剖面图(D-D剖)。
图中1.山体,2.上游引航道,3.船闸主体段,4.下游引航道,5-1.上游导航墙,5-2.下游导航墙,6.上游挡水门槽,7.上游工作门,8.下游工作门,9.输水主廊道,10.输水支廊道,11.下游引航道开挖边坡,12.第一检修阀门井,13.上游工作阀门井,14.第二检修阀门井,15.下游检修门槽,16.下游工作阀门井,17.第三检修阀门井,18.第四检修阀门井,19.上游引航道开挖边坡,20.上闸首,21.下闸首,22.闸室,23.闸门室。
具体实施方式
下面结合附图详细说明本发明的实施情况,但它们并不构成对本发明的限定,仅作举例而已。同时通过说明本发明的优点将变得更加清楚和容易理解。
参阅附图可知:本发明布置在山体内部的地下式船闸,它包括连接船闸主体段3的上游引航道2和下游引航道4,位于山体1内的船闸主体段3,船闸主体段3由上闸首20、闸室22和下闸首21组成,在上游引航道2和下游引航道4设有上游导航墙5-1和下游导航墙5-2,在船闸上闸首20设有上游挡水门槽6,在上游挡水门槽6后设有上游工作门7,在船闸下闸首21设有下游工作门8,下游工作门8后设有下游检修门槽15。在船闸主体段3的两侧设有输水主廊道9,输水主廊道9连通闸室22底板内的输水支廊道10,所述船闸采用钢筋混凝土衬砌结构。在所述上游引航道2的两侧为上游引航道开挖边坡19,在所述下游引航道4的两侧为下游引航道开挖边坡11(如图1、图2、图3、图4、图5、图6所示)。。
在所述输水主廊道9的上游布置有上游工作阀门井13。上游工作阀门井13的上游设有第一检修阀门井12,工作阀门井13的下游还设有第二检修阀门井14。在所述的输水主廊道9的下游布置有工作阀门井16,所述下游工作阀门井16的上游设有第三检修阀门井17,工作阀门井16的下游还设有第四检修阀门井18(如图1、图2、图3、图4、图5、图6所示)。
本发明在枢纽有省水的要求时,也可以充分利用基础岩石较好的条件,在船闸主体结构旁侧,通过洞挖和衬砌修建地下节水池。
地下式船闸目前尚无应用的实例,在国内外至今也未见到有关类似发明的报导,是船闸建筑工程中,一种全新的布置型式。在高山狭谷地区的水利水电枢纽上修建船闸时,通过洞挖代替明挖,船闸的主体结构采用钢筋混凝土衬砌结构,充分利用墙后岩体与混凝土衬砌墙联合受力,在高水位工况下,利用墙后岩体的支承作用以抵抗闸门推力、内水压力等荷载;在完建、检修工况下,利用锚杆将衬砌墙与两侧岩体联成整体,共同承受渗压力等荷载,较多地节省船闸的工程量、造价;配合修建大坝,改善上、下游河道的通航条件,为河道向上游拓展通航里程,发展山区的水运交通,提供了美好的前景。
其它未详细说明的部分均为现有技术。

Claims (4)

1.布置在山体内部的地下式船闸,其特征在于它包括连接船闸主体段(3)的上游引航道(2)和下游引航道(4),位于山体(1)内的船闸主体段(3),船闸主体段(3)由上闸首(20)、闸室(22)和下闸首(21)组成,在上游引航道(2)和下游引航道(4)设有上游导航墙(5-1)和下游导航墙(5-2),在船闸上闸首(20)设有上游挡水门槽(6),在上游挡水门槽(6)后设有上游工作门(7),在船闸下闸首(21)设有下游工作门(8),下游工作门(8)后设有下游检修门槽(15),在船闸主体段(3)的两侧设有输水主廊道(9),输水主廊道(9)连通闸室(22)底板内的输水支廊道(10),所述船闸采用钢筋混凝土衬砌结构。
2.根据权利要求1所述的布置在山体内部的地下式船闸,其特征在于在所述上游引航道(2)的两侧设有上游引航道开挖边坡(19),在所述下游引航道(4)的两侧设有下游引航道开挖边坡(11)。
3.根据权利要求1所述的布置在山体内部的地下式船闸,其特征在于在所述输水主廊道(9)的上游布置有上游工作阀门井(13),上游工作阀门井(13)的上游设有第一检修阀门井(12),工作阀门井(13)的下游还设有第二检修阀门井(14)。
4.根据权利要求1或3所述的布置在山体内部的地下式船闸,其特征在于在所述的输水主廊道(9)的下游布置有工作阀门井(16),所述下游工作阀门井(16)的上游设有第三检修阀门井(17),工作阀门井(16)的下游还设有第四检修阀门井(18)。
CN201110048428XA 2011-03-01 2011-03-01 布置在山体内部的地下式船闸 Active CN102134846B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110048428XA CN102134846B (zh) 2011-03-01 2011-03-01 布置在山体内部的地下式船闸

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110048428XA CN102134846B (zh) 2011-03-01 2011-03-01 布置在山体内部的地下式船闸

Publications (2)

Publication Number Publication Date
CN102134846A true CN102134846A (zh) 2011-07-27
CN102134846B CN102134846B (zh) 2013-01-09

Family

ID=44294758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110048428XA Active CN102134846B (zh) 2011-03-01 2011-03-01 布置在山体内部的地下式船闸

Country Status (1)

Country Link
CN (1) CN102134846B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102518093A (zh) * 2012-01-10 2012-06-27 卢现立 一种投资少工期短的水电站布局结构及其施工方法
CN102535422A (zh) * 2011-12-13 2012-07-04 贾福裕 一种水利升船系统
CN102535423A (zh) * 2012-02-01 2012-07-04 水利部交通运输部国家能源局南京水利科学研究院 船闸坝上非正交布置方法
CN102561290A (zh) * 2012-01-31 2012-07-11 河海大学 集通航、发电和泄洪为一体的船闸
CN102605756A (zh) * 2012-04-01 2012-07-25 长江水利委员会长江科学院 船闸自动防淤廊道系统
CN102691285A (zh) * 2012-05-29 2012-09-26 河海大学 一种解决误载水深的航道升船机装置及方法
CN104153338A (zh) * 2014-08-18 2014-11-19 中国电建集团成都勘测设计研究院有限公司 船闸和河床式水电站厂房联合结构
CN106759210A (zh) * 2017-01-17 2017-05-31 汪哲荪 埋置式自浮动垂直升降船闸及其运行方法
CN109706906A (zh) * 2019-02-18 2019-05-03 河海大学 一种三角门船闸开通闸运行的控制方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4310769A (en) * 1979-10-17 1982-01-12 Bechtel International Corporation Ship lock system with hydroelectric pumped-storage capability
CN1099834A (zh) * 1994-05-25 1995-03-08 余江 集合船闸
EP0937824A1 (de) * 1998-02-20 1999-08-25 Büro für Industrieplanung Dipl.-Ing. Pieper und Partner GmbH Stossschutzeinrichtung für Schleusen

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4310769A (en) * 1979-10-17 1982-01-12 Bechtel International Corporation Ship lock system with hydroelectric pumped-storage capability
CN1099834A (zh) * 1994-05-25 1995-03-08 余江 集合船闸
EP0937824A1 (de) * 1998-02-20 1999-08-25 Büro für Industrieplanung Dipl.-Ing. Pieper und Partner GmbH Stossschutzeinrichtung für Schleusen

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《人民长江》 19920530 宋维邦 三峡水利枢纽船闸设计 1-6 1-4 第23卷, 第5期 *
《人民长江》 20030830 钮新强 长江三峡水利枢纽通航建筑物设计 58-62 1-4 第34卷, 第8期 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535422B (zh) * 2011-12-13 2014-03-26 贾福裕 一种水利升船系统
CN102535422A (zh) * 2011-12-13 2012-07-04 贾福裕 一种水利升船系统
CN102518093B (zh) * 2012-01-10 2015-06-17 卢现立 一种投资少工期短的水电站布局结构及其施工方法
CN102518093A (zh) * 2012-01-10 2012-06-27 卢现立 一种投资少工期短的水电站布局结构及其施工方法
CN102561290A (zh) * 2012-01-31 2012-07-11 河海大学 集通航、发电和泄洪为一体的船闸
CN102535423B (zh) * 2012-02-01 2014-07-16 水利部交通运输部国家能源局南京水利科学研究院 船闸坝上非正交布置方法
CN102535423A (zh) * 2012-02-01 2012-07-04 水利部交通运输部国家能源局南京水利科学研究院 船闸坝上非正交布置方法
CN102605756A (zh) * 2012-04-01 2012-07-25 长江水利委员会长江科学院 船闸自动防淤廊道系统
CN102691285A (zh) * 2012-05-29 2012-09-26 河海大学 一种解决误载水深的航道升船机装置及方法
CN102691285B (zh) * 2012-05-29 2015-04-01 河海大学 一种解决误载水深的航道升船机装置及方法
CN104153338A (zh) * 2014-08-18 2014-11-19 中国电建集团成都勘测设计研究院有限公司 船闸和河床式水电站厂房联合结构
CN106759210A (zh) * 2017-01-17 2017-05-31 汪哲荪 埋置式自浮动垂直升降船闸及其运行方法
CN109706906A (zh) * 2019-02-18 2019-05-03 河海大学 一种三角门船闸开通闸运行的控制方法

Also Published As

Publication number Publication date
CN102134846B (zh) 2013-01-09

Similar Documents

Publication Publication Date Title
CN102134846B (zh) 布置在山体内部的地下式船闸
Hong Typical underwater tunnels in the mainland of China and related tunneling technologies
Chen et al. Long rectangular box jacking project: a case study
CN104165056A (zh) 一种富水浅埋暗挖隧道的开挖施工方法
CN201874614U (zh) 引水隧洞放空检修排水结构
CN101598022A (zh) 立井一次成巷的施工方法
Liu et al. A case study on key techniques for long-distance sea-crossing shield tunneling
Giramonti et al. Conceptual design of compressed air energy storage electric power systems
CN103603666B (zh) 一种尾矿库采砂方法
CN204059460U (zh) 电厂循环水系统的内河水取水口结构
Goel Status of tunnelling and underground construction activities and technologies in India
CN104120696B (zh) 环保型贴坡式拦污栅结构及其建造方法
CN202989895U (zh) 山体船闸
CN104074234B (zh) 电厂循环水系统的内河水取水口结构及其施工方法
CN202416325U (zh) 一种浅层基坑围护结构
CN212865778U (zh) 一种抗震坝顶结构
CN204000796U (zh) 河床式水电站结构
KR101290920B1 (ko) 조력발전소용 수차구조물
CN102031821B (zh) 软土地基海滨电厂循环水桩墙式排水口
CN202148496U (zh) 齿墙式箱涵透空进海路结构
CN110144861A (zh) 一种多沙河流水利发电站的排沙结构及方法
CN201738228U (zh) 一种支撑于防波堤上的通道结构
CN111677512A (zh) 一种竖井式引水隧道开挖方法
CN115045670B (zh) 一种输水隧洞岩石顶管法与钻爆法组合施工方法
CN110513121B (zh) 一种蛋壳形灌浆隧洞避车洞结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No. 1863, Jiefang Avenue, Hankou, Jiang'an District, Wuhan, Hubei 430010

Patentee after: Changjiang Design Group Co.,Ltd.

Address before: No. 1863, Jiefang Avenue, Hankou, Jiang'an District, Wuhan, Hubei 430010

Patentee before: CHANGJIANG WATER RESOURCES COMMISSION CHANGJIANG INST OF SURVEY PLANNING DESIGN AND RES

CP01 Change in the name or title of a patent holder