CN102128051A - Method for filling gob area with attal in coal mine underhole - Google Patents

Method for filling gob area with attal in coal mine underhole Download PDF

Info

Publication number
CN102128051A
CN102128051A CN 201110058002 CN201110058002A CN102128051A CN 102128051 A CN102128051 A CN 102128051A CN 201110058002 CN201110058002 CN 201110058002 CN 201110058002 A CN201110058002 A CN 201110058002A CN 102128051 A CN102128051 A CN 102128051A
Authority
CN
China
Prior art keywords
attal
granularity
coal
spoil
filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110058002
Other languages
Chinese (zh)
Inventor
柏建彪
王襄禹
徐营
冯伟
陈勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN 201110058002 priority Critical patent/CN102128051A/en
Publication of CN102128051A publication Critical patent/CN102128051A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to a method for filling a gob area with attal in a coal mine underhole. The method comprises the following steps of: directly crushing and screening a mixture of coal and attal which are mined from an underhole stope working surface, conveying the mixture material with the granularity larger than or equal to 40mm into a coal-and-attal selective crusher to crush again and then grading; adding a suitable amount of water to the crushed attal with the granularity smaller than 30mm and fully stirring and mixing into a pumpable plastic condensed material; and directly conveying the stirred condensed material to a gob area for filling through a pipeline pump by an attal conveying pump. Through separating underhole coal and attal to directly fill the gob area, the invention reduces ground depression and lightens lifting pressure in transmission while reducing the occupation area and the pollution of an attal mountain without a special bracket or rod-casting system or underhole attal cabin and has the advantages of high filling speed, simple filling method, strong reliability, less investment and low cost.

Description

The method of filling goaf by gangue under a kind of coal mine
Technical field
The present invention relates to the method for bashing, especially a kind of method that is applicable to filling goaf by gangue under the bigger coal mine of bastard coal difference in hardness.
Background technology
It is the topmost environmental problem root of Coal Production that open-air discharging of gangue and surface subsidence destroy, and is the key factor that influences mining area economic development and social stability.Filling goaf by gangue can reduce surface subsidence under the coal mine, realizes that spoil does not go out well, alleviates the pressure that transportation promotes, and reduces the floor space and the pollution of hillock simultaneously.The downhole gangue bashing needs special support, throws the cash system and sets up the downhole gangue storehouse at present, and investment is big, the cost height.
Summary of the invention
Technical problem: the objective of the invention is to overcome the deficiency in the prior art, provide a kind of and need not special support, need not to throw the cash system and set up the downhole gangue storehouse, directly bastard coal separated then method with the gangue pump packing goaf in the down-hole.
Technical scheme: the method for filling goaf by gangue under the coal mine of the present invention comprises the steps:
A, the bastard coal compound under the down-hole stope adopted are transported to the discaling roll formula Sizing Crusher that is located in the haulage way and are carried out fragmentation, and the bastard coal compound is broken for granularity smaller or equal to 80mm;
B, then with granularity smaller or equal to 80mm the bastard coal compound directly flow to the underground vibrating classifying screen and sieve through belt, granularity enters the coal conveyer belt less than the material of 40mm and transports, and granularity is sent into the bastard coal bradford breaker more than or equal to the material of 40mm and carried out once more broken;
C, the material behind the selective crushing crusher machine are again by the spiral classifier classification, granularity enters the coal conveyer belt less than the coal of 40mm and transports, granularity is carried out fragmentation once more more than or equal to the spoil of 40mm through the pair roller type Sizing Crusher, is broken into the spoil of granularity less than 30mm;
D, in the spoil of granularity, add entry less than 30mm, its quality ratio range is: water is 10 ~ 30%, spoil is 70 ~ 90%, fully stirs by the twin-shaft screw-type mixer that is located at the down-hole, and the thick material after directly will stirring by the spoil delivery pump is delivered to the goaf through tubing pump and carried out filling.
Beneficial effect: the present invention has realized that the down-hole bastard coal directly separates and transhipment, direct pumping bashing after the spoil fragmentation that the down-hole is separated, solved the direct separation problem of down-hole bastard coal, and make the direct bashing of spoil after the separation, reduced surface subsidence, alleviated the pressure that transportation promotes, reduced the floor space and the pollution of hillock simultaneously, need not special support, need not to throw the pole system and set up the downhole gangue storehouse, filling velocity is fast, placement method is simple, has realized that working face extraction and bashing carry out good reliability simultaneously, small investment, cost is low, has practicality widely in the present technique field.
The specific embodiment
The method of filling goaf by gangue under the coal mine of the present invention, the bastard coal compound under directly the down-hole stope being adopted is transported to the discaling roll formula Sizing Crusher that is located in the haulage way and is carried out the one-level fragmentation, and the bastard coal compound is broken for granularity smaller or equal to 80mm; Granularity is directly flowed to the underground vibrating classifying screen through belt smaller or equal to the bastard coal compound of 80mm sieves, granularity enters the coal conveyer belt less than the material of 40mm and transports, granularity is sent into the bastard coal bradford breaker more than or equal to the material of 40mm and is carried out once more broken, utilize the nonhomogeneous hardness of bastard coal, identical impact force makes the lower coarse coal of hardness be broken into fritter, and the bulk spoil keeps original lumpiness substantially; Material behind the selective crushing crusher machine is again by the spiral classifier classification, granularity enters the coal conveyer belt less than the coal of 40mm and transports, granularity is carried out fragmentation once more more than or equal to the spoil of 40mm through the pair roller type Sizing Crusher, is broken into the spoil of granularity less than 30mm; In the spoil of granularity, add entry less than 30mm, its quality ratio range is: water is 10 ~ 30%, spoil is 70 ~ 90%, fully stir by the twin-shaft screw-type mixer that is located at the down-hole, but be mixed into the mobile thick material of pump plasticity, the thick material after directly will stirring by the spoil delivery pump is delivered to the goaf through tubing pump and is carried out filling.

Claims (1)

1. the method for filling goaf by gangue under the coal mine is characterized in that: comprise the steps:
A, the bastard coal compound under the down-hole stope adopted are transported to the discaling roll formula Sizing Crusher that is located in the haulage way and are carried out fragmentation, and the bastard coal compound is broken for granularity smaller or equal to 80mm;
B, then granularity is directly flowed to the underground vibrating classifying screen through belt smaller or equal to the bastard coal compound of 80mm and sieve, granularity enters the coal conveyer belt less than the material of 40mm and transports, and granularity is sent into the bastard coal bradford breaker more than or equal to the material of 40mm and carried out once more broken;
C, the material behind the selective crushing crusher machine are again by the spiral classifier classification, granularity enters the coal conveyer belt less than the coal of 40mm and transports, granularity is carried out fragmentation once more more than or equal to the spoil of 40mm through the pair roller type Sizing Crusher, is broken into the spoil of granularity less than 30mm;
D, in the spoil of granularity, add entry less than 30mm, its quality ratio range is: water is 10 ~ 30%, spoil is 70 ~ 90%, fully stir by the twin-shaft screw-type mixer that is located at the down-hole, but form the mobile thick material of pump plasticity, the thick material after directly will stirring by the spoil delivery pump is then delivered to the goaf through tubing pump and is carried out filling.
CN 201110058002 2011-03-11 2011-03-11 Method for filling gob area with attal in coal mine underhole Pending CN102128051A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110058002 CN102128051A (en) 2011-03-11 2011-03-11 Method for filling gob area with attal in coal mine underhole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110058002 CN102128051A (en) 2011-03-11 2011-03-11 Method for filling gob area with attal in coal mine underhole

Publications (1)

Publication Number Publication Date
CN102128051A true CN102128051A (en) 2011-07-20

Family

ID=44266300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110058002 Pending CN102128051A (en) 2011-03-11 2011-03-11 Method for filling gob area with attal in coal mine underhole

Country Status (1)

Country Link
CN (1) CN102128051A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103133031A (en) * 2013-02-28 2013-06-05 中国矿业大学 Method and equipment for separating, conveying and filling underground coal and gangues
WO2014131323A1 (en) * 2013-02-28 2014-09-04 中国矿业大学 Method and device for using gangue aboveground to backfill mine goaf
CN104453994A (en) * 2014-11-18 2015-03-25 中国矿业大学(北京) Gob-side entry retaining method for putting top waste rock down to achieve roadway side packing
CN104879162A (en) * 2015-05-29 2015-09-02 中国矿业大学(北京) Reasonable gangue dropping and gob-side entry retaining method of top coal caving face
CN106499435A (en) * 2016-11-29 2017-03-15 重庆大学 A kind of placement method of underground goaf and filling system
CN108757023A (en) * 2018-07-09 2018-11-06 中国矿业大学 A method of exploiting displacement coal column using spoil strip filling
CN110439610A (en) * 2019-08-30 2019-11-12 陕西开拓建筑科技有限公司 A kind of remote slurry filling transportation system in coal mine gob and method
CN111841846A (en) * 2020-07-23 2020-10-30 中国矿业大学 Efficient water-saving type coal resource upgrading process for underground separation and pre-discharge of gangue
CN113638770A (en) * 2021-08-30 2021-11-12 烟台杰瑞石油装备技术有限公司 Goaf filling equipment and method and goaf filling structure
CN114233375A (en) * 2021-11-12 2022-03-25 中煤科工开采研究院有限公司 Pure gangue slurry filling material for mine filling and application thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101734887A (en) * 2008-11-26 2010-06-16 佟成林 Sintering-free self-igniting coal gangue novel wall material and production method thereof
CN101967993A (en) * 2010-09-30 2011-02-09 江苏中机矿山设备有限公司 Underground gangue sorting and filling system and method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101734887A (en) * 2008-11-26 2010-06-16 佟成林 Sintering-free self-igniting coal gangue novel wall material and production method thereof
CN101967993A (en) * 2010-09-30 2011-02-09 江苏中机矿山设备有限公司 Underground gangue sorting and filling system and method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103133031A (en) * 2013-02-28 2013-06-05 中国矿业大学 Method and equipment for separating, conveying and filling underground coal and gangues
WO2014131323A1 (en) * 2013-02-28 2014-09-04 中国矿业大学 Method and device for using gangue aboveground to backfill mine goaf
CN103133031B (en) * 2013-02-28 2015-05-20 中国矿业大学 Method and equipment for separating, conveying and filling underground coal and gangues
CN104453994A (en) * 2014-11-18 2015-03-25 中国矿业大学(北京) Gob-side entry retaining method for putting top waste rock down to achieve roadway side packing
CN104879162A (en) * 2015-05-29 2015-09-02 中国矿业大学(北京) Reasonable gangue dropping and gob-side entry retaining method of top coal caving face
CN106499435A (en) * 2016-11-29 2017-03-15 重庆大学 A kind of placement method of underground goaf and filling system
CN108757023A (en) * 2018-07-09 2018-11-06 中国矿业大学 A method of exploiting displacement coal column using spoil strip filling
CN110439610A (en) * 2019-08-30 2019-11-12 陕西开拓建筑科技有限公司 A kind of remote slurry filling transportation system in coal mine gob and method
CN111841846A (en) * 2020-07-23 2020-10-30 中国矿业大学 Efficient water-saving type coal resource upgrading process for underground separation and pre-discharge of gangue
CN113638770A (en) * 2021-08-30 2021-11-12 烟台杰瑞石油装备技术有限公司 Goaf filling equipment and method and goaf filling structure
CN113638770B (en) * 2021-08-30 2023-07-18 烟台杰瑞石油装备技术有限公司 Goaf filling equipment and method and goaf filling structure
CN114233375A (en) * 2021-11-12 2022-03-25 中煤科工开采研究院有限公司 Pure gangue slurry filling material for mine filling and application thereof

Similar Documents

Publication Publication Date Title
CN102128051A (en) Method for filling gob area with attal in coal mine underhole
CN101967993B (en) Underground gangue sorting and filling system and method
CN101008316B (en) Phosphogypsum cementing and post-filling mining method and pulping technology thereof
CN101215976B (en) Down-hole gangue pump packing system and method
CN102155261B (en) Paste combined filling method utilizing solid wastes of mine
CN103133031B (en) Method and equipment for separating, conveying and filling underground coal and gangues
CN106401586A (en) A coal-rock sorting and utilizing method for a coal-rock co-mining working surface
AU2014223132B2 (en) Method and device for using gangue aboveground to backfill mine goaf
CN106761754A (en) A kind of girdle comprehensive mining and gas control network one cooperative control system and method
CA2745066C (en) Continuous mining
CN201857994U (en) Downhole gangue sorting and filling system
CN112377247B (en) In-situ grouting filling method for in-situ separation of coal mine underground gangue
CN110030031A (en) The method that coal column is left in a kind of longwell recycling house column type goaf
CN103590851A (en) Underground waste-rock concrete preparation, pumping and filling system and method
CN106884675A (en) The technique that a kind of consolidated fill slurry fills underground goaf
CN104847357A (en) Pumper and pipeline transportation type semicontinuous mining transportation technology for open-pit mine
CN112796829A (en) Underground original gangue filling system and method for caving area of fully mechanized caving face
CN102162364B (en) Layout method for underground dense-medium shallow-slot coal preparation in coal mine
CN201982137U (en) Underground preparation device taking waste rock as aggregate concrete filling material
CN102661170A (en) Process and device for continuously stirring and filling paste-like body for mine manufactured by use of building waste
CN207813647U (en) Coordinative composition of equipments system for pumped downhole waste filling exploitation
CN105971605A (en) A non-waste mining method for underground mines
CN102808624A (en) System and method for simultaneous mining of coal gangue
CN103334784B (en) A kind of solid filling tilt feeding method
CN111841846A (en) Efficient water-saving type coal resource upgrading process for underground separation and pre-discharge of gangue

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110720