CN102116060A - Masonry construction technology of bearing wall body - Google Patents
Masonry construction technology of bearing wall body Download PDFInfo
- Publication number
- CN102116060A CN102116060A CN200910264290XA CN200910264290A CN102116060A CN 102116060 A CN102116060 A CN 102116060A CN 200910264290X A CN200910264290X A CN 200910264290XA CN 200910264290 A CN200910264290 A CN 200910264290A CN 102116060 A CN102116060 A CN 102116060A
- Authority
- CN
- China
- Prior art keywords
- wall
- masonry
- post
- column
- build
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention discloses a masonry construction technology of a bearing wall body, and belongs to masonry construction technology. The masonry construction technology comprises a series of working procedures, that is, the connection of turning corners of masonry and frame columns with a filler wall, the construction of a back masonry partition wall retaining wall, the construction of a door lintel on a block wall body, the tying of a back masonry wall and a poured concrete slab, and the arrangement of wall body reinforcing ribs. The masonry construction technology has the benefits that the technology is scientific and reasonable, and the quality of the wall body built by using the method is steady and the requirements for the building bearing wall body are met.
Description
Technical field
The present invention relates to a kind of bearing wall building construction technology., specifically be a kind of bearing wall building construction technology.
Background technology
The quality of building wall has a strong impact on whole workmanship.So the quality of reply building block is carried out strict control in construction work, but present building wall construction technology does not have the regulation of unified strictness, causes construction quality to be affected.
Summary of the invention
The invention provides a kind of building wall construction technology, utilize technology of the present invention can guarantee the construction quality of body of wall.
The present invention realizes with following technical scheme: a kind of bearing wall building construction technology, and concrete grammar is as follows;
1) corner of masonry, T-joint place should be built by laying bricks or stones simultaneously, and makes wall interlock in length and breadth, builds by laying bricks or stones when having any problem if sting stubble, should build in the mortar joint of junction and go into steel tie, and the reinforcing bar vertical interval is not more than 500mm, and 700mm is within the walls stretched on every limit, reinforcing bar two ends hook.The end of masonry must add constructional column and steel tie; The inner corner trim of allowable ratio of height to sectional thickness of masonry wall or column and external corner, and every about 4000mm constructional column is set along allowable ratio of height to sectional thickness of masonry wall or column, each expection is stayed 4 Φ 12 and constructional column to indulge muscle to be connected in upper and lower floor beam relevant position, and the body of wall lacing wire should be established in constructional column and brick wall junction;
2) frame column and infilled wall junction should be by the positions in the building operations, when structure construction, reserve steel tie every 500mm along wall, post height in wall, post are wide, and steel tie anchors into 200mm in the concrete, stretches out wall column crust 300mm; Every 500mm height is provided with reinforcing bar along the wall total length in the partition wall, and two ends and wall, post are reserved the tension rib welding;
3) partition wall is built when wall 〉=4 meter in the back, the elongated steel bar concrete collar tie beam that is connected with pillar in the setting of wall height middle part; Pre-buried and collar tie beam muscle welding during the post construction; When collar tie beam is met lintel, be provided with by cross section, arrangement of reinforcement the greater respectively;
4) door lintel on the blockwork adopts the C20 concrete, and crossing beam length is width of cave entrance+2a; The top, hole is when distance is crossed depth of beam less than concrete at the bottom of the beam, and lintel and beam are whole to be watered; When the hole side from the post limit less than a, in post when construction, is at the pre-buried connecting reinforcement in the vertical muscle relevant position of lintel;
5) every layer build at the bottom of the plate or at the bottom of the beam near the time, treat that building block is heavy up to build again to beam, plate bottom after real that hold out against with neck brick and beam, plate, block-by-block strikes tight block reality; If do not build at the bottom of floor or the beam, must establish and bear down on one;
6) build a wall after drawknot with cast-in-place plate: when constructing cast-in-place plate,, reserve anchor and draw reinforcing bar if at the bottom of the plate partition wall is arranged;
7) when partition wall corner does not establish post, the body of wall reinforcing rib should be set.
The invention has the beneficial effects as follows: craft science is reasonable, and is stable with the wall quality that this method assembles, the requirement of composite building bearing wall.
The specific embodiment
The corner of masonry, T-joint place should be built by laying bricks or stones simultaneously, and makes wall interlock in length and breadth, builds by laying bricks or stones when having any problem if sting stubble, should build in the mortar joint of junction and go into φ 6 steel ties, and the reinforcing bar vertical interval is not more than 500mm, and 700mm is within the walls stretched on every limit, reinforcing bar two ends hook.The end of masonry when concrete wall column (no) must add constructional column and steel tie.The inner corner trim of allowable ratio of height to sectional thickness of masonry wall or column and external corner, and every about 4000mm constructional column is set along allowable ratio of height to sectional thickness of masonry wall or column, the constructional column sectional dimension is wall thickness * 240mm, vertical muscle 4 Φ 12, stirrup φ 6@200, each expection stays the vertical muscle of 4 Φ 12 and constructional column to be connected constructional column and brick wall junction in upper and lower floor beam relevant position, should establish the body of wall lacing wire, shown in Fig. 7-5-1.Should build a wall earlier during construction and afterwards water constructional column.
Frame column, with the infilled wall junction, should be by the position in the architectural working drawing, when structure construction, in wall, post are wide, reserve 2 φ 6 " U " shape steel ties every 500mm along wall, post height, steel tie anchors into the interior 200mm of concrete, stretches out wall column crust 300mm.Every 500mm height is provided with 2 φ, 6 reinforcing bars along the wall total length in the partition wall, and two ends and wall, post are reserved the tension rib welding.
Partition wall is built when wall 〉=4 meter in the back, the elongated steel bar concrete collar tie beam that is connected with pillar in wall height middle part (top, door and window hole) setting.Sectional dimension: wall thickness * 150mm, vertical muscle be each 2 Φ 10 up and down, stirrup φ 6@200.Pre-buried 4 Φ 12 and the welding of collar tie beam muscle during post (concrete wall) construction.When collar tie beam is met lintel, be provided with by cross section, arrangement of reinforcement the greater respectively.
Door lintel on the blockwork adopts the C20 concrete, and crossing beam length is width of cave entrance+2a; The top, hole is when distance is crossed depth of beam less than concrete at the bottom of the beam, and lintel and beam are whole to be watered; When the hole side from post (wall) limit less than a, in post (concrete wall) when construction, is at the pre-buried connecting reinforcement in the vertical muscle relevant position of lintel.
Every layer build at the bottom of the plate or at the bottom of the beam near the time, should treat that building block is heavy up to build again to beam, plate bottom after real that hold out against with neck brick and beam, plate, block-by-block strikes tight block reality.If do not build at the bottom of floor or the beam, must establish and bear down on one.
After build a wall drawknot with cast-in-place plate: when constructing cast-in-place plate,, reserve φ 6@1500 anchor and draw reinforcing bar if at the bottom of the plate partition wall is arranged.
When partition wall corner does not establish post, the body of wall reinforcing rib should be set.
Claims (1)
1. bearing wall building construction technology is characterized in that:
1) corner of masonry, T-joint place should be built by laying bricks or stones simultaneously, and makes wall interlock in length and breadth, builds by laying bricks or stones when having any problem if sting stubble, should build in the mortar joint of junction and go into steel tie, and the reinforcing bar vertical interval is not more than 500mm, and 700mm is within the walls stretched on every limit, reinforcing bar two ends hook.The end of masonry must add constructional column and steel tie; The inner corner trim of allowable ratio of height to sectional thickness of masonry wall or column and external corner, and every about 4000mm constructional column is set along allowable ratio of height to sectional thickness of masonry wall or column, each expection is stayed 4 Φ 12 and constructional column to indulge muscle to be connected in upper and lower floor beam relevant position, and the body of wall lacing wire should be established in constructional column and brick wall junction;
2) frame column and infilled wall junction should be by the positions in the building operations, when structure construction, reserve steel tie every 500mm along wall, post height in wall, post are wide, and steel tie anchors into 200mm in the concrete, stretches out wall column crust 300mm; Every 500mm height is provided with reinforcing bar along the wall total length in the partition wall, and two ends and wall, post are reserved the tension rib welding;
3) partition wall is built when wall 〉=4 meter in the back, the elongated steel bar concrete collar tie beam that is connected with pillar in the setting of wall height middle part; Pre-buried and collar tie beam muscle welding during the post construction; When collar tie beam is met lintel, be provided with by cross section, arrangement of reinforcement the greater respectively;
4) door lintel on the blockwork adopts the C20 concrete, and crossing beam length is width of cave entrance+2a; The top, hole is when distance is crossed depth of beam less than concrete at the bottom of the beam, and lintel and beam are whole to be watered; When the hole side from the post limit less than a, in post when construction, is at the pre-buried connecting reinforcement in the vertical muscle relevant position of lintel;
5) every layer build at the bottom of the plate or at the bottom of the beam near the time, treat that building block is heavy up to build again to beam, plate bottom after real that hold out against with neck brick and beam, plate, block-by-block strikes tight block reality; If do not build at the bottom of floor or the beam, must establish and bear down on one;
6) build a wall after drawknot with cast-in-place plate: when constructing cast-in-place plate,, reserve anchor and draw reinforcing bar if at the bottom of the plate partition wall is arranged;
7) when partition wall corner does not establish post, the body of wall reinforcing rib should be set.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910264290XA CN102116060A (en) | 2009-12-30 | 2009-12-30 | Masonry construction technology of bearing wall body |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910264290XA CN102116060A (en) | 2009-12-30 | 2009-12-30 | Masonry construction technology of bearing wall body |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102116060A true CN102116060A (en) | 2011-07-06 |
Family
ID=44214972
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910264290XA Pending CN102116060A (en) | 2009-12-30 | 2009-12-30 | Masonry construction technology of bearing wall body |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102116060A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103821252A (en) * | 2014-02-28 | 2014-05-28 | 浙江海天建设集团有限公司 | Process for constructing aerated concrete building block infilled wall through membrane maintenance technology |
CN103821253A (en) * | 2014-02-28 | 2014-05-28 | 浙江海天建设集团有限公司 | Constructing technique for aerated concrete block filler wall |
CN106128280A (en) * | 2016-08-08 | 2016-11-16 | 江苏建筑职业技术学院 | Brick masonry wall structural model and manufacture method |
CN106205350A (en) * | 2016-08-08 | 2016-12-07 | 江苏建筑职业技术学院 | Fill wall construction model and manufacture method |
-
2009
- 2009-12-30 CN CN200910264290XA patent/CN102116060A/en active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103821252A (en) * | 2014-02-28 | 2014-05-28 | 浙江海天建设集团有限公司 | Process for constructing aerated concrete building block infilled wall through membrane maintenance technology |
CN103821253A (en) * | 2014-02-28 | 2014-05-28 | 浙江海天建设集团有限公司 | Constructing technique for aerated concrete block filler wall |
CN106128280A (en) * | 2016-08-08 | 2016-11-16 | 江苏建筑职业技术学院 | Brick masonry wall structural model and manufacture method |
CN106205350A (en) * | 2016-08-08 | 2016-12-07 | 江苏建筑职业技术学院 | Fill wall construction model and manufacture method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103410332B (en) | A kind of concrete hollow block reinforcement wall construction technology | |
CN103469939B (en) | A kind of masonry filler wall and main body flexibly connect earthquake resistant structure and construction method thereof | |
CN102116061B (en) | Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure | |
CN201785865U (en) | Structure and system for house combining external prestress post tensioning method steel beam and pretensioning method prestress composite beam | |
CN206016309U (en) | A kind of overall assembled building system | |
CN103953114B (en) | Steel frame-reinforced masonry shear wall combinative structure and construction method thereof | |
CN203701334U (en) | Reinforced and prefabricated type shear wall structure | |
CN104060629A (en) | Covered top-down excavation subway station overlapped wall construction method and movable side wall formwork jumbo | |
CN102418425B (en) | Prefabrication integral casting building structure system with cast-in-site haunched beams, and construction method for prefabrication integral casting building structure system | |
CN102094525B (en) | Method for constructing reinforced concrete lintel | |
CN103790267A (en) | Reinforcement type prefabricated assembly type shear wall structure and construction method thereof | |
CN102418387B (en) | Post-tensioning external prestressed steel beam and pre-tensioning prestressed superposed beam combined building structure system and construction technology thereof | |
CN203924116U (en) | Portable side wall formwork jumbo | |
CN109235702A (en) | A kind of assembled double steel plate combined shear wall construction and its construction method with ribbing | |
CN102116060A (en) | Masonry construction technology of bearing wall body | |
CN107313532A (en) | Assembled heat insulation concrete walls structural connection and connection structure and method | |
CN108060789A (en) | A kind of wall support and change method of existing masonry structure base isolation reinforcement | |
JP2010159543A (en) | Aseismatic reinforcing structure | |
CN106703212A (en) | Device for connecting shear wall and concrete floor in building structure and setting method of device | |
CN106149733A (en) | Tunnel immediately adjacent to bridge section deep foundation pit supporting structure and construction method | |
CN207110214U (en) | A kind of prefabricated interior fill concrete wallboard | |
CN211172527U (en) | Fire prevention and decoration structure of steel plate shear wall | |
CN218091465U (en) | Assembled non-bearing masonry wall structure | |
CN105649259B (en) | A kind of wallboard structural system of the dark framework of band of precast concrete wall panel and its structure | |
CN209040348U (en) | A kind of assembled double steel plate combined shear wall construction with ribbing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20110706 |