CN102109849A - Method for realizing intelligent detection and verification of transformer substation system on basis of replacement function - Google Patents

Method for realizing intelligent detection and verification of transformer substation system on basis of replacement function Download PDF

Info

Publication number
CN102109849A
CN102109849A CN2011100487767A CN201110048776A CN102109849A CN 102109849 A CN102109849 A CN 102109849A CN 2011100487767 A CN2011100487767 A CN 2011100487767A CN 201110048776 A CN201110048776 A CN 201110048776A CN 102109849 A CN102109849 A CN 102109849A
Authority
CN
China
Prior art keywords
value
replacement
transformer substation
adopts
sending
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100487767A
Other languages
Chinese (zh)
Other versions
CN102109849B (en
Inventor
朱东升
季玮
郭乐
孙纯军
苏麟
李刚
陈飞
娄悦
鲁东海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guodian Nanjing Automation Co Ltd
China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Original Assignee
Guodian Nanjing Automation Co Ltd
Jiangsu Electric Power Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guodian Nanjing Automation Co Ltd, Jiangsu Electric Power Design Institute filed Critical Guodian Nanjing Automation Co Ltd
Priority to CN2011100487767A priority Critical patent/CN102109849B/en
Publication of CN102109849A publication Critical patent/CN102109849A/en
Application granted granted Critical
Publication of CN102109849B publication Critical patent/CN102109849B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/30State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a method for realizing intelligent detection and verification of a transformer substation system on the basis of a replacement function. The method is characterized by including steps as follows: (1) setting a replacement value: a, setting one or more data objects to adopt the replacement value by a background system interface; b, issuing the replacement value to a device by a protocol processor, and placing a replacement mark; c, reporting a set value with the replacement mark by the device; d, receiving and recognizing the report value by a background monitoring system; and e, adopting a replacement mode to display the corresponding reported value by a display interface; and (2) canceling the replacement value. The method integrates the replacement function in the transformer substation system, sets the replacement value according to the detection requirement for a parameter of the transformer substation system directly at a substation control layer single-point, and forms a complete data link, so as to more conveniently, rapidly, and accurately simulate the practical situation of the transformer substation, and realize comprehensive detection and verification to the functions like complete substation lock-mistake prevention, sequential control, motion and so on.

Description

Realize the intelligent method that detects and verify of transformer substation system based on replacing function
Technical field
The present invention relates to the intelligent electronic device of electric system and the test and the verification method of electric substation automation system, belong to the power automation technical field.
Background technology
When carrying out the unified debugging of transformer substation system, how the actual conditions of simulated field are carried out integration test, be the problem that needs emphasis to solve always, especially be related to the test of the functions such as anti mis-closedown function, remote moving function and order chemical control system of substation safety operation.
Conventional substation and digital transformer substation carry out the normal method that adopts of system verification at present: the method by external mimic-disconnecting switch and relay-protection tester realizes.By the various state parameters of breaker are set at external mimic-disconnecting switch; Arrange at the protection tester, provide analog quantity parameter.These parameter acquisitions are entered in the electric substation automation system, carry out the detection and the checking of the function such as anti-misoperation locking, sequential control of transformer station again based on these parameters.
Present general mode Main Problems:
(1) need to the operation that cooperatively interacts of the many devices of many people, make mistakes easily;
(2) can only carry out checking partial or substep checking (each device or backstage are verified respectively) to system;
(3) for the systematicness operation of full station, such as sequence fall busbar, the testing authentication of striding the functions such as the interval is anti-error, telecontrol information teletransmission has difficulties;
During (4) for the extension project testing authentication, the test value that system can't distinguish actual value and arrange for experiment, test and verification step complexity, the cycle is long.
Summary of the invention
Technical matters to be solved by this invention provides the intelligent method that detects and verify of a kind of transformer substation system, can simulate transformer station's actual conditions more convenient, accurately, realize functions such as full station anti-misoperation locking, sequential control, telemechanical are carried out integration test and checking.
For solving the problems of the technologies described above, the invention provides a kind of method based on replacing the intelligent detection of function realization transformer substation system and checking, it is characterized in that, may further comprise the steps:
1) set substitution value:
A) certain or a plurality of data object of background system interface setting adopts substitution value;
B) the stipulations handling procedure issues substitution value to each equipment of automated system intermediate interlayer, and puts the replacement sign; C) device adopts on the setting value and send, and this setting value possesses the sign of replacement;
D) background monitoring system receives and identifies the value of sending on the device;
E) display interface adopts the value of sending in the substitute mode demonstration accordingly;
2) cancellation substitution value:
A) background system issues cancellation certain device, a plurality of device or all substitution value orders;
B) the replacement sign of stipulations handling procedure cancellation related device substitution value;
C) device adopts on the instantaneous value and send, on the value of sending do not possess the sign of replacement;
D) to recognize the respective value of sending on the device be normal value to background monitoring system;
E) display interface adopts the display mode of normal value,
Described device is for participating in whole measure and control device or the monitoring and protection combined into one apparatus of debugging the electric substation automation system intermediate interlayer of checking.
Aforesaid based on replacing the intelligent method that detects and verify of function realization transformer substation system, it is characterized in that: described data object comprises state value and measuring amount data.
Aforesaid based on replacing the intelligent method that detects and verify of function realization transformer substation system, it is characterized in that: described data object is used for by the report of reporting that control object is controlled the report controlled attribute of server being set with certain data objects.
The beneficial effect that the present invention reached:
The present invention is by integrated replacement function in transformer substation system, directly finish at the station level single-point transformer substation system parameter is set substitution value according to the test needs, form complete Data-Link, thereby can simulate more convenient, exactly transformer station's actual conditions, realize the functions such as full station anti-misoperation locking, sequential control, telemechanical are carried out integration test and checking.
Description of drawings
Fig. 1 is for setting the process flow diagram of substitution value process among the present invention;
Fig. 2 is the process flow diagram of the single substitution value process of cancellation among the present invention;
Fig. 3 is the process flow diagram of a plurality of substitution value processes of cancellation among the present invention.
Embodiment
Among the present invention, propose integrated replacement function in electric substation automation system, technical solution is described in detail as follows:
Replace model enable state value and measuring amount data object and manually replace, these state values or measuring amount data object can be used to by the report of reporting that control object is controlled.Replace service and will be used to the report controlled attribute that certain data objects removes to arrange server.Replace and comprise request and response, response notice request client.
Substitution value is set to the replacement mark and actual value is distinguished.Substitution value can be directly used in the test and the checking of functions such as transformer substation system anti-misoperation locking, sequential control, telemechanical.
Electric substation automation system is carried out to replace and cancel the replacement operating process and is seen Fig. 1 to Fig. 3 for details, may further comprise the steps:
1) set substitution value:
A) certain or a plurality of data object of background system interface setting adopts substitution value;
B) the stipulations handling procedure issues substitution value to each equipment of automated system intermediate interlayer, and puts the replacement sign; C) device adopts on the setting value and send, and this setting value possesses the sign of replacement;
D) background monitoring system receives and identifies the value of sending on the device;
E) display interface adopts the value of sending in the substitute mode demonstration accordingly;
2) cancellation substitution value:
A) background system issues cancellation certain device, a plurality of device or all substitution value orders;
B) the replacement sign of stipulations handling procedure cancellation related device substitution value;
C) device adopts on the instantaneous value and send, on the value of sending do not possess the sign of replacement;
D) to recognize the respective value of sending on the device be normal value to background monitoring system;
E) display interface adopts the display mode of normal value.
The substitution value of device can be by the supervisory system setting, and substitution value shows supports the multiple form of expression so that distinguish mutually with the value and the artificial setting value of normal demonstration.System can cancel the device substitution value in groups by the interval, but whether visual display unit has substitution value to exist, and guarantees normally to move not have the substitution value existence in the timer, guarantees the safe and reliable of operation.
After the integrated replacement function of transformer substation system, can fast form accurately complete Data-Link, simulate various actual operating modes, can greatly simplify the preparation of system testing, be convenient to realize allomeric function and performance test and the checking of transformer substation system.

Claims (3)

1. the method based on the intelligent detection of replacement function realization transformer substation system and checking is characterized in that, may further comprise the steps:
1) set substitution value:
A) certain or a plurality of data object of background system interface setting adopts substitution value;
B) the stipulations handling procedure issues substitution value to each equipment of automated system intermediate interlayer, and puts the replacement sign;
C) device adopts on the setting value and send, and this setting value possesses the sign of replacement;
D) background monitoring system receives and identifies the value of sending on the device;
E) display interface adopts the value of sending in the substitute mode demonstration accordingly;
2) cancellation substitution value:
A) background system issues cancellation certain device, a plurality of device or all substitution value orders;
B) the replacement sign of stipulations handling procedure cancellation related device substitution value;
C) device adopts on the instantaneous value and send, on the value of sending do not possess the sign of replacement;
D) to recognize the respective value of sending on the device be normal value to background monitoring system;
E) display interface adopts the display mode of normal value,
Described device is for participating in whole measure and control device or the monitoring and protection combined into one apparatus of debugging the electric substation automation system intermediate interlayer of checking.
2. according to claim 1 based on replacing the method that function realizes intelligent detection of transformer substation system and checking, it is characterized in that: described data object comprises state value and measuring amount data.
3. according to claim 1 based on replacing the intelligent method that detects and verify of function realization transformer substation system, it is characterized in that: described data object is used for by the report of reporting that control object is controlled the report controlled attribute of server being set with certain data objects.
CN2011100487767A 2011-03-01 2011-03-01 Method for realizing intelligent detection and verification of transformer substation system on basis of replacement function Expired - Fee Related CN102109849B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100487767A CN102109849B (en) 2011-03-01 2011-03-01 Method for realizing intelligent detection and verification of transformer substation system on basis of replacement function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100487767A CN102109849B (en) 2011-03-01 2011-03-01 Method for realizing intelligent detection and verification of transformer substation system on basis of replacement function

Publications (2)

Publication Number Publication Date
CN102109849A true CN102109849A (en) 2011-06-29
CN102109849B CN102109849B (en) 2012-05-23

Family

ID=44174030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100487767A Expired - Fee Related CN102109849B (en) 2011-03-01 2011-03-01 Method for realizing intelligent detection and verification of transformer substation system on basis of replacement function

Country Status (1)

Country Link
CN (1) CN102109849B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109193945A (en) * 2018-10-19 2019-01-11 国网福建省电力有限公司 A kind of method that intelligent substation remote action data configuration automated closed-loop is checked
CN110568284A (en) * 2019-08-20 2019-12-13 国网江苏省电力有限公司电力科学研究院 intelligent substation one-key sequential control automatic test verification method, device and system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101257224A (en) * 2008-04-17 2008-09-03 国电南瑞科技股份有限公司 Technique for realizing transforming plant anti mis-closedown function in transforming plant observe and control apparatus
JP2008216268A (en) * 2008-06-02 2008-09-18 Aisin Aw Co Ltd Map information management system, map information management method, and in-vehicle map information management device
CN101388570A (en) * 2008-07-08 2009-03-18 国电南瑞科技股份有限公司 Data stream fast reliable interaction method for transformer plant automatic system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101257224A (en) * 2008-04-17 2008-09-03 国电南瑞科技股份有限公司 Technique for realizing transforming plant anti mis-closedown function in transforming plant observe and control apparatus
JP2008216268A (en) * 2008-06-02 2008-09-18 Aisin Aw Co Ltd Map information management system, map information management method, and in-vehicle map information management device
CN101388570A (en) * 2008-07-08 2009-03-18 国电南瑞科技股份有限公司 Data stream fast reliable interaction method for transformer plant automatic system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109193945A (en) * 2018-10-19 2019-01-11 国网福建省电力有限公司 A kind of method that intelligent substation remote action data configuration automated closed-loop is checked
CN109193945B (en) * 2018-10-19 2021-12-07 国网福建省电力有限公司 Automatic closed-loop checking method for telecontrol data configuration of intelligent substation
CN110568284A (en) * 2019-08-20 2019-12-13 国网江苏省电力有限公司电力科学研究院 intelligent substation one-key sequential control automatic test verification method, device and system
CN110568284B (en) * 2019-08-20 2021-11-30 国网江苏省电力有限公司电力科学研究院 Intelligent substation one-key sequential control automatic test verification method, device and system

Also Published As

Publication number Publication date
CN102109849B (en) 2012-05-23

Similar Documents

Publication Publication Date Title
CN102788921B (en) Detection method of function and performance of power distribution automation terminal device
CN114640173A (en) Early warning model of transformer and generator based on many characteristic quantities
CN103051065A (en) Distribution-automation distributed type FA (feeder automation) linkage test method and system
CN102354175B (en) Remote I/O (input/output) control system of Modbus fieldbus DI-16-route monitor
CN102737287B (en) Regional power grid on-line power supply risk assessment system
CN103852744A (en) Distributed online monitoring system and method for electric energy metering device
WO2015149593A1 (en) Iec61850-based communication simulation method for transformer grounding on-line monitoring device
CN204291050U (en) A kind of dispatching and monitoring information check system
CN104269090B (en) The analogue system of a kind of power information acquisition terminal wheel secondary control switch and method thereof
WO2015149596A1 (en) Iec61850-based communication simulation method for leakage current on-line monitoring device
CN103107914A (en) Detection method and detection system for remote power acquisition terminal
CN103078403A (en) On-line state evaluation method for secondary system of intelligent substation
CN104750095B (en) Regulation and control center inspection pilot system and method
CN102426309A (en) Method for testing area spare power automatic switching system in engine room environment of master station
CN204906004U (en) Distributed intelligent regional power grid of network layering
CN104076807A (en) Method of debugging automation system of intelligent substation
CN110611312B (en) On-line simulation system and method for panoramic data of substation bay level
CN103279520B (en) Power substation secondary system failure reconnaissance method
CN102109849B (en) Method for realizing intelligent detection and verification of transformer substation system on basis of replacement function
CN102570610A (en) Intelligent electricity-stealing preventing system and method
CN102508052B (en) Test method for field band channel operation of automatic bus transfer system of area network
CN104267284A (en) One-click cooperative testing and detecting method and device for stability control system
CN109634849B (en) Visual signal interaction intelligent substation reconstruction and extension virtual testing device and method
CN105785149A (en) Network tester for undercurrent grounding line selection apparatus of smart substation and network testing method therefor
CN102903286B (en) Distant place fault setting and monitoring system of practical training substation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP JIANGSU ELECTRIC PO

Free format text: FORMER NAME: JIANGSU ELECTRIC POWER DESIGNING INST.

CP01 Change in the name or title of a patent holder

Address after: 210009 Gulou District, Jiangsu, Nanjing new model road, No. 5

Patentee after: Chinese energy construction group Jiangsu Prov. Power Design Inst Co., Ltd

Patentee after: Nanjing Automation Co., Ltd., China Electronics Corp.

Address before: 210009 Gulou District, Jiangsu, Nanjing new model road, No. 5

Patentee before: Jiangsu Electric Power Designing Institute

Patentee before: Nanjing Automation Co., Ltd., China Electronics Corp.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120523

Termination date: 20200301

CF01 Termination of patent right due to non-payment of annual fee