CN102097742B - 激光器第一透镜焊接耦合器 - Google Patents

激光器第一透镜焊接耦合器 Download PDF

Info

Publication number
CN102097742B
CN102097742B CN201010601321.9A CN201010601321A CN102097742B CN 102097742 B CN102097742 B CN 102097742B CN 201010601321 A CN201010601321 A CN 201010601321A CN 102097742 B CN102097742 B CN 102097742B
Authority
CN
China
Prior art keywords
module
lens
fixed station
welding
laser
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010601321.9A
Other languages
English (en)
Other versions
CN102097742A (zh
Inventor
付艳玲
刘学洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DALIAN ACTECH Inc
Original Assignee
DALIAN ACTECH Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DALIAN ACTECH Inc filed Critical DALIAN ACTECH Inc
Priority to CN201010601321.9A priority Critical patent/CN102097742B/zh
Publication of CN102097742A publication Critical patent/CN102097742A/zh
Application granted granted Critical
Publication of CN102097742B publication Critical patent/CN102097742B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Optical Couplings Of Light Guides (AREA)

Abstract

激光器第一透镜焊接耦合器,包括基板(1),在基板(1)上设置有多个固定孔(2),通过固定孔(2)与基板(1)固定设置有三维调节平台(3)、模块固定台(4)和光路模拟台(5),三维调节平台(3)的工作端(13)与设置在模块固定台(4)上端的模块卡槽(6)相对应,在模块固定台(4)上还设置有多个模块加电针槽(7),光路模拟台(5)由相互连接的固定台(8)和调节块(9)组成,调节块(9)上设置有长槽(10),调节块(9)通过固定螺栓(11)固定连接在固定台(8)上,在调节块(9)的端头处设置有光路模拟块(12)。它具有结构简单,使用方便,能够提高激光器模块中第一透镜的焊接效率等优点。

Description

激光器第一透镜焊接耦合器
技术领域
本发明涉及一种耦合装置,尤其是一种操作简单,使用方便,可以提高激光器模块中第一透镜的焊接效率的耦合器。
背景技术
目前的半导体激光器的制作工艺有多种,主要是采用第一透镜焊接后,在进行第二透镜的焊接固定的模式。由于第一透镜的焊接位置与耦合效率会直接影响到半导体激光器的最终功率,因此第一透镜的焊接固定在制作半导体激光器模块的过程中是一个十分关键的步骤。目前进行激光器第一透镜的焊接时,大多采用光束分析仪进行光路耦合,但是由于光束分析仪的收光面比较大,因此在功率耦合方面不是十分的准确,从而降低了模块的最终耦合功率,影响了半导体激光器模块的使用性能和应用范围;同时这种方式需要的耦合时间较长,降低了生产效率;并且对焊接偏移量的修正较为困难,为后续的焊接工作带来了一定的不便。
发明内容
本发明是为了解决现有技术所存在的上述不足,提出一种结构简单,使用方便,能够提高激光器模块中第一透镜的焊接效率的激光器第一透镜焊接耦合器。
本发明的具体解决方案是:一种激光器第一透镜焊接耦合器,其特征在于:所述的耦合器包括基板1,在基板1上设置有多个固定孔2,通过固定孔2与基板1固定设置有三维调节平台3、模块固定台4和光路模拟台5,三维调节平台3的工作端13与设置在模块固定台4上端的模块卡槽6相对应,在模块固定台4上还设置有多个模块加电针槽7,光路模拟台5由相互连接的固定台8和调节块9组成,调节块9上设置有长槽10,调节块9通过固定螺栓11固定连接在固定台8上,在调节块9的端头处设置有光路模拟块12。
本发明同现有技术相比,具有如下优点:
本装置的结构简单,设计巧妙,利用它进行第一透镜和激光器模块之间的焊接,不仅操作简单,而且可以提高焊接的效率,缩短调整、焊接时间;更重要的是,它在焊接前模拟了焊接完成状态下的模块结构,因此第一透镜耦合时的光路可完整的汇聚于光纤,不仅耦合时间短,而且还有利于耦合效率的判断,可用于对模块进行初步的筛选。因此可以说这种激光器第一透镜焊接耦合器具备了多种优点,十分有利于在本领域中推广应用,具备了广泛的市场前景。
附图说明
图1是本发明实施例的结构示意图
图2是本发明实施例模拟固定台和光路模拟台部分的俯视图。
具体实施方式
下面将结合附图说明本发明的具体实施方式。如图1、图2所示:一种激光器第一透镜焊接耦合器,它包括一个作为基础的基板1,在基板1上开设有多个固定孔,通过这些固定孔2,三维调节平台3、模块固定台4和光路模拟台5均固定连接在基板1上;三维调节平台3的工作端13通过设置在远端的真空泵控制,工作端13上吸附第一透镜;在模块固定台4上端设置有模块卡槽6,用于固定模块,在模块卡槽6的附近设置有多个模块加电针槽7,模块上的针脚插接在模块加电针槽7内;光路模拟台5由固定台8和调节块9组成,固定台8通过螺栓固定在基板1上,在调节块9上设置有长槽10,并且固定螺栓11穿过长槽10将调节块9固定在固定台8的上端,第二透镜便设置在调节块9的端头14处。
本发明实施例的激光器第一透镜焊接耦合器的工作过程如下:首先将模块固定台4和光路模拟台5固定连接在基板1上,并调节第二透镜所在的端头14与模块卡槽6的相对位置,调整完毕后,将模块放置在模块卡槽6中固定,并将模块的针脚插接在模块加电针槽7内,准备工作完成后,通过调节三维调节平台3,使吸附在工作端13上的第一透镜在空间上运动,模块发出的光线通过第一透镜后传送至第二透镜上,通过测试第一透镜与第二透镜之间的耦合率来确定第一透镜的最佳位置,待第一透镜与模块之间的最佳位置找到后,停止调节三维调节平台3,利用激光焊接的方式将第一透镜与模块焊接为一体结构,第一透镜的焊接工作完成。
将焊接有第一透镜的模块从模块卡槽6中取出,送至下一环节进行加工;并在模块卡槽6内放入新的模块,重复上述操作,实现第一透镜的焊接。

Claims (1)

1.一种激光器第一透镜焊接耦合器,其特征在于:所述的耦合器包括基板(1),在基板(1)上设置有多个固定孔(2),通过固定孔(2)与基板(1)固定设置有三维调节平台(3)、模块固定台(4)和光路模拟台(5),三维调节平台(3)的工作端(13)与设置在模块固定台(4)上端的模块卡槽(6)相对应,在模块固定台(4)上还设置有多个模块加电针槽(7),光路模拟台(5)由相互连接的固定台(8)和调节块(9)组成,调节块(9)上设置有长槽(10),调节块(9)通过固定螺栓(11)固定连接在固定台(8)上,在调节块(9)的端头处设置有第二透镜。
CN201010601321.9A 2010-12-23 2010-12-23 激光器第一透镜焊接耦合器 Expired - Fee Related CN102097742B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010601321.9A CN102097742B (zh) 2010-12-23 2010-12-23 激光器第一透镜焊接耦合器

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010601321.9A CN102097742B (zh) 2010-12-23 2010-12-23 激光器第一透镜焊接耦合器

Publications (2)

Publication Number Publication Date
CN102097742A CN102097742A (zh) 2011-06-15
CN102097742B true CN102097742B (zh) 2014-04-02

Family

ID=44130666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010601321.9A Expired - Fee Related CN102097742B (zh) 2010-12-23 2010-12-23 激光器第一透镜焊接耦合器

Country Status (1)

Country Link
CN (1) CN102097742B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111468830B (zh) * 2020-04-17 2021-06-04 中南大学 Coc光纤自动耦合封装设备及方法
CN114578499B (zh) * 2022-05-09 2022-08-05 武汉乾希科技有限公司 用于激光器的耦合方法和系统

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1305251A (zh) * 2000-11-30 2001-07-25 中国科学院上海光学精密机械研究所 含有准直模块激光二极管线列阵的激光装置
JP2006350048A (ja) * 2005-06-17 2006-12-28 Matsushita Electric Ind Co Ltd 導波路素子の光結合モジュール調芯固定冶具
JP2007115933A (ja) * 2005-10-21 2007-05-10 Nippon Telegr & Teleph Corp <Ntt> 光半導体モジュールおよびその組立方法
CN101435918A (zh) * 2008-11-26 2009-05-20 北京交通大学 一种激光二极管列阵/面阵的尾纤耦合输出装置
CN101557076A (zh) * 2009-05-22 2009-10-14 中国科学院国家授时中心 抗振外腔半导体激光器
CN101752784A (zh) * 2008-12-03 2010-06-23 中国科学院半导体研究所 激光二极管的准直封装结构
CN101783478A (zh) * 2010-02-03 2010-07-21 中国科学院半导体研究所 光纤放大器种子源模块
JP2010278201A (ja) * 2009-05-28 2010-12-09 Anritsu Corp 光半導体素子モジュール

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1305251A (zh) * 2000-11-30 2001-07-25 中国科学院上海光学精密机械研究所 含有准直模块激光二极管线列阵的激光装置
JP2006350048A (ja) * 2005-06-17 2006-12-28 Matsushita Electric Ind Co Ltd 導波路素子の光結合モジュール調芯固定冶具
JP2007115933A (ja) * 2005-10-21 2007-05-10 Nippon Telegr & Teleph Corp <Ntt> 光半導体モジュールおよびその組立方法
CN101435918A (zh) * 2008-11-26 2009-05-20 北京交通大学 一种激光二极管列阵/面阵的尾纤耦合输出装置
CN101752784A (zh) * 2008-12-03 2010-06-23 中国科学院半导体研究所 激光二极管的准直封装结构
CN101557076A (zh) * 2009-05-22 2009-10-14 中国科学院国家授时中心 抗振外腔半导体激光器
JP2010278201A (ja) * 2009-05-28 2010-12-09 Anritsu Corp 光半導体素子モジュール
CN101783478A (zh) * 2010-02-03 2010-07-21 中国科学院半导体研究所 光纤放大器种子源模块

Also Published As

Publication number Publication date
CN102097742A (zh) 2011-06-15

Similar Documents

Publication Publication Date Title
CN102508344B (zh) 半导体激光二极管自动耦合装置的实现方法
CN202479680U (zh) 二次电池点焊机
CN106735874A (zh) 一种飞秒激光并行加工导光板散射网点的装置和方法
CN209487937U (zh) 一种激光驱动的调制电路与系统
CN102097742B (zh) 激光器第一透镜焊接耦合器
CN205765543U (zh) 一种适用于云计算多芯连接器的研磨夹具装置
CN105458324B (zh) 一种高效的自动化钻孔系统
CN201776293U (zh) 一种用于轧机孔型对中的光学仪器
CN104339089A (zh) 全自动带条激光切割雕刻机
CN204322701U (zh) 一种导光板印刷定位治具
CN206084137U (zh) 一种焊接3c构件的上下双头激光设备
CN202726318U (zh) 半导体激光二极管自动耦合且自动焊接的装置
CN206937141U (zh) 一种光纤连接器封装夹持系统
CN103495524B (zh) 一种镜头模组点胶方法
CN203448876U (zh) 多用激光加工机床
CN206892403U (zh) 一种光接收组件的自动耦合装置
CN204209283U (zh) 一种电芯激光自动点焊装置
CN203460554U (zh) 可快速定焦的大功率激光打标机
CN205427237U (zh) Plc光分路器对准封装系统
CN202317440U (zh) 半导体激光二极管自动耦合装置
CN204019002U (zh) 扶梯模组拼接工装
CN205982790U (zh) 准直光束调节装置
CN215356700U (zh) 双平台紫外皮秒切割光路装置
CN206301092U (zh) 一种中心校准装置及激光器耦合台装置
CN207547997U (zh) 一种提高钻头同轴度的对位装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140402

Termination date: 20161223