CN102094525A - 一种钢筋混凝土过梁施工方法 - Google Patents

一种钢筋混凝土过梁施工方法 Download PDF

Info

Publication number
CN102094525A
CN102094525A CN 201110002967 CN201110002967A CN102094525A CN 102094525 A CN102094525 A CN 102094525A CN 201110002967 CN201110002967 CN 201110002967 CN 201110002967 A CN201110002967 A CN 201110002967A CN 102094525 A CN102094525 A CN 102094525A
Authority
CN
China
Prior art keywords
building
block
concrete
reinforced concrete
cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201110002967
Other languages
English (en)
Other versions
CN102094525B (zh
Inventor
周绪红
吴方伯
张明
黄婷
黄海林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wu Chong
Original Assignee
吴方伯
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 吴方伯 filed Critical 吴方伯
Priority to CN201110002967XA priority Critical patent/CN102094525B/zh
Publication of CN102094525A publication Critical patent/CN102094525A/zh
Application granted granted Critical
Publication of CN102094525B publication Critical patent/CN102094525B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种钢筋混凝土过梁施工方法,该施工方法按照以下步骤进行:先将空心砌块(1)竖向砌筑,形成竖向空腔(4),在空腔(4)内放置钢筋笼(2),浇筑混凝土(3),待混凝土达到一定的强度后,空心砌块(1)、钢筋笼(2)、混凝土(3)形成整体预制构件,然后将该预制构件横放在建筑洞口上方形成钢筋混凝土过梁。该钢筋混凝土过梁,不用支模板,施工速度快,防水性好,能保证清水砌体墙的整体美观。

Description

一种钢筋混凝土过梁施工方法
技术领域:
本发明涉及建筑施工领域,具体指一种钢筋混凝土过梁施工方法。
背景技术:
目前,在建筑实施中,普通现浇钢筋混凝土过梁施工方法,需要支模板后进行浇筑混凝土,浇筑完成后还需养护,然后再拆除模板进行砌体砌筑,施工过程复杂,工期长,浪费工时和原材料,给施工带来诸多不便。
发明内容:
本发明的目的在于提供一种钢筋混凝土过梁施工方法,该方法不用支模板或不用支侧模板,施工速度快,形成的钢筋混凝土过梁防水性好,能保证清水砌体墙的整体美观。
本发明目的是这样来实现的,一种钢筋混凝土过梁施工方法,该方法按照以下步骤进行:
a.将空心砌块竖向砌筑,形成竖向空腔;
b.在空腔内放置钢筋笼,浇注混凝土;
c.待混凝土达到一定的强度后,空心砌块、钢筋笼、混凝土形成整体预制构件,然后将该预制构件横放在建筑洞口上方形成钢筋混凝土过梁。
本发明的特征还在于该方法还可以按照以下步骤进行:
a.在建筑洞口上方支底模板;
b.在底模板上横向砌筑空心砌块,形成横向空腔;
c.在空腔内放置钢筋笼,通过空心砌块顶板上的孔洞往空腔内浇注混凝土,或直接从空腔两端往空腔内灌注混凝土;
d.待混凝土达到一定强度后,拆除底模板,空心砌块、钢筋笼、混凝土形成整体钢筋混凝土过梁。
所述的空心砌块为横孔空心砌块,横孔空心砌块砌筑时形成贯通空腔,可以方便放置钢筋笼、浇筑混凝土。
所述的钢筋混凝土过梁由两块或两块以上的空心砌块砌筑而成,空心砌块形成的空腔内有钢筋笼、混凝土。钢筋笼、混凝土与空心砌块共同作用形成整体钢筋混凝土过梁承担上部传来的荷载。
所述的空心砌块的顶板上有孔洞,在建筑洞口上方现场施工时可以通过空心砌块顶板上的孔洞往空心砌块形成的空腔内浇注混凝土,这样操作更方便。
附图说明:
图1为空心砌块竖向砌筑示意图,1为空心砌块,4为空心砌块1形成的竖向空腔。
图2为钢筋混凝土过梁预制构件结构示意图,2为钢筋笼,3为混凝土。
图3为钢筋混凝土过梁整体结构示意图。
图4为空心砌块横向砌筑示意图,5为空心砌块1的顶板,6为顶板1上的孔洞,4为空心砌块1形成的横向空腔。
图5为钢筋混凝土过梁整体结构另一实施例。
具体实施方式:
下面结合附图对本发明作进一步说明。
如附图1~3所示,一种钢筋混凝土过梁施工方法,该方法按照以下步骤进行:
a.将空心砌块1竖向砌筑,形成竖向空腔4;
b.在空腔4内放置钢筋笼2,浇注混凝土3;
c.待混凝土3达到一定的强度后,空心砌块1、钢筋笼2、混凝土3形成整体预制构件,将该预制构件横放在建筑洞口上方形成钢筋混凝土过梁。
如附图4~5所示,该钢筋混凝土过梁施工方法还可以按照以下步骤进行:
a.在建筑洞口上方支底模板7;
b.在底模板7上横向砌筑空心砌块1,形成横向空腔4;
c.在空腔4内放置钢筋笼2,通过空心砌块1顶板5上的孔洞6往空腔4内浇注混凝土3,或直接从空腔4两端往空腔4内灌注混凝土3;
d.待混凝土3达到一定强度后,拆除底模板7,空心砌块1、钢筋笼2、混凝土3形成整体钢筋混凝土过梁。
所述的空心砌块1为横孔空心砌块,横孔空心砌块砌筑时形成贯通空腔4,可以方便放置钢筋笼2、浇筑混凝土3。
所述的钢筋混凝土过梁由两块或两块以上的空心砌块1砌筑而成,空心砌块1形成的空腔4内有钢筋笼2、混凝土3。钢筋笼2、混凝土3与空心砌块1共同作用形成整体钢筋混凝土过梁承担上部传来的荷载。
所述的空心砌块1的顶板5上有孔洞6,在建筑洞口上方现场施工时可以通过空心砌块顶板5上的孔洞6往空心砌块1形成的空腔4内浇注混凝土3,这样施工更方便易行。

Claims (5)

1.一种钢筋混凝土过梁施工方法,其特征在于,该方法按照以下步骤进行:
a.将空心砌块(1)竖向砌筑,形成竖向空腔(4);
b.在空腔(4)内放置钢筋笼(2),浇注混凝土(3);
c.待混凝土达到一定的强度后,空心砌块(1)、钢筋笼(2)、混凝土(3)形成整体预制构件,然后将该预制构件横放在建筑洞口上方形成钢筋混凝土过梁。
2.一种钢筋混凝土过梁施工方法,其特征在于,该方法还可以按照以下步骤进行:
a.在建筑洞口上方支底模板(7);
b.在底模板(7)上横向砌筑空心砌块(1),形成横向空腔(4);
c.在空腔(4)内放置钢筋笼(2),通过空心砌块(1)顶板(5)上的孔洞(6)往空腔(4)内浇注混凝土(3),或直接从空腔(4)两端往空腔(4)内灌注混凝土(3);
d.待混凝土(3)达到一定强度后,拆除底模板(7),空心砌块(1)、钢筋笼(2)、混凝土(3)形成整体钢筋混凝土过梁。
3.根据权利要求1或2所述的钢筋混凝土过梁施工方法,其特征在于,所述的空心砌块(1)为横孔空心砌块。
4.根据权利要求1或2所述的钢筋混凝土过梁施工方法,其特征在于,所述的过梁由二块或二块以上的空心砌块(1)砌筑而成,空心砌块(1)形成的空腔(4)内有钢筋笼(2)、混凝土(3)。
5.根据权利要求2所述的钢筋混凝土过梁施工方法,其特征在于,所述的空心砌块(1)的顶板(5)上有孔洞(6)。
CN201110002967XA 2011-01-07 2011-01-07 一种钢筋混凝土过梁施工方法 Expired - Fee Related CN102094525B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110002967XA CN102094525B (zh) 2011-01-07 2011-01-07 一种钢筋混凝土过梁施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110002967XA CN102094525B (zh) 2011-01-07 2011-01-07 一种钢筋混凝土过梁施工方法

Publications (2)

Publication Number Publication Date
CN102094525A true CN102094525A (zh) 2011-06-15
CN102094525B CN102094525B (zh) 2012-05-23

Family

ID=44127773

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110002967XA Expired - Fee Related CN102094525B (zh) 2011-01-07 2011-01-07 一种钢筋混凝土过梁施工方法

Country Status (1)

Country Link
CN (1) CN102094525B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102353264A (zh) * 2011-08-30 2012-02-15 中冶长天国际工程有限责任公司 一种点火炉炉衬的砌筑法
CN105421775A (zh) * 2015-11-06 2016-03-23 北京崇建工程有限公司 一种砖混结构的过梁施工方法
CN106436967A (zh) * 2016-09-26 2017-02-22 福州大学 一种混凝土砌块及其施工方法
CN106592865A (zh) * 2016-11-17 2017-04-26 重庆建工第三建设有限责任公司 装配式预制混凝土过梁
CN108071230A (zh) * 2017-12-12 2018-05-25 北京崇建工程有限公司 一种门窗洞口的施工方法
CN108612261A (zh) * 2018-05-11 2018-10-02 上海宝冶集团有限公司 加筋砌体过梁的施工方法
CN109779144A (zh) * 2019-02-28 2019-05-21 广西建工集团建筑工程总承包有限公司 利用u型砌块预制的门窗过梁及其施工方法
CN112962863A (zh) * 2021-02-08 2021-06-15 江西科技学院 一种半预制圈梁的施工方法及半预制圈梁结构

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB818982A (en) * 1954-11-15 1959-08-26 Mary Kathleen Muriel Mason Improvements in and relating to building blocks
CN87213891U (zh) * 1987-09-30 1988-06-08 秦永淮 现浇芯柱式大孔混凝土砌块墙体
CN2756736Y (zh) * 2004-12-14 2006-02-08 朱和鸣 后张法预应力混凝土砌块组合梁
CN2863962Y (zh) * 2005-12-21 2007-01-31 北京市燕兴隆新型墙体材料有限公司 多功能砌块及隔墙
CN101042000A (zh) * 2006-03-23 2007-09-26 吴方伯 建筑用空心砌块
FR2928390A1 (fr) * 2008-03-10 2009-09-11 Andre Loew Element de construction en maconnerie de type poutre

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB818982A (en) * 1954-11-15 1959-08-26 Mary Kathleen Muriel Mason Improvements in and relating to building blocks
CN87213891U (zh) * 1987-09-30 1988-06-08 秦永淮 现浇芯柱式大孔混凝土砌块墙体
CN2756736Y (zh) * 2004-12-14 2006-02-08 朱和鸣 后张法预应力混凝土砌块组合梁
CN2863962Y (zh) * 2005-12-21 2007-01-31 北京市燕兴隆新型墙体材料有限公司 多功能砌块及隔墙
CN101042000A (zh) * 2006-03-23 2007-09-26 吴方伯 建筑用空心砌块
FR2928390A1 (fr) * 2008-03-10 2009-09-11 Andre Loew Element de construction en maconnerie de type poutre

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《山西建筑》 20050831 孙秀兰 承重混凝土小型空心砌块施工技术 第147-148页 1-5 第31卷, 第16期 2 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102353264A (zh) * 2011-08-30 2012-02-15 中冶长天国际工程有限责任公司 一种点火炉炉衬的砌筑法
CN105421775A (zh) * 2015-11-06 2016-03-23 北京崇建工程有限公司 一种砖混结构的过梁施工方法
CN106436967A (zh) * 2016-09-26 2017-02-22 福州大学 一种混凝土砌块及其施工方法
CN106592865A (zh) * 2016-11-17 2017-04-26 重庆建工第三建设有限责任公司 装配式预制混凝土过梁
CN108071230A (zh) * 2017-12-12 2018-05-25 北京崇建工程有限公司 一种门窗洞口的施工方法
CN108612261A (zh) * 2018-05-11 2018-10-02 上海宝冶集团有限公司 加筋砌体过梁的施工方法
CN109779144A (zh) * 2019-02-28 2019-05-21 广西建工集团建筑工程总承包有限公司 利用u型砌块预制的门窗过梁及其施工方法
CN112962863A (zh) * 2021-02-08 2021-06-15 江西科技学院 一种半预制圈梁的施工方法及半预制圈梁结构

Also Published As

Publication number Publication date
CN102094525B (zh) 2012-05-23

Similar Documents

Publication Publication Date Title
CN102094525B (zh) 一种钢筋混凝土过梁施工方法
CN201206328Y (zh) 用于现浇混凝土密肋楼盖预制模壳
CN101769008B (zh) 利用预制构造柱圈梁建造抗震砌体房屋的方法
CN101858119B (zh) 一种钢筋混凝土空心楼板及施工方法
CN105804292A (zh) 一种绿色节能一体化现浇轻质混凝土墙体及其施工方法
CN203429641U (zh) 建筑施工用单侧支模加固结构体系
CN204531076U (zh) 轻钢格构现浇泡沫混凝土复合墙体
CN205653934U (zh) 一种绿色节能一体化现浇轻质混凝土墙体
CN106400982A (zh) 一种箍筋加密的装配式钢筋混凝土柱与柱拼接节点
CN108071169A (zh) 装配预制构件式房屋
CN203022222U (zh) 砖混建筑支座整浇圈梁
CN112982735A (zh) 一种装配整体式圈梁、过梁、腰梁、构造柱施工方法
CN103741883B (zh) 预制钢筋混凝土柱模板及其制作方法
CN108978996B (zh) 一种在既有砖混结构中增加的挑梁及其施工方法
CN105019645A (zh) 逆作法中取土口处构建混凝土结构的模板系统及施工方法
CN218091465U (zh) 一种装配式非承重砌筑墙体结构
CN107012973A (zh) 一种新型加强肋砌块的砌体结构及其施工方法
CN202000562U (zh) 一种剪力墙用多功能限位装置
CN105317109A (zh) 三维网固整体浇筑发泡墙体房屋及施工方法
CN203361332U (zh) 预制装配式框架结构
CN103498574A (zh) 砌筑墙体内后增芯柱抗震加固方法
CN103498567A (zh) 砌筑墙体内后增暗圈梁抗震加固方法及其加固结构
CN103334492A (zh) 一种预制装配式框架结构
CN203499262U (zh) 门窗洞口过梁及竖向板带砼一次浇筑结构
CN102116060A (zh) 一种承重墙体砌筑施工工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221008

Address after: Xiangjiang Century City, Kaifu District, Changsha City, Hunan Province 410008

Patentee after: Wu Chong

Address before: 410082 Hunan province Changsha Lushan Road Structure Engineering Research Institute Hunan University

Patentee before: Wu Fangbo

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120523