CN102094388A - 一种桥梁沉降缝的施工方法 - Google Patents

一种桥梁沉降缝的施工方法 Download PDF

Info

Publication number
CN102094388A
CN102094388A CN 201110046826 CN201110046826A CN102094388A CN 102094388 A CN102094388 A CN 102094388A CN 201110046826 CN201110046826 CN 201110046826 CN 201110046826 A CN201110046826 A CN 201110046826A CN 102094388 A CN102094388 A CN 102094388A
Authority
CN
China
Prior art keywords
bridge
channel
settlement joint
settlement
channel beams
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110046826
Other languages
English (en)
Inventor
彭红美
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Municipal Design & Research Institute Co Ltd
Original Assignee
Dalian Municipal Design & Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Municipal Design & Research Institute Co Ltd filed Critical Dalian Municipal Design & Research Institute Co Ltd
Priority to CN 201110046826 priority Critical patent/CN102094388A/zh
Publication of CN102094388A publication Critical patent/CN102094388A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

本发明公开了一种桥梁沉降缝的施工方法,包括以下步骤:在两个槽钢内侧按一定间距焊上预埋钢筋;在两个槽钢外侧分别错位焊上角钢;将两个槽钢分别预埋入沉降缝两侧新桥和旧桥或路和桥的混凝土铺装层内;在槽钢以及角钢之间的缝隙内填充沥青玛蹄酯。本发明在沉降缝的两边包裹了槽钢,使沉降缝两边的混凝土不会被压碎,结实耐用,保证了沉降缝的质量。本发明的槽钢及其上的附件先焊接好了,施工时只需预埋,不需要做另外的施工处理,因此施工方法简单了。本发明在沉降缝隙内填充沥青玛蒂脂膏,不仅使桥面上不出现明缝,确保行车顺畅,同时又实现了桥面美观的目的。

Description

一种桥梁沉降缝的施工方法
技术领域
本发明涉及一种桥梁附属设施的构造方法,特别是一种桥梁沉降缝的施工方法。
背景技术
在桥梁建设过程中,会遇到很多旧桥加宽或半路半桥的情况,为了使新桥和旧桥两部分结构之间彻底分开、各自沉降、受力互不影响,通常会在两部分结构之间从桥面到基础设置一个沉降缝,但由于桥面或路面不宜出现明缝,所以需要对这个沉降缝进行处理。现有的沉降缝处理方法多种多样,最常见的一种方法就是在明缝里填塞沥青麻丝。由于在旧桥加宽的情况下,沉降缝沿纵向设置、距离比较长,并且沉降缝往往在行车道内,使得这种处理方法很容易破坏沉降缝,难以保证沉降缝的质量,而且施工比较复杂。
发明内容
为解决现有技术存在的上述问题,本发明要设计一种结实耐用、施工简单、且桥面美观的桥梁沉降缝的施工方法。
为了实现上述目的,本发明的技术方案如下:一种桥梁沉降缝的施工方法,包括以下步骤:
A、在两个槽钢内侧按一定间距焊上预埋钢筋;
B、在两个槽钢外侧分别错位焊上角钢;
C、将两个槽钢分别预埋入沉降缝两侧新桥和旧桥或路和桥的混凝土铺装层内;
D、清理沉降缝之间的杂质;
E、在槽钢以及角钢之间的缝隙内填充沥青玛蹄酯。
本发明所述的角钢的边长略小于两个槽钢之间的距离。
本发明所述的槽钢的高度与铺装层的厚度相当,所述的铺装层的厚度为混凝土铺装层和沥青铺装层厚度之和。
本发明所述的槽钢的高度略小于铺装层的厚度。
与现有技术相比,本发明具有以下有益效果:
1、由于本发明在沉降缝的两边包裹了槽钢,使沉降缝两边的混凝土不会被压碎,结实耐用,保证了沉降缝的质量。
2、由于本发明的槽钢及其上的附件先焊接好了,施工时只需预埋即可,因此施工方法简单了。
3、由于本发明在沉降缝隙内填充沥青玛蒂脂膏,不仅使桥面上不出现明缝,确保行车顺畅,同时又实现了桥面美观的目的。
4、本发明还适用于半桥半路之间沉降缝的建设施工。
附图说明
本发明仅有附图1张,其中:
图1是桥梁沉降缝的结构示意图。
图中:1、槽钢,2、角钢,3、沥青玛蹄酯,4、预埋钢筋,5、混凝土铺装层,6、沥青铺装层。
具体实施方式
下面结合附图对本发明进行进一步地描述。如图1所示,一种桥梁沉降缝的施工方法,包括以下步骤:
A、在两个槽钢1内侧按一定间距焊上预埋钢筋;
B、在两个槽钢1外侧分别错位焊上角钢2;
C、将两个槽钢1分别预埋入沉降缝两侧新桥和旧桥或路和桥的混凝土铺装层5内;
D、清理沉降缝之间的杂质;
E、在槽钢1以及角钢2之间的缝隙内填充沥青玛蹄酯3。
所述的角钢2的边长略小于两个槽钢1之间的距离。所述的槽钢1的高度小于铺装层的厚度,所述的铺装层的厚度为混凝土铺装层5和沥青铺装层6厚度之和。所述的钢筋直径及长度根据实际情况进行调整。

Claims (4)

1.一种桥梁沉降缝的施工方法,其特征在于:包括以下步骤:
A、在两个槽钢(1)内侧按一定间距焊上预埋钢筋(4);
B、在两个槽钢(1)外侧分别错位焊上角钢(2);
C、将两个槽钢(1)分别预埋入沉降缝两侧新桥和旧桥或路和桥的混凝土铺装层(5)内;
D、清理沉降缝之间的杂质;
E、在槽钢(1)以及角钢(2)之间的缝隙内填充沥青玛蹄酯(3)。
2.根据权利要求1所述的一种桥梁沉降缝的施工方法,其特征在于:所述的角钢(2)的边长略小于两个槽钢(1)之间的距离。
3.根据权利要求1所述的一种桥梁沉降缝的施工方法,其特征在于:所述的槽钢(1)的高度与铺装层的厚度相当,所述的铺装层的厚度为混凝土铺装层(5)和沥青铺装层(6)厚度之和。
4.根据权利要求3所述的一种桥梁沉降缝的施工方法,其特征在于:所述的槽钢(1)的高度略小于铺装层的厚度。
CN 201110046826 2011-02-25 2011-02-25 一种桥梁沉降缝的施工方法 Pending CN102094388A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110046826 CN102094388A (zh) 2011-02-25 2011-02-25 一种桥梁沉降缝的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110046826 CN102094388A (zh) 2011-02-25 2011-02-25 一种桥梁沉降缝的施工方法

Publications (1)

Publication Number Publication Date
CN102094388A true CN102094388A (zh) 2011-06-15

Family

ID=44127639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110046826 Pending CN102094388A (zh) 2011-02-25 2011-02-25 一种桥梁沉降缝的施工方法

Country Status (1)

Country Link
CN (1) CN102094388A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266557A (zh) * 2013-05-30 2013-08-28 南京辰顺交通科技有限责任公司 采用衬滑套以普通焊接方式对装配式桥梁模数伸缩装置进行对接的方法
CN106906739A (zh) * 2017-02-28 2017-06-30 中国冶集团有限公司 用于桥梁伸缩缝与沉降缝相交处的双向伸缩橡胶止水片及其施工方法
CN113981838A (zh) * 2021-10-20 2022-01-28 广东二十冶建设有限公司 一种加宽桥梁连接处连接施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2249260Y (zh) * 1996-07-11 1997-03-12 梁双库 压紧型橡胶桥梁伸缩装置
JPH10298924A (ja) * 1997-04-28 1998-11-10 P S Co Ltd 橋梁の目地上面保持方法及び装置
CN2297478Y (zh) * 1997-06-24 1998-11-18 张宏生 桥梁伸缩缝
CN2307027Y (zh) * 1997-08-04 1999-02-10 徐斌 桥梁伸缩缝装置
JP2003253610A (ja) * 2002-03-06 2003-09-10 Nakai Shoko Kk 道路の遊間用止水体
US20040154247A1 (en) * 2003-02-04 2004-08-12 Frank Bellino Precast composite header joint system and a method for forming and installing the same

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2249260Y (zh) * 1996-07-11 1997-03-12 梁双库 压紧型橡胶桥梁伸缩装置
JPH10298924A (ja) * 1997-04-28 1998-11-10 P S Co Ltd 橋梁の目地上面保持方法及び装置
CN2297478Y (zh) * 1997-06-24 1998-11-18 张宏生 桥梁伸缩缝
CN2307027Y (zh) * 1997-08-04 1999-02-10 徐斌 桥梁伸缩缝装置
JP2003253610A (ja) * 2002-03-06 2003-09-10 Nakai Shoko Kk 道路の遊間用止水体
US20040154247A1 (en) * 2003-02-04 2004-08-12 Frank Bellino Precast composite header joint system and a method for forming and installing the same

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266557A (zh) * 2013-05-30 2013-08-28 南京辰顺交通科技有限责任公司 采用衬滑套以普通焊接方式对装配式桥梁模数伸缩装置进行对接的方法
CN103266557B (zh) * 2013-05-30 2016-03-23 南京辰顺交通科技有限责任公司 采用衬滑套以普通焊接方式对装配式桥梁模数伸缩装置进行对接的方法
CN106906739A (zh) * 2017-02-28 2017-06-30 中国冶集团有限公司 用于桥梁伸缩缝与沉降缝相交处的双向伸缩橡胶止水片及其施工方法
CN113981838A (zh) * 2021-10-20 2022-01-28 广东二十冶建设有限公司 一种加宽桥梁连接处连接施工方法

Similar Documents

Publication Publication Date Title
CN105696747B (zh) 高空大跨度钢筋混凝土梁的施工方法
CN104233942B (zh) 一种提高装配式斜交预应力空心板梁桥整体受力的方法
CN107905114B (zh) 一种特大跨径连续刚构拱桥的施工方法
CN101591882B (zh) 一种应力吸收带的施工方法
CN105350458B (zh) 一种桥梁y型墩施工用组合结构平台的施工方法
CN101982610A (zh) 热洒布式橡胶沥青路面及其施工方法
CN109338866A (zh) 一种适用于大跨径桥梁的超轻型组合梁结构及其施工方法
CN102094388A (zh) 一种桥梁沉降缝的施工方法
CN104060781A (zh) 一种梯段无缝的现浇板式楼梯及施工方法
CN110080087A (zh) 一种钢桥轻型铺装层结构及铺装方法
CN107237257A (zh) 一种预制拼装护栏施工连接方法
CN103485281A (zh) 一种装配式体外横向预应力空心板桥的施工方法
CN108330823A (zh) 装配式钢混组合梁桥桥面板纵缝连接构造及施工方法
CN211312247U (zh) 利用空心板铰缝空间增设预应力钢绞线加固装置
CA2922365C (en) System for and method of stabilizing rail track structures using a load transfer apparatus
CN205822006U (zh) 钢‑超高性能混凝土组合板连接接头
CN203755135U (zh) 一种桥梁拼接施工中减振装置
CN206457711U (zh) 适应软土地基的半整体式无缝桥梁结构
CN105113420B (zh) 一种预制钢筋混凝土简支梁桥桥面铺装维修结构及施工方法
CN107268438A (zh) 采用uhpc材料进行拼宽桥梁桥面系快速连接结构
JP2005127065A (ja) 既設橋梁の拡幅歩道構造及び同歩道構造の施工方法
CN206408543U (zh) 适用于铰接t型截面梁的横向加固系统
FR3019565A1 (fr) Procede de realisation d'un carrefour de tramway
CN206298821U (zh) 简支梁桥复合连接板构造
CN205347925U (zh) 预制型橡胶跑道

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110615