CN102092648A - Tower crane and balance detection system thereof - Google Patents

Tower crane and balance detection system thereof Download PDF

Info

Publication number
CN102092648A
CN102092648A CN 201010577756 CN201010577756A CN102092648A CN 102092648 A CN102092648 A CN 102092648A CN 201010577756 CN201010577756 CN 201010577756 CN 201010577756 A CN201010577756 A CN 201010577756A CN 102092648 A CN102092648 A CN 102092648A
Authority
CN
China
Prior art keywords
tower crane
stock
force transducer
supporting leg
undersetting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010577756
Other languages
Chinese (zh)
Other versions
CN102092648B (en
Inventor
江运金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGSHA HAICHUAN AUTOMATION Co Ltd
Original Assignee
CHANGSHA HAICHUAN AUTOMATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGSHA HAICHUAN AUTOMATION Co Ltd filed Critical CHANGSHA HAICHUAN AUTOMATION Co Ltd
Priority to CN 201010577756 priority Critical patent/CN102092648B/en
Publication of CN102092648A publication Critical patent/CN102092648A/en
Application granted granted Critical
Publication of CN102092648B publication Critical patent/CN102092648B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The invention provides a tower crane and a balance detection system thereof. In the balance detection system of the tower crane according to the invention, the tower crane comprises a lower support and a stock, the balance detection system of the tower crane comprises a force sensor, and the lower support and the stock are connected through the force sensor. The tower crane according to the invention comprises the balance detection system of the tower crane. Because the stress condition of the stock is detected by the force sensor, whether a rotating part on the tower crane under a dismounting working condition is in a balance state is judged, thereby reducing significant personal injury accidents under the dismounting working condition, and improving the use safety performance of the tower crane.

Description

Tower crane and balance master system thereof
Technical field
The present invention relates to technical field of engineering machinery, more specifically, relate to a kind of tower crane and balance master system thereof.
Background technology
Tower crane is one of main construction machinery and equipment of modern industry and civil construction, and the lifting altitude of tower crane and the performance advantage of work range are widely used it in high-building construction.
Because the tower crane aloft work, it is more that it brings out unsafe factor.In the installation of high-rise tower crane, use, the demolishing process, high, careless slightly to Safety Technical Management and operator's level requirement, very easily cause serious accident.From China's accident case of tower crane in recent years, accident mainly occurs in the assembling and dissembling process of tower crane.With regard to the technical merit of present tower crane, it is very high that the disassemble and assemble work of tower crane requires operator's technical merit, and a slight carelessness just very easily causes great human casualty accident.So relevant intendance with the each place of country has put into effect various safety procedure, each production firm and user have also formulated technology and management expectancy separately, but are difficult to avoid owing to the generation of installing and removing the particularly serious accident of tower crane that reason causes.
As shown in Figure 1, tower crane generally is made up of last rotating part and body of the tower two parts, and these two parts were used the revolution support and connection together.Revolution is supported similar to the principle of work of surface bearing, and revolution is supported top and is connected with upper bracket, and upper bracket is connected with arm 50 ', equilibrium arm 60 ' etc.; Revolution is supported the bottom and is connected with undersetting 30 ', and undersetting 30 ' is connected respectively with stock 20 ' with standard knot 10 '.Several standard knots 10 ' are formed body of the tower, and stock 20 ' is contained on the standard knot 10 ' by two groups of roller housings, and jacking cylinder also is installed on the stock 20 '.When tower crane is done gyroscopic movement, turn round to support and rotate around the body of the tower center with top, so be called rotating part, revolution is supported with lower part such as standard knot 10 ' and is then maintained static with stock 20 '.
The tower crane process of increasing is such, at first, the suspension hook 40 ' that is contained on the arm 50 ' hangs on a suitable weight, the level attitude of mobile suspension hook 40 ' on arm 50 ', make arm 50 ' and equilibrium arm 60 ' both sides with respect to the moment of flexure of body of the tower in a basic balance after, unclamp undersetting 30 ' and standard knot 10 ' bonded assembly tie bolt, and an end that makes the jacking cylinder that is installed on the stock 20 ' is supported on the marking time of standard knot 10 ', when oil cylinder extends, under the effect of two groups of roller guiding, stock 20 ' will make the last rotating part of tower crane break away from standard knot 10 ' top by the connection supporting leg on top and rise along standard knot 10 '.After jacking is finished, undersetting 30 ' will can be vacated the room of a standard knot with standard knot 10 ' top, at this moment, last rotating part will all be supported by stock 20 ', if between standard knot 10 ' top and undersetting 30 ', refill a last joint standard knot 10 ' this moment, the top of new clothes standard knot 10 ' is connected with undersetting 30 ', and the bottom of new standard joint 10 ' links to each other with original standard knot 10 ', and tower crane has just been finished the process of increasing like this.
Tower crane will reduce when height, above process get final product on the contrary.
The several times of stock 20 ' are also because the function difference also has different appellations, under the dismounting operating mode, facing arm the stock 20 ' here has a bigger opening, so that standard knot 10 ' turnover, so be called introduction face, the top of introducing face is connected with undersetting 30 ' by two supporting legs; And at equilibrium arm 60 ' over there, under the dismounting operating mode, play rotating part on the tower crane by the oil cylinder jacking, the face that mainly plays the carrying effect is called jacking face, jacking face also is to be connected with undersetting by two supporting legs, and jacking cylinder also is installed on the jacking face.The jacking face of stock 20 ' and introduction face are shaped by the rod member of two sides is fixing.
In the tower crane disassembly process, an important link is the trim link, and exactly before the tie bolt of four supporting legs that unclamp undersetting 30 ' and standard knot 10 ', it is flat that rotating part is distributed.The trim process is as follows: suspension hook 40 ' certain weight of slinging at first, mobile then suspension hook 40 ' be in the position that arm 50 ' is gone up level, and the center of gravity of rotating part on the tower crane is dropped on two supporting legs of jacking face of stock 20 '.If not trim just grave accident may occur, because after rotating part on the tower crane is risen by the oil cylinder on the stock 20 ', stock 20 ' has carried whole weight and the unbalanced moments of rotating part on the tower crane, and when generally designing stock 20 ', just consider the weight of rotating part on the carrying tower crane in principle, think under the jacking state it is balance, because under state of equilibrium, the weight of last rotating part is the jacking face that is delivered to stock of two supporting legs by undersetting, be passed to the jacking cylinder of the jacking face of being installed in one side through the part-structure of stock 20 ' jacking face, be delivered on the marking time of standard knot 10 ' by oil cylinder again, carry top weight by body of the tower then, and the unbalanced moment that this moment, stock bore is less.So, when design stock 20 ', be not consider substantially to the load-carrying capacity of unbalanced moment, that is to say that stock 20 ' is very limited to the load-carrying capacity of the unbalanced moment of rotating part on the tower crane.Under the situation of not trim, just might make unbalanced moment excessive, will make stock 20 ' structural failure and grave accident occur, secondly, this moment, the unbalanced moment on top was by being installed on the side that two groups of rollers on the stock 20 ' are delivered to standard knot 10 ', and the normal working of this and standard knot 10 ' is completely different, when the unbalanced moment on top excessive, even stock 20 ' structure is not destroyed, also can makes the structural failure of standard knot 10 ' and cause grave accident.
As mentioned above, under the dismounting operating mode of tower crane, can whether the center of gravity that how to guarantee rotating part drop on the most important condition that implement safe dismounting on the jacking face of stock exactly to tower crane, the explanation of installing and using of various tower cranes all requires must accomplish the rotating part balance-dividing before dismounting, and country and the various safety standards that go out of each place government have all been made this and being emphasized.With regard to present tower crane, technologically speaking, the method by mobile suspension hook is that the center of gravity of the last rotating part of tower crane is dropped on the jacking face of stock, but how to judge and go up rotating part whether to reach balance be a difficult problem.Even because trim does not have tangible state can represent whether tower crane top has reached balance yet.In most cases all be to judge whether balance by rule of thumb, such as observing the bolted connection situation, support situation of stock 20 ' each roller and standard knot 10 ' or the like, this just requires the operator must possess cooresponding practical experience and thinking clearly, yet this getting sth into one's head tends to occur the result of mistake, and this also is the major cause that hoisting crane often has an accident under the dismounting operating mode.
Summary of the invention
Thereby whether the present invention aims to provide a kind of last rotating part that can detect the tower crane under the dismounting operating mode reaches tower crane and the balance master system thereof that balance improves the usage safety performance of tower crane.
According to an aspect of the present invention, provide a kind of balance master system of tower crane, tower crane comprises undersetting and stock, and the balance master system of tower crane comprises force transducer, and undersetting is connected by force transducer with stock.
Further, undersetting is provided with the undersetting supporting leg, and stock is provided with the stock supporting leg, and force transducer connects undersetting supporting leg and stock supporting leg.
Further, force transducer is the pin type force transducer.
Further, have the stock connecting bore on the stock supporting leg, have the bearing connecting bore coaxial with the stock connecting bore on the undersetting supporting leg, the pin type sensor passes stock connecting bore and bearing connecting bore.
Further, force transducer connects the stock supporting leg and the corresponding undersetting supporting leg of the introduction face side that is positioned at stock.
Further, between two stock supporting legs of the introduction face side of stock and corresponding undersetting supporting leg, all be connected by force transducer.
Further, all be connected between each undersetting supporting leg and corresponding each stock supporting leg by force transducer.
Further, the balance master system of tower crane also comprises the measurement display unit, communicates to connect with force transducer, and shows the testing result of force transducer.
Further, measure display unit and comprise: signal processing unit, the measurement signal that the reception force transducer sends also converts thereof into take off data; Data handing and display unit communicate to connect with signal processing unit, the take off data that reception and processing signals processing unit send, and show take off data.
According to another aspect of the present invention, provide a kind of tower crane, tower crane comprises the balance master system of aforesaid tower crane.
Adopt tower crane of the present invention and balance master system thereof, balance master system comprises force transducer, and the undersetting of tower crane is connected by force transducer with stock.Detect the force-bearing situation of stock by force transducer, judge under the dismounting operating mode of tower crane whether rotating part reaches state of equilibrium on it, reduce the generation of the great human casualty accident under the dismounting operating mode, improved the usage safety performance of tower crane.
Description of drawings
Accompanying drawing is used to provide further understanding of the present invention, constitutes the application's a part, and illustrative examples of the present invention and explanation thereof are used to explain the present invention, do not constitute improper qualification of the present invention.In the accompanying drawings:
Fig. 1 is the structural representation of the tower crane of prior art;
Fig. 2 is according to the stock of tower crane of the present invention and the structural representation of undersetting;
Fig. 3 is the installation site scheme drawing according to the force transducer of the balance master system of tower crane of the present invention;
Fig. 4 is the partial enlarged drawing of installation site scheme drawing of the force transducer of Fig. 3; And
Fig. 5 is the scheme drawing according to the measurement display unit of the balance master system of tower crane of the present invention.
The specific embodiment
Below with reference to the accompanying drawings and in conjunction with the embodiments, describe the present invention in detail.
The invention provides a kind of balance master system of tower crane.
To shown in Figure 5, according to the balance master system of tower crane of the present invention, tower crane comprises undersetting 30 and stock 20 as Fig. 2, and balance master system comprises force transducer 80, and undersetting 30 is connected by force transducer 80 with stock 20.
Force transducer 80 is as the connecting portion of undersetting 30 with stock 20, stressed by himself, detect the force-bearing situation of stock 20, thereby judge under the dismounting operating mode of tower crane whether rotating part reaches state of equilibrium on it, reduce the generation of the great human casualty accident under the dismounting operating mode, improved the usage safety performance of tower crane.Specifically, support under the situation of rotating weight on the tower crane at stock 20, the center-of-gravity position difference of last rotating part, the suffered power that is handed down by undersetting of stock 20 is diverse, thereby also is affected as the force transducer 80 of connecting portion.According to the stressing conditions of force transducer 80, can learn out the center-of-gravity position of rotating part, thereby judge and go up whether trim of rotating part whether can carry out the installation or the dismounting of standard knot.
According to one embodiment of present invention, to shown in Figure 4, undersetting 30 is provided with undersetting supporting leg 31 as Fig. 2, and stock 20 is provided with stock supporting leg 21, and force transducer 80 connects undersetting supporting leg 31 and stock supporting leg 21.
Under the situation of rotating part on the 70 support tower cranes of the jacking cylinder on the jacking face of stock 20, the center-of-gravity position difference of last rotating part, the suffered power that is handed down by undersetting 31 of two supporting legs of two supporting legs of the jacking face of stock 20 and the face of introduction is diverse, when the center-of-gravity position of last rotating part promptly is on the arm of tower crane beyond introduction face, the stock supporting leg 21 of introduction face bears pressure, and the stock supporting leg 21 of jacking face bears pulling force; When the center-of-gravity position of last rotating part was between introduction face and jacking face, the stock supporting leg 21 of introduction face and jacking face all bore pressure; When the top center of gravity dropped on the equilibrium arm that jacking face promptly is in tower crane later on, the stock supporting leg 21 of stock jacking face bore pressure, and the stock supporting leg 21 of the face of introduction side bears pulling force; When the center-of-gravity position of rotating part on the tower crane dropped on the jacking face of stock 20, the stressed of stock supporting leg 21 on the introduction face of stock 20 was close to zero, and what the stock supporting leg 21 of jacking face was born is the total weight of rotating part on the tower crane.
According to as above analyzing, under normal jacking state, the center-of-gravity position of rotating part drops on the jacking face in the requirement, so the stock supporting leg 21 of introduction face one side of connection stock 20 and the force transducer on the connecting portion between the undersetting supporting leg 31 will only bear less pressure, the setting of the force transducer 80 by connecting undersetting supporting leg 31 and stock supporting leg 21, measure the stressing conditions of force transducer 80, whether the last rotating part that can learn tower crane intuitively trim, thereby judges whether to carry out the work of follow-up dismounting standard knot 40.
As shown in Figure 4, force transducer 80 is the pin type force transducer.Have the stock connecting bore on the stock supporting leg 21, have the bearing connecting bore coaxial with the stock connecting bore on the undersetting supporting leg 31, the pin type force transducer passes stock connecting bore and bearing connecting bore.
Stock supporting leg 21 is provided with the insertion section, insert in the link slot of undersetting supporting leg 31 bottoms the insertion section, has the stock connecting bore on the insertion section, have the bearing connecting bore coaxial on the side walls of link slot with the stock connecting bore, the pin type force transducer passes stock connecting bore and bearing connecting bore, and undersetting 30 and stock 20 are linked together.Adopt pin type sensor 80, easy for installation, and can accurately measure the stressed of stock 20.
According to the foregoing description as can be known, on bearing 30 and stock 20 force transducer is set, whether the last rotating part that can predict tower crane trim.Force transducer is not limited to the pin type force transducer, when bearing 30 and stock 20 do not adopt the pin type connection mode and when adopting other connection modes, force transducer also can be other types, for example is bolt fastening or shears beam measuring load sensor.
According to one embodiment of present invention, force transducer is provided with stock supporting leg 21 and the corresponding undersetting supporting leg 31 that 80 connections are positioned at the introduction face side of stock 20.
Undersetting 30 is connected by force transducer 80 with stock 20, can measures on the stock supporting leg 21 by force transducer 80 and will carry great power, the size by this power is a whether balance of decidable tower crane top.As shown in Figures 2 and 3, stock 20 has 4 supporting legs to be connected with undersetting 30, and jacking face side has two, and introducing the face side has two.Preferably, at introduction face force transducer 80 is installed, when tower crane was in non-jacking state, stock 20 hung on the undersetting 30, bore stock 20 weight as 80 of the force transducers of connecting portion; When tower crane is in the jacking state, in last rotating part office during in state of equilibrium, force transducer 80 does not stress yet, so, force transducer 80 is arranged on the connecting portion of introduction face side, load-carrying capacity to force transducer 80 is less demanding, therefore can reduce the cost of balance master system.
Preferably, between two stock supporting legs 21 of the introduction face side of stock 20 and corresponding undersetting supporting leg 31, all be connected by force transducer 80.
All be connected between two stock supporting legs 21 of introduction face one side of stock 20 and the undersetting supporting leg 31 of undersetting 30 by force transducer 80, can be so that result of a measurement be more accurate.In addition, under less demanding situation to survey precision, for cost-cutting, also can be just any one supporting leg in two supporting legs of the introduction face side of stock 20 be connected with employing force transducer 80 between the undersetting supporting leg 31.
According to another embodiment of the invention, all be connected between each undersetting supporting leg 31 and corresponding each stock supporting leg 21 by force transducer 80.
Under exigent situation to survey precision, all be connected between all undersetting supporting legs 31 and the stock supporting leg 21 by force transducer 80, judge stressed on the stock supporting leg 21 comprehensively, thereby whether the last rotating part of accurately determining tower crane reaches state of equilibrium, avoids dangerous generation.
As shown in Figure 5, the balance master system of tower crane also comprises measures display unit 90, communicates to connect with force transducer 80, and shows the testing result of force transducer 80.
Measure between display unit 90 and the force transducer 80 and communicate to connect, indicate force transducer 80 when bearing pressure when the operator observes measurement display unit 90, can conductor driver with suspension hook to equilibrium arm one side shifting; Measure display unit and indicate force transducer 80 when bearing pulling force when the operator observes, can conductor driver with suspension hook to arm one side shifting; If measure stressing conditions that display unit demonstrates force transducer 80 near zero point the time, show that then next step disassemble and assemble work can be carried out in state of equilibrium in the rotating part office on the tower crane.As from the foregoing, measure the stressing conditions that display unit demonstrates force transducer 80, just can know at this moment on the tower crane whether trim of rotating part intuitively with force transducer 80 bonded assemblys, thus the safety of enhanced system.
Can be arranged in the operator's compartment of tower crane measuring display unit 90, thereby the driver of tower crane can directly observe the stressing conditions of stock supporting leg 21, thereby fast speed is judged the whether trim of last rotating part of tower crane, makes operation and control quick more and convenient.
Preferably, measure display unit 90 and comprise: signal processing unit 91, the measurement signal that reception force transducer 80 sends also converts thereof into take off data; Data handing and display unit 92 communicate to connect with signal processing unit 91, the take off data that reception and processing signals processing unit 91 send, and show take off data.
Signal processing unit 91 and data handing and display unit 92 can be integrated in to be measured in the display unit 90, becomes the component part of measuring display unit 90.Force transducer 80 detects the stressed of stock 20, and measurement signal is sent to signal processing unit 91, signal processing unit 91 receives measurement signal and converts thereof into take off data, take off data is sent to the data handing and the display unit 92 that communicate to connect with it, data handing and display unit 92 receive take off data and display it again.Measure between display unit 90 and the force transducer and can be connected and carry out the signal transmission, perhaps carry out the signal transmission by wireless transmission and receiving device by wireless mode between the two by transmission cable.
The present invention also provides a kind of tower crane, and tower crane comprises the balance master system of aforesaid tower crane.
The balance master system of tower crane is described in detail in the above-described embodiments, is not described in detail in this.The miscellaneous part of tower crane of the present invention is conventional components of the prior art, also is not described in detail at this.After being assemblied in balance master system on the tower crane, whether balance to the last rotating part of tower crane has had tangible indication, reduced under the dismounting operating mode requirement to operator's technical capacity, stopped because the erroneous judgement that artificial assumption brings can reduce the generation of the grave accident of tower machine dismounting operating mode significantly.
As can be seen from the above description, the above embodiments of the present invention have realized following technique effect:
Tower crane of the present invention and balance master system thereof, detect the force-bearing situation of stock by the force transducer that connects undersetting and stock, thereby judge under the dismounting operating mode of tower crane whether rotating part reaches state of equilibrium on it, has improved the usage safety performance of tower crane.
The above is the preferred embodiments of the present invention only, is not limited to the present invention, and for a person skilled in the art, the present invention can have various changes and variation.Within the spirit and principles in the present invention all, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. the balance master system of a tower crane, tower crane comprises undersetting (30) and stock (20), it is characterized in that, comprise force transducer (80), described undersetting (30) is connected by described force transducer (80) with described stock (20).
2. the balance master system of tower crane according to claim 1, it is characterized in that, described undersetting (30) is provided with undersetting supporting leg (31), described stock (20) is provided with stock supporting leg (21), and described force transducer (80) connects described undersetting supporting leg (31) and described stock supporting leg (21).
3. the balance master system of tower crane according to claim 2 is characterized in that, described force transducer (80) is the pin type force transducer.
4. the balance master system of tower crane according to claim 3, it is characterized in that, has the stock connecting bore on the described stock supporting leg (21), have the bearing connecting bore coaxial with described stock connecting bore on the described undersetting supporting leg (31), described pin type sensor passes described stock connecting bore and described bearing connecting bore.
5. the balance master system of tower crane according to claim 2 is characterized in that, described force transducer (80) connects the described stock supporting leg (21) and the corresponding described undersetting supporting leg (31) of the introduction face side that is positioned at described stock (20).
6. the balance master system of tower crane according to claim 5, it is characterized in that, be positioned between two stock supporting legs (21) and the corresponding described undersetting supporting leg (31) of introduction face side of described stock (20) and all be connected by described force transducer (80).
7. the balance master system of tower crane according to claim 2 is characterized in that, all is connected by described force transducer (80) between each described undersetting supporting leg (31) and corresponding each described stock supporting leg (21).
8. according to the balance master system of each described tower crane in the claim 1 to 7, it is characterized in that, also comprise and measure display unit (90), communicate to connect with described force transducer (80), and show the testing result of described force transducer (80).
9. the balance master system of tower crane according to claim 8 is characterized in that, described measurement display unit (90) comprising:
Signal processing unit (91) receives the measurement signal that described force transducer (80) sends and converts thereof into take off data;
Data handing and display unit (92) communicate to connect with described signal processing unit (91), receive and handle the take off data that described signal processing unit (91) sends, and show described take off data.
10. a tower crane is characterized in that, described tower crane comprises the balance master system of each described tower crane in the claim 1 to 9.
CN 201010577756 2010-12-07 2010-12-07 Tower crane and balance detection system thereof Active CN102092648B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010577756 CN102092648B (en) 2010-12-07 2010-12-07 Tower crane and balance detection system thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010577756 CN102092648B (en) 2010-12-07 2010-12-07 Tower crane and balance detection system thereof

Publications (2)

Publication Number Publication Date
CN102092648A true CN102092648A (en) 2011-06-15
CN102092648B CN102092648B (en) 2012-12-19

Family

ID=44125939

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010577756 Active CN102092648B (en) 2010-12-07 2010-12-07 Tower crane and balance detection system thereof

Country Status (1)

Country Link
CN (1) CN102092648B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102616679A (en) * 2012-04-16 2012-08-01 中联重科股份有限公司 Tower crane, climbing frame thereof and climbing frame installation method
CN102795556A (en) * 2012-08-13 2012-11-28 唐山建设集团有限责任公司 Tower crane suspending connection stabilization mechanism used for emergency usage in tower crane jacking process
CN102890003A (en) * 2012-09-28 2013-01-23 杭州科曼萨杰牌建设机械有限公司 Simulation test method of internal-climbing tower crane and test platform device
CN102915045A (en) * 2012-10-31 2013-02-06 中联重科股份有限公司 Method and device for controlling cantilever crane type engineering vehicle
CN104925678A (en) * 2015-04-23 2015-09-23 南通大力神建筑机械有限公司 Tower crane
CN106144651A (en) * 2016-08-23 2016-11-23 大连奇重机电成套设备有限公司 Hanging arm type bucket wheel stacker-reclaimer luffing mechanism balance detecting device
CN110092305A (en) * 2018-01-30 2019-08-06 马尼托沃克起重机集团(法国)公司 For the installation system of crane, crane and the method for implementing installation
CN113264459A (en) * 2021-05-31 2021-08-17 湖南三一塔式起重机械有限公司 Tower crane and jacking and balancing method thereof
CN113734995A (en) * 2021-06-28 2021-12-03 廊坊中建机械有限公司 Full-automatic jacking and joint adding tower crane
CN116735079A (en) * 2023-08-15 2023-09-12 山东宇飞传动技术有限公司 Mining winch balance detection equipment and method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU551238A1 (en) * 1974-11-15 1977-03-25 Центральное Конструкторское Бюро "Строймашина" Device for balancing the load moment of a tower crane with a movable counterweight
FR2467169A1 (en) * 1979-10-11 1981-04-17 Tranchand Marc Tower crane with permanent balancing - has base supports with monitors to measure side loads and control counter-balance weight
CN201046891Y (en) * 2007-04-23 2008-04-16 梁耀荣 Rising frame of self-elevating tower crane
CN101670987A (en) * 2009-09-30 2010-03-17 大连益利亚工程机械有限公司 Crane safe operation electronic monitoring networking system
CN201619959U (en) * 2010-03-30 2010-11-03 三一重工股份有限公司 Engineering machine and stability control system thereof
JP4605310B2 (en) * 2010-06-16 2011-01-05 株式会社大林組 Tower crane mount, tower crane support method, tower crane mount mounting structure
CN201932851U (en) * 2010-12-07 2011-08-17 长沙海川自动化设备有限公司 Tower type crane and balance detection device thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU551238A1 (en) * 1974-11-15 1977-03-25 Центральное Конструкторское Бюро "Строймашина" Device for balancing the load moment of a tower crane with a movable counterweight
FR2467169A1 (en) * 1979-10-11 1981-04-17 Tranchand Marc Tower crane with permanent balancing - has base supports with monitors to measure side loads and control counter-balance weight
CN201046891Y (en) * 2007-04-23 2008-04-16 梁耀荣 Rising frame of self-elevating tower crane
CN101670987A (en) * 2009-09-30 2010-03-17 大连益利亚工程机械有限公司 Crane safe operation electronic monitoring networking system
CN201619959U (en) * 2010-03-30 2010-11-03 三一重工股份有限公司 Engineering machine and stability control system thereof
JP4605310B2 (en) * 2010-06-16 2011-01-05 株式会社大林組 Tower crane mount, tower crane support method, tower crane mount mounting structure
CN201932851U (en) * 2010-12-07 2011-08-17 长沙海川自动化设备有限公司 Tower type crane and balance detection device thereof

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102616679A (en) * 2012-04-16 2012-08-01 中联重科股份有限公司 Tower crane, climbing frame thereof and climbing frame installation method
CN102616679B (en) * 2012-04-16 2013-09-04 中联重科股份有限公司 Tower crane, climbing frame thereof and climbing frame installation method
CN102795556A (en) * 2012-08-13 2012-11-28 唐山建设集团有限责任公司 Tower crane suspending connection stabilization mechanism used for emergency usage in tower crane jacking process
CN102890003A (en) * 2012-09-28 2013-01-23 杭州科曼萨杰牌建设机械有限公司 Simulation test method of internal-climbing tower crane and test platform device
CN102890003B (en) * 2012-09-28 2015-01-28 杭州科曼萨杰牌建设机械有限公司 Simulation test method of internal-climbing tower crane and test platform device
CN102915045A (en) * 2012-10-31 2013-02-06 中联重科股份有限公司 Method and device for controlling cantilever crane type engineering vehicle
CN102915045B (en) * 2012-10-31 2015-01-07 中联重科股份有限公司 Method and device for controlling cantilever crane type engineering vehicle
CN104925678A (en) * 2015-04-23 2015-09-23 南通大力神建筑机械有限公司 Tower crane
CN106144651A (en) * 2016-08-23 2016-11-23 大连奇重机电成套设备有限公司 Hanging arm type bucket wheel stacker-reclaimer luffing mechanism balance detecting device
CN110092305A (en) * 2018-01-30 2019-08-06 马尼托沃克起重机集团(法国)公司 For the installation system of crane, crane and the method for implementing installation
CN113264459A (en) * 2021-05-31 2021-08-17 湖南三一塔式起重机械有限公司 Tower crane and jacking and balancing method thereof
WO2022252511A1 (en) * 2021-05-31 2022-12-08 湖南三一塔式起重机械有限公司 Tower crane and jacking and balancing method therefor
CN113734995A (en) * 2021-06-28 2021-12-03 廊坊中建机械有限公司 Full-automatic jacking and joint adding tower crane
CN113734995B (en) * 2021-06-28 2024-02-13 廊坊中建机械有限公司 Full-automatic jacking adds tower crane of festival
CN116735079A (en) * 2023-08-15 2023-09-12 山东宇飞传动技术有限公司 Mining winch balance detection equipment and method
CN116735079B (en) * 2023-08-15 2023-11-14 山东宇飞传动技术有限公司 Mining winch balance detection equipment and method

Also Published As

Publication number Publication date
CN102092648B (en) 2012-12-19

Similar Documents

Publication Publication Date Title
CN102092648B (en) Tower crane and balance detection system thereof
CN201932851U (en) Tower type crane and balance detection device thereof
CN111891951B (en) Method and system for monitoring safety of jacking system of tower crane
CN105547683B (en) Lifting lug or the security performance detection method for lifting pipe
CN103398668B (en) The detection device of boom system and detection method
JP7128612B2 (en) Load weighing device for hanging hooks
CN104045006B (en) Tower crane and jacking Self-balance Control System thereof and control method
CN103523684B (en) Hoisting coupling device with cooperation of multiple cranes and detection method
CN110411772B (en) Elevator no-load static traction test detection method and device
CN203455162U (en) Derrick carrying capacity test loading device
CN205103102U (en) A triaxial compression test machine for rock test
CN203938406U (en) A kind of tower machine jacking trim monitored control system and monitor
CN102866009A (en) Intelligent rope breaking tester for safety lock
CN112816115A (en) Stress detection method and measuring tool for elastic vibration isolator in built-in floating slab track bed
CN104045010B (en) A kind of tower machine jacking trim monitored control system, monitoring method and monitor
EP2202194B1 (en) Personnel hoist
CN106400682A (en) Force-measurement type laminated rubber bearing based on optical fiber deformation sensor
CN106847055B (en) Stress-strain test demonstration device for metal structure of hoisting machinery
CN108534948B (en) A kind of on-line measuring device and method of mining pressure sensor
CN113321118A (en) Hoisting positioning and automatic releasing system for underwater flexible protection pad
JP7098403B2 (en) Safety management system for loading and unloading work
CN103863267B (en) Engineering truck and support leg device, leg assembly
CN203053619U (en) Polished rod dynamometer
CN206638417U (en) Military aircraft working stand static load test machine
CN105217468B (en) The detection method of the load of crane gear and its counterweight loading equipemtn and counterweight

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant