CN102076900B - Washing machine - Google Patents

Washing machine Download PDF

Info

Publication number
CN102076900B
CN102076900B CN2009801243402A CN200980124340A CN102076900B CN 102076900 B CN102076900 B CN 102076900B CN 2009801243402 A CN2009801243402 A CN 2009801243402A CN 200980124340 A CN200980124340 A CN 200980124340A CN 102076900 B CN102076900 B CN 102076900B
Authority
CN
China
Prior art keywords
control device
power
content
situation
power failure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009801243402A
Other languages
Chinese (zh)
Other versions
CN102076900A (en
Inventor
秋田真吾
反田大介
池田博志
牧野嘉幸
小岛孝夫
小仓范史
增田美穗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Toshiba Lifestyle Products and Services Corp
Original Assignee
Toshiba Corp
Toshiba Consumer Electronics Holdings Corp
Toshiba Home Appliances Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP2008165788A external-priority patent/JP5032403B2/en
Priority claimed from JP2008245769A external-priority patent/JP4987829B2/en
Application filed by Toshiba Corp, Toshiba Consumer Electronics Holdings Corp, Toshiba Home Appliances Corp filed Critical Toshiba Corp
Priority to CN201210409909.3A priority Critical patent/CN102877263B/en
Publication of CN102076900A publication Critical patent/CN102076900A/en
Application granted granted Critical
Publication of CN102076900B publication Critical patent/CN102076900B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • DTEXTILES; PAPER
    • D06TREATMENT OF TEXTILES OR THE LIKE; LAUNDERING; FLEXIBLE MATERIALS NOT OTHERWISE PROVIDED FOR
    • D06FLAUNDERING, DRYING, IRONING, PRESSING OR FOLDING TEXTILE ARTICLES
    • D06F34/00Details of control systems for washing machines, washer-dryers or laundry dryers
    • D06F34/08Control circuits or arrangements thereof
    • DTEXTILES; PAPER
    • D06TREATMENT OF TEXTILES OR THE LIKE; LAUNDERING; FLEXIBLE MATERIALS NOT OTHERWISE PROVIDED FOR
    • D06FLAUNDERING, DRYING, IRONING, PRESSING OR FOLDING TEXTILE ARTICLES
    • D06F34/00Details of control systems for washing machines, washer-dryers or laundry dryers
    • D06F34/10Power supply arrangements, e.g. stand-by circuits

Abstract

Disclosed is a washing machine including a control device (43) to which power is supplied from a power supply, a non-volatile memory (52), and a power supply cut-off switch (16) for interrupting the supply of power to the control device (43). The control device (43) has: a function for, when the machine is operating, storing the setting content and state of progress of this operation in the non-volatile memory (52); a function for, when the operation is normally completed or when the power supply cut-off switch (16) is actuated during this operation to interrupt the supply of power to the control device (43), clearing the stored content of the non-volatile memory (52); a function for, when power is supplied to the control device (43), judging whether or not the stored content of the non-volatile memory (52) has been cleared; and a function for, if the stored content in the non-volatile memory (52) is judged not to have been cleared, restarting the operation from a progress stage which is based on stored content stored in the non-volatile memory (52) using content that is based on this stored content.

Description

Rinsing maching
Technical field
The control content that the present invention relates to when restoring electricity is carried out improved rinsing maching.
Background technology
In rinsing maching, when the dump that is in operation (particularly have a power failure), general, operation is interrupted.Therefore, the user needs to carry out for the operation that brings into operation again again after the recovery of power supply.The rinsing maching of the countermeasure when having taked to have a power failure and during service restoration, the rinsing maching of record in the rinsing maching of record and the patent documentation 2 in the known for example patent documentation 1.The rinsing maching of record possesses nonvolatile memory in the patent documentation 1, is in operation to store the setting content of this operation and/or carry out situation in this nonvolatile memory.And, this rinsing maching when having a power failure, after the recovery of power supply the time (during connection), in the carrying out stage from the operation that is stored in nonvolatile memory, bring into operation again with the content that is stored in nonvolatile memory.
In addition, the rinsing maching of record in the patent documentation 2 on electric network source commonly used (1 secondary source), via non-break power supply and main power source device (supply unit that each equipment that rinsing maching possesses is used), connects master control part.And this rinsing maching when electric network source is cut off, stops master control part with the pre-arranged procedure automatically.In addition, this rinsing maching when the supply of electric network source begins again, starts master control part automatically.
Patent documentation 1: the spy opens flat 7-275561 communique
Patent documentation 2: the spy opens flat 6-282360 communique
According to the rinsing maching of patent documentation 1, the user can bring into operation from the discontinued stage after the recovery of the power supply after the power failure again, and is relatively more convenient.Yet, the rinsing maching of patent documentation 1, when the power failure that not only is in operation takes place, and during the rupturing operation of the power switch that is undertaken by the user that is in operation, also carry out above-mentioned control (when power up, from the carrying out stage of the operation that is stored in nonvolatile memory, to be stored in the content of nonvolatile memory, the control that brings into operation again).Therefore, though user for example in order from beginning at first to rerun power switch to be cut off, when power up, operation also begins from the way again, inconvenience sometimes becomes.
In addition, the rinsing maching of patent documentation 2, situation and/or operation content are carried out in the operation of not storing when having a power failure.Therefore, can not begin the operation of rinsing maching again from the state before the dump.
Summary of the invention
The object of the present invention is to provide a kind of rinsing maching, it waits under the cut situation of powering because having a power failure when being in operation, when service restoration, the content that stage in the time of can cutting off from power supply begins when disconnected for TURP begins operation again, under the situation that operation normally is through with or under the cut situation of the power switch that is in operation, when service restoration, can move from beginning at first.
Rinsing maching of the present invention comprises: the control device that is powered from power supply; Nonvolatile memory; And be used for releasing to the power cut-out switch of the power supply state of described control device; Described control device has: be in operation the setting content of this operation and/or carry out the function that situation is stored in described nonvolatile memory; Operated and removed under the situation of the power supply state of described control device under the situation that described operation normally is through with or at described described power cut-out switch in service, the function that the memory contents of described nonvolatile memory is removed; When described control device is had power supply, the function whether memory contents of judging described nonvolatile memory has been eliminated; And under the situation that the memory contents that is judged as described nonvolatile memory is not eliminated, from the carrying out stage of the memory contents of storing based on described nonvolatile memory, to begin the function of described operation again based on the content of this memory contents.
According to rinsing maching of the present invention, when being in operation because have a power failure waiting under the situation about being cut off of power, when service restoration, the content when stage in the time of can cutting off from power supply begins to break for TURP begins operation again.On the other hand, under the situation that operation normally is through with or under the cut situation of the power switch that is in operation, when service restoration, can be from bringing into operation at first.
Description of drawings
Fig. 1 is the figure of expression the 1st embodiment of the present invention, the flow chart of the control content when being the expression power connection.
Fig. 2 is the flow chart (its 1) of the control content of the common operation of expression.
Fig. 3 is the flow chart (its 2) of the control content of the common operation of expression.
Fig. 4 is the flow chart (its 3) of the control content of the common operation of expression.
Fig. 5 is the flow chart (its 4) of the control content of the common operation of expression.
Fig. 6 is the figure that the expression process content of " standardization program " and its carry out the process storage number in the stage.
Fig. 7 is the figure that the expression process content of " immersion program " and its carry out the process storage number in the stage.
Fig. 8 is the figure that the process content of expression " with the standardization program of setting of reservation " and its carry out the process storage number in the stage.
Fig. 9 is the figure that the process content of expression " with the immersion program of setting of reservation " and its carry out the process storage number in the stage.
Figure 10 is the figure that the expression process content of " groove cleaning procedure " and its carry out the process storage number in the stage.
Figure 11 is the figure of a part of the memory map of expression nonvolatile memory.
To be sub-item ground represent to be stored in the figure of the memory contents of nonvolatile memory with each memory capacity to Figure 12.
Figure 13 is the integrally-built sectional side view of expression rinsing maching.
Figure 14 is the vertical view of guidance panel.
Figure 15 is the block diagram of electric structure.
Figure 16 is expression figure the 2nd embodiment of the present invention, suitable with Figure 14.
Figure 17 is the flow chart of expression the 3rd embodiment of the present invention.
Figure 18 is the flow chart of expression the 4th embodiment of the present invention.
Figure 19 is the flow chart of expression the 5th embodiment of the present invention.
Figure 20 is the electric structure chart of expression the 6th embodiment of the present invention.
Figure 21 is the time diagram of " standardization program ".
Figure 22 is the time diagram of " standardization program of band book setting ".
Figure 23 is the time diagram of " standardization program that band soaks ".
Figure 24 is the flow chart of expression control content.
Symbol description
15 expression switching devices, 15A represents the power connection switch, 15B represents to latch relay, 15C represents the connection coil, 15D represents the cut-out coil, 16 expression power cut-out switches, and 17 expressions have power failure display (special-purpose display), 18 expression reservation switches, 28 expression woollen blanket procedure display (existing display), 32 expression water level displays (existing display), 39 expression rinsing number of times displays (existing display), 40 expression water filling rinsing displays (existing display), 42 expression dewatering time displays (existing display), 43 expression control device, 44 expression power supplys, 44a, 44b represents the circuit of switching on, 45 expression power supply relay circuit, 50 expression buzzers, 52 expression nonvolatile memories, relay drive circuit is latched in 61 expressions, 65 expression washing cover opening and closing sensors.
The specific embodiment
[the 1st embodiment]
Below, about the 1st embodiment of the present invention, describe referring to figs. 1 through Figure 15.
In Figure 13, the overall structure of the rinsing maching of expression rinsing maching, especially impeller-type.As the outer container 1 of the shell of rinsing maching, comprise that base station 1a, the mounting of bottom is incorporated into the box main body 1b of this base station 1a and the top cover 1c that installation is incorporated into this box main body 1b.At this top cover 1c, can be provided with washing cover 1d with opening and closing.In the inside of outer container 1, be equipped with tank 2.Tank 2 is held mechanism's 3 elasticity supports by hanging based on the elasticity of many (only illustrating 1) outstanding excellent 3a.In the inside of tank 2, be equipped with swivelling chute 4.
Swivelling chute 4 is basket, has a plurality of (an only diagram part) dewatering hole 5 in the whole zone of its all sidewall.In the upper edge of swivelling chute 4, for example spin balancing device 6 of liquid sealed-in type is installed.Bottom in the inside of swivelling chute 4 is equipped with stirring body 7.Following quadrate part in the outside of tank 2 is equipped with the drive unit 8 that extends from the bottom as the rinsing maching motor.Drive unit 8 is based on the DC Brushless Motor of for example outer-rotor type, and portion is built-in with clutch (not shown) within it.During washing that drive unit 8 is in operation (washing procedure, rinsing program), under the state of preventing swivelling chute 4, make stirring body 7 to for example alternately directly rotation of positive and negative two directions.In addition, drive unit 8 makes swivelling chute 4 directly rotate to a direction with stirring body 7 when dehydration.
In the bottom of tank 2, be formed with water discharge outlet 9.Tank 2 is discharged from this water discharge outlet 9 water of inside by draining valve 10 and drainpipe 11.With water discharge outlet 9, be set side by side with the air trap (air trap) 12 that water level detecting is used.Be connected with air hose 13 in this air trap 12.
In Figure 14, with specific show state described later guidance panel 14 is shown.This guidance panel 14 is arranged at for example front portion of top cover 1c.Guidance panel 14 have power connection switch 15A that the push switch by automatic recovery type constitutes and the power cut-out switch 16 that constituted by the push switch of automatic recovery type as power switch.In addition, guidance panel 14 has: what show power failure has a power failure display 17, be used for setting the reservation switch 18 of the reservation that moves, the reservation display 19 that shows the setting of the reservation that moves, demonstration begins the display 20 remaining time of the remaining time (reservation stand-by period) till the operation beginning from the reservation that moves, and is used for setting air-dry dry air-dry dry switch 21 and shows the air-dry dry display 22 of air-dry dry setting.
And then, guidance panel 14 has: the program switch 23 that is used for setting the program of moving, be used for showing the working procedure (" standardization program " that sets, " strong washing procedure ", " extra rinsing program ", " immersion program ", " woollen blanket program ", " groove cleaning procedure ") procedure display 24~29, be used for making the beginning switch 30 of operation beginning, the water level switch 31 that is used for designated water level, the water level display 32~35 of display setting water level, be used for setting the wash switch 36 of washing process, the wash time display 37 that shows the setting-up time of washing process, be used for setting the rinsing switch 38 of rinse cycle, the rinsing number of times display 39 that shows the set point number of rinse cycle, display setting has the water filling rinsing display 40 of water filling rinsing, the dewatering time display 42 that is used for setting the dehydration switch 41 of dehydration and shows the setting-up time of dehydration.
In addition, for above-mentioned various displays, use LED.
Relative therewith, in Figure 15, expression is based on the electric structure of control device 43.As the control core device 43 of electric structure, constituted by the microcomputer of the inside that for example is equipped on top cover 1c.This microcomputer constitutes and comprises CPU, ROM, RAM etc., and it is by carrying out program stored in advance, all work of control rinsing maching.
If power connection switch 15A is operated, then from 43 power supplies of 44 pairs of control device of power supply.By the signal from control device 43 based on this power supply, power supply relay circuit 45 keeps power supply state.In addition, if the power cut-out switch 16 that guidance panel 14 has is operated, then by the signal from control device 43 based on this operation, power supply relay circuit 45 is removed power supply state.And then in the discontinued moment of supply because of power supplys such as power failures, power supply relay circuit 45 is also removed to the power supply state of control device 43.
For control device 43, the various operation signals of switch input part 46 inputs that constitute from other the switches set that is had by guidance panel 14.In addition, for control device 43, the turn-sensitive device 47 input rotation detection signals that arrange from the mode with the rotation (and then rotation of swivelling chute 4 and/or stirring body 7) that detects drive unit 8.In addition, for control device 43, from the level sensor 48 that the mode that detects the water level in the tank 2 to communicate with air trap 12 via air hose 13 arranges, input water level detecting signal.In addition, control device 43 carries out and will calculate the rotary speed (and then rotary speed of swivelling chute 4 and/or stirring body 7) that detects drive unit 8 from the computing divided by this unit interval of the rotation detection signal of the time per unit of turn-sensitive device 47 input.
And, control device 43 is based on the various signals of importing and the control program of storage in advance, the work of the work of the display part 49 that the various display group that had by guidance panel 14 of control constitute, the buzzer 50 that particularly is made of electronic buzzer, with work, the work of draining valve 10 and the work of drive unit 8 of feed water valve 51 that the modes that supply water in the tank 2 are arranged.And then control device 43 sends the storage information that receives as described later like that between itself and the nonvolatile memory 52 that for example is made of EEPROM.
The effect of the rinsing maching of said structure then, is described.
Fig. 1 to Fig. 5 represents the control content of the rinsing maching that undertaken by control device 43.Control content when Fig. 1 represents power connection.If power connection switch 15A is operated, then as previously mentioned, from 43 power supplies of 44 pairs of control device of power supply.Based on this power supply, control device 43 makes power supply relay circuit 45 keep power supply state (steps A 1).
Then, control device 43 reads the storage information (steps A 2) of power failure from nonvolatile memory 52, judges according to this information that reads whether power failure information has been eliminated (steps A 3).Control device 43, be eliminated (being) if be judged as power failure information in steps A 3, the various displays of guidance panel 14 are carried out " demonstration of common power connection " (steps A 4), make buzzer 50 carry out " work of common power connection " (steps A 5).In " work of common power connection " of buzzer 50, control device 43 makes buzzer 50 carry out the work of 1 0.05 second time.In addition, the work number of times of the buzzer 50 in this " work of common power connection " and/or working time etc. can suit to change and implement.
Then, control device 43 judges that whether beginning switch 30 is by operation (steps A 6).Control device 43 if be judged as beginning switch 30 by operation (being), is then carried out common operation (steps A 7).
Relative therewith, control device 43 is not if being judged as power failure information in steps A 3 is eliminated (deny), then makes the various displays of guidance panel 14 be presented at power failure information among the storage information that steps A 2 reads (generation of power failure, nonvolatile memory 52 store power failure the setting content of preceding operation takes place and/or carry out situation) (steps A 4 ').
Figure 14 is illustrated in an example of the shown content of above-mentioned steps A4 ' control device 43.In the case, the content that has a power failure has taken place by 17 flickers of power failure display are shown in control device 43.And control device 43 is lighted woollen blanket procedure display 28 and water filling rinsing display 40, shows " 2 " (2 times) at rinsing number of times display 39, shows " 5 " (5 minutes) at dewatering time display 42, and water level display 32 is lighted.Thus, control device 43 show the setting program that has a power failure before taking place be " woollen blanket program ", in this woollen blanket program, " in the 2nd time water filling rinsing, move and stop ", the content of " dewatering time remained 5 minutes ", " designated water level is high water level ".
In addition, control device 43 makes buzzer 50 carry out " work that has a power failure and take place is arranged " (steps A 5 ').In " work that has a power failure and take place is arranged " of this buzzer 50, control device 43 makes 50 repetition 0.2 second time of 10 tasks of buzzer, stops the work of 0.3 second time.That is, control device 43 makes buzzer 50 different mode (different patterns) with above-mentioned common power connection the time carry out work.The working time of the buzzer 50 during in addition, this " have the work that has a power failure and take place ", dwell time, number of repetition etc. can suit to change and implement.
Then, control device 43 judges that whether beginning switch 30 is by operation (steps A 6 ').Control device 43 is if be judged as beginning switch 30 by operation (being), then from the carrying out stage of the shown operation of steps A 4 ', brings into operation with shown content again.That is, control device 43 is from being stored in before have a power failure taking place the carrying out stage of the operation of nonvolatile memory 52, with the content that is stored in nonvolatile memory 52 bring into operation (steps A 7 ') again.
Fig. 2 to Fig. 5 represents that at length control device 43 is in the control content of the common operation of steps A 7 execution.At first, control device 43 judges whether to be in (steps A 11) in service.In the case, handle if do not carry out the end of run of steps A 52 described later, then control device 43 is judged as in this steps A 11 and is in (being) in service.Therefore, then, control device 43 judges whether the setting (steps A 12) of reservation.If control device 43 be judged as not have the setting (denying) of preengaging, then and then judge whether the setting (steps A 13) of washing process.
Here, if the user has set " standardization program " automatically set under the situation of inoperation program switch 23, then control device 43 is judged as the setting (being) of washing process at above-mentioned steps A13.Therefore, control device 43 testing process (steps A 14) of washings amount that then judges whether to be through with.Control device 43 then in this stage, is stored power failure information (steps A 15) if be judged as the testing process (denying) that does not finish the washings amount.
Fig. 6 represents the process content of " standardization program " and carries out process storage number of the power failure information in the stage as it.The process corresponding with the testing process of washings amount storage number is " 1 ".Therefore, at above-mentioned steps A15, control device 43 is set the testing process of the washings amount that advances to " standardization program ", and storage is as process storage number " 1 " (with reference to Fig. 2) of the power failure information corresponding with this stage.In addition, in this " standardization program ", the process storage corresponding with the water supply process after the testing process of washings amount number is " 3 ".The process corresponding with the drainage procedure behind washing process storage number is " 4 ".The process storage corresponding with the 1st spray rinsing process (spray rinsing 1) after the dehydration (dehydration 1) in the middle of the 1st number is " 5 ".The process storage corresponding with the 2nd spray rinsing process (spray rinsing 2) after the dehydration (dehydration 2) in the middle of the 2nd number is " 6 ".The process storage corresponding with water supply process after the dehydration (dehydration 3) in the middle of the 3rd number is " 7 ".The process corresponding with the drainage procedure behind final rinse cycle storage number is " 8 ".The process corresponding with the air-dry dry process after final dewatering process storage number is " 9 ".About other process, set corresponding process storage number.Therefore, control device 43 is not stored power failure information about other process.
Fig. 7 represents the process content of " immersion program " and carries out process storage number of the power failure information in the stage as it.In addition, the later process of the later process of dehydration (dehydration 1) and the 1st centre dehydration in above-mentioned " standardization program " is identical in the middle of the 1st in " the immersion program ".In Fig. 8, the process content of expression " with the standardization program of setting of reservation " and carry out process storage number of the power failure information in the stage as it.In Fig. 9, the process content of expression " with the immersion program of setting of reservation " and carry out process storage number of the power failure information in the stage as it.In addition, the later process of the later process of dehydration (dehydration 1) and the 1st centre dehydration in above-mentioned " standardization program " is identical in the middle of the 1st in " with the immersion program of setting of reservation ".In Figure 10, the process content of expression " groove cleaning procedure " and carry out process storage number of the power failure information in the stage as it.About other program, omit the diagram of process content and process storage number.
Figure 11 represents the part of the memory map of nonvolatile memory 52.In the address 10 of nonvolatile memory 52, respectively, with 4 memory capacity storage program, the memory capacity storage water level with 2 has a power failure regularly with 4 memory capacity storages, with 4 memory capacity storage dewatering time.In the address 12 of nonvolatile memory 52, respectively, with 4 memory capacity storage wash time, with 3 memory capacity storage rinsing number of times, store the air-dry dry time with 3 memory capacity, with 3 memory capacity storage soak time.
Figure 12 represents to be stored in the memory contents of nonvolatile memory 52 with dividing above-mentioned projects with above-mentioned each memory capacity.Control device 43 is stored the memory contents relevant with program as shown in Figure 12.Namely, control device 43 respectively, with " 1 " storage memory contents corresponding with " standardization program ", with " 2 " storage memory contents corresponding with " strong washing procedure ", with " 3 " storage memory contents corresponding with " extra rinsing program ", with " 4 " storage memory contents corresponding with " woollen blanket program ", with " 5 " storage memory contents corresponding with " immersion program ", with " 6 " storage content corresponding with " groove cleaning procedure ".Control device 43 is also stored the relevant memory contents of project (water level, wash time ...) with other respectively as shown in Figure 12.
After steps A 15, control device 43 detects washings amount (steps A 16 shown in Figure 2).In the detection of this washings amount, the driving that control device 43 bases for example make swivelling chute 4 rise to needed time of predetermined rotary speed and the groove 4 that stops the rotation afterwards makes the rotation of swivelling chute 4 inertia, the rotary speed of swivelling chute 4 drops to the needed time of predetermined rotary speed thus, detects the amount of washings.That is, control device 43 detects the washings amount based on the rotary load of drive unit 8.Like this, turn-sensitive device 47 and control device 43 are born the function that detects the washings amount.
After steps A 16, control device 43 is set the end (end mark) (steps A 17) of the testing process of washings amount.Then, control device 43 turns back to steps A 11, with above-mentioned steps A 12, the A13 of similarly passing through, arrives steps A 14.At this moment, according to the result of above-mentioned steps A17, the testing process that control device 43 is judged as the washings amount finishes (being).Therefore, then, control device 43 judges whether to have set " immersion program " (steps A 18).Control device 43 then in this stage, is stored power failure information (steps A 19) if be judged as not setting " immersion program " (denying).At this moment, control device 43 is set the testing process of the washings amount that finishes " standardization program " and is advanced to water supply process then, and storage is as process storage number " 3 " (with reference to Fig. 6) of the power failure information corresponding with this stage.
Then, control device 43 begins through washing process (steps A 20) from water supply process.In addition, in water supply process, control device 43 makes feed water valve 51 open, to supply with in the tank 2 up to the corresponding water level of washings amount that detects in steps A 16 till the water yield or operate water level switch 31 and the water yield till the water level manually set up to the user.In washing process, control device 43 cleans washings by stirring body 7 is alternately rotated to for example positive and negative two directions.
After steps A 20, control device 43 is set the end (steps A 21) of washing process, then, removes the setting (steps A 22) of washing process.Then, control device 43 turns back to steps A 11 again, with the above-mentioned steps A 12 of similarly passing through, arrives steps A 13.At this moment, according to the result of above-mentioned steps A22, control device 43 is judged as the setting (denying) that does not have washing process.Therefore, then, control device 43 judges whether the setting (steps A 23 shown in Figure 3) of rinse cycle.
In steps A 23, control device 43 is if be judged as the setting (being) of washing process, and the 1st middle dehydration (dehydration 1) (steps A 24) then judges whether to be through with.Control device 43 does not finish the 1st middle dehydration (denying) as if being judged as, then in this stage, and storage power failure information (steps A 25).At this moment, control device 43 is set the washing process that finishes " standardization program " and is advanced to drainage procedure then, and storage is as process storage number " 4 " (with reference to Fig. 6) of the power failure information corresponding with this stage.
Then, control device 43 from drainage procedure through dehydration (steps A 26) in the middle of the 1st.In addition, in drainage procedure, control device 43 makes draining valve 10 open, and the water in the tank 2 is discharged outside machine by drainpipe 11.In the dehydration, control device 43 carries out centrifugal dehydration by making swivelling chute 4 rotations to washings in the middle of the 1st.
After steps A 26, control device 43 is set the end (steps A 27) of dehydration in the middle of the 1st.Then, control device 43 and then turn back to steps A 11 with above-mentioned steps A 12, A13, the A23 of similarly passing through, arrives steps A 24.At this moment, according to the result of above-mentioned steps A27, control device 43 is judged as the 1st middle dehydration (being) that is through with.Therefore, then, control device 43 judges whether the number of times of rinse cycle is set to (steps A 28) 3 times.
Control device 43 is set to (being) 3 times if be judged as the number of times of rinse cycle, then in this stage, and storage power failure information (steps A 30).At this moment, control device 43 is set the 1st middle dehydration that finishes " standardization program " and is advanced to the 1st spray rinsing process (spray rinsing 1) then, and storage is as process storage number " 5 " (with reference to Fig. 6) of the power failure information corresponding with this stage.
Then, control device 43 from the 1st spray rinsing process through dehydration in the middle of the 2nd (dehydration 2) (steps A 31).In addition, in the 1st spray rinsing process, control device 43 comes the rinsing washings by alternately or side by side carrying out water supply (water filling) in the tank 2 and the rotation of swivelling chute 4.In the dehydration, control device 43 carries out the work same with the 1st above-mentioned middle dehydration in the middle of the 2nd.
After steps A 31, control device 43 is set the end (steps A 32) of the 1st spray rinsing process.Then, control device 43 is removed and is set " 3 times " as the number of times of rinse cycle, and sets " 2 times " (steps A 33) as the number of times of rinse cycle.Then, control device 43 and then turn back to steps A 11 with above-mentioned steps A 12, A13, A23, the A24 of similarly passing through, arrives steps A 28.At this moment, according to the result of above-mentioned steps A33, the number of times that control device 43 is judged as rinse cycle is not set to (denying) 3 times.Therefore, then, control device 43 judges whether the number of times of rinse cycle is set to (steps A 29) 2 times.
Control device 43 is set to (being) 2 times if be judged as the number of times of rinse cycle, then in this stage, and storage power failure information (steps A 34).At this moment, control device 43 is set the 2nd middle dehydration that finishes " standardization program " and is advanced to the 2nd spray rinsing process (spray rinsing 2) then, and storage is as process storage number " 6 " (with reference to Fig. 6) of the power failure information corresponding with this stage.
Then, control device 43 from the 2nd spray rinsing process through dehydration in the middle of the 3rd (dehydration 3) (steps A 35).In addition, in the 2nd spray rinsing process, control device 43 carries out the work same with the 1st spray rinsing process.In the middle of the 3rd in the dehydration, control device 43 carry out with the 1st in the middle of the same work of dehydration in the middle of the dehydration and the 2nd.After steps A 35, control device 43 is set the end (steps A 36) of the 2nd spray rinsing process.Then, control device 43 is removed and is set " 2 times " as the number of times of rinse cycle, and sets " 1 time " (steps A 37) as the number of times of rinse cycle.
Then, control device 43 and then turn back to steps A 11 with above-mentioned steps A 12, A13, A23, A24, the A28 of similarly passing through, arrives steps A 29.At this moment, according to the result of above-mentioned steps A37, the number of times that control device 43 is judged as rinse cycle is not set to (denying) 2 times.Therefore, then, control device 43 is stored power failure information (steps A 38) in this stage.At this moment, control device 43 is set the 2nd spray rinsing process that finishes " standardization program " and is advanced to water supply process then, and storage is as process storage number " 7 " (with reference to Fig. 6) of the power failure information corresponding with this stage.
Then, control device 43 is from water supply process process final rinsing dehydration (steps A 39).In addition, in water supply process, control device 43 carries out the work same with above-mentioned water supply process.In final rinse cycle, control device 43 carries out the work same with above-mentioned washing process.After steps A 39, control device 43 is set the end (steps A 40) of final rinse cycle, then, removes the setting (steps A 41) of rinse cycle.
Then, control device 43 and then turn back to steps A 11 with above-mentioned steps A 12, the A13 of similarly passing through, arrives steps A 23.At this moment, according to the result of steps A 41, control device 43 is judged as and does not set rinse cycle (denying).Therefore, then, control device 43 judges whether the setting (steps A 42 shown in Figure 4) of dehydration.
In steps A 42, control device 43 is if be judged as the setting (being) of dehydration, and final dewatering process (steps A 43) then judges whether to be through with.Control device 43 does not finish final dewatering process (denying) as if being judged as, then in this stage, and storage power failure information (steps A 44).At this moment, control device 43 is set the final rinse cycle that finishes " standardization program " and is advanced to drainage procedure then, and storage is as process storage number " 8 " (with reference to Fig. 6) of the power failure information corresponding with this stage.
Then, control device 43 is from drainage procedure process final dewatering process (steps A 45).In addition, in drainage procedure, control device 43 carries out the work same with above-mentioned drainage procedure.In the final dewatering process, control device 43 carries out the work same with each above-mentioned middle dehydration.But control device 43 is must be than the time of dehydration in the middle of above-mentioned each long and carry out with the time set of this final dewatering process.
After steps A 45, control device 43 is set the end (steps A 46) of final dewatering process.Then, control device 43 judges whether the setting (steps A 47) of air-dry dry process.Control device 43 is if be judged as the setting (being) of air-dry dry process, then and then turn back to steps A 11.Then, control device 43 with above-mentioned steps A 12, A13, A23, the A42 of similarly passing through, arrives steps A 43 from steps A 11.At this moment, according to the result of above-mentioned steps A46, control device 43 is judged as the final dewatering process (being) that is through with.Therefore, then, control device 43 is stored power failure information (steps A 48) in this stage.At this moment, control device 43 is set the final dewatering process that finishes " standardization program " and is advanced to air-dry dry process then, and storage is as process storage number " 9 " (with reference to Fig. 6) of the power failure information corresponding with this stage.
Then, control device 43 is through air-dry dry process (steps A 49).In addition, in this air-dry dry process, control device 43 carries out the work same with the final dewatering process.After steps A 49, the setting (steps A 50) that control device 43 is removed dehydration turns back to steps A 11.Then, control device 43 with above-mentioned steps A 12, A13, the A23 of similarly passing through, arrives steps A 42 from steps A 11.At this moment, according to the result of above-mentioned steps A50, control device 43 is judged as and does not set dehydration (denying).Therefore, then, control device 43 is removed the power failure information (steps A 51) of storing, and carries out end of run and handles (steps A 52).Therefore, after power connection the time, control device 43 is judged as power failure information in steps A 3 and has been eliminated (being).
Though not shown, control device 43 also detect the power cut-out switch 16 in the running operation, be the cut-out of power switch.And control device 43 is also removed the power failure information of storing when the cut-out that detects this power switch.Therefore, even operating power is cut off under the situation of switch 16 in running, after power connection the time, control device 43 also is judged as power failure information in steps A 3 and has been eliminated (being).
In addition, in steps A 47, control device 43 then advances to steps A 50 if be judged as the setting (denying) that does not have air-dry dry process.
In steps A shown in Figure 2 18, control device 43 has been set " immersion program " (being) as if being judged as, and then follows, and judges whether immersion process finishes (steps A 53).Control device 43 does not finish (denying) if be judged as immersion process, then in this stage, and storage power failure information (steps A 54).At this moment, control device 43 is set the testing process of the washings amount that finishes " immersion program " and is advanced to water supply process then, and storage is as process storage number " 2 " (with reference to Fig. 7) of the power failure information corresponding with this stage.
Then, control device 43 is from water supply process process immersion program (steps A 55).In addition, in immersion process, control device 43 is soaked in washings with the washings of (in the swivelling chute 4) in the tank 2.After steps A 55, control device 43 is set the end (steps A 56) of immersion process, then, and then turns back to steps A 11.Then, control device 43 with above-mentioned steps A 12, A13, A14, the A18 of similarly passing through, arrives steps A 53 from steps A 11.At this moment, according to the result of above-mentioned steps A56, control device 43 is judged as immersion process be through with (being).Therefore, then, control device 43 advances to steps A 19.
On the other hand, in above-mentioned steps A 12, control device 43 is then followed if be judged as the setting (being) of reservation, judges whether the reservation stand-by period finishes (steps A 57 shown in Figure 5).Control device 43 is not if being judged as the reservation stand-by period finishes, and then through carrying out the steps A 58~A61 with the same work of above-mentioned steps A 14~A17, turns back to steps A 11.
Then, control device 43 with above-mentioned steps A 12, the A57 of similarly passing through, arrives steps A 58 from steps A 11.Control device 43 is then followed if being judged as the testing process of washings amount is through with (being), judges whether to have set " immersion program " (steps A 62).Control device 43 then in this stage, is stored power failure information (steps A 63) if be judged as not setting " immersion program " (denying).At this moment, control device 43 is set the testing process of the washings amount that finishes " with the standardization program of the setting of preengaging " and is advanced to reservation wait state (in the reservation stand-by period), and storage is stored number " 3 " (with reference to Fig. 8) as the process of the power failure information corresponding with this stage.
In steps A 62, control device 43 has been set " immersion program " (being) as if being judged as, then in this stage, and storage power failure information (steps A 64).At this moment, control device 43 is set the testing process of the washings amount that finishes " with the immersion program of the setting of preengaging " and is advanced to reservation wait state (in the reservation stand-by period), and storage is stored number " 2 " (with reference to Fig. 9) as the process of the power failure information corresponding with this stage.
Process storage number " 2 " and process storage number " 3 " all are the memory contents identical with power failure information under the situation that advances to water supply process.That is, control device 43 under the situation of the setting of having carried out reservation, also do not store the content that this advances to reservation wait process even advance to reservation wait process, and storage advances to the content of water supply process.Then, control device 43 is not waited under situation about bringing into operation again, and is directly brought into operation from water supply process.
In steps A 57, control device 43 is then removed the setting (steps A 65) of reservation if being judged as the reservation stand-by period is through with (being).
In addition, in Fig. 2 to Fig. 5, " strong washing procedure " performed with control device 43, " extra rinsing program ", " woollen blanket program ", " groove cleaning procedure " control contents have been omitted.
Like this, in the rinsing maching of this structure, control device 43 is in operation nonvolatile memory 52 and stores the setting content of this operation and/or carry out situation.In addition, control device 43 is removed the memory contents of nonvolatile memory 52 when the end of common operation or when detecting the cut-out of power switch.And, control device 43, when power connection, if the cut-out that is judged as the power supply of last time is not the end of common operation or the cut-out of power switch (in steps A 3 for not), then can be from carrying out stage of the operation that is stored in nonvolatile memory 52 (particularly from carry out corresponding process of stage at first), to be stored in the content of nonvolatile memory 52, operation is begun again.
Thus, rinsing maching is under the situation that has taken place to have a power failure that is in operation (in steps A 3 for not), afterwards when power up, can to be stored in the content of nonvolatile memory 52, make operation begin (steps A 7 ') again from the carrying out stage of the operation that is stored in nonvolatile memory 52.On the other hand, carried out when being in operation under the situation of rupturing operation of the power switch that undertaken by the user (in steps A 3 for being), afterwards when power up, can be from beginning to rerun (steps A 7) at first.
In addition, in the rinsing maching of this structure, control device 43 is not the end of common operation or the cut-out of power switch if be judged as the cut-out of the power supply of last time when power connection, then shows the content (steps A 4 ') that has a power failure has taken place.Thus, the user can be easily and is learnt the generation of power failure clearly.
And then in the rinsing maching of this structure, control device 43 makes buzzer 50 different mode with common power connection time the work (steps A 5 ') when the content that demonstration has taken place to have a power failure.Thus, the user also can be easily and is learnt the generation of power failure clearly.
In addition, in the rinsing maching of this structure, under the situation of the setting of having carried out reservation, control device 43 does not make nonvolatile memory 52 carry out the storage (steps A 63, A64) of stand-by period.Thus, under the situation about bringing into operation again when connecting power supply again, need not to wait for, and can directly bring into operation again.
With above relative, Figure 16 to Figure 19 represents the 2nd embodiment to the 5 embodiment of the present invention.In addition, in these the 2nd embodiment to the 5 embodiment, give identical symbol and omit explanation for the part identical with the 1st embodiment, only be described about different parts.
[the 2nd embodiment]
In the 2nd embodiment shown in Figure 16, control device 43 does not use special-purpose display and the demonstration of the content that taken place by existing display to have a power failure.Particularly, rinsing maching does not have as the display of special use above-mentioned power failure display 17 is arranged.Control device 43 makes as the woollen blanket procedure display 28 of existing display with as water filling rinsing display 40 flicker of existing display.And control device 43 makes rinsing number of times display 39 demonstrations " 2 " while glimmering as existing display, makes dewatering time display 42 demonstrations " 5 " while glimmering as existing display.In addition, control device 43 makes as the water level display 32 of existing display and lights.
Thus, control device 43 shows the content that power failure has taken place, and, with above-mentioned same, show the setting program that has a power failure before taking place be " woollen blanket program ", in this woollen blanket program, " in the 2nd time water filling rinsing, move and stop ", the content of " dewatering time remained 5 minutes ", " designated water level is high water level ".According to the present invention, can need to have taken place for demonstration the display of the special use of the content that has a power failure, can reduce cost.
[the 3rd embodiment]
In the 3rd embodiment shown in Figure 17, control device 43, when the content of power failure has taken place in demonstration, the change of the setting content that can not move.
Particularly, control device 43, initial as the interruption routine in the demonstration of the content that has taken place to have a power failure, judge whether the operation (step B1) of the various switches that guidance panel 14 has.Control device 43 then turns back to main routine (returning) if be judged as not operation (denying).On the other hand, control device 43 judges then whether the power failure information that is stored in nonvolatile memory 52 has been eliminated (step B2) if be judged as operation (being).
Control device 43 then responds to the processing (step B3) of operated switch if being judged as power failure information at step B2 has been eliminated (being).On the other hand, control device 43 judges then whether operated switch is beginning switch 30 (step B4) if being judged as power failure information is not eliminated (denying).At this step B4, control device 43 then advances to step B3 if be judged as operated switch for beginning switch 30 (being).On the other hand, control device 43 judges then whether operated switch is protection of the child switch (step B5) if being judged as operated switch is not beginning switch 30 (denying).In addition, the rinsing maching of present embodiment in the case, by for example while operation appointment switch 18 and beginning switch 30, is realized the function as protection of the child switch.
And at step B5, control device 43 then advances to step B3 if being judged as operated switch is protection of the child switch (being).On the other hand, control device 43 then turns back to main routine if being judged as operated switch is not protection of the child switch (denying).
That is, control device 43 responds to the processing of the operation of this switch for the beginning switch 30 that is used for bringing into operation again and the operation that is used for the protection of the child switch of safety.Relative therewith, control device 43 is for the operation of the switch beyond beginning switch 30, the protection of the child switch etc., do not accept the change of the setting content of the operation that the operation by this switch causes.Thus, when the content of power failure has taken place in demonstration in control device 43, the change of the setting content that can not move.
Control device 43 when the content that demonstration has taken place to have a power failure, is the state (with reference to Figure 14, Figure 16) different with common state with the display setting of guidance panel 14.Under this state, if make the switching manipulation of the setting content changing of operation, then showing becomes is difficult to identification, the possibility that exists the user to obscure.In the rinsing maching of the 3rd embodiment, demonstration can not change.Therefore, can keep demonstration with the state of easy identification, also the possibility that does not exist the user to obscure.
[the 4th embodiment]
In the 4th embodiment shown in Figure 180, control device 43 when the content that demonstration has taken place to have a power failure, under the situation of the operation of the setting content changing that has carried out making operation, is eliminated the demonstration that the content that has a power failure has taken place, and is switched to common demonstration.
Particularly, control device 43, initial as the interruption routine in the demonstration of the content that has taken place to have a power failure, judge whether the operation (step C1) of the various switches (switch that comprises the setting content changing that makes operation) that guidance panel 14 has.Control device 43 then turns back to main routine (returning) if be judged as not operation (denying).On the other hand, control device 43 judges then whether the power failure information that is stored in nonvolatile memory 52 has been eliminated (step C2) if be judged as operation (being).
If being judged as power failure information at step C2 control device 43 has been eliminated (being), then respond to the processing (step C3) of operated switch.On the other hand, control device 43 is then eliminated the demonstration (step C4) of power failure information, and is advanced to step C3 if being judged as power failure information is not eliminated (denying).In addition, in the processing (responding to the processing of operated switch) of step C3, comprise the common demonstration that responds to switching manipulation.Control device 43 when the content that demonstration has taken place to have a power failure, under the situation of the operation of the setting content changing that has carried out making operation, is eliminated the demonstration of the content that taken place to have a power failure, switches to common demonstration.
Like this, eliminate by the demonstration of the content that will take place to have a power failure, switch to common demonstration, can eliminate the possibility that the user obscures.
[the 5th embodiment]
In the 5th embodiment shown in Figure 19, control device 43 when the content of power failure has taken place in demonstration, under the situation of the cut-out that detects power switch, is removed the memory contents of nonvolatile memory 52, then with dump.
Particularly, control device 43, initial as the interruption routine in the demonstration of the content that has taken place to have a power failure, judge whether the cut-out (operation of power cut-out switch 16) (step D1) of power switch.Control device 43 then turns back to main routine (returning) if be judged as the cut-out (denying) that does not have power switch.On the other hand, control device 43 judges then whether the power failure information that is stored in nonvolatile memory 52 has been eliminated (step D2) if be judged as the cut-out (being) of power switch.
Be eliminated (being), the processing of then cutting off the electricity supply (step D3) if be judged as power failure information at step D2 control device 43.On the other hand, control device 43 is then removed and is stored in the power failure information (step D4) of nonvolatile memory 52, and advance to step D3 (processing of dump) if being judged as power failure information is not eliminated (denying).
According to such structure, under situation about bringing into operation again from the state that has a power failure before taking place in the demonstration of the content of having wanted to have taken place to have a power failure, as previously mentioned, as long as operation begins switch 30.Relative therewith, when implementing common operation in the demonstration of the content of having wanted to have taken place to have a power failure, reclose power supply again as long as carry out the cut-out of power switch.Thus, can improve ease of use with the operation of easy differentiation.
In addition, control device 43 also can be in each specific process as described above and is carried out the setting content of the operating operation of being undertaken by nonvolatile memory 52 and/or carry out the storage of situation in each specific time.
In addition, control device 43 also can make the have a power failure Presentation Function that takes place and state brings into operation again before have a power failure function ineffective treatment by specific operation (for example limit operation appointment switch 18 limit operating powers are connected the operation of switch 15A etc.).In the case, can when the dispatching from the factory of product, make the above-mentioned functions validation, and make the above-mentioned functions ineffective treatment by the specific operation that the user carries out.If make the above-mentioned functions ineffective treatment, even then connect power supply in the back that taking place to have a power failure, show the state when also being common power connection.In addition, if from make the above-mentioned functions ineffective treatment state carry out same specific operation again, then can make above-mentioned functions validation again.And then control device 43 preferably constitutes and makes nonvolatile memory 52 storage above-mentioned functions is that effective state still is the information of invalid state.Thus, once set above-mentioned functions effective or invalid after, do not need to set again the effective or invalid of above-mentioned functions.
[the 6th embodiment]
Then, about the 6th embodiment of the present invention, describe with reference to Figure 20 to Figure 24.In addition, in the 6th embodiment, give identical symbol and omit explanation for the part identical with the 1st embodiment, only be described about different parts.Figure 20 represents the electric structure of the rinsing maching of present embodiment.
Attaching plug 44A is connected in supply socket (not shown), and this supply socket is connected in the power supply 44 (with reference to Figure 15) as the grid alternating current source.An attaching plug 44A one power supply terminal is connected in the input terminal of control power circuit 45A, and another power supply terminal is connected in another input terminal of control power circuit 45A via switching device 15.Two lead-out terminals of this control power circuit 45A are connected in the power input terminal of control device 43.That is, switching device 15 is arranged at the energising circuit 44a among energising circuit 44a, the 44b between attaching plug 44A and the control power circuit 45A.This control power circuit 45A constitutes the part of power supply relay circuit 45 (with reference to Figure 15).
Switching device 15 constitutes to have: power connection switch 15A, latch relay 15B, connect with coil 15C and cut off and use coil 15D.Power connection switch 15A comprises by manual connection makes energising circuit 44a become the push switch of closed circuit automatic recovery type.Latch relay 15B and this power connection switch 15A is connected in parallel.This latchs relay 15B by connecting closure with the energising of coil 15C, even and after closure, connect to be de-energized with coil 15C and also be kept closed, then latch relay 15B and open if cut-out is energized with coil 15D.Therefore, this latchs relay 15B and is not kept closed as long as cut off not to be energized just with coil 15D.
Latch relay drive circuit 61 and use coil 15C and cut-out with energising and the outage of coil 15D by control (power on/off control) connection, control the switching of latching relay 15B.
This latchs relay drive circuit 61 possesses: as the transistor 62 of the NPN type that is used for connecting the switch element of using coil 15C connection/cut-out, making operation for detection of the closure of power cut-out switch 16/undertaken by the user) testing circuit 63 and connect/transistor 64 of the NPN type of the switch element of cut-out as being used for to connect with coil 15C.
Connect and be connected in series between dc source Vd and the GND (ground connection) with coil 15C and transistor 62.To the base stage of this transistor 62, provide latch signal Sa (transistor turns signal) from control device 43.In addition, testing circuit 63 has divider resistance 63a and the divider resistance 63b that is connected between dc source Vd and the GND.And testing circuit 63 constitutes with the divider resistance 63a on top and is connected power cut-out switch 16 in parallel, and then is connected the capacitor 63c that noise absorption is used in parallel with the divider resistance 63b of bottom.The current potential of the tie point of divider resistance 63a and divider resistance 63b works as the going code/cutting off instruction of power cut-out switch 16.Especially, the current potential when power cut-out switch 16 is carried out making operation, Sb is provided for control device 43 as the dump instruction.
Cut off and be connected in series between dc source Vd and the GND with coil 15D and transistor 64.To the base stage of this transistor 64, provide from control device 43 and to latch clearing signal Sc (transistor turns signal).
On control device 43, be connected with: the turn-sensitive device 47 of the rotary speed of switches set 46a (it comprises each switch 21,23,30,36,38,41), display group 49a (it comprises each display 17,19,20,22,32~35,37,39,40,42), washing cover opening and closing sensor 65, detection rinsing maching motor 8, level sensor 48 and the nonvolatile memory 52 of the water level in the detection tank 2.
And then, on this control device 43, be connected with: for the drive circuit 8A that drives rinsing maching motor 8, for the drive circuit 10A that drives draining valve 10 with for the drive circuit 51A of driving to the feed water valves 51 of water supply in the tank 2.To these drive circuits 8A, 10A, 51A, closed circuit by switching device 15 provides the grid alternating current source.In addition, to the drive circuit 10A of draining valve 10 and the drive circuit 51A of feed water valve 51, also can provide dc source from control power circuit 45A.
Nonvolatile memory 52 is made of for example EEPROM etc.This nonvolatile memory 52 also can be included in control device 43.
The control function of the washing operation that is realized by control device 43, drives control to rinsing maching motor 8, feed water valve 51, draining valve 10 thus and carries out washing and move the operation control program by carrying out storage in advance, realizes.In the case, as the washing working procedure, there are various programs.In the present embodiment, carry out diagrammatic illustration about for example " standardization program ", " standardization program of band book setting ", " standardization program that band soaks ".
" standardization program " is the program of carrying out washings amount testing process, water supply process, washing process, drainage procedure, the 1st middle dehydration (dehydration 1), the 1st spray rinsing process (spray rinsing 1), the 2nd middle dehydration (dehydration 2), the 2nd spray rinsing process (spray rinsing 2), the 3rd middle dehydration (dewatering 3), water supply process, final rinse cycle, drainage procedure, final dewatering process, air-dry dry process in order as shown in figure 21.The storage that situation is carried out in operation in this " standardization program " regularly is: T1 (before the washings amount testing process), T2 (after the washings amount testing process and before the water supply process), T3 (after the washing process and before the drainage procedure), T4 (after the 1st middle dehydration and before the 1st spray rinsing process), T5 (after the 2nd middle dehydration and before the 2nd spray rinsing process), T6 (after the 3rd middle dehydration and before the water supply process), T7 (after the final rinse cycle and before the drainage procedure), T8 (after the final rinse cycle), T9 (after the air-dry dry process).
At timing T1, control device 43 storages " 1 " are as carrying out the situation stored parameter.This parameter " 1 " mean carry out situation (control device 43 be considered as carrying out situation) for the washings amount detect before or in the testing process, mean from washings amount testing process to bring into operation again.
At timing T2, control device 43 storages " 3 " are as carrying out the situation stored parameter.This parameter " 3 " mean that to carry out situation be after the washings amount testing process and the process of water supply process in or in the process of washing process, mean from water supply process to bring into operation again.
At timing T3, control device 43 storages " 4 " are as carrying out the situation stored parameter.This parameter " 4 " mean that to carry out situation be after the washing process and the process of drainage procedure in or the 1st in the middle of in the process of dehydration, mean from drainage procedure to bring into operation again.
At timing T4, control device 43 storages " 5 " are as carrying out the situation stored parameter.This parameter " 5 " means that carrying out situation is in the middle of the 1st after the dehydration and in the process of the 1st spray rinsing process or in the middle of the 2nd in the process of dehydration, means from the 1st spray rinsing process to bring into operation again.
At timing T5, control device 43 storages " 6 " are as carrying out the situation stored parameter.This parameter " 6 " means that carrying out situation is in the middle of the 2nd after the dehydration and in the process of the 2nd spray rinsing process or in the middle of the 3rd in the process of dehydration, means from the 2nd spray rinsing process to bring into operation again.
At timing T6, control device 43 storages " 7 " are as carrying out the situation stored parameter.This parameter " 7 " means that carrying out situation is in the middle of the 3rd after the dehydration and in the process of water supply process or in the process of final rinse cycle, means from water supply process to bring into operation again.
At timing T7, control device 43 storages " 8 " are as carrying out the situation stored parameter.This parameter " 8 " mean that to carry out situation be after the final rinse cycle and the process of drainage procedure in or in the process of final dewatering process, mean from drainage procedure to bring into operation again.
At timing T8, control device 43 storages " 9 " are as carrying out the situation stored parameter.This parameter " 9 " mean that to carry out situation be after the final dewatering process and the process of air-dry dry process in, mean from air-dry dry process to bring into operation again.
At timing T9, washing operation normal termination, the memory contents that control device 43 is removed before this, and storage " 0 " is as carrying out the situation stored parameter.This parameter " 0 " means has removed memory contents.
In addition, control device 43 when power cut-out switch 16 is carried out making operation in the process of above-mentioned washing operation, also remove memory contents before this, and storage " 0 " is as carrying out the situation stored parameter.
The storage timing of situation is carried out in operation in should " being with the standardization program of book setting ", is T1, Ta, Tb, T3, T4, T5, T6, T7, T8, T9.The standardization program of book setting " band " replaces regularly T2 and increased regularly Ta, Tb this point, and be different with " standardization program ".
Regularly Ta is after the washings amount testing process and before reservation wait process begins.At this timing Ta, control device 43 storages " 3 " are as carrying out the situation stored parameter.This parameter " 3 " mean that to carry out situation be after the washings amount testing process and the process of water supply process in or in the process of washing process, mean and omit reservation wait process and bring into operation again from water supply process.Its implication is because if preengage the wait process in operation again when beginning, then have the possibility of stand-by period increase again.
Regularly Tb for reservation wait process finish after and before water supply process begins.At this timing Tb, control device 43 storages " 3 " are as carrying out the situation stored parameter.This parameter " 3 " mean that to carry out situation be after the washings amount testing process and the process of water supply process in or in the process of washing process, mean and omit reservation wait process and bring into operation again from water supply process.Its implication is because if preengage the wait process in operation again when beginning, then have the possibility of stand-by period increase again.
" standardization program that band soaks " as shown in figure 23, increased the immersion process this point after water supply process, different with " standardization program ".The storage that situation is carried out in operation in should " being with the standardization program of soaking " regularly is T1, T2, Tc, T3, T4, T5, T6, T7, T8, T9." band soak standardization program " is different and increased regularly Tc this point in the memory contents of timing T2, and be different with " standardization program ".
Regularly T2 is after washings amount testing process finishes and before water supply process begins.At this timing T2, control device 43 storages " 2 " are as carrying out the situation stored parameter.This parameter " 2 " mean that to carry out situation be after the washings amount testing process and the process of water supply process in or in the process of immersion process, mean from water supply process to bring into operation again.
In addition, regularly Tc is after the immersion process and after washing process begins.At this timing Tc, control device 43 storages " 3 " are as carrying out the situation stored parameter.This parameter " 3 " mean that to carry out situation be after the immersion process and the process of washing process in, mean and omit immersion process and bring into operation again from washing process.Its implication is because if carry out immersion process in operation again when beginning, then have the possibility of soak time increase again.
In addition, control device 43 carries out work based on flow chart shown in Figure 24.The flow chart that this is shown in Figure 24, when service restoration (when power connection switch 15A is carried out making operation) beginning when control device 43 receives the electric power of control power supply.At step S1,43 pairs of transistors of control device, 62 output latch signal Sa, butt joint universal coil 15C energising and make and latch relay 15B closure.At this moment, latching relay 15B is kept closed.
At step S2, the memory contents of control device 43 reading non-volatile storages 52 and judge whether the remaining memory contents that has.Here, be carried out in situation that the washing of last time operation normally is through with, at the washing of last time power cut-out switch 16 in service under the situation such as making operation, becoming the expression memory contents does not have remaining parameter " 0 ".Therefore, control device 43 is judged as "No" at step S2, advances to step S3.At this step S3, control device 43 begins the washing operation with the program of setting.At step S4, control device 43 carries out situation at the timing storage running of setting as mentioned above.
At the step S5 that follows, control device judges whether the washing operation normally is through with.If the situation (deny) that washing operation does not normally finish, then control device 43 advances to step S6, judges at this washing whether power cut-out switch 16 in service to be carried out making operation (whether have dump instruct Sb).If there is not dump instruction Sb (denying), then control device 43 turns back to step S4.
Here, if the washing operation normally finishes or dump instruction Sb (being) is arranged, then control device 43 is removed the content of storage before this at step S7, at step S8, stops the driving of each equipment.And control device 43 is at step S9, to transistor 64 output latch clearing signal Sc and to cutting off the energising with coil 15D.Thus, latch relay 15B and open, comprise control device 43 and be de-energized at interior armamentarium.Its result, under washing end of run state, control device 43 is cut off power supply, does not become wait state.Therefore, can eliminate power consumption under the end of run state (rinsing maching does not use state).
Here, when existing under the situation about having a power failure in washing (circulation by control device 43 execution in step S4 → S5 → S6 → S4 during) in service, at this constantly, disappear to the power supply of control device 43 and other equipment.Thus, the control of being undertaken by control device 43 is ended.At this moment, the remaining memory contents that the moment that has a power failure is arranged in nonvolatile memory 52.In addition, when this has a power failure generation, latch relay 15B and be kept closed.
And, if service restoration then is kept closed owing to latching relay 15B as mentioned above, so provide the grid alternating current source to control power circuit 45A.Thus, control device 43 is powered, and begins control as shown in figure 24 like that.At this moment, at step S1, though control device 43 butt joint universal coil 15C univocality ground (unilaterally) energisings are latched relay 15B and remained closed.Afterwards, in the judgment processing of step S2, it is remaining that control device 43 is judged as the memory contents of nonvolatile memory 52.Therefore, control device 43 advances to step S10, is having power failure display 17 to show the content of power failure.And then control device 43 based on the output of washing cover opening and closing sensor 65, judges whether washing cover 1d closes at step S11.And control device 43 cuts out (being) if be judged as washing cover 1d, then advances to step S12, brings into operation according to memory contents again.
Control device 43 advances to step S13 being judged as washing cover 1d when opening (deny), points out the demonstration of closing of washing cover 1d at suitable display.And control device 43 waits for cutting out of the washing cover 1d that undertaken by the user.
Control device 43 is carried out the above-mentioned later processing of step S4 after step S12.
Like this, according to the rinsing maching of present embodiment, the energising circuit 44a between attaching plug 44A and control power circuit 45A is provided with switching device 15.It is closed circuit that the operation of this switching device 15 by the user becomes this energising circuit 44a, and keep this closed circuit state in this closed circuit back.And switching device 15 normally finishes or has produced the situation of the dump instruction Sb that is formed by power cut-out switch 16 based on the washing operation, make this energising circuit 44a become open circuit.Therefore, at the washing end of run state under, make energising circuit 44a become open circuit, with the dump of control device 43.Therefore, control device 43 does not become wait state.Its result can suppress power consumption.In addition, if washing operation beginning, then control device 43 will carry out situation and/or move content being stored in nonvolatile memory 52 in predetermined timing.And control device 43 when having imported dump instruction Sb when the washing operation normally finishes or by power cut-out switch 16, is removed the memory contents of this nonvolatile memory 52.Therefore, under the situation beyond when when the washing operation normally finishes or by power cut-out switch 16, having imported dump instruction Sb, namely, under the situation that the washing operation is through with because of power failure, in nonvolatile memory 52, store carrying out situation and/or moving content of washing operation.
Therefore, even power failure detecting unit and/or power supply holding unit are not set, this power failure detecting unit makes running control circuit carry out to the storage of nonvolatile memory and controls for detection of power failure, this power supply holding unit is used for beginning to be kept for the power supply that running control circuit is stored control from having a power failure, and what the washing in the time of also can storing power failure moved carries out situation and/or move content.
And then, the memory contents of control device 43 reading non-volatile storage 52 when power supply is arranged.And, having when carrying out situation and/or the relevant memory contents of operation content remaining, control device 43 begins the washing operation again based on this memory contents.Therefore, behind service restoration, can bring into operation again by the state when having a power failure.
And then the energising circuit 44a between attaching plug 44A and control power circuit 45A is provided with above-mentioned switching device 15.Therefore, even power failure is arranged, also energising circuit 44a can be maintained closed circuit state, when service restoration, can be automatically to control power circuit 45A power supply.Therefore, also can automatically supply with the control power supply to control device 43.
Thus, when service restoration, needn't wait for user's operation, the state in the time of just can automatically making the rinsing maching operation from power failure again.
In addition, according to the rinsing maching of present embodiment, switching device 15 comprises power connection switch 15A and latchs relay 15B.Power connection switch 15A is made of the push switch that makes energising circuit 44a become closed circuit automatic recovery type by manual connection.Latch relay 15B and power connection switch 15A is connected in parallel, by connecting the closure with the energising of coil 15C, even and this connections is de-energized also with coil 15C and is kept closed after the closure, is energized with coil 15D as if cut-out and then latchs relay 15B opening.Control device 43 becomes closed circuit situation based on energising circuit 44a, via latching relay drive circuit 61, butt joint universal coil 15C energising.And control device 43 normally finishes or has produced the situation of the dump instruction Sb that is formed by power cut-out switch 16 based on the washing operation, via latching relay drive circuit 61, to cutting off the energising with coil 15D.Thus, can carry out the work of the expectation of switching device 15 reliably.
In addition, according to the rinsing maching of present embodiment, control device 43 is having 17 demonstrations of power failure display that the content that has a power failure has taken place.Thus, can make the user learn the generation of power failure easily and reliably.
In addition, according to present embodiment, control device 43 is condition to cut out at service restoration time washing cover 1d, begins the washing operation again based on memory contents.Generally, will wash cover 1d halfway and open and also carry out washing process even rinsing maching constitutes the user mostly.In the case, if when the user does not notice service restoration, under the state that washing cover 1d is opening, bring into operation, then not preferred on safety.In the present embodiment, under the state that washing cover 1d is opening, operation is begun again, from but safety.
[other embodiment]
In addition, the present invention is not limited to each above-mentioned embodiment.For example, as switching device, be not limited to said structure, and can carry out various changes and implement.In addition, the present invention can suit to change in the scope that does not break away from its purport and implement.

Claims (9)

1. a rinsing maching is characterized in that, comprising:
Display unit;
The control device that is powered from power supply;
Nonvolatile memory; And
Be used for removing the power cut-out switch to the power supply state of described control device;
Wherein, described control device has:
The setting content that will move and/or carry out the function that situation is stored in described nonvolatile memory is in operation;
Operated and removed under the situation of the power supply state of described control device under the situation that described operation normally is through with or at described described power cut-out switch in service, the function that the memory contents of described nonvolatile memory is removed;
When described control device is had power supply, the function whether memory contents of judging described nonvolatile memory has been eliminated;
Under the situation that the memory contents that is judged as described nonvolatile memory is not eliminated, from the carrying out stage of the memory contents of storing based on described nonvolatile memory, to begin the function of described operation again based on the content of this memory contents; And
When described control device is had power supply, under the situation that the memory contents that is judged as described nonvolatile memory is not eliminated, show the function of the content that power failure has taken place at described display unit.
2. rinsing maching as claimed in claim 1 is characterized in that, comprising:
For the power connection switch that the power supply from described power supply to described control device is begun.
3. rinsing maching as claimed in claim 1 is characterized in that:
Described display unit is not special-purpose display, but existing display.
4. rinsing maching as claimed in claim 1 is characterized in that, comprising:
Buzzer;
Wherein, described control device constitutes, when showing the content that power failure has taken place at described display unit, operated with situation about normally being through with described operation or at described described power cut-out switch in service and removed to the different mode of situation of the power supply state of described control device, made described buzzer work.
5. rinsing maching as claimed in claim 1 is characterized in that:
Described control device constitutes, and when showing the content that power failure has taken place at described display unit, can not change the setting content of operation.
6. rinsing maching as claimed in claim 1 is characterized in that:
Described control device constitutes, when showing the content that power failure has taken place at described display unit, under the situation of the operation of the setting content that has carried out changing operation, elimination be shown in described display unit generation the demonstration of the content that has a power failure, and the demonstration of this display unit is switched to common demonstration.
7. rinsing maching as claimed in claim 1 is characterized in that:
Described control device constitutes, when showing the content that power failure has taken place at described display unit, operated at described power cut-out switch and removed under the situation of the power supply state of described control device, removed the memory contents of described nonvolatile memory, afterwards with dump.
8. rinsing maching as claimed in claim 1 is characterized in that, comprising:
The book setting unit that is used for the reservation of the described operation of setting;
Wherein, described control device constitutes, and is operated in described book setting unit and has carried out or not the storage of stand-by period at described nonvolatile memory under the situation of setting of reservation.
9. rinsing maching as claimed in claim 1 is characterized in that, comprising:
Detect the sensor of the switching of washing cover;
Wherein, described control device constitutes, when described control device is had power supply, under the situation that the memory contents that is judged as described nonvolatile memory is not eliminated, with based on from the output of described sensor and to be judged as that described washing cover closed be condition, from the carrying out stage based on described memory contents, begin described operation again with the content based on this memory contents.
CN2009801243402A 2008-06-25 2009-06-11 Washing machine Active CN102076900B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210409909.3A CN102877263B (en) 2008-06-25 2009-06-11 Rinsing maching

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
JP165788/2008 2008-06-25
JP2008165788A JP5032403B2 (en) 2008-06-25 2008-06-25 Washing machine
JP245769/2008 2008-09-25
JP2008245769A JP4987829B2 (en) 2008-09-25 2008-09-25 Washing machine
PCT/JP2009/002640 WO2009157144A1 (en) 2008-06-25 2009-06-11 Washing machine

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201210409909.3A Division CN102877263B (en) 2008-06-25 2009-06-11 Rinsing maching

Publications (2)

Publication Number Publication Date
CN102076900A CN102076900A (en) 2011-05-25
CN102076900B true CN102076900B (en) 2013-08-07

Family

ID=41444217

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201210409909.3A Active CN102877263B (en) 2008-06-25 2009-06-11 Rinsing maching
CN2009801243402A Active CN102076900B (en) 2008-06-25 2009-06-11 Washing machine

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201210409909.3A Active CN102877263B (en) 2008-06-25 2009-06-11 Rinsing maching

Country Status (4)

Country Link
CN (2) CN102877263B (en)
EG (1) EG26000A (en)
TW (1) TWI373543B (en)
WO (1) WO2009157144A1 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103290652B (en) * 2013-05-20 2018-05-08 青岛海尔洗衣机有限公司 A kind of control method for washing machine and washing machine
CN104233701B (en) * 2013-06-19 2017-08-04 无锡小天鹅股份有限公司 Washing machine and its power-fail memory function control method and device
CN108729111B (en) * 2017-04-24 2020-08-04 青岛海尔滚筒洗衣机有限公司 Washing machine control method and washing machine
CN107142668A (en) * 2017-06-05 2017-09-08 青岛海尔洗衣机有限公司 The control method and washing facility of a kind of washing facility
CN112981850A (en) * 2019-12-18 2021-06-18 青岛海尔洗衣机有限公司 Water amount control method for washing machine

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4642753A (en) * 1983-08-17 1987-02-10 U.S. Philips Corporation Domestic electrical appliance
JP4224795B2 (en) * 2006-09-14 2009-02-18 ソニー株式会社 Optical disc apparatus and optical aberration correction method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04224795A (en) * 1990-12-26 1992-08-14 Sharp Corp Washing machine
JP3162527B2 (en) * 1993-02-18 2001-05-08 株式会社東芝 Washing machine
JPH10136567A (en) * 1996-10-25 1998-05-22 Sharp Corp Power source controller
JPH11239690A (en) * 1998-02-26 1999-09-07 Matsushita Electric Ind Co Ltd Power source switching device of washing machine and control device
CN1548610A (en) * 2003-05-13 2004-11-24 乐金电子(天津)电器有限公司 Washing machine with power switch ON/OFF program and its control mode
KR101166185B1 (en) * 2004-07-28 2012-07-18 엘지전자 주식회사 Washing Machine

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4642753A (en) * 1983-08-17 1987-02-10 U.S. Philips Corporation Domestic electrical appliance
JP4224795B2 (en) * 2006-09-14 2009-02-18 ソニー株式会社 Optical disc apparatus and optical aberration correction method

Also Published As

Publication number Publication date
TW201002900A (en) 2010-01-16
EG26000A (en) 2012-12-05
CN102076900A (en) 2011-05-25
TWI373543B (en) 2012-10-01
CN102877263B (en) 2015-08-19
CN102877263A (en) 2013-01-16
WO2009157144A1 (en) 2009-12-30

Similar Documents

Publication Publication Date Title
CN102076900B (en) Washing machine
EP1186695B1 (en) Remote control system of laundry appliance
KR100413290B1 (en) Failure analysis system of laundry machine
CN104185699B (en) Washing machine and control method thereof
JP2839527B2 (en) How to operate an electronically controlled washing machine
EP2824230B1 (en) Washing machine and communication system for washing machine
WO2006001586A2 (en) Method of controlling opening and closing of a door in a drum-type washing machine
CN105074076B (en) Washing machine
JPH07275561A (en) Washing machine
JP2000202190A (en) Door open safety device for washing machine
KR101464547B1 (en) A method of controlling washing machine
US8833109B2 (en) Home appliance
JP2010075351A (en) Washing machine
CN1904188B (en) Washing method and control device of water saving washing machine
JP2017077280A (en) Clothing treatment apparatus
KR101166185B1 (en) Washing Machine
JP2693590B2 (en) Washing machine
KR20010093968A (en) Washing machine
JP2714314B2 (en) Laundry equipment
JPH0515919Y2 (en)
KR101100162B1 (en) Washer using the midnight electric power and Method for controlling the same
KR20020088814A (en) Reservation time Setting method of washing machine
JP2778757B2 (en) Washing machine
KR19990066640A (en) Automatic door device of drum type washing machine and control method
JPH0822354B2 (en) Washing machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Tokyo, Japan

Patentee after: Toshiba Corp.

Patentee after: TOSHIBA LIFESTYLE PRODUCTS & SERVICES Corp.

Address before: Tokyo, Japan

Patentee before: Toshiba Corp.

Patentee before: TOSHIBA HOME APPLIANCES Corp.

TR01 Transfer of patent right

Effective date of registration: 20160817

Address after: Tokyo, Japan

Patentee after: TOSHIBA LIFESTYLE PRODUCTS & SERVICES Corp.

Address before: Tokyo, Japan

Patentee before: Toshiba Corp.

Patentee before: TOSHIBA LIFESTYLE PRODUCTS & SERVICES Corp.

Effective date of registration: 20160817

Address after: Tokyo, Japan

Patentee after: Toshiba Corp.

Patentee after: TOSHIBA HOME APPLIANCES Corp.

Address before: Tokyo, Japan

Patentee before: Toshiba Corp.

Patentee before: Toshiba Home Appliances Holdings Corp.

Patentee before: TOSHIBA HOME APPLIANCES Corp.