CN102074921B - Method for inserting electric tubes into case in concrete wall - Google Patents
Method for inserting electric tubes into case in concrete wall Download PDFInfo
- Publication number
- CN102074921B CN102074921B CN 201010571106 CN201010571106A CN102074921B CN 102074921 B CN102074921 B CN 102074921B CN 201010571106 CN201010571106 CN 201010571106 CN 201010571106 A CN201010571106 A CN 201010571106A CN 102074921 B CN102074921 B CN 102074921B
- Authority
- CN
- China
- Prior art keywords
- chamber
- case
- fulgurite
- cover plate
- concrete walls
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 15
- 239000004568 cement Substances 0.000 claims abstract description 9
- 239000011083 cement mortar Substances 0.000 claims description 16
- 230000001012 protector Effects 0.000 claims description 9
- 239000011509 cement plaster Substances 0.000 abstract 4
- 239000011324 bead Substances 0.000 abstract 1
- 239000006260 foam Substances 0.000 description 3
- 239000000463 material Substances 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a method for inserting electric tubes into a case in a concrete wall. The method comprises the steps: the case is put in a hole on the concrete wall and fixed with the electric tubes, the opening of the case is higher than the concrete wall surface; a small amount of cement plaster is used to fix the case, and meanwhile the levelness of the case is adjusted; the clearances between the case and the hole are filled with cement plaster, the height of the completion surface of the cement plaster is slightly lower than the concrete surface, and the four edges of the case are formed into an inclined angle beadswith the concrete wall surface; a square frame is formed by using black cement to brush the periphery of the case within the range of 80mm; the inside of the opening of the case is plugged with a plastic cover plate, and fixing bolts are used to fix the cover plate with the case. The invention has the advantages that the repair traces on the surface can be covered, so that the attractiveness and the elegance are achieved; the levelness of the case in the wall is great; the inclined angle beads can better protect the parts of the case, which project from the wall surface; foreign matters such as cement plaster can not enter and pollute the case, so that the future wire threading is facilitated; and the plastic cover plate can be recycled.
Description
Technical field
The present invention relates to the method for splicing of the interior chamber of a kind of concrete walls and fulgurite.
Background technology
When needing to lay all kinds of chamber in the buildings in general, common employing reservation chamber position then chamber is installed and fulgurite is spliced.Chamber and fulgurite lay in the concrete, and to do fado be to lay first fulgurite and foam block watering the stage of smashing, and behind form removal, foam block taken out chamber is put into the hole of vacating, and then fulgurite and chamber is connected and fixed.Technology is first chamber and fulgurite to be fixed at present, and chamber protrudes the metope certain distance, directly the space between chamber and the hole is repaired with cement mortar, and chamber is inner uncovered or use the hardboard shutoff, then waits for next procedure.
And this kind treatment technology may produce following shortcoming:
1, chamber periphery body of wall impression quality is poor, and it is rough and uneven in surface that the cement mortar aberration reaches greatly the surface, and concrete hole limit is irregular;
2, protruding the metope chamber damages easily;
3, chamber is crooked or out-of-level easily within the walls;
4, chamber inside enters cement mortar easily, pollute chamber and cause after threading inconvenient;
5, hardboard can not be reused, and slightly has damage can cause refuse pollution.
Summary of the invention
Technical problem to be solved by this invention provides the method for splicing of the interior chamber of a kind of concrete walls and fulgurite, can remedy the above shortcoming of conventional method.
In order to solve above technical problem, the invention provides the method for splicing of the interior chamber of a kind of concrete walls and fulgurite, may further comprise the steps:
One. chamber is put into the hole of concrete walls, and fix with fulgurite, described chamber oral area is higher than described concrete wall surface;
Two. the chamber that secures the above with a small amount of cement mortar first, adjust simultaneously the levelness of described chamber;
Three. repair space between described chamber and the hole with cement mortar again, the height of described cement mortar finished surface is a little less than concrete surface, and the inclination corner protector is made in described chamber four limits and described concrete walls surface simultaneously.
Preferably, also comprise after the described step 3: four. in described chamber periphery 80mm scope, whitewash into a square frame with black cement.
Further, also comprising after the described step 4: five. described chamber oral area is inboard uses the plastic cover plate shutoff, and with set bolt described cover plate and chamber is fixed.
Preferably, the unnecessary fulgurite that enters in the step 1 in the described chamber will excise, and the fulgurite that enters described chamber is wanted vertically.
Preferably, the described chamber oral area of step 1 is higher than described concrete wall surface 8mm.
Preferably, the described inclination corner protector of step 3 is 45 °.
Preferably, rapid five described plastic cover plate thickness are 2mm, and the size of described plastic cover plate is just put into described chamber.
The present invention has the following advantages:
1, chamber perimeter walls body and function black cement whitewashes, and can hide the skin patching vestige, and is elegant in appearance.
2, the chamber levelness is high within the walls.
3,45 ° of inclination corner protectors can be good at protecting chamber protruding wall face portion.
4, chamber inside is effectively protected, and the foreign material such as cement mortar can not enter the pollution chamber, threading after being convenient to.
5, this plastic cover plate can be recycled repeatedly.
Description of drawings
Below in conjunction with the drawings and specific embodiments the present invention is described in further detail.
Fig. 1 is the schematic diagram of the method for splicing of the interior chamber of concrete walls of the present invention and fulgurite;
Fig. 2 be Fig. 1 along A-A to cutaway view.
Reference numeral among the figure is: 1, concrete; 2, chamber; 3, cement mortar; 4,45 degree inclination corner protectors; 5, bolt fixed head; 6, set bolt; 7, plastic cover plate; 8, black cement frame; 9, concrete walls surface; 10, locking nut; 11, fulgurite.
Embodiment
Such as Fig. 1, shown in 2, wait for that chamber 2 is put into the hole of concrete 1 and fulgurite 11 and fixed after, the chamber oral area will be higher than about concrete wall surface 9 about 8mm.Fix chamber 2 with a small amount of cement mortar 3 first, adjust simultaneously the levelness of chamber 2.The space of repairing between chamber 2 and the hole with cement mortar 3 again after mixing up, mortar finished surface height is a little less than concrete surface, 45 ° of inclination corner protectors 4 are made in chamber 2 four limits and concrete walls surface 9 simultaneously, then in chamber 2 peripheral 80mm scopes, whitewash into a square frame 8 with black cement, 7 shutoff of special plastic cover plate are selected in chamber 2 oral area inboards, be bolted plate 5 usefulness set bolts 6 cover plate 7 and chamber 2 are fixed.Then wait for next procedure.
Embodiment 1
After concrete blinding is removed, the foam block that is embedded in the reinforcing steel bars of wallboards is taken out, the hole periphery is cleaned out.Then with chamber 2 according to fulgurite 11 position perforates (generally be abate empty), chamber 2 is put into the hole, with locking nut 10 fulgurite 11 is fixed with it, notices entering that chamber 2 interior unnecessary fulgurites 11 will excise and the fulgurite of inlet box 2 11 is vertical; The chamber oral area will be given prominence to about concrete wall surface 9 about 8mm simultaneously.Then adjust the levelness of chamber 2, the space of filling between chamber 2 and the hole with a small amount of cement mortar 3 first, all repair with cement mortar 3 after adjust the position for the treatment of chamber 2, mortar finished surface height is a little less than concrete surface again, and 45 ° of corner protectors are made in chamber four limits and concrete walls surface 9.
Finish embodiment 1 the institute in steps after, then around chamber 2, whitewash into a square frame (black cement frame 8) with black cement in the 80mm scope, the plastic cover plate 7 about special 2mm is put in chamber oral area inboard, plastic cover plate 7 sizes are advisable just to put into chamber 2, cover plate 7 and chamber 2 are fixed with set bolt 6 by two bolts hole of chamber 2 inside at last.
The present invention has following implementation result:
1, chamber perimeter walls body and function black cement whitewashes, and can hide the skin patching vestige, and is elegant in appearance.
2, the chamber levelness is high within the walls.
3,45 ° of inclination corner protectors can be good at protecting chamber protruding wall face portion.
4, chamber inside is effectively protected, and the foreign material such as cement mortar can not enter the pollution chamber, threading after being convenient to.
5, this plastic cover plate can be recycled repeatedly.
Claims (5)
1. the method for splicing of chamber and fulgurite in the concrete walls is characterized in that, may further comprise the steps:
One. chamber is put into the hole of concrete walls, and fix with fulgurite, described chamber oral area is higher than the metope of described concrete walls;
Two. the chamber that secures the above with a small amount of cement mortar first, adjust simultaneously the levelness of described chamber;
Three. repair space between described chamber and the hole with cement mortar again, the height of described cement mortar finished surface is a little less than concrete surface, and the surface of wall of described chamber four limits and described concrete walls is made the inclination corner protector simultaneously;
Four. in described chamber periphery 80mm scope, whitewash into a square frame with black cement;
Five. described chamber oral area is inboard uses the plastic cover plate shutoff, and with set bolt described cover plate and chamber is fixed.
2. the method for splicing of chamber and fulgurite in the concrete walls as claimed in claim 1 is characterized in that the unnecessary fulgurite that enters in the step 1 in the described chamber will excise, and the fulgurite that enters described chamber wants vertical.
3. the method for splicing of chamber and fulgurite in the concrete walls as claimed in claim 1 is characterized in that the described chamber oral area of step 1 is higher than the metope 8mm of described concrete walls.
4. the method for splicing of chamber and fulgurite in a kind of concrete walls as claimed in claim 1 is characterized in that the described inclination corner protector of step 3 is 45 °.
5. the method for splicing of chamber and fulgurite in the concrete walls as claimed in claim 1 is characterized in that the described plastic cover plate thickness of step 5 is 2mm, and the size of described plastic cover plate is just put into described chamber.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010571106 CN102074921B (en) | 2010-12-02 | 2010-12-02 | Method for inserting electric tubes into case in concrete wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010571106 CN102074921B (en) | 2010-12-02 | 2010-12-02 | Method for inserting electric tubes into case in concrete wall |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102074921A CN102074921A (en) | 2011-05-25 |
CN102074921B true CN102074921B (en) | 2013-01-30 |
Family
ID=44033321
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010571106 Expired - Fee Related CN102074921B (en) | 2010-12-02 | 2010-12-02 | Method for inserting electric tubes into case in concrete wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102074921B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110086112A (en) * | 2019-04-01 | 2019-08-02 | 上海聚通装饰集团有限公司 | A kind of wet zone power supply comb leakage preventing structure and its mounting process |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6648277B2 (en) * | 2000-05-23 | 2003-11-18 | Douglas F. De Leu | Electrical conduit box mounting strap |
CN201084864Y (en) * | 2006-09-26 | 2008-07-09 | 徐金旺 | A terminal box for wall pre-embedded pipes |
-
2010
- 2010-12-02 CN CN 201010571106 patent/CN102074921B/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6648277B2 (en) * | 2000-05-23 | 2003-11-18 | Douglas F. De Leu | Electrical conduit box mounting strap |
CN201084864Y (en) * | 2006-09-26 | 2008-07-09 | 徐金旺 | A terminal box for wall pre-embedded pipes |
Non-Patent Citations (3)
Title |
---|
住宅楼混凝土柱中线盒固定法;张士国等;《建筑工人》;20050228(第2期);31 * |
张士国等.住宅楼混凝土柱中线盒固定法.《建筑工人》.2005,(第2期),31. |
才家刚.接线盒的安装.《家庭小电工》.1999,63-65. * |
Also Published As
Publication number | Publication date |
---|---|
CN102074921A (en) | 2011-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208056637U (en) | A kind of concrete shear force wall sealing hole device | |
US9255413B2 (en) | Method for plastering construction in architectural decoration | |
CN101368444B (en) | Novel profiled bar and wood combination type door, window shaping template and its installation method | |
CN204001662U (en) | A kind of fastening devices external member of Cantilever Beams | |
US7311867B1 (en) | Method of rapid mold development for swimming pools, spas and ponds | |
CN213683198U (en) | Pay-off hole mold sealing device capable of being circulated | |
CN102074921B (en) | Method for inserting electric tubes into case in concrete wall | |
CN107237492A (en) | The installation method of sizing cylindrical form | |
CN204112860U (en) | Detachable enclosure wall | |
CN205370110U (en) | Constructon site fence | |
CN110630021A (en) | One-step forming construction process for embedded distribution box | |
CN206737184U (en) | A kind of rammed earth feature wall | |
CN207314830U (en) | A kind of shear wall negative and positive angle construction mould | |
CN205857565U (en) | The column mounting seat on stair provisional protection hurdle and mounting structure thereof | |
CN106381999A (en) | Fair-faced concrete wall intaglio character die plate construction method | |
CN205243157U (en) | Enclose fender from counter weight door plant formula | |
CN205743005U (en) | Inflatable adjustable concrete structural slab hole to be provided construction mould | |
CN207829461U (en) | The die device of component hole to be provided | |
CN113431369A (en) | Ancient building wall repairing method | |
CN110924691A (en) | Environment-friendly building construction method | |
CN111042414A (en) | Electromechanical embedded box installation method for building floor construction supported by all-aluminum mold | |
CN201184026Y (en) | Wall body internal wall corner protecting structure | |
CN113216653B (en) | Construction device and construction method for sunken toilet | |
CN204960190U (en) | Stair bone for building shape angle bead | |
CN212706234U (en) | A sand blasting unit for imitating production of pc brick |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130130 |
|
CF01 | Termination of patent right due to non-payment of annual fee |