CN102071652B - Method and device for dragging large-tonnage object ashore - Google Patents

Method and device for dragging large-tonnage object ashore Download PDF

Info

Publication number
CN102071652B
CN102071652B CN 201010608649 CN201010608649A CN102071652B CN 102071652 B CN102071652 B CN 102071652B CN 201010608649 CN201010608649 CN 201010608649 CN 201010608649 A CN201010608649 A CN 201010608649A CN 102071652 B CN102071652 B CN 102071652B
Authority
CN
China
Prior art keywords
ship
bank
right track
tonnage
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201010608649
Other languages
Chinese (zh)
Other versions
CN102071652A (en
Inventor
朱慈祥
吴威
姜传刚
张绍才
曾文锋
邓惠斌
李少芳
王蔚
向中富
盛海军
易继华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Harbour Engineering Co Ltd
CCCC Road and Bridge Special Engineering Co Ltd
Original Assignee
CCCC Road and Bridge Special Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Road and Bridge Special Engineering Co Ltd filed Critical CCCC Road and Bridge Special Engineering Co Ltd
Priority to CN 201010608649 priority Critical patent/CN102071652B/en
Publication of CN102071652A publication Critical patent/CN102071652A/en
Application granted granted Critical
Publication of CN102071652B publication Critical patent/CN102071652B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ship Loading And Unloading (AREA)

Abstract

The invention discloses a method and a device for dragging a large-tonnage object ashore. The method comprises the following steps of: putting the large-tonnage object on a ship steel sliding plate of a ship rail, and dragging the large-tonnage object by using a traction device of a winch until the large-tonnage object is dragged and slipped to the end part of a protruding section of the ship rail; and jacking the large-tonnage object by using a lifting jack to get away from the ship steel sliding plate, withdrawing the ship rail from a shore ground rail, lowering the large-tonnage object to a shore steel sliding plate of the shore rail by using the lifting jack, and dragging the large-tonnage object to the other end of the shore rail by using the traction device of the winch, so that the large-tonnage heavy object is ashore. The device is low in cost; cutting and disassembling cost is greatly saved; meanwhile, the machine-shift cost of large-scale lifting equipment is greatly reduced, and good economic benefits are achieved.

Description

Implement method and the device thereof of the dilatory disembarkation of large-tonnage object
Technical field
The invention belongs to bridge hoisting transportation construction, be specifically related to the technology of a kind of large-tonnage object dilatory disembarkation from water.
Background technology
The major technique that concrete-bridge is removed is mainly decomposes and hoisting technology, realize that the bridge dismounting obtains higher economic and social benefit, must the balance concrete decomposes and the expense of hoisting technology aspect.When existing concrete-bridge across water channel was removed, the member that disassembles can be transferred on the bank from waterborne, then carries out after-treatment.As what disassemble is little tonnage member, can select conventional as crane, mast hangs with crane gears such as crane barges and transports, this bridge mode of removing not only needs to expend a large amount of concrete and decomposes expense, also need expend a large amount of allocation and transportation machine-team expenses, on definite meaning, this is inappropriate for the bridge projects without the later stage economic well-being of workers and staff.
When actual bridge is removed; often decompose in order to reduce cutting the expensive expense of bringing; often can consider large sections ground dismounting bridge construction; the member that disassembles like this is exactly large-tonnage (surpassing 50t); as adopting again the large lifting equipment lifting, must pay larger economic cost.When how farthest to have reduced cutting decomposition expense, realize the ground transfer disembarkation of large-tonnage concrete component safety economy, there is no at present effective solution.
Summary of the invention
The object of the present invention is to provide a kind of method and device thereof of implementing the dilatory disembarkation of large-tonnage object, to address the above problem.
The method of the dilatory disembarkation of enforcement large-tonnage object of the present invention, it is two parallel ships to be set get on the right track on dull and stereotyped barge keel, ship gets on the right track and has overhanging section that stretches out outside dull and stereotyped barge ship side, on the bank ground rail; Ship gets on the right track overhanging section be connected with the joining section of ground rail on the bank, ship get on the right track and ground rail on respectively arrange on a cover ship steel slide plate and steel slide plate on the bank; The large-tonnage object is placed on the ship that ship gets on the right track on the steel slide plate, dilatory by the hoist engine draw-gear, the dilatory slippage of large-tonnage object stops to the overhanging section end that ship gets on the right track, utilize lifting jack with large-tonnage object jack-up, break away from ship after the steel slide plate, after ship gets on the right track and withdraws on the bank ground rail, lifting jack is transferred to the large-tonnage object on the slide plate of steel on the bank of track on the bank, again draw the ashore other end of track of large-tonnage object by the hoist engine draw-gear, thereby realize the disembarkation of large-tonnage weight.
Described large-tonnage object is placed the pallet of steel slide plate aboard ship or is drawn in the pallet of steel slide plate on the bank.
When get on the right track when ship the overhanging section joining section absolute altitude with ground rail on the bank is inconsistent, by the sump of dull and stereotyped barge or husky container or soil container are loaded or the off-loading adjustment, overhanging section of making that ship gets on the right track of the height of dull and stereotyped barge is identical with the absolute altitude of ground rail on the bank.
The device of the dilatory disembarkation of enforcement large-tonnage object of the present invention, it comprises the hoist engine draw-gear, it also comprise arrange with dull and stereotyped barge on parallel two ships get on the right track, ship gets on the right track to have and stretches out outward overhanging section of dull and stereotyped barge ship side; Be arranged at ground rail on the bank on the bank, overhanging section of getting on the right track of the joining section of ground rail and ship is connected on the bank; The joining place that gets on the right track of ground track and ship is provided with lifting jack on the coast, ship get on the right track and ground rail on respectively arrange on a cover ship steel slide plate and steel slide plate on the bank.
On ship, the steel slide plate comprises the first steel plate, and the first steel plate has the first tetrafluoro plate, and the end of the first steel plate is upturned; The first steel plate has the first spacing steel plate, the parallel sided that the first spacing steel plate and ship get on the right track.
The steel slide plate comprises the second steel plate on the bank, and the second steel plate has the second tetrafluoro plate, and the end of the second steel plate is upturned; The second steel plate has the second spacing steel plate, the second spacing steel plate and the parallel sided of ground rail on the bank.
The joining section of ground rail and ship overhanging period overlapping linking of getting on the right track on the bank.
Dull and stereotyped barge is provided with sump or husky container or soil container.
Ground rail is fixed on the bank on track foundation on the bank, and track foundation is that two parallel concrete enlarge the basis on the bank, and basic domestic demand shifts to an earlier date pre-buried positioning screw, and surface of base need flatten processing.
The technical characterictic such as this invention has that compliance is good, simple in structure, easy to make, operability is good, safe and reliable, good economy performance, utilization prospect are good:
Compliance is good: be applicable to have the object disembarkation on the river course of water transport function, both be suitable for little tonnage object, also be adapted to the large-tonnage object; Both adapted to and concentrated the case disembarkation, also be adapted to the disembarkation of concrete and steel work.
This apparatus structure is simple: only need simple dull and stereotyped barge, shaped steel, steel plate combination and small lifting equipment commonly used just can realize that weight is without the function of hanging device transhipment disembarkation.
Easy to make: the parts that this device needs are shaped article on market, can realize by rationalization.
Operability is good: when towed equipment uses, only need 1 commander in chief's hand, and 1 hoist engine operator, 1 jack hydraulic pumping plant operator and 2 sliding rails are followed the tracks of hand and can be completed smoothly.
Safe and reliable: a whole set of towed equipment is shaped article, and each ingredient degree of safety of system synthesis is high; Do not need the raising center to lift in weight disembarkation moving process, eliminated the lifting risk; The work progress special-less process, operating mode is stable, is convenient to control, and the construction technology risk is little.
Good economy performance: on the one hand, this device mainly is comprised of the market formed product, and assembling and processing are simple, and the cost of implement device itself is lower; On the other hand, saved a large amount of cutting disaggregated costs; Also greatly reduce simultaneously the expense of large lifting equipment mechanical one-shift, had extraordinary economic benefit.
The utilization prospect is good: this kind device is removed the disembarkation processing for large sections concrete box girder possibility is provided, and good technical characterstic and superior economic performance have been demonstrated, this has good application prospect for being fit closely without the bridge projects of later stage economic well-being of workers and staff.Simultaneously, this kind device also can be used in the engineerings such as the concentrated case of port and pier and large-scale steel structure disembarkation and go, and greatly expands its suitable application area.
Description of drawings
The dilatory disembarkation of Fig. 1 large-tonnage regular object device floor map.
The dilatory disembarkation of the irregular object of Fig. 2 large-tonnage device elevational schematic view.
Fig. 3 ground rail on the bank is connected the plane enlarged diagram with the ship section of getting on the right track.
Fig. 4 ground rail on the bank is connected with the ship section of getting on the right track and puts the large schematic diagram of facade.
As shown in Figure 1, 2.object for track, dull and stereotyped barge 1 positions and fixes by cable device 2, arrange that ship gets on the right track 3 on dull and stereotyped barge 1, ship gets on the right track and steel slide plate 4 on ship is set on 3, shelve weight 5 on ship on steel slide plate 4, ship gets on the right track and 3 has and stretch out outer overhanging section 3.1 of dull and stereotyped barge ship side, ground rail 8 is arranged on the bank on track foundation 6 on the bank, the joining section 8.3 of ground rail 8 and ship get on the right track 3 overhanging section 3.3 and are connected on the bank, in the present embodiment, two ships get on the right track 3 overhanging section 3.1 and are embedded in two on the bank in the joining section 8.3 of ground rail 8, the joining place that gets on the right track of ground track and ship is provided with lifting jack 7 on the coast, rail steel slide plate 9 on the bank is set on track 8 on the bank, weight 5 by hoist engine draw-gear 10 successively along ship get on the right track 3 and on the bank track 8 toward moving on the bank.It is the dilatory front structural representation of weight.
Dull and stereotyped barge 1 need to have stronger keel 1.1, hold the sump of enough regulating levels (or husky, soil container) 1.2, and during lower than the absolute altitude of track 8 on the bank, sump (or husky, soil container) 1.2 need reduce discharging when the absolute altitude of ship upper track device 3; Cable device 2 needs suitable on the coast position that anchor ingot 2.2 is set, and couples together by anchor post 2.3 on hawser 2.1 and barge;
As shown in Fig. 3,4, ship gets on the right track and 3 is comprised of type steel skeleton 3.1 and stiffener 3.2; On ship on ship gets on the right track, steel slide plate 4 comprises that steel plate 4.1, steel plate 4.1 have tetrafluoro plate 4.3, and the end of steel plate is upturned to consist of and faces upward head structure 4.4; Steel plate 4.1 has spacing steel plate 4.2, get on the right track 3 parallel sided of spacing steel plate 4.2 and ship; Type steel skeleton 3.1 and stiffener 3.2 are all structures of track inside, and orbital plane is smooth.
Between the one side of tetrafluoro plate 4.3 and steel plate 4.1, the glue station connects, and another side gets on the right track with ship and contacts by coating butter between 3 upper surfaces.So structure is convenient to move on rail set on the coast by the weight on the dilatory steel skate apparatus on the bank of less external force.When weight moved turning point, the steel skate apparatus should be first in place in the position of jack system on the bank.Spacing steel plate 4.2 is used for restriction steel plate 4.1 and skids off track, and plays guiding; In the present embodiment, spacing steel plate 4.2 is bent to form by steel plate 4.1.
Track 8 is comprised of type steel skeleton 8.1 and stiffener 8.2 on the bank; Track slide plate 9 is by comprising that steel plate 9.1, steel plate 9.1 have tetrafluoro plate 9.3 on the bank, and the end of steel plate is upturned to consist of and faces upward head structure 9.4; Steel plate 9.1 has spacing steel plate 9.2, spacing steel plate 9.2 and the parallel sided of track 8 on the bank.Type steel skeleton 8.1 in figure and stiffener 8.2 are all structures of track inside, and orbital plane is smooth.
As shown in Figure 1, 2, hoist engine draw-gear 10 comprises wire rope 10.1, hook 10.4, fly block group 10.2, windlass device 10.3 successively.
During construction: the large-tonnage object is placed on the ship that ship gets on the right track on the steel slide plate, dilatory by the hoist engine draw-gear, the dilatory slippage of large-tonnage object stops to the overhanging section end that ship gets on the right track, utilize lifting jack with large-tonnage object jack-up, break away from ship after the steel slide plate, after ship gets on the right track and withdraws on the bank ground rail, lifting jack is transferred to the large-tonnage object on the slide plate of steel on the bank of track on the bank, again draw the ashore other end of track of large-tonnage object by the hoist engine draw-gear, thereby realize the disembarkation of large-tonnage weight.
The large-tonnage object is placed the pallet of steel slide plate aboard ship or is drawn in the pallet of steel slide plate on the bank.
When get on the right track when ship the overhanging section joining section absolute altitude with ground rail on the bank is inconsistent, by the sump of dull and stereotyped barge or husky container or soil container are loaded or the off-loading adjustment, overhanging section of making that ship gets on the right track of the height of dull and stereotyped barge is identical with the absolute altitude of ground rail on the bank.

Claims (8)

1. implement the dilatory method of debarking of large-tonnage object for one kind, it is two parallel ships to be set get on the right track on dull and stereotyped barge keel, and ship gets on the right track and has overhanging section that stretches out outside dull and stereotyped barge ship side; Ship gets on the right track overhanging section be connected with the joining section of ground rail on the bank, the ship steel slide plate on upper layout one cover ship that gets on the right track arranges on ground rail that on the bank one overlaps steel slide plate on the bank; The large-tonnage object is placed on the ship that ship gets on the right track on the steel slide plate, dilatory by the hoist engine draw-gear, the dilatory slippage of large-tonnage object stops to the overhanging section end that ship gets on the right track, utilize lifting jack with large-tonnage object jack-up, break away from ship after the steel slide plate, after ship gets on the right track and withdraws on the bank ground rail, lifting jack is transferred to the large-tonnage object on the slide plate of steel on the bank of ground rail on the bank, again draw the ashore other end of track of large-tonnage object by the hoist engine draw-gear, thereby realize the disembarkation of large-tonnage weight.
2. implement as claimed in claim 1 the method for the dilatory disembarkation of large-tonnage object, it is characterized in that the large-tonnage object places the pallet of steel slide plate aboard ship or draw in the pallet of steel slide plate on the bank.
3. implement as claimed in claim 1 the method for the dilatory disembarkation of large-tonnage object, when it is characterized in that getting on the right track when ship the overhanging section joining section absolute altitude with ground rail on the bank is inconsistent, by the sump of dull and stereotyped barge or husky container or soil container are loaded or the off-loading adjustment, overhanging section of making that ship gets on the right track of the height of dull and stereotyped barge is identical with the absolute altitude of ground rail on the bank.
4. device of implementing the dilatory disembarkation of large-tonnage object, it comprises the hoist engine draw-gear, it is characterized in that it also comprise arrange with dull and stereotyped barge on parallel two ships get on the right track, ship gets on the right track to have and stretches out outward overhanging section of dull and stereotyped barge ship side; Be arranged at ground rail on the bank on the bank, overhanging section of getting on the right track of the joining section of ground rail and ship is connected on the bank; The joining place that gets on the right track of ground track and ship is provided with lifting jack on the coast, and the ship steel slide plate on upper layout one cover ship that gets on the right track arranges on ground rail that on the bank one overlaps steel slide plate on the bank.
5. the device of the dilatory disembarkation of enforcement large-tonnage object as claimed in claim 4, is characterized in that on ship, the steel slide plate comprises the first steel plate, and the first steel plate has the first tetrafluoro plate, and the end of the first steel plate is upturned; The first steel plate has the first spacing steel plate, the parallel sided that the first spacing steel plate and ship get on the right track.
6. the device of the dilatory disembarkation of enforcement large-tonnage object as claimed in claim 4, is characterized in that the steel slide plate comprises the second steel plate on the bank, and the second steel plate has the second tetrafluoro plate, and the end of the second steel plate is upturned; The second steel plate has the second spacing steel plate, the second spacing steel plate and the parallel sided of ground rail on the bank.
7. overhanging period overlapping linking that the device of the dilatory disembarkation of enforcement large-tonnage object as claimed in claim 4, the joining section that it is characterized in that ground rail on the bank and ship get on the right track.
8. the device of the dilatory disembarkation of enforcement large-tonnage object as claimed in claim 4, is characterized in that dull and stereotyped barge is provided with sump or husky container or soil container.
CN 201010608649 2010-12-28 2010-12-28 Method and device for dragging large-tonnage object ashore Expired - Fee Related CN102071652B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010608649 CN102071652B (en) 2010-12-28 2010-12-28 Method and device for dragging large-tonnage object ashore

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010608649 CN102071652B (en) 2010-12-28 2010-12-28 Method and device for dragging large-tonnage object ashore

Publications (2)

Publication Number Publication Date
CN102071652A CN102071652A (en) 2011-05-25
CN102071652B true CN102071652B (en) 2013-06-12

Family

ID=44030391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010608649 Expired - Fee Related CN102071652B (en) 2010-12-28 2010-12-28 Method and device for dragging large-tonnage object ashore

Country Status (1)

Country Link
CN (1) CN102071652B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103498420B (en) * 2013-10-18 2016-03-30 中交一公局厦门工程有限公司 Large-scale steel box beam ashore construction method
CN103603275B (en) * 2013-10-22 2015-08-26 中铁大桥局集团第四工程有限公司 A kind of system and method for sections steel box-girder slippage disembarkation
CN103991720B (en) * 2014-04-24 2016-03-02 中交二航局第三工程有限公司 Large-sized concrete caisson transport systems and transportation resources
CN113605263B (en) * 2021-09-07 2023-04-04 中交瑞通建筑工程有限公司 Old bridge dismantling method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0619129B2 (en) * 1984-12-04 1994-03-16 清水建設株式会社 Construction method of Tsukishima and pile for Tsukishima construction
CN101117793A (en) * 2007-09-05 2008-02-06 中国建筑第七工程局 Steelwork pipe arch bridge float-dragging construction method
CN201144394Y (en) * 2007-12-27 2008-11-05 中铁四局集团有限公司 Large-scale girder shift unit
CN201334782Y (en) * 2008-12-26 2009-10-28 倪湘凝 Water lifting bridge

Also Published As

Publication number Publication date
CN102071652A (en) 2011-05-25

Similar Documents

Publication Publication Date Title
CN102381440B (en) Guide chain device
CN202415021U (en) Irrotational foldable variable-amplitude large-scale crane ship
CN205257825U (en) Offshore platform fan hoist and mount system
KR101230357B1 (en) Radial wire drive type marine column structure construction apparatus
CN102071652B (en) Method and device for dragging large-tonnage object ashore
CN106218827A (en) Offshore wind farm O&M supports platform
US20150217838A1 (en) Method for lowering and hoisting of a load to or from an ocean floor
CN101987651A (en) Assembling method and assembling bracket of total segments of small ship
CN203333189U (en) Hoisting device for ships
CN206635654U (en) A kind of barging device of underwater narrow-bore tunnel super long type prefabricated case beam
CN113335475B (en) Deck bottom fixed pulley sliding platform dismantling process
CN102381438B (en) Wholly lifting mounting method for wholly built upstairs stem section of large-size semi-submerged ship
CN103174093A (en) Mounting device and mounting method of steel box girder in support zone
CN207536826U (en) Prefabricated guardrail is unloaded and the integrated table system of installation
CN101787687B (en) Offshore oil drilling platform sledge block and hoisting technology thereof
CN206279527U (en) A kind of deep concrete mixture ship pile frame system
CN206766292U (en) Middle-size and small-size submarine handling torpedo new exclusive landing stage
CN105317031B (en) A kind of ship lift main equipment room bridge main beam hanging method
CN207060339U (en) A kind of marine piling job platform and its elemental floating body and platform section
CN202416191U (en) Descending-type movable mould frame offshore dismounting main beam lifting device
CN104627326A (en) Special lifting and vibration-driving ship for integrated driving of cell type steel sheet pile large cylinders and vice cells
CN209023076U (en) Jacket handling integrated ship
CN107487724A (en) A kind of the large-scale floating crane arm support erecting device and installation method of non-loop wheel machine auxiliary
CN205365984U (en) Marine multifunctional platform
CN109441734A (en) Jacket handling integral type construction technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA HARBOUR ENGINEERING CO., LTD.

Effective date: 20150727

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150727

Address after: 430071 Wuhan, Wuchang, North Road, No. 122, east sand building, layer 20,

Patentee after: CCCC Road & Bridge Special Engineering Co., Ltd.

Patentee after: China Harbour Engineering Co., Ltd.

Address before: 430071 Wuhan, Wuchang, North Road, No. 122, east sand building, layer 20,

Patentee before: CCCC Road & Bridge Special Engineering Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130612

Termination date: 20191228