CN102070172A - Drainage process for suspension in gas purification and absorption process - Google Patents
Drainage process for suspension in gas purification and absorption process Download PDFInfo
- Publication number
- CN102070172A CN102070172A CN 201010597312 CN201010597312A CN102070172A CN 102070172 A CN102070172 A CN 102070172A CN 201010597312 CN201010597312 CN 201010597312 CN 201010597312 A CN201010597312 A CN 201010597312A CN 102070172 A CN102070172 A CN 102070172A
- Authority
- CN
- China
- Prior art keywords
- tower
- nitrogen
- gas
- suspension
- drainage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Treating Waste Gases (AREA)
Abstract
The invention discloses a drainage process for suspension in a gas purification and absorption process. After a gas is washed by using liquid in a tower to generate suspension, nitrogen is inflated from a drainage pipe, the nitrogen ascends to displace the washed gas in the tower, and the suspension is drained from the bottom of the tower after the tower is full of the nitrogen and the pressure is raised. The nitrogen is adopted for pressure charge and drainage, namely the nitrogen is inflated into the tower at the same time of drainage, so that the liquid in the tower can be fully drained; and because the washed gas is displaced by the nitrogen, the gas does not escape during emptying, the drainage pipe has no residual liquid, and the probability of pipe blockage does not exist.
Description
Technical field
The present invention relates to the fluid-discharge technology of suspension liquid, particularly the fluid-discharge technology of suspension liquid in barium carbonate and the similar substance is produced in gas liquid reaction.
Background technology
The gas of sulfide hydrogen and carbonic acid gas and barium sulfide solution reaction are produced in the process of barium carbonate, and key link is the discharge opeing of falling tower discharging, and it is very important how resolving this Control essentials.If control badly, drain time is long, very easily causes hydrogen sulfide to be overflowed, and drain time is too short then may blocking pipe.
Summary of the invention
The fluid-discharge technology that the purpose of this invention is to provide suspension liquid in a kind of purification for gas absorption process, this technology can make the as safe as a house reliable of this process change, thereby produce safety and environmental protection benefit preferably.
The technical scheme that the present invention takes is:
The fluid-discharge technology of suspension liquid in the purification for gas absorption process after gas liquid scrubbing in tower generates suspension liquid, charges into nitrogen from Drainage pipe, and line replacement falls gas after the washing in the tower on the nitrogen, and suspension liquid is discharged at the bottom of tower.
Suspension liquid was drained only, avoided toxic gas excessively together to enter storage tank again with suspension liquid because of discharging.
This process using nitrogen pressurising discharge opeing, i.e. discharge opeing be inflated with nitrogen in tower simultaneously, and the interior liquid of tower is discharged fully, because washing back gas is by nitrogen replacement, so no longer overflow during emptying, and do not have remaining liquid in the liquid discharge pipe yet, the pipe possibility of jamming has not just existed yet.This is simple for process, only consumes a spot of nitrogen, just can make the fool proof of device operation control change, the effusion of particularly having stopped hydrogen sulfide, and the environmental benefit that brings is considerable.
Description of drawings
Fig. 1 is a processing unit structure iron of the present invention,
Wherein: 1. washing tower, 2. nitrogen blanketing valve, 3. storage tank.
Embodiment
Embodiment 1
Contain barium carbonate discharge opeing process in the waste gas washing of hydrogen sulfide and carbonic acid gas:
Ta Neitong contains the waste gas of hydrogen sulfide and carbonic acid gas, treat that barium sulphide and the carbon dioxide reaction in the barium sulfide solution becomes barium carbonate fully in the tower, close exhaust gas inlet, the internally piloted valve of inflated with nitrogen is opened, after the nitrogen of tower inner accumulated displaces tower to hydrogen sulfide, close tower gas phase valve, tapping valve began to arrange the interior barium carbonate suspension liquid of tower to storage tank at the bottom of the continuation inflated with nitrogen was opened tower simultaneously in the tower, when in the tower during liquid emptying, nitrogen is full of whole tower, continue the end of logical nitrogen and overflow, show that the barium carbonate suspension liquid in the liquid discharge pipe does not exist yet, avoided raffinate to amass precipitation blocking pipe in pipe to nitrogen from liquid discharge pipe.Then add barium sulfide solution in tower, each valve reset begins new operation.
Claims (1)
1. the fluid-discharge technology of suspension liquid in the purification for gas absorption process, it is characterized in that, in tower, behind the liquid scrubbing generation suspension liquid, charge into nitrogen from Drainage pipe at gas, line replacement falls gas after the washing in the tower on the nitrogen, and suspension liquid is discharged at the bottom of tower.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010597312 CN102070172A (en) | 2010-12-20 | 2010-12-20 | Drainage process for suspension in gas purification and absorption process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010597312 CN102070172A (en) | 2010-12-20 | 2010-12-20 | Drainage process for suspension in gas purification and absorption process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102070172A true CN102070172A (en) | 2011-05-25 |
Family
ID=44028959
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010597312 Pending CN102070172A (en) | 2010-12-20 | 2010-12-20 | Drainage process for suspension in gas purification and absorption process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102070172A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115124161A (en) * | 2022-05-13 | 2022-09-30 | 华能山东发电有限公司烟台发电厂 | Method for prolonging resin service cycle of generator rotor cooling water treatment device |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101856589A (en) * | 2009-04-07 | 2010-10-13 | 毕亚凡 | Purification method of industrial tail gas rich in carbon monoxide |
-
2010
- 2010-12-20 CN CN 201010597312 patent/CN102070172A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101856589A (en) * | 2009-04-07 | 2010-10-13 | 毕亚凡 | Purification method of industrial tail gas rich in carbon monoxide |
Non-Patent Citations (1)
Title |
---|
《低温工程》 20071231 张勇等 低温液体储箱加压排液过程计算模型比较 第25页左栏第2段 1 , 第2期 2 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115124161A (en) * | 2022-05-13 | 2022-09-30 | 华能山东发电有限公司烟台发电厂 | Method for prolonging resin service cycle of generator rotor cooling water treatment device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202427299U (en) | Closed dust removal and desulphurization device for boiler flue gas | |
CN102070172A (en) | Drainage process for suspension in gas purification and absorption process | |
WO2009092569A3 (en) | Method and plant for removing accumulating slag from a slag bath | |
CN205109350U (en) | Energy -concerving and environment -protective type domestic sewage septic tank gas conditioning equipment | |
CN203740430U (en) | Acidic stench removing system for rubbish storage pool | |
CN104289092A (en) | Reclaimed rubber desulfurized tail gas purification device | |
CN101893231B (en) | Boiler periodic/continuous blowdown pressure-increasing and thermal energy-recovering device | |
CN203725014U (en) | Hydrogen sulfide gas purification device | |
CN210764556U (en) | Anaerobic reactor for landfill leachate treatment | |
CN112604420B (en) | Hydrogen sulfide purifying device and method for high-sulfur coal seam gas extraction | |
CN203112777U (en) | Coke oven gas purification plant | |
CN106169592B (en) | Gravity ball-type moisture trap | |
CN103768920A (en) | Treatment method for tail gas generated by sewage and sludge drying and treatment device thereof | |
CN105003922A (en) | Smoke discharge system of household garbage incinerator | |
CN102068894B (en) | Innocent treatment process and equipment for waste in refining process of titanium tetrachloride | |
KR102091862B1 (en) | Desulfurization system for recovering hydrogen sulfide of biogas as reusable sulfur element by biological oxidation reaction of thiobacillus | |
CN102489094B (en) | Seal type dedusting and desulfurization device for smoke of boiler | |
CN205042351U (en) | Device of zeroth order mercury in degree of depth desorption mercury smelting flue gas | |
CN203899434U (en) | Treating device for sewage sludge drying tail gas | |
CN206665393U (en) | One plants case tank base drainage | |
CN202823097U (en) | Vortex wet type deodorizing system | |
CN204865518U (en) | A non - catalytic reduction flue gas denitration system of waste incinerator for retrieving useless ammonia | |
CN205933389U (en) | Anaerobic jar goes out water water seal arrangement | |
CN204509079U (en) | A kind of gas-liquid separation device | |
CN204625578U (en) | Biogas dehydration desulfurizer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20110525 |