CN102061661A - Bamboo rod system structure pedestrian arch bridge - Google Patents
Bamboo rod system structure pedestrian arch bridge Download PDFInfo
- Publication number
- CN102061661A CN102061661A CN 201010581963 CN201010581963A CN102061661A CN 102061661 A CN102061661 A CN 102061661A CN 201010581963 CN201010581963 CN 201010581963 CN 201010581963 A CN201010581963 A CN 201010581963A CN 102061661 A CN102061661 A CN 102061661A
- Authority
- CN
- China
- Prior art keywords
- bamboo
- bridge
- arch ring
- arch
- bank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention relates to a bamboo rod system structure pedestrian arch bridge which comprises a bridge pier, a bamboo arch ring, a bamboo bridge panel, a bamboo bridge panel support and a bamboo handrail, wherein the bamboo arch ring comprises at least three parallel bamboo arch ring wattles, connecting element bolts and a bamboo connecting system beam; the heads and the tails of the bamboo arch ring wattles are connected by bolts, and the middles are also connected by bolts; the bamboo connecting system beam penetrates through clearances among the end parts of all the bamboo arch ring wattles and connects all the independent bamboo arch rings together; the bamboo arch ring is fixedly connected with the bridge pier by a steel connecting element; the bamboo bridge panel support is fixed to the side surface of the bamboo arch ring; a vertical rod of the bamboo handrail and an outside guard board of the arch ring are fixed to the arch ring by bolts; and the bamboo bridge panel is fixed to the bamboo bridge panel support. The bamboo rod system structure pedestrian arch bridge of the invention has light self weight and small horizontal thrust and has the characteristics of low carbon, environmental friendliness, material saving, high processing speed of members, high construction and installation speed, and the like.
Description
Technical field
The present invention relates to a kind of arch bridge, particularly relate to a kind of bamboo wood structural system composed of bar People's Bank of China arch bridge.
Background technology
Arch bridge is a kind of common bridge form.In the long span bridge beam, generally adopt steel and/or steel concrete as the bridge construction material.But,, can adopt timber as the bridge construction material as span less pedestrian bridge or Landscape Bridge.In People's Bank of China's arch bridge, generally adopt arched girder or freely-supported crossbeam as primary structure member, the also employing barnacle arch that has is as stress system.The barnacle arch adopts more than the area of horn of plenty at some stone materials, still, because stone material is also bigger to the processing and the difficulty of construction of arch bridge stone material from great, so speed of application is slower, and constructs and need use heavy duty equipment often, and cost is higher.If adopt steel to build People's Bank of China's arch bridge, need to girder steel by designing requirement carry out in advance radian processing or the mode by assembling form arch, this is disadvantageous to industrial batch production, and its maintenance costs is also higher.For steel concrete People's Bank of China arch bridge, need formwork during construction, need form removal after the construction, not only construction is complicated, and the duration is longer.Even adopt prefabricated arched girder, its prefabricated time is also longer.For the wood arch bridge, much all adopting anticorrosion carpentery workshop is raw material, and generally all adopts arched girder as force structure.But anticorrosion carpentery workshop is a kind of deep processing timber, and its price is more expensive, and as outdoor anticorrosion wood, special control is not passed through in expanding with heat and contract with cold of himself, and deformation ratio is more serious, and is very unfavorable to the pedestrian bridge that span is big slightly, so its span is more limited.If with anticorrosion wood as the bigger pedestrian bridge of span, the prefabricated processing of its stressed arched girder with is connected comparatively difficultly, this also is one of limited reason of anticorrosion wood arch spanning degree.
Summary of the invention
It is bigger to the objective of the invention is to overcome the existing prefabricated difficulty of People's Bank of China's arch bridge, and construction is complicated, and the time is long, the primary structure member deadweight is bigger, and defectives such as not environmental protection of material provide a kind of component quality light, construction is easily simple, raw material and cheap bamboo wood structural system composed of bar People's Bank of China arch bridge.
Technical scheme of the present invention is: it comprises bridge pier, the bamboo arch ring, the bamboo bridge panel, the bamboo bridge panel support, the bamboo railing, the bamboo arch ring is by at least three bamboo arch ring laths that are arranged in parallel, connector bolt and bamboo link crossbeam and constitute, bamboo arch ring lath head and the tail connect by bolt, the middle part also connects by bolt, bamboo links crossbeam and passes gap (bamboo arch ring radian is fixed) between each bamboo arch ring lath end, each independent bamboo arch ring is coupled together, the bamboo arch ring is affixed by steel connector and bridge pier, the bamboo bridge panel support is fixed in bamboo arch ring side, on the bamboo arch ring, the bamboo bridge panel is fixed on the bamboo bridge panel support the outer side guard board of the montant of bamboo railing and bamboo arch ring by bolt.
Described bamboo bridge panel, bamboo bridge panel support, bamboo arch ring lath and bamboo link crossbeam and are made by the bamboo plywood material.
Described bamboo railing is connected by nailing with the bamboo handrail by bamboo montant, bamboo tabula and combines.
Described bamboo links crossbeam should use waterproofing materials (for example glass fabric) parcel.
Described bamboo arch ring lath also should be used waterproofing materials (for example glass fabric) parcel.
Described bamboo bridge panel should be fixed on the bamboo bridge panel support by nailing.
Described bamboo arch ring lath, except that the bamboo arch ring lath of end, the physical dimension of each bamboo arch ring lath and connecting hole position are all suitable identical, and four bolts hole of symmetry are in twos arranged on the single bamboo arch ring, so that bolt connects.
Described bamboo bridge panel support should be fixed in bamboo arch ring side by nailing, and forms cambered surface in the position that the bamboo bridge panel is installed, to make things convenient for the installation of bamboo bridge panel.
The outer side guard board of described bamboo arch ring should select for use glue bamboo (promptly gluing together bamboo wood) to make.
Bamboo wood structural system composed of bar of the present invention People's Bank of China arch bridge has the following advantages: (1) has overcome shortcomings such as bigger, the single primary structure member build of common arched girder arch bridge deadweight is big, processing or constructional difficulties, the construction period is long, horizontal thrust is bigger, can either guarantee the span of pedestrian bridge, being convenient to processing and construction again, is permanent or the fine selection of interim pedestrian bridge; (2) production and processing can realize modularization, and simple and fast is installed, and uses manpower and material resources sparingly; (3) structural safety, the moulding gracefulness is succinctly attractive in appearance, and manufacturing specification can be varied; Be convenient to adopt standardization member, standardization modulus to design and construct; (4) adopt bamboo wood as main raw material(s), its raw material sources are wide, and be renewable resource, advantages such as bamboo has fast growth, the cycle of becoming a useful person is short, output is big, China is that maximum in the world bamboo produces one of state, occupied the about 1/5 to 1/4 of world's bamboo resource, so the bamboo wood source is secure; What is more important, bamboo wood are green materials, and its manufacturing process low-carbon environment-friendly is pollution-free, meets the requirement of sustainable development.
Description of drawings
Fig. 1 is an embodiment of the invention unitary side view;
Fig. 2 is spaning middle section figure embodiment illustrated in fig. 1;
Fig. 3 is a bamboo railing structural representation embodiment illustrated in fig. 1;
Fig. 4 is bamboo railing and an arch ring syndeton schematic diagram embodiment illustrated in fig. 1;
Fig. 5 is the outer side guard board structure schematic diagram of bamboo arch ring embodiment illustrated in fig. 1;
Fig. 6 is bamboo arch ring lath embodiment illustrated in fig. 1 and the syndeton schematic diagram between bamboo bridge panel support and the bamboo bridge panel;
Fig. 7 is that bamboo arch ring embodiment illustrated in fig. 1 is connected vertical view with bridge pier;
Fig. 8 is that bamboo arch ring embodiment illustrated in fig. 1 is connected lateral view with bridge pier.
Among the figure: the 1-bridge pier; The outer side guard board of 2-bamboo arch ring; 3-bamboo arch ring; 4-bamboo railing; 5-bamboo bridge panel; The 6-bamboo links crossbeam; 7-bamboo arch ring lath; 8-bamboo bridge panel support; 9-steel connector.
The specific embodiment
Below in conjunction with drawings and Examples the present invention is described in further details.
With reference to accompanying drawing, present embodiment comprises that bridge pier 1(adopts steel concrete cast or concrete block masonry), bamboo arch ring 3, bamboo bridge panel 5, bamboo bridge panel support 8, bamboo railing 4, single bamboo arch ring 3 is by seven bamboo arch ring laths 7 that are enclosed with glass fabric that are arranged in parallel, bolt links crossbeam 6 with the bamboo that is enclosed with glass fabric and constitutes, bamboo arch ring lath 7 head and the tail connect by bolt, the middle part also connects by bolt, bamboo links crossbeam 6 and passes gap between each bamboo arch ring lath 7 end, each independent bamboo arch ring is coupled together, it is affixed that bamboo arch ring 3 passes through steel connector 9 and anchor bolt and bridge pier 1, bamboo bridge panel support 8 is fixed on the bamboo arch ring lath 7 of bamboo arch ring 3 by nailing, on arch ring 3, bamboo bridge panel 5 is fixed on the bamboo bridge panel support 8 the outer side guard board 2 of the montant of bamboo railing 5 and arch ring by bolt.
Described bamboo arch ring lath 7, except that the bamboo arch ring lath of end, the physical dimension and the connecting hole position of each bamboo arch ring lath are all identical.Four bolts hole of symmetry are in twos arranged, so that bolt connects on the single bamboo arch ring.
Prefabricated installation steps: (1) links crossbeam 6, bamboo railing 4(referring to Fig. 3 with bamboo arch ring lath 7, bamboo) process and stayed the connecting hole at each position by design size; (2) bamboo arch ring lath 7 and bamboo are linked crossbeam 6 parcel glass fabrics, again bamboo arch ring lath 7 head and the tail are connected to the length that needs with bolt, and press same procedure and make totally 14 identical components, parallel misalignment is arranged in twos then, and two bolts hole that pass through each bamboo arch ring lath 7 middle part connect, at this moment can between the end tie point of each bamboo arch ring lath 7 and another bamboo arch ring lath, form the gap, bamboo being linked crossbeam 7 passes corresponding gap and makes 7 identical single bamboo arch rings form bamboo arch ring 3 again, at this moment, the bamboo arch ring 3 that assembly unit is good is seated on the bridge pier 1, with steel connector 9 each single bamboo arch ring is connected on the bridge pier 1 (referring to Fig. 7, Fig. 8), cut bamboo bridge panel support 8 then and be fixed in (referring to Fig. 6) on the arch ring lath 7 with nailing, again with the outer side guard board 2(of railing montant and arch ring referring to Fig. 5) be connected to (referring to Fig. 4) on the bamboo arch ring 3 by bolt successively, and then the fixedly diaphragm of bamboo railing 4 and accommodation rail successively, again bamboo bridge panel 5 usefulness nailings are connected to bridge deck and support on 8, at last railing is brushed waterproof paint.
Claims (10)
1. bamboo wood structural system composed of bar People's Bank of China arch bridge, comprise bridge pier, it is characterized in that, also comprise the bamboo arch ring, the bamboo bridge panel, the bamboo bridge panel support, the bamboo railing, described bamboo arch ring is by at least three bamboo arch ring laths that are arranged in parallel, connector bolt and bamboo link crossbeam and constitute, bamboo arch ring lath head and the tail connect by bolt, the middle part also connects by bolt, bamboo links crossbeam and passes gap between each bamboo arch ring lath end, each independent bamboo arch ring is coupled together, the bamboo arch ring is affixed by steel connector and bridge pier, the bamboo bridge panel support is fixed in bamboo arch ring side, on arch ring, the bamboo bridge panel is fixed on the bamboo bridge panel support the outer side guard board of the montant of bamboo railing and arch ring by bolt.
2. bamboo wood structural system composed of bar according to claim 1 People's Bank of China arch bridge is characterized in that described bamboo bridge panel, bamboo bridge panel support, bamboo arch ring lath and bamboo link crossbeam and made by the bamboo plywood material.
3. bamboo wood structural system composed of bar according to claim 1 and 2 People's Bank of China arch bridge is characterized in that, described bamboo railing is connected by nailing with the bamboo handrail by bamboo montant, bamboo tabula and combines.
4. bamboo wood structural system composed of bar according to claim 1 and 2 People's Bank of China arch bridge is characterized in that described bamboo links crossbeam and is enclosed with glass fabric.
5. bamboo wood structural system composed of bar according to claim 1 and 2 People's Bank of China arch bridge is characterized in that described bamboo arch ring lath is enclosed with glass fabric.
6. bamboo wood structural system composed of bar according to claim 1 and 2 People's Bank of China arch bridge is characterized in that, described bamboo bridge panel is fixed in bridge deck by nailing to be supported.
7. bamboo wood structural system composed of bar according to claim 1 and 2 People's Bank of China arch bridge, it is characterized in that described bamboo arch ring lath is except that the arch ring lath of end, the physical dimension and the connecting hole position of each bamboo arch ring lath are all identical, and four bolts hole of symmetry are in twos arranged on the single bamboo arch ring.
8. bamboo wood structural system composed of bar according to claim 1 and 2 People's Bank of China arch bridge is characterized in that the bamboo bridge panel support is fixed in the arch ring side by nailing, and forms cambered surface in the position that bridge deck are installed.
9. bamboo wood structural system composed of bar according to claim 1 and 2 People's Bank of China arch bridge is characterized in that, the outer side guard board of bamboo arch ring is by the bamboo one-tenth of glue.
10. bamboo wood structural system composed of bar according to claim 3 People's Bank of China arch bridge is characterized in that, the outer side guard board of bamboo arch ring is by the bamboo one-tenth of glue.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010581963A CN102061661B (en) | 2010-12-10 | 2010-12-10 | Bamboo rod system structure pedestrian arch bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010581963A CN102061661B (en) | 2010-12-10 | 2010-12-10 | Bamboo rod system structure pedestrian arch bridge |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102061661A true CN102061661A (en) | 2011-05-18 |
CN102061661B CN102061661B (en) | 2012-09-19 |
Family
ID=43997143
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010581963A Expired - Fee Related CN102061661B (en) | 2010-12-10 | 2010-12-10 | Bamboo rod system structure pedestrian arch bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102061661B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561180A (en) * | 2011-12-27 | 2012-07-11 | 东南大学 | Bamboo bridge deck |
CN104195940A (en) * | 2014-08-06 | 2014-12-10 | 成都佳美嘉科技有限公司 | Embedded-type high-stability gallery road handrail |
CN104594175A (en) * | 2014-12-23 | 2015-05-06 | 重庆交通大学 | Modern arch type bamboo bridge and construction method thereof |
CN104631327A (en) * | 2014-12-26 | 2015-05-20 | 重庆交通大学 | Construction method for modern bamboo pedestrian truss bridge |
CN106544948A (en) * | 2017-01-10 | 2017-03-29 | 重庆交通大学 | A kind of people's row cantilever glider bridge construction method |
CN108425313A (en) * | 2018-05-15 | 2018-08-21 | 中南林业科技大学 | A kind of wood-ultra-high performance concrete combination beam and its construction method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002004223A (en) * | 2000-06-23 | 2002-01-09 | Noboru Watanabe | Steel-assist rigid bamboo girder, bamboo column and bamboo plate |
CN2918523Y (en) * | 2006-07-12 | 2007-07-04 | 湖南大学 | Bamboo wood bridge |
CN201883369U (en) * | 2010-12-10 | 2011-06-29 | 长沙凯森竹木新技术有限公司 | Pedestrian arch bridge with bamboo skeletal structure |
-
2010
- 2010-12-10 CN CN201010581963A patent/CN102061661B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002004223A (en) * | 2000-06-23 | 2002-01-09 | Noboru Watanabe | Steel-assist rigid bamboo girder, bamboo column and bamboo plate |
CN2918523Y (en) * | 2006-07-12 | 2007-07-04 | 湖南大学 | Bamboo wood bridge |
CN201883369U (en) * | 2010-12-10 | 2011-06-29 | 长沙凯森竹木新技术有限公司 | Pedestrian arch bridge with bamboo skeletal structure |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561180A (en) * | 2011-12-27 | 2012-07-11 | 东南大学 | Bamboo bridge deck |
CN102561180B (en) * | 2011-12-27 | 2013-10-30 | 东南大学 | Bamboo bridge deck |
CN104195940A (en) * | 2014-08-06 | 2014-12-10 | 成都佳美嘉科技有限公司 | Embedded-type high-stability gallery road handrail |
CN104594175A (en) * | 2014-12-23 | 2015-05-06 | 重庆交通大学 | Modern arch type bamboo bridge and construction method thereof |
CN104631327A (en) * | 2014-12-26 | 2015-05-20 | 重庆交通大学 | Construction method for modern bamboo pedestrian truss bridge |
CN106544948A (en) * | 2017-01-10 | 2017-03-29 | 重庆交通大学 | A kind of people's row cantilever glider bridge construction method |
CN108425313A (en) * | 2018-05-15 | 2018-08-21 | 中南林业科技大学 | A kind of wood-ultra-high performance concrete combination beam and its construction method |
CN108425313B (en) * | 2018-05-15 | 2024-04-26 | 中南林业科技大学 | Wood-ultra-high performance concrete composite beam and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN102061661B (en) | 2012-09-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102061661B (en) | Bamboo rod system structure pedestrian arch bridge | |
CN100510262C (en) | Bamboo bridge | |
CN102108752B (en) | Energy dissipating and damping type multi-ribbed composite wallboard and manufacturing method thereof | |
CN104452571B (en) | A kind of modern bamboo figure's row trussed bridge | |
CN201883369U (en) | Pedestrian arch bridge with bamboo skeletal structure | |
CN102943434B (en) | Semi-assembly bamboo-concrete composite bridge | |
CN203097361U (en) | Novel steel structure workshop | |
CN104131652A (en) | Fabricated RPC-steel-concrete hybrid beam structure | |
CN107806006B (en) | Raw bamboo-concrete combined bridge and manufacturing method thereof | |
CN202248298U (en) | Node of steel reinforced concrete framework | |
CN102733506A (en) | Assembly type seismic insulation house structure | |
EP3450748B1 (en) | Connecting structure for steel tube truss and tower barrel of lattice wind power generation tower | |
CN109083323A (en) | A kind of install convenient and the movable villa furred ceiling composite plate with pooling feature | |
CN2918523Y (en) | Bamboo wood bridge | |
CN203066254U (en) | Node structure of steel bamboo composite beam and steel bamboo composite pillar | |
CN104631327A (en) | Construction method for modern bamboo pedestrian truss bridge | |
KR102408862B1 (en) | Girder bridge using box module | |
CN211113115U (en) | Steel-bamboo combined truss bridge | |
CN106639091A (en) | Laminated wood-concrete combined floor | |
CN205313990U (en) | Embedded prestressing force CFRP muscle reinforcing veneer timber beams's anchor | |
CN211548038U (en) | Connecting node of beam column of prefabricated frame concrete structure | |
CN212453089U (en) | Shear connector structure of assembled steel-concrete composite structure | |
CN104652607A (en) | Upright structure of timber architecture and upright structure and foundation connecting method | |
KR102408853B1 (en) | Girder bridge using box module with excellent torsion resistance | |
CN204552138U (en) | A kind of bracing means for wooden construction node |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170509 Address after: 412500 Jiulong economic and Technological Development Zone, Zhuzhou, Hunan, Yanling Patentee after: Hunan BOSCH New Technology Co. Ltd. Address before: Yuelu District City, Hunan province 410082 Changsha Lushan Road No. 1 Civil Engineering College of Hunan University Patentee before: Changsha kaisen Bamboo Wood New Technology Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120919 Termination date: 20171210 |
|
CF01 | Termination of patent right due to non-payment of annual fee |