CN102060040A - Train operation schedule displaying device - Google Patents

Train operation schedule displaying device Download PDF

Info

Publication number
CN102060040A
CN102060040A CN2010105225573A CN201010522557A CN102060040A CN 102060040 A CN102060040 A CN 102060040A CN 2010105225573 A CN2010105225573 A CN 2010105225573A CN 201010522557 A CN201010522557 A CN 201010522557A CN 102060040 A CN102060040 A CN 102060040A
Authority
CN
China
Prior art keywords
train
operation schedule
station
train operation
track circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105225573A
Other languages
Chinese (zh)
Inventor
山本刚
高野谦治
吉田弘毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Publication of CN102060040A publication Critical patent/CN102060040A/en
Pending legal-status Critical Current

Links

Images

Abstract

To provide a train diagram display device for accurately grasping the on-track position information and traveling condition of a train by displaying the performance traveling diagram of the train corresponding to the on-track position (track circuit) closer to actual traveling. In this train diagram display device (50), time is displayed in a first axis on a screen and a position of a station is displayed in a second axis orthogonal to the first axis, and moreover, the planned diagram and the performance diagram of the train are displayed as a diagram line. The length of each track circuit between selected stations is reflected and zoomed by selecting the stations and the train in the diagram line, and the performance traveling line is displayed for each track circuit of the selected train.

Description

Train operation schedule displaying device
The application is based on dividing an application of application number is 200510070236.3, denomination of invention for " train operation schedule displaying device ", the applying date is on May 11st, 2005 patent application.
Technical field
The present invention relates to a kind of train operation schedule displaying device, it can be presented at the plan outline of the train operation schedule that uses in the operation management system in railway field and the outline of the actual conditions of travelling.
Background technology
In train operation schedule displaying device in the past, to the plan outline of train, by connection be configured in the interchange of position on the longitudinal axis and be configured in the intersection point of frequency of each train on the moment axle on the transverse axis and the interchange of position of the next stop and constantly the intersection point constantly that arrives at a station of the next stop on the axle describe.In addition, the actual conditions outline of train shows actual conditions train operation schedule outline by connecting the intersection point that the actual conditions outline that travels with each train is configured in the interchange of position on the longitudinal axis and is configured in the actual conditions of travelling of each train on the moment axle on the transverse axis successively.
In the demonstration of such actual conditions train operation schedule outline, when being that the middle part train in station is fogbound, even see actual conditions train operation schedule outline, though can learn in the middle of this station some fault has been taken place travelling of train, the details of fault etc. has taken place in which track circuit in the middle of not knowing AT STATION.
As evolutionary approach, as recording and narrating at [patent documentation 1], the descending moment of each track circuit of savings in the middle of the station, the up moment or its both, show the train operation schedule outline, promptly show the demonstration actual conditions train operation schedule outline of the point that each railway line route of cutting apart with wire joint intersects with track circuit unit.
[patent documentation 1] spy opens flat 9-132144 communique
The technology of in [patent documentation 1], being put down in writing in the past, to cutting apart with the railway line way between the station, it cuts apart number is five equilibrium, even see the actual conditions train operation schedule outline that on picture, shows, though can differentiate rough train at line position, actual track circuit is because each length difference can not correctly be differentiated which place the problem that is positioned between the station with regard to having.
In addition, in train operation schedule displaying device in the past, owing to amplify the centre portion between the station, do not consider with the showing corresponding to track circuit of train, so just have instruction person only can not hold the problem of train at line position with train operation schedule displaying device at line position.
Summary of the invention
The object of the present invention is to provide a kind of pass through demonstration and approaching the showing of the actual travel situation of train, can correctly hold the online location information of train, the train operation schedule displaying device of travel conditions in line position (track circuit) the corresponding train operation actual.
In order to achieve the above object, train operation schedule displaying device of the present invention, on the 1st of picture, show constantly, with the 2nd of the 1st vertical direction on show interchange of position, and the plan train operation schedule and the actual conditions train operation schedule of train is shown as the train operation schedule outline; By between the station of selecting described train operation schedule outline and the length reflection of train each track circuit that starting point kilometrage and terminal point kilometrage by each track circuit between the selecteed station are calculated and enlarging be presented on the picture, by the reflection of the train of described selection and each track circuit of the length that expansion has shown each track circuit, show the actual conditions outline that travels with each track circuit and time information renewal.
According to the present invention, the actual conditions train operation schedule of train operation schedule displaying device shows, can understand the operation conditions of detailed train more in real time, between AT STATION, be presented at line states, can hold the correct of train at line position with track circuit unit.
Description of drawings
Fig. 1 is the pie graph of the train operation schedule displaying device of one embodiment of the invention.
Fig. 2 is that the actual conditions of present embodiment show processing, actual conditions outline display file, the diagram of circuit of describing to handle.
Fig. 3 is the figure of an example of expression plan train operation schedule file.
Fig. 4 is travel in detail between the station figure of an example of actual conditions train operation schedule file of expression.
Fig. 5 is the figure of an example of expression track circuit information table.
Fig. 6 is the figure of an example of expression actual conditions outline display file.
Fig. 7 is the figure that the summary of the train operation schedule displaying device of expression present embodiment shows example.
Fig. 8 is the figure of the detailed demonstration example of the station in-to-in of train operation schedule displaying device of expression present embodiment.
Fig. 9 be illustrated in train in the train operation schedule displaying device of present embodiment AT STATION between the figure of demonstration example of actual conditions outline during cruising.
Figure 10 is the figure of example of the table of the actual conditions outline when being illustrated in train in the train operation schedule displaying device of present embodiment and stopping between AT STATION.
Among the figure: the 1-data reception portion, 2-plan train operation schedule file, actual conditions train operation schedule file in detail travels between the 3-station, 4-station information table, 5-track circuit information table, the 6-time meter, the 7-train operation schedule shows handling part, 8-present tense groove shows to be handled, 9-plan train operation schedule outline shows to be handled, the 10-station shows handles, and the 11-track circuit shows to be handled, and the 12-actual conditions show to be handled, the 13-scroll bar shows to be handled, 14-present tense groove display file, 15-plan outline display file, 16-station line, station name display file, 17-railway line route display file, 18-actual conditions outline display file, 19-scroll bar display file, 20-are described to handle.
The specific embodiment
In the picture of train operation schedule displaying device, the function that have usually the inside, station of simple displaying if desired, station pars intermedia, then can at length show, and have the function that the travel conditions with more real-time train shows with the actual conditions outline.
(embodiment 1)
One embodiment of the invention are described by Fig. 1 to Figure 10.Fig. 1 is the pie graph of the train operation schedule displaying device of present embodiment.In data reception portion 1, the actual conditions train operation schedule file 3 that travels in detail between never graphic operation management apparatus reception plan train operation schedule file 2, station, station information table 4, track circuit information table 5, time meter 6 inputs that have from train operation schedule displaying device 50 are also carried out each processing in operation schedule shows handling part 7.
Plan train operation schedule file 2 as in an example shown in Figure 3, on the row license number frequency at each station such as additional and record A station, B station, arrive at a station constantly.In addition, the actual conditions train operation schedule file 3 that travels in detail between the station as in an example shown in Figure 4, adds and is recorded in the trajectory circuit on the row license number.
Groove show to handle 8 and obtained present moment and be recorded in the present tense groove display file 14 from time meter 6 present tense.Plan train operation schedule outline shows handles 9 from planning train operation schedule file 2 input plan train operation schedule information and being recorded in the plan outline display file 15.The station show to handle 10 from station information table 4 input station information and be recorded in station line, the station name indicator gauge 16.Track circuit show to handle 11 from track circuit information table 5 input track circuit information and be recorded in the railway line route display file 17.Actual conditions show to be handled 12 actual conditions, the track circuit information and be recorded in the actual conditions outline display file 18 of travelling in detail between actual conditions train operation schedule file 3, track circuit information table 5 input stations of travelling in detail between the station.Scroll bar show to handle 13 will by train operation schedule displaying device with the position on the longitudinal axis of present demonstration and the location records on the transverse axis in scroll bar display file 19.The information of each file 14~19 is imported into to describe to handle and describes in 20 to handle.
Fig. 2 is that the actual conditions of the main processing of present embodiment show processing 12, actual conditions outline display file 18, describe to handle 20 processing flow chart.In step 21, take out row license number and online track circuit.In this is handled, the row license number of the train the actual conditions train operation schedule file 3 that travels in detail between the station will travel is now retrieved the affiliated station and the project 204 of its front rail circuit and is taken out track circuit information as retrieval point retrieval project 203 shown in Figure 4.
In step 22, carry out line position whether with the judgement that changes had last time taken place, line position with last time taken place to change in, carry out online evolution is become the processing of kilometrage in step 23.In this is handled, the affiliated name of station that is recorded in the online track circuit in the project shown in Figure 4 204 is retrieved the project 205 of the affiliated station of expression name from track circuit information table 5 as the retrieval point.Track circuit information table 5, an example as shown in fig. 5 is attached on the affiliated station track record circuit name, initial point kilometrage, terminal point kilometrage.Come search terms 206 from the online track circuit name of project 204, obtain the starting point kilometrage of the present position of train.By the starting point kilometrage and the present moment of the present position of train, describe coordinate in step 24 decision, and the coordinate on the picture of the present position of decision expression train.Be meant the distance that begins from the reference position as kilometrage here.
Make at the actual conditions outline display file of step 25 and to handle, with the row license number of actual conditions outline display file 18 as retrieval point retrieval project 207 shown in Figure 6.Actual conditions outline display file 18, as in an example shown in Figure 6, enclose the row license number record reach the station, dispatch a car from the station, the coordinate when track circuit is descending etc.The online track circuit of project 204 is come search terms 208 as the retrieval point, use the coordinate (terminal point coordinate) of the present position of the train of representing actual conditions outline display file 18 to upgrade.Set the moment of this moment at terminal point coordinate.Based on actual conditions outline display file 18, with describing to handle 20 by carrying out the demonstration of actual conditions outline with line segment connection source coordinate and terminal point coordinate.
In step 22,, in step 26, set present moment in the moment of terminal point coordinate at line position and when last time not changing.In this is handled, with the setting coordinate that is illustrated in line position for the coordinate of identical starting point kilometrage last time, be present moment with expression setting coordinate constantly.And, to describe to handle in 20, connection source coordinate and terminal point coordinate show the actual conditions outline on picture.In step 27, carry out this terminal point coordinate is set at the processing of the starting point coordinate of next time.By such processing, the terminal of actual conditions outline can correctly be represented the present position of train.
Fig. 7 is the figure of the summary picture displayed example of expression train operation schedule displaying device.In this embodiment, at picture top display menu,,, carry out the train operation schedule outline in remaining part and show in lower end show scroll bars 33 and scroll bar indication 34 in right-hand member show scroll bars 31 and scroll bar indication 32.Scroll bar indication 32 indication range is AT STATION rolled, and scroll bar 33 rolls in indication range constantly.
In addition, also has by the C station portion of in Fig. 7, selecting to represent function in the demonstration station as shown in Figure 8 at length with symbol 103.In example shown in Figure 8, line number and operation schedule outline on the bottom at C station demonstration platform.Can know to vision the line number on the platform of parking by the demonstration of line number on the platform and time shaft.
In addition, by being chosen between the station of representing with symbol 104 among Fig. 7 and train, as shown in Figure 9, between C capable of enlarged displaying station and the D station.In Fig. 9, the expression train AT STATION between actual conditions outline during cruising show.Like this in the train operation schedule displaying device of present embodiment, amplify and show between the station, the length of each track circuit and upgrade the actual conditions outline by track circuit and show during the reflection train travels between AT STATION on drawing is travelled so can know which position between train just AT STATION.In addition, because the slope of actual conditions outline can correctly show the speed of train, so also can know the velocity variations of train from picture.
By being chosen between the station that Fig. 7 represents with symbol 104 and train amplifies between the station at the C station that shows among Figure 10 and D station, and the outline of the actual conditions of Figure 10 when also representing to stop between train AT STATION shows.In train operation schedule displaying device in the past, train is after dispatching a car between the station, owing to show that from sending the departure signal that the station provides back to next station arrives actual conditions outline and do not change, so even train stops between AT STATION, can not know the parking of train by train operation schedule displaying device, but in the present embodiment, owing to upgraded the actual conditions outline, so can vision ground assurance train stop at which position between the station by train operation schedule displaying device with each track circuit and time information.In addition, about the train that travels in the past also the picture of the train operation schedule displaying device by present embodiment show the actual conditions of travelling that can know train.

Claims (3)

1. train operation schedule displaying device, on the 1st of picture, show constantly, with the 2nd of the 1st vertical direction on show interchange of position, and the plan train operation schedule and the actual conditions train operation schedule of train be shown as the train operation schedule outline, it is characterized in that:
By between the station of selecting described train operation schedule outline and the length reflection of train each track circuit that starting point kilometrage and terminal point kilometrage by each track circuit between this selecteed station are calculated and enlarging be presented on the picture, by the reflection of the train of described selection and each track circuit of the length that expansion has shown each track circuit, show the actual conditions outline that travels with each track circuit and time information renewal.
2. according to the described train operation schedule displaying device of claim 1, it is characterized in that: when above-mentioned selected train is in halted state, upgrades the time information of the track circuit that stops and showing the actual conditions outline that travels.
3. according to the described train operation schedule displaying device of claim 1, it is characterized in that: above-mentioned plan train operation schedule, the row license number is attached to the frequency at each station, arrive at a station constantly, import and Showplan train operation schedule information according to the plan train operation schedule file that is write down, by the travel demonstration of actual conditions outline of each track circuit of the train of above-mentioned selection, according to the track circuit information table, detailed train operation schedule file and import the actual conditions of travelling between the station between the station, track circuit information, and with reference to the arriving at a station on the row license number that be attached to of upgrading to obtaining present moment from time meter, playing the station dispatches a car, the coordinate that the track circuit train is online and the moment have been carried out the actual conditions outline display file of record, and show by describing to handle.
CN2010105225573A 2004-05-11 2005-05-11 Train operation schedule displaying device Pending CN102060040A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2004140533A JP4305272B2 (en) 2004-05-11 2004-05-11 Train diagram display device
JP2004-140533 2004-05-11

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN 200510070236 Division CN1695998B (en) 2004-05-11 2005-05-11 Train operation schedule displaying device

Publications (1)

Publication Number Publication Date
CN102060040A true CN102060040A (en) 2011-05-18

Family

ID=35348936

Family Applications (2)

Application Number Title Priority Date Filing Date
CN2010105225573A Pending CN102060040A (en) 2004-05-11 2005-05-11 Train operation schedule displaying device
CN 200510070236 Expired - Fee Related CN1695998B (en) 2004-05-11 2005-05-11 Train operation schedule displaying device

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN 200510070236 Expired - Fee Related CN1695998B (en) 2004-05-11 2005-05-11 Train operation schedule displaying device

Country Status (2)

Country Link
JP (1) JP4305272B2 (en)
CN (2) CN102060040A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113077649A (en) * 2021-03-25 2021-07-06 杭州海康威视系统技术有限公司 Vehicle running condition display method and device and computer storage medium
CN113779340A (en) * 2021-08-25 2021-12-10 通号城市轨道交通技术有限公司 Train operation diagram generation method and system, electronic device and storage medium
CN116880949A (en) * 2023-09-07 2023-10-13 比亚迪股份有限公司 Running chart self-adaptive display method, controller and medium

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101308584B (en) * 2007-05-17 2010-08-04 株洲南车时代电气股份有限公司 Method and system for accurately determining task starting time of means of transportation
JP5183535B2 (en) * 2009-03-16 2013-04-17 株式会社日立製作所 Data input support device and data input support method
US9227640B2 (en) * 2009-11-12 2016-01-05 Mitsubishi Electric Corporation Video information delivery and display system and video information delivery and display method
CN102001347B (en) * 2010-11-18 2012-08-15 国电南瑞科技股份有限公司 Method for controlling time schedules of urban rail transit electromechanical equipment
JP6504941B2 (en) * 2015-06-30 2019-04-24 株式会社日立製作所 Train operation management system and train operation management method
CN105128893B (en) * 2015-08-26 2017-10-27 北京全路通信信号研究设计院集团有限公司 The generation method and system of a kind of whole time of running information of train
CN107215361B (en) * 2017-06-09 2018-12-28 湖南中车时代通信信号有限公司 Time-table display device based on Locomotive Running Monitor System
WO2020026351A1 (en) * 2018-07-31 2020-02-06 東芝デジタルソリューションズ株式会社 Train operation scheduling assist system and data structure of data about train operation scheduling
CN112572548A (en) * 2019-09-30 2021-03-30 比亚迪股份有限公司 Vehicle operation information display method and system
CN110789579B (en) * 2019-11-22 2021-09-10 北京明略软件系统有限公司 Train position obtaining method and device, storage medium and electronic equipment
JP7184258B2 (en) * 2019-12-24 2022-12-06 株式会社京三製作所 Operation management support device and operation management support method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1156866A (en) * 1996-02-08 1997-08-13 王晓君 Train positioning mode and system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113077649A (en) * 2021-03-25 2021-07-06 杭州海康威视系统技术有限公司 Vehicle running condition display method and device and computer storage medium
CN113779340A (en) * 2021-08-25 2021-12-10 通号城市轨道交通技术有限公司 Train operation diagram generation method and system, electronic device and storage medium
CN116880949A (en) * 2023-09-07 2023-10-13 比亚迪股份有限公司 Running chart self-adaptive display method, controller and medium
CN116880949B (en) * 2023-09-07 2024-01-30 比亚迪股份有限公司 Running chart self-adaptive display method, controller and medium

Also Published As

Publication number Publication date
CN1695998A (en) 2005-11-16
CN1695998B (en) 2010-12-08
JP2005319927A (en) 2005-11-17
JP4305272B2 (en) 2009-07-29

Similar Documents

Publication Publication Date Title
CN1695998B (en) Train operation schedule displaying device
CN1715835B (en) Navigation system
JP5671117B2 (en) Driving arrangement support system and method
EP2136184A3 (en) Traffic scheduling system
US20120277939A1 (en) System, method, and computer readable memory medium for verifying track database information
WO2007078704A2 (en) Apparatus and method for locating assets within a rail yard
KR101255029B1 (en) RouteInformation providing system of complex public transport using public transportation schedules
JP5882831B2 (en) Train and moving body display method, operation grasping device, and operation management system
EP2821314A2 (en) Train operation control system, train operation simulation device, and train operation simulation method
US20230322279A1 (en) Track condition monitoring device, track condition monitoring system and track condition monitoring method
CN107097811A (en) A kind of emulation mode and system based on bottle-neck section track space-time conflict prediction
JP2009064283A (en) Traffic information providing system and traffic information providing method
CN105303245B (en) Traffic analysis system and traffic analysis method
CN108225338A (en) Navigation method and device for accurate matching of high-speed area
WO2017046933A1 (en) Operation rescheduling support apparatus and system
CN101315282A (en) Route setting system, route setting method, and program for executing the method
JPH06290191A (en) Method for estimating vehicle operation
CN102410839A (en) Navigation device and path guiding method thereof
CN100567900C (en) Car-mounted information apparatus
JPH0729099A (en) Device for displaying delivery map
JP3201509B2 (en) Train diagram display
JP4252407B2 (en) Navigation device and route guidance method
JP4377189B2 (en) Navigation device and guide sign display method
JP4732810B2 (en) Timetable system
CA3034070A1 (en) Method and system for performing a planning process of a railway service

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110518