CN102055139A - 深孔式电控箱底板水冷却回路装置 - Google Patents

深孔式电控箱底板水冷却回路装置 Download PDF

Info

Publication number
CN102055139A
CN102055139A CN 201010545610 CN201010545610A CN102055139A CN 102055139 A CN102055139 A CN 102055139A CN 201010545610 CN201010545610 CN 201010545610 CN 201010545610 A CN201010545610 A CN 201010545610A CN 102055139 A CN102055139 A CN 102055139A
Authority
CN
China
Prior art keywords
deep hole
deep holes
baseplate
base plate
deep
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010545610
Other languages
English (en)
Other versions
CN102055139B (zh
Inventor
吕宏伟
李鸿岩
佟巍
徐铮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENYANG MINING MACHINERY GROUP CO Ltd
Original Assignee
SHENYANG MINING MACHINERY GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENYANG MINING MACHINERY GROUP CO Ltd filed Critical SHENYANG MINING MACHINERY GROUP CO Ltd
Priority to CN2010105456101A priority Critical patent/CN102055139B/zh
Publication of CN102055139A publication Critical patent/CN102055139A/zh
Application granted granted Critical
Publication of CN102055139B publication Critical patent/CN102055139B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cooling Or The Like Of Electrical Apparatus (AREA)

Abstract

本发明提供了一种深孔式电控箱底板水冷却回路装置,所要解决的问题是:现有采煤机电控箱底板上的水冷却回路的缺陷是一是金属切削量大,加工时间长。本发明的要点是:在底板厚度上钻有若干排深孔,该深孔的轴线与底板面平行,销堵焊接在深孔的孔口并密封,在相邻的两排深孔之间开连通水道,使相邻的两排深孔连通,相邻的连通水道一个在深孔的上端,一个在深孔的下端,将所有的冷却主水道连接成脉冲波形冷却水道。本发明的优点是:大幅度减少钢板封水道的焊接量和金属切削量。

Description

深孔式电控箱底板水冷却回路装置
技术领域
本发明涉及采煤机电控箱底板上的水冷却回路装置。
背景技术
现有采煤机电控箱底板上的水冷却回路,均由T型矩形槽铣成,槽上部用钢板焊接封口,中间留矩形孔,形成水系统回路。该技术的缺陷是一是金属切削量大,加工时间长;二是矩形槽整个回路均需要焊接钢板封水,以形成水回路,焊接量大,焊接后不能保证打压试验过关,二次焊接次数多,极大的影响电控箱生产制造周期及成本;三是矩形槽因涉及焊接量大,底板焊接时受到巨大焊接应力,需增加去应力工艺过程,增加生产工序及成本,影响电控箱生产周期。
发明内容
为解决上述技术问题,本发明的目的在于提供一种深孔式电控箱底板水冷却回路装置。
本发明的目的是这样实现的:在底板厚度上钻有若干排深孔作为冷却主水道,该深孔的轴线与底板面平行,销堵焊接在深孔的孔口并密封,在相邻的两排深孔之间开连通水道,使相邻的两排深孔连通,相邻的连通水道一个在深孔的上端,一个在深孔的下端,将所有的冷却主水道连接成脉冲波形冷却水道,加工连通水道的方法是在底板上开一个断面呈倒凸字形槽,将盖板镶嵌在上层槽里并焊接固定,下层槽形成连通水道。使用前将水道回路进行打压试验,压力3MPa,保压10分钟,不得渗漏。
与现有技术相比,本发明的有益效果是:
a)通过选择加长钻头的直径,可保证水回路的覆盖面积和空截面直径,保证冷却水道的冷却面积和通过底板的水量,从而保证正常冷却相关电气元器件。
b)根据采煤机用电控箱底板上电气元器件的位置和发热量,计算各个元器件的需用冷却水量,确定冷却水道的位置、孔间距和孔截面直径等参数,形成布置方案。
c)大幅度减少钢板封水道的焊接量,大幅度减少底板加工时的金属切削量,缩短加工时间。
d)因焊接量少,节省去焊接应力工序,减少工件制造成本和周期。
附图说明
下面结合附图进一步说明本发明。
图1是本发明的示意图。
图2是图1的俯视图。
图3是图2的A-A剖视图。
图4是图1的B-B剖视图。
具体实施方式
在底板1的厚度上钻有若干排深孔作为冷却主水道4,该深孔的轴线与底板面平行,销堵3焊接在深孔的孔口并密封,在相邻的两排深孔之间开连通水道2,使相邻的两排深孔连通,相邻的连通水道一个在深孔的上端,一个在深孔的下端,将所有的冷却主水道4连接成脉冲波形冷却水道,参见图4,加工连通水道的方法是在底板上开一个断面呈倒凸字形槽,将盖板5镶嵌在上层槽里并焊接固定,下层槽形成连通水道2。使用前将水道回路进行打压试验,压力3MPa,保压10分钟,不得渗漏。

Claims (1)

1.一种深孔式电控箱底板水冷却回路装置,有底板,其特征是:在底板厚度上钻有若干排深孔作为冷却主水道,该深孔的轴线与底板面平行,销堵焊接在深孔的孔口并密封,在相邻的两排深孔之间开连通水道,使相邻的两排深孔连通,相邻的连通水道一个在深孔的上端,一个在深孔的下端,将所有的冷却主水道连接成脉冲波形冷却水道,该连通水道是在底板上开一个断面呈倒凸字形槽,将盖板镶嵌在上层槽里并焊接固定,下层槽形成连通水道。
CN2010105456101A 2010-11-16 2010-11-16 深孔式电控箱底板水冷却回路装置 Expired - Fee Related CN102055139B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105456101A CN102055139B (zh) 2010-11-16 2010-11-16 深孔式电控箱底板水冷却回路装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105456101A CN102055139B (zh) 2010-11-16 2010-11-16 深孔式电控箱底板水冷却回路装置

Publications (2)

Publication Number Publication Date
CN102055139A true CN102055139A (zh) 2011-05-11
CN102055139B CN102055139B (zh) 2012-07-18

Family

ID=43959226

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105456101A Expired - Fee Related CN102055139B (zh) 2010-11-16 2010-11-16 深孔式电控箱底板水冷却回路装置

Country Status (1)

Country Link
CN (1) CN102055139B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102359375A (zh) * 2011-08-03 2012-02-22 三一重型装备有限公司 一种电控箱盖板
CN110557911A (zh) * 2019-09-02 2019-12-10 徐州华峰测控技术有限公司 一种采煤机用隔爆兼本质安全型电控箱

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2544327Y (zh) * 2002-05-15 2003-04-09 刘震宇 水冷式散热装置
JP2005005361A (ja) * 2003-06-10 2005-01-06 Nitto Electric Works Ltd ヒートシンク
CN2842826Y (zh) * 2005-10-27 2006-11-29 中国南车集团株洲电力机车研究所 一种电传动电力电子功率变换器水冷散热板
CN200969727Y (zh) * 2006-10-27 2007-10-31 中国电子科技集团公司第三十八研究所 深孔型水冷微波功率组件壳体
CN201252706Y (zh) * 2008-07-30 2009-06-03 中国北车集团大连机车研究所有限公司 板式水散热器
CN201869487U (zh) * 2010-11-16 2011-06-15 沈阳矿山机械有限公司 深孔式电控箱底板水冷却回路装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2544327Y (zh) * 2002-05-15 2003-04-09 刘震宇 水冷式散热装置
JP2005005361A (ja) * 2003-06-10 2005-01-06 Nitto Electric Works Ltd ヒートシンク
CN2842826Y (zh) * 2005-10-27 2006-11-29 中国南车集团株洲电力机车研究所 一种电传动电力电子功率变换器水冷散热板
CN200969727Y (zh) * 2006-10-27 2007-10-31 中国电子科技集团公司第三十八研究所 深孔型水冷微波功率组件壳体
CN201252706Y (zh) * 2008-07-30 2009-06-03 中国北车集团大连机车研究所有限公司 板式水散热器
CN201869487U (zh) * 2010-11-16 2011-06-15 沈阳矿山机械有限公司 深孔式电控箱底板水冷却回路装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102359375A (zh) * 2011-08-03 2012-02-22 三一重型装备有限公司 一种电控箱盖板
CN110557911A (zh) * 2019-09-02 2019-12-10 徐州华峰测控技术有限公司 一种采煤机用隔爆兼本质安全型电控箱
CN110557911B (zh) * 2019-09-02 2022-05-27 徐州华峰测控技术有限公司 一种采煤机用隔爆兼本质安全型电控箱

Also Published As

Publication number Publication date
CN102055139B (zh) 2012-07-18

Similar Documents

Publication Publication Date Title
CN110779811B (zh) 一种降雨渗流和爆破振动耦合模拟软岩剪切流变试验系统
CN108180035B (zh) 高瓦斯低透气性煤层钻孔与增透联合作业的瓦斯抽采方法
TW201016346A (en) Mould for casting metal
CN109488302B (zh) 劈裂装置及巷道底板卸压方法
CN102055139B (zh) 深孔式电控箱底板水冷却回路装置
CN103452102B (zh) 一种管桩快速接头
CN102922144B (zh) 电路板钻孔方法
CN103792120B (zh) 离心混凝土强度检测用试模及离心混凝土强度检测方法
CN112302654B (zh) 特厚煤层快速放煤参数实测确定方法
Yong et al. Technical improvements and application of air-lift reverse circulation drilling technology to ultra-deep geothermal well
CN201869487U (zh) 深孔式电控箱底板水冷却回路装置
CN106500894A (zh) 一种二氧化碳爆破冲击波压力测试装置及其测试方法
CN203156099U (zh) 一种带压开孔装置
CN201486579U (zh) 一种钻凿锚杆孔定位装置
CN110617103B (zh) 煤矿井下瓦斯抽放钻孔增透改造方法
CN106475734A (zh) 一种螺纹盲孔深度超差后的补焊工艺
CN205530265U (zh) 预应力混凝土管桩桩芯清孔装置
CN106239005A (zh) 一种磁介质盒焊接夹具及焊接工艺
CN109877945B (zh) 一种混凝土梁预留孔道的成孔定位施工方法
CN108505992B (zh) 应用于砂砾石覆盖层以下基岩勘探的压水试验的方法
CN105448364A (zh) 一种燃料贮存格架组件
CN204876088U (zh) 箱形柱-工形梁预制装配式高延性梁柱节点
CN206707634U (zh) 一种金刚石复合片内凹钻头
CN216227780U (zh) 一种柔性调圆支撑保型装置
CN204782728U (zh) 一种可快速维修的放水盘

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120718

Termination date: 20131116