CN102041947A - After installing method for aluminum alloy doors and windows - Google Patents
After installing method for aluminum alloy doors and windows Download PDFInfo
- Publication number
- CN102041947A CN102041947A CN2009101974202A CN200910197420A CN102041947A CN 102041947 A CN102041947 A CN 102041947A CN 2009101974202 A CN2009101974202 A CN 2009101974202A CN 200910197420 A CN200910197420 A CN 200910197420A CN 102041947 A CN102041947 A CN 102041947A
- Authority
- CN
- China
- Prior art keywords
- window
- window frame
- aluminum alloy
- doorframe
- door
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Door And Window Frames Mounted To Openings (AREA)
- Wing Frames And Configurations (AREA)
Abstract
The invention discloses an after installing method for aluminum alloy doors and windows and provides a new construction process for installing aluminum alloy doors and windows, which is a continuous construction method with high quality, high efficiency and remarkable economic benefit. In the invention, under the premise of not changing the main structures (section, vertical face, opening way and the like) of the aluminum alloy doors and windows, the details of door and window frame installation are improved, the door and window frame installation is performed after civil construction and decoration are basically finished, and finally door leaves and window sashes are installed.
Description
One, technical field:
The present invention is a kind of new constructure scheme of alumium alloy door and window in architectural installation, belongs to the room and builds construction field.
Two, background technology:
Alumium alloy door and window are because of the characteristics of himself, be widely adopted at Fang Jianzhong, common construction sequence is at present: aluminium alloy doorframe and window frame and bar parts are made by the door and window factory of specialty, the dimension of opening that civil engineering is reserved on body of wall, the gap of top and both sides and doorframe and window frame is about 25mm, and reservation 180-200mm gap, bottom is stayed and done windowsill.After civil engineering is bound, aluminium alloy doorframe and window frame can be installed, around the frame with behind the timber wedge location, be fixed on the body of wall in door and window hole with iron connector and swell fixture again, with bipeltate filling gap therebetween, construction workss such as the decoration of wall face and windowsill are used the concrete filleting in being made by civil engineering after waiting to solidify again.After the civil works completion, carry out the installation of bar again and smear seam with fluid sealant at doorframe and window frame and decorative layer junction.Door and window is installed and civil engineering is respectively to be finished by two professional contingents usually, and there are many drawbacks in the construction sequence of this cross-operation:
1, the slit is bigger between doorframe and window frame and body of wall, and the blowing agent of filling is also non-watertight, and the concrete of filleting also is difficult for closely knit, and rain leakage takes place easily, also unfavorable heat preservation energy-saving.
2, door and window construction team withdraws after doorframe and window frame is installed, carry out decorating inner and external walls by civil engineering troop again, the aluminium alloy doorframe and window frame that has installed easily caused dirty hinder, distortion even damage, major injury so that the owner require to renew generally reach 2-4%, economic loss is quite serious.
3, the owner lives in back generation percolating water phenomenon, is difficult for distinguishing responsibility, and two construction teams shift onto each other, dispute over trifles, and bring difficulty to after-sale service work.
4, summary of the invention:
The objective of the invention is to propose a kind of new construction sequence, mainly construct under the prerequisite of (section bar, facade, unlatching form etc.) not changing alumium alloy door and window, the thin portion of installation to doorframe and window frame improves, and the installation work of doorframe and window frame is arranged in carries out after the civil engineering decorative engineering is finished substantially, just can bar be installed immediately and a kind of high-quality that accomplishs without any letup, high efficiency job practices.
Be 5-8mm behind the civil engineering decorating inner and external walls around the gap of door and window hole to be provided and aluminium alloy doorframe and window frame, after doorframe and window frame is located with timber wedge, directly with swell fixture or by being embedded in the iron connector on the aluminium alloy extrusions and doorframe and window frame being fixed on the body of wall with swell fixture, filling-foam rubber between less slit covers it with fluid sealant after the curing correction of the flank shape more subsequently.
After-assembly method of aluminum alloy door and window of the present invention is except above-mentioned many drawbacks of dissolving crossed construction effectively and bringing, also have high efficiency, good in economic efficiency characteristics, its tightness, watertightness and resisting wind press capacity detect through authoritative department, satisfy related standard requirements.Even the damage that must renew occurred, only need independently finish getting final product by door and window construction team, simple and easy.
Three, description of drawings:
Fig. 1 is the invention after-assembly method of aluminum alloy door and window, with the directly fixing aluminium alloy doorframe and window frame of swell fixture and the cross section node diagram of body of wall.
Fig. 2 is the sharp after-assembly method of aluminum alloy door and window of invention, by the iron connector and with the fixing aluminium alloy doorframe and window frame of swell fixture and the cross section node diagram of body of wall.
Four, specific embodiments:
Now in conjunction with the accompanying drawings the technical program is further described:
Among Fig. 1 and Fig. 2,1 is insulation layer, and 2 are anticracking grout layer (containing network cloth), 3 is the face brick tack coat, and 4 is facing tile, and 5 is fluid sealant, 6 is the technology port lid, and 7 is the aluminium alloys window frame, and 8 is aluminium alloy sash, 9 is bipeltate, 10 is the iron connector, and 11 is tapping screw, and 12 is the nylon expansion tube, 13 is the wall body structure layer, and 14 is the inner wall decoration fine-powder bed.
By the iron connector and as shown in Figure 2 with the technical scheme of fixing aluminium alloy doorframe and window frame of swell fixture and body of wall, the gap is 5-8mm around the hole after window frame 7 is decorated with civil engineering, behind the window frame 7 usefulness timber wedges location, tapping screw 11 passes iron connector 10 and the anticracking grout layer 2 that is embedded on the window frame 7, and enter the nylon expansion tube 12 that is embedded in the wall body structure layer 13, frame 7 firmly is connected with body of wall 13, take out timber wedge, with the slit between bipeltate 9 filling window frames 7 and the decorative detail bisque 14, after the curing spill is accomplished on the surface of bipeltate 9, smear seam with weather proofing sealant 5 again, should hide foaming rubber layer 9 fully, form the anti-leakage function.Fabrication hole on the window frame 7 with technology port lid 6 stifled on, not only waterproof but also attractive in appearance.
With the direct fixing aluminium alloy doorframe and window frame of swell fixture and the technical scheme of body of wall also is (as shown in Figure 1) of practical, the gap is 5-8mm around the hole after window frame 7 is decorated with civil engineering, behind the window frame 7 usefulness timber wedges location, it has saved iron connector 10 and technology port lid 6, tapping screw 11 passes the hole and the anticracking grout layer 2 of window frame 7, and enter the nylon expansion tube 12 that is embedded in the wall body structure layer 13, window frame 7 firmly is connected with body of wall 13, take out timber wedge, with the slit between bipeltate 9 filling window frames 7 and the decorative detail bisque 14, after the curing spill is accomplished on the surface of bipeltate 9, smear seam with weather proofing sealant 5 again, should hide foaming rubber layer 9 fully, form the anti-leakage function.This scheme need be used long tapping screw.
Claims (2)
1. after-assembly method of aluminum alloy door and window of the present invention, a kind of installation construction procedure of new alumium alloy door and window is proposed, it is characterized in that: mainly construct under the prerequisite of (section bar, facade, unlatching form etc.) not changing alumium alloy door and window, the installation work of doorframe and window frame is arranged in civil engineering decorates and carry out after finishing substantially, and with the job practices that bar can be installed.
2. according to the described after-assembly method of aluminum alloy door and window of claim 1, the thin portion of installation to doorframe and window frame improves, it is characterized in that: aluminium alloy doorframe and window frame (7) and wall body structure layer (13), can fixedly connected with nylon expansion tube (12) by iron connector (10) and with tapping screw (11), also can directly use tapping screw (11) to be connected with nylon expansion tube (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200910197420 CN102041947B (en) | 2009-10-20 | 2009-10-20 | After installing method for aluminum alloy doors and windows |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200910197420 CN102041947B (en) | 2009-10-20 | 2009-10-20 | After installing method for aluminum alloy doors and windows |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102041947A true CN102041947A (en) | 2011-05-04 |
CN102041947B CN102041947B (en) | 2013-01-30 |
Family
ID=43908452
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200910197420 Active CN102041947B (en) | 2009-10-20 | 2009-10-20 | After installing method for aluminum alloy doors and windows |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102041947B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102953628A (en) * | 2011-08-18 | 2013-03-06 | 佛山市广成铝业有限公司 | Window mounting mode and window mounting structure convenient for mounting |
CN103470141A (en) * | 2013-08-15 | 2013-12-25 | 巢湖市海风门窗有限公司 | Method for mounting aluminum-alloy sliding door/window |
CN109441289A (en) * | 2018-12-21 | 2019-03-08 | 上海建工七建集团有限公司 | A kind of outer window frame waterproofing node structure and its construction method |
CN109750943A (en) * | 2017-11-07 | 2019-05-14 | 湖南固尔邦幕墙装饰股份有限公司 | A kind of novel building window frame and its installation method |
CN110593715A (en) * | 2019-09-25 | 2019-12-20 | 西安市紫旭幕墙有限责任公司 | Glass door sealing system and glass door with same |
CN113482490A (en) * | 2021-07-13 | 2021-10-08 | 珠海固美幕墙装饰工程有限公司 | Door and window installation and fixation method |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1223739C (en) * | 2001-01-19 | 2005-10-19 | Vkr控股公司 | Roof window withan improved securing device |
JP2002227531A (en) * | 2001-01-30 | 2002-08-14 | Bs Door Kk | Door fitting structure of prefabricated shed |
CN1470731A (en) * | 2002-07-26 | 2004-01-28 | 陈志华 | Parallel-opening hinged window with sound-proofing and heat-insulating function |
CN1514101A (en) * | 2002-12-31 | 2004-07-21 | 郝长岭 | Multifunction aluminium plastic door and window |
-
2009
- 2009-10-20 CN CN 200910197420 patent/CN102041947B/en active Active
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102953628A (en) * | 2011-08-18 | 2013-03-06 | 佛山市广成铝业有限公司 | Window mounting mode and window mounting structure convenient for mounting |
CN102953628B (en) * | 2011-08-18 | 2016-08-10 | 佛山市广成铝业有限公司 | A kind of convenient forms mounting means installed and structure thereof |
CN103470141A (en) * | 2013-08-15 | 2013-12-25 | 巢湖市海风门窗有限公司 | Method for mounting aluminum-alloy sliding door/window |
CN109750943A (en) * | 2017-11-07 | 2019-05-14 | 湖南固尔邦幕墙装饰股份有限公司 | A kind of novel building window frame and its installation method |
CN109441289A (en) * | 2018-12-21 | 2019-03-08 | 上海建工七建集团有限公司 | A kind of outer window frame waterproofing node structure and its construction method |
CN110593715A (en) * | 2019-09-25 | 2019-12-20 | 西安市紫旭幕墙有限责任公司 | Glass door sealing system and glass door with same |
CN113482490A (en) * | 2021-07-13 | 2021-10-08 | 珠海固美幕墙装饰工程有限公司 | Door and window installation and fixation method |
Also Published As
Publication number | Publication date |
---|---|
CN102041947B (en) | 2013-01-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102041947B (en) | After installing method for aluminum alloy doors and windows | |
CN207017857U (en) | Bridge cut-off aluminum alloy outer window binding off structure | |
CN101775862A (en) | Composite heat preserving template and building main body integrated construction heat preserving system | |
CN211287246U (en) | Window attaches frame structure | |
CN104164956A (en) | Flexible connecting system for polyurethane heat preservation decorative sheets | |
CN207004378U (en) | A kind of waterproof exterior window trim and its installation node | |
CN207048135U (en) | The general expansion joint system of curtain wall indoor and outdoor | |
CN206279656U (en) | Prefabricated assembled steel silo concrete structure sandwich heat preservation combined wall and connector | |
CN201155182Y (en) | Thermal-insulating decorative board for exterior wall | |
CN214835736U (en) | Double inward-opening drainage casement window | |
CN207080092U (en) | Close up construction on a kind of curtain wall window side | |
CN204139841U (en) | A kind of door and window installation structure | |
CN107217766A (en) | The general expansion joint system of curtain wall indoor and outdoor | |
CN103526832B (en) | High-rise outer wall dividing joint structure | |
CN108756602A (en) | A kind of waterproof energy-saving pair frame and its mounting structure for PC structures | |
CN204199585U (en) | A kind of decoration of exterior wall integrated plate for heat insulation | |
CN208858270U (en) | A kind of waterproof energy-saving pair frame and its mounting structure for PC structure | |
CN203978153U (en) | A kind of aluminum wood composite door and window | |
CN202202764U (en) | Energy-saving and environment-friendly door and window system | |
CN202787802U (en) | Waterproof type wall thermal insulation decorative board and sleeve line for door and window | |
CN110952879A (en) | Structure of aluminum profile double-layer energy-saving sunshade integrated window | |
CN201517255U (en) | Integral cement composite heat-insulating external wall | |
CN104314421B (en) | A kind of door and window installation structure | |
CN205135236U (en) | Prefabricated wall body of prefabricated window frame guide housing | |
KR20140063542A (en) | Total solution that double skin facade type unitized exterior finishing panel system for outer insulated method of an apartment housing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: SHANGHAI QIANXIANG DOOR WINDOW + CURTAIN WALL CO., Free format text: FORMER NAME: QIANXIANG DECORATING ENGINEERING CO., LTD., SHANGHAI |
|
CP01 | Change in the name or title of a patent holder |
Address after: 201802 Shanghai City, Jiading District Nanxiang Town, Shen Hui Road No. 350 Patentee after: Shanghai dry door and window curtain wall Co., Ltd. Address before: 201802 Shanghai City, Jiading District Nanxiang Town, Shen Hui Road No. 350 Patentee before: Shanghai Qianxiang Decoration Engineering Co., Ltd. |