CN102041773B - Low removable across road overline bridge across high assembled - Google Patents

Low removable across road overline bridge across high assembled Download PDF

Info

Publication number
CN102041773B
CN102041773B CN201010564078.8A CN201010564078A CN102041773B CN 102041773 B CN102041773 B CN 102041773B CN 201010564078 A CN201010564078 A CN 201010564078A CN 102041773 B CN102041773 B CN 102041773B
Authority
CN
China
Prior art keywords
road
spelling group
central post
group beam
overline bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010564078.8A
Other languages
Chinese (zh)
Other versions
CN102041773A (en
Inventor
倪既民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201010564078.8A priority Critical patent/CN102041773B/en
Publication of CN102041773A publication Critical patent/CN102041773A/en
Application granted granted Critical
Publication of CN102041773B publication Critical patent/CN102041773B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Road Paving Structures (AREA)

Abstract

Low across high assembled removable across road overline bridge be a kind of by spelling group beam, central post and ascending table scene spell take combination form disassembled resettlement displacement across road overline bridge.Spelling group beam connects spelling group by several discrete hollows or U-shaped unit and forms, and beam frame bottom plane is set to walkway; Central post is combined by bottom surface, column and crossbeam and forms, and is built in road center rear and front end and is respectively configured with crash bearer; Ascending table is assembled by end face, pillar and step level ladder or ramp bulk-breaking and is formed.Low across removable, the conveniently moving cheap, widely applicable across road overline bridge of high assembled, a large-scale cost across road billboard frame of need just can realize traffic and publicity makes the best of both worlds; It can be applied in business street, downtown area, can set up in other venue campus, can facilitate the interim collecting and distributing stream of people, can solve engineering worksite sidewalk, it can remove application towards building dusk, can change and give way across height, road widening municipal administration can be followed and arrange change, pedestrian's moving traffic safety guarantee can be provided.

Description

Low removable across road overline bridge across high assembled
Technical field
The invention belongs to the improvement that a kind of road crosses over current overline bridge, especially a kind of low removable across road overline bridge across high assembled.Technical background
Industrial civilization and development in science and technology make automobile become the main traffic instrument of society, and the crisscross collection of road office of gathering has been the obvious characteristic in city.In prior art, for solving the traffic conflict of pedestrians travel's road and vehicle pass-through, be applied to busy road already across road overline bridge.But existing fixed overline bridge, often because urban development road widening etc. is caused huge waste by helpless demolition; Simultaneously those interim people's stream aggregations or need often to have little time again to build pedestrian across paths across road especially.Cut the waste for economizing on resources and hinder traffic safety in order efficiently, being necessary very much to improve across the design of road overline bridge, making it the temporary variations adapting to city and Road Development rhythm or the magnitude of traffic flow.Summary of the invention
The object of the invention is to provide a kind of low removable across road overline bridge across high assembled, apply modular assembled principle Shi Kua road overline bridge and can save material and the duration fast practices, conveniently can move displacement change and adapting to varying environment demand and reach economical and efficient environmental protection.
The object of the present invention is achieved like this: lowly take combination form across removable to be spelled by group beam, central post and ascending table scene of spelling across road overline bridge of high assembled, be disassembled resettlement displacement across road overline bridge.Described spelling group beam is connect hollow or U-shaped that spelling group forms across road bearing beam by several separate units, the base plane of hollow or U-shaped spelling group beam is set to walkway, spelling group beam and ascending table link are provided with bearing pin chain connection interface, be provided with to shelve to be connected with central post link and arrange, spelling group beam and central post link top are also ad hoc hanging system mouth hanging.Described central post is combine by bottom surface, column and crossbeam the support column being built in road center formed, and central post rear and front end is respectively configured with crash bearer.Described ascending table is assemble by end face, pillar and step level ladder or ramp bulk-breaking the scaoffold formed, and scaoffold end face is provided with safe fence, is provided with the bearing pin chain connection interface be connected with spelling group beam to trackside face.Low across removable central authorities and the roadside, both sides being positioned over road across road overline bridge by a central post and two ascending tables respectively of high assembled, two spelling group beams respectively one end and ascending table are worn chain as bearing pin and are connected one end and shelve to be connected with central post and be cross-placed on above road, what spelling group beam was arranged is the elevation that passes through only for common motor bus across height, form freely-moving bridge Shang Nengkua road under bridge to pass through, pontic can conveniently disassemble again resettlement displacement across road overline bridge.
Low across high assembled removable across road overline bridge apply modular assembled principle improve design across road overline bridge, Shi Kua road overline bridge can save material and the duration fast practices, conveniently can disassemble resettlement be shifted and change adaptation varying environment demand, reduce the material energy across high flexible modes and across road physical demands with low, spelling group beam and central post are shelved link and or can also be fixed ad hoc hanging equipment and lift by crane that to promote across height be that Overheight Vehicles give way temporarily by the hanging instrument moved to temporarily; Reach and not only adapt to urban traffic present situation and change but also economical and efficient environmental protection.Accompanying drawing explanation
The basic structure, mechanism principle and the typical exemplifying embodiment that design this patent below in conjunction with accompanying drawing signal are further described:
Fig. 1 a kind ofly forms hollow section across the front of road spelling group beam and side example by several separate units through connecting spelling group.
Fig. 2 is combined by bottom surface, column and crossbeam to form central post front and the side example that rear and front end is respectively configured with crash bearer.
Fig. 3 is a kind of front and side structure example of being made up of ascending table end face, pillar and step level ladder or ramp group structure bulk-breaking.
Fig. 4 is made up of spelling group beam, central post and high platform lowly to illustrate across the removable vehicles and pedestrians across road overline bridge of high assembled.Fig. 5 lowly meets with Overheight Vehicles across road overline bridge and lifts by crane spelling group beam by hanging instrument across high assembled is removable and promote across high example.
In the accompanying drawings: be 1. spelling group beam, being 2. central post, is 3. crash bearer, is 4. ascending table, is 5. hanging instrument.Detailed description of the invention
Implement low removable less demanding across road overline bridge technique and equipment across high assembled, not only simple and convenient material-saving but also flexible economical and efficient.In enforcement, spelling group beam 1 can be designed to the separate unit of the different scale of construction and length according to different flow steppings, make it change connection spelling group and can adapt to different kinds of roads fabric width, the section of spelling group beam 1 is most economical efficient hollow or U-shaped, and the laid one-tenth of the optional various material of base plane passes through road surface; The bearing pin chain connection interface of spelling group beam 1 and ascending table 4 link and with the shelving to be connected and arrange of central post 2 link, concrete structure can be selected by safe and simple principle.Central post 2 is combined by bottom surface, column and crossbeam and forms, and must there be enough areas that contacts to earth bottom surface to bear the load-carrying of bridge, and crash bearer 3 ensures must arranging of bridge security, needs enough firmly ground and installs.Ascending table 4 is assembled by end face, pillar and step level ladder or ramp bulk-breaking and is formed, scaoffold end face is provided with safe fence, under platform, space also can be built into closed room and manages or store place, ascending table 4 can be installed escalator and pick pedestrian, also can add suspension bridge and be communicated with neighbouring building.In force, low across high assembled removable arrange to can be across height across road overline bridge to pass through elevation only for common motor bus, not only flexible adaptation urban traffic but also reduce the material energy and across road physical demands; Spelling group beam 1 and ascending table 4 can add weathertight enclosure, can add advertisement, poster or lamp decoration, are decorated unique profile style.Low across removable, the conveniently moving cheap, widely applicable across road overline bridge of high assembled, a large-scale cost across road billboard frame of need just can realize gradate separation traffic and publicity makes the best of both worlds; It can be applied in business street, downtown area, can set up in other venue campus, can facilitate the interim collecting and distributing stream of people, engineering worksite sidewalk can be solved, application can be removed towards building dusk, can change and give way across height, road widening municipal administration can be followed and arrange change, pedestrian's moving traffic safety guarantee can be provided.

Claims (1)

1. one kind low removable across road overline bridge across high assembled, by spelling group beam, central post and ascending table scene are spelled and are taken combination formation, it is characterized in that: described spelling group beam (1) is connect hollow or U-shaped that spelling group forms across road bearing beam by several separate units, the base plane of described spelling group beam (1) is set to walkway, spelling group beam (1) and ascending table (4) link are provided with bearing pin chain connection interface, spelling group beam (1) and central post (2) link are provided with to shelve to be connected and arrange, spelling group beam (1) have hanging system mouth hanging with central post (2) link top is also ad hoc, described each spelling group beam (1) and central post (2) are shelved one end of being connected and can be lifted by crane by the hanging instrument (5) moved to or fixing ad hoc hanging equipment temporarily temporarily promote across height, described central post (2) is for combine by bottom surface, column and crossbeam the support column being built in road center formed, and central post (2) rear and front end is respectively configured with crash bearer (3), described ascending table (4) is for assemble by end face, pillar and step level ladder or ramp bulk-breaking the scaoffold formed, the avris of scaoffold end face is provided with safe fence, be provided with the bearing pin chain connection interface be connected with spelling group beam (1) to trackside face, ascending table (4) arranges suspension bridge and is communicated with neighbouring building, described low central authorities and the roadside, both sides being positioned over road across the removable central post (2) across road overline bridge of high assembled and two ascending tables (4) respectively, two spelling group beam (1) difference one end are worn chain with ascending table (4) as bearing pin and are connected, one end is shelved to be connected with central post (2) and is cross-placed on above road, what spelling group beam (1) was arranged is the elevation that passes through only for common motor bus across height, form freely-moving bridge Shang Nengkua road under bridge to pass through, pontic can conveniently disassemble again resettlement displacement across road overline bridge.
CN201010564078.8A 2010-11-29 2010-11-29 Low removable across road overline bridge across high assembled Expired - Fee Related CN102041773B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010564078.8A CN102041773B (en) 2010-11-29 2010-11-29 Low removable across road overline bridge across high assembled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010564078.8A CN102041773B (en) 2010-11-29 2010-11-29 Low removable across road overline bridge across high assembled

Publications (2)

Publication Number Publication Date
CN102041773A CN102041773A (en) 2011-05-04
CN102041773B true CN102041773B (en) 2016-04-20

Family

ID=43908287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010564078.8A Expired - Fee Related CN102041773B (en) 2010-11-29 2010-11-29 Low removable across road overline bridge across high assembled

Country Status (1)

Country Link
CN (1) CN102041773B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103362061A (en) * 2013-08-05 2013-10-23 金光道环境建设集团有限公司 Assembled totally-closed bridge
CN105421215B (en) * 2015-11-09 2016-11-23 中国矿业大学 Removable overline bridge
CN108517731A (en) * 2018-05-08 2018-09-11 李化雷 Three-dimensional device of solar generating

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4042064A (en) * 1976-02-13 1977-08-16 Lobb George W Platform structure
CN2380602Y (en) * 1999-03-26 2000-05-31 胡鼎祥 Combined foot overline-bridge
JP2008223341A (en) * 2007-03-13 2008-09-25 Mitsubishi Electric Corp Mobile installation type pedestrian overpass
CN201873938U (en) * 2010-11-29 2011-06-22 倪既民 Low-span high-assembly movable over-line bridge

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4042064A (en) * 1976-02-13 1977-08-16 Lobb George W Platform structure
CN2380602Y (en) * 1999-03-26 2000-05-31 胡鼎祥 Combined foot overline-bridge
JP2008223341A (en) * 2007-03-13 2008-09-25 Mitsubishi Electric Corp Mobile installation type pedestrian overpass
CN201873938U (en) * 2010-11-29 2011-06-22 倪既民 Low-span high-assembly movable over-line bridge

Also Published As

Publication number Publication date
CN102041773A (en) 2011-05-04

Similar Documents

Publication Publication Date Title
CN202324747U (en) Ferris wheel type parking lot
CN106498842A (en) A kind of voluntarily axle beam and its method of construction under existing elevated bridge
CN103410066B (en) The building of grade crossing, remodeling method and structure thereof
CN102587235B (en) Urban rapid transit network system
CN2832895Y (en) Multi-deck easily-dismountable full-stereo road traffic system
CN102041773B (en) Low removable across road overline bridge across high assembled
CN201873938U (en) Low-span high-assembly movable over-line bridge
CN206143684U (en) Traffic guardrail
CN202380792U (en) Bridge type stereoscopic parking garage
KR101702466B1 (en) Promotional equipment for roads
CN103215867B (en) Assembled type intersected road system of bridge floor supporting band traveling device
CN216304315U (en) Four-layer co-constructed three-dimensional traffic system
CN2224860Y (en) Street over-crossing bridge
CN107022930B (en) Support assembly for vehicle track
CN103452022A (en) Construction and transformation methods and structure of flyover junction
CN210684404U (en) Traffic frame for municipal administration ground maintenance engineering
CN210104683U (en) River highway protection fence
CN202509392U (en) Fast installing-dismounting city small car over-bridge
CN204589781U (en) Novel pedestrian bridge
CN102277815B (en) Suspension type urban overhead bus channel
CN212103512U (en) Pedestrian and non-motor vehicle shunting overbridge
CN202064268U (en) Street crossing pedestrian bridge
CN205063473U (en) Road stereo garage
KR200297826Y1 (en) Fence having advertisement
CN212404771U (en) Combined pedestrian overpass suitable for shunting of employees and social personnel in enterprise

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160420

Termination date: 20181129