The method of the hot machine test of elevator
Technical field
The present invention relates to elevator installation quality field tests technology, refer in particular to the method for the hot machine test of a kind of elevator.
Background technology
As everyone knows, elevator is the vertical transport equipment and the vehicle that transport passenger or goods in the building up and down, and in modern society, people are accustomed to the elevator as the vertical transportation instrument, and more and more rely on it.As any vehicle, elevator save time to people and muscle power in, also brought certain risk inevitably, for this risk is dropped to bottom line, people are groping elevator safety always for many years, its safety precautions is gradually improved, manages to make elevator to become green channel, emphasize that elevator is more comfortable, be to produce and service for life more safely.
Traditional method, after the elevator installation, examination through Bureau of Technical Supervision, just can deliver to customer to use, but the installation quality of elevator and stability will just embody in client's use, the quality of elevator just can't be guaranteed, and especially weakest link---the installation quality problem of elevator door and gate can't in time be found in the elevator installation.
Summary of the invention
Main purpose of the present invention provides the method for the hot machine test of a kind of elevator, and the quality problems of door system in installing with effective solution elevator are finished the hot machine test of elevator automatically, and the installation quality and the stability of elevator door were found and solved in the very first time.
For realizing above-mentioned goal of the invention, the present invention adopts following technical scheme:
The method of the hot machine test of a kind of elevator connects a hot machine test input and a hot machine test output terminal on the elevator master control board, and the number of run N of default one hot machine test in the elevator master control board; After the elevator installation, to press this hot machine test input and test, elevator begins to move to successively in order last floor from Stall, and then be reset to Stall and finish the test run process one time, number of run adds 1, and so circulation reaches N until number of run, and hot machine test stops; It is in the process of operation each time, automatically open the door and close the door action at each layer by elevator master control board control elevator door, and detection is opened the door and is closed the door process automatically, if open the door or close the door and break down, then send breakdown signal and indication fault number of floor levels automatically, withdraw from hot machine test mode by elevator master control board control system simultaneously by hot machine test output terminal.
Preferably, the open the door method of fault of described detection is: in elevator opened the door process, whether the detecting gate lock-switch disconnected, if disconnect, and spacing also the connection 2 seconds of closing the door judges that then this layer can not open the door, and sends breakdown signal.
Preferably, the open the door method of fault of described detection is: in elevator opens the door process, whether the detecting gate lock-switch disconnects, if disconnect, the spacing also disconnection of closing the door, detect elevator door and whether reach 1/3 position this moment, if in 5 seconds, 1/3 switch is not connected, and then is judged as the machine stall that opens the door, and sends breakdown signal.
Preferably, the open the door method of fault of described detection is: in elevator opened the door process, whether the detecting gate lock-switch disconnected, if door switch disconnects, closing the door spacingly also disconnects, and 1/3 switch connection is after 5 seconds, door open limit is not connected, and then is judged as door and does not reach the position, sends breakdown signal.
Preferably, the close the door method of fault of described detection is: in the process of closing the door, when door open limit disconnects, if after 5 seconds, 1/3 switch is not connected, and then is judged as a machine generation stall, sends breakdown signal;
Preferably, the close the door method of fault of described detection is: in the process of closing the door, when door open limit disconnects and 1/3 switch is also connected, in 5 seconds, if door lock is connected, spacingly do not connect and close the door, then be judged as the door lock short circuit, send breakdown signal.
Preferably, described hot machine test input is hot machine testing button.
Preferably, described hot machine test output terminal is hot machine test indicator lamp, siren horn or read-out.
After adopting technique scheme, the present invention has tangible advantage and beneficial effect, particularly, as shown from the above technical solution, the present invention is mainly used in the quality and the stability of test elevator car door system, especially after the installation elevator is finished, press hot machine testing button, elevator can reach each floor automatically, tests each layer elevator door and installs whether meet standard, and can repeat thousands of times carrying out test and validation repeatedly, and need not be by manually removing to exhale elevator.When elevator door has problem, hot machine test stops automatically, the commissioning staff can directly promptly arrive the state that corresponding floor is checked elevator door according to indication, to finish debugging and maintenance quickly and easily, and then improved efficient that elevator installs and the installation quality problem of finding elevator door as early as possible, guaranteed the elevator installation quality.
The specific embodiment
The present invention is described in detail below in conjunction with specific embodiment:
The method of the hot machine test of a kind of elevator, it connects a hot machine test input and a hot machine test output terminal on the elevator master control board, and the number of run N of default one hot machine test in the elevator master control board.Wherein, this hot machine test input can be a hot machine testing button etc., this hot machine test output terminal then can be hot machine test indicator lamp, siren horn or read-out etc., and this number of run N can suitably determine for example 2000 times according to parameters such as elevator running model, service lifes.
After the elevator installation, to press this hot machine test input and test, elevator begins to move to successively in order last floor from Stall, and then be reset to Stall and finish the test run process one time, number of run adds 1, and so circulation reaches N until number of run, and hot machine test stops.
It is in the process of operation each time, automatically open the door and close the door action at each layer by elevator master control board control elevator door, and detection is opened the door and is closed the door process automatically, if open the door or close the door and break down, then send breakdown signal automatically by hot machine test output terminal, record indication fault number of floor levels, the prompting installation personnel need be readjusted elevator door in bad order, withdraws from hot machine test mode by elevator master control board control system simultaneously.
When the following any elevator door of generation opens the door or close the door fault, hot machine test will be withdrawed from automatically, and record trouble time and failure code, and the concrete method that detects the fault of opening the door or close the door mainly contains following several:
Method one: in elevator opened the door process, whether the detecting gate lock-switch disconnected, if disconnect, and spacing also the connection 2 seconds of closing the door judges that then this layer can not open the door, and sends breakdown signal.
Method two: in elevator opened the door process, whether the detecting gate lock-switch disconnected, if disconnect, closing the door spacingly also disconnects, and detect elevator door and whether reach 1/3 position this moment, if in 5 seconds, 1/3 switch is not connected, and then is judged as the machine stall that opens the door, and sends breakdown signal.
Method three: in elevator opened the door process, whether the detecting gate lock-switch disconnected, if door switch disconnects, and the spacing also disconnection of closing the door, 1/3 switch connection, after 5 seconds, door open limit is not connected, and then is judged as door and does not reach the position, sends breakdown signal.
Method four: in elevator was closed the door process, when door open limit disconnects, if after 5 seconds, 1/3 switch was not connected, and then decision gate machine generation stall sends breakdown signal;
Method five: in elevator is closed the door process, when door open limit disconnects and 1/3 switch is also connected, in 5 seconds,, spacingly do not connect, then be judged as the door lock short circuit, send breakdown signal and close the door if door lock is connected.
In sum, the present invention is mainly used in the quality and the stability of test elevator car door system, especially after the installation elevator is finished, press hot machine testing button, elevator can reach each floor automatically, test each layer elevator door and install whether meet standard, and can repeat thousands of times carrying out test and validation repeatedly, and need not be by manually removing to exhale elevator.When elevator door has problem, hot machine test stops automatically, the commissioning staff can directly promptly arrive the state that corresponding floor is checked elevator door according to indication, to finish debugging and maintenance quickly and easily, and then improved efficient that elevator installs and the installation quality problem of finding elevator door as early as possible, guaranteed the elevator installation quality.
The above, it only is preferred embodiment of the present invention, be not that technical scope of the present invention is imposed any restrictions, so every foundation technical spirit of the present invention all still belongs in the scope of technical solution of the present invention any trickle modification, equivalent variations and modification that above embodiment did.