The specific embodiment
Embodiment 1
The fish pond of present embodiment: because pearl culturing clam is relatively stricter to environmental requirement, otherwise can influence the quality of pearl, river Acidity of Aikalinity pH value 7-8, water temperature 10-30 ℃, below the dark 1.5m of the water surface.During the transmission line of electricity location, the tower position is chosen near earth embankment, preferably is selected in the two dike arms of angle.Like Fig. 1, shown in Figure 2.
The cofferdam scope: the cofferdam scope according to the iron tower root open, basic pattern and digging mode decide.The basis volume of placing into the soil is big, needs to consider to pile up earth and area increases.Adopt machinery to cut the earth, consider the excavation machinery working face.Generally serve as the rectangle on long limit with former earth embankment, the place net area, left and right sides minor face edge of foundation adds 15m, and the outer long side edge of foundation adds 10m.
It is that material carries out the cofferdam job practices that a kind of employing steel pipe bamboo basketry of present embodiment indication is moulded cloth, comprises following processing step: selecting starting point and intersecting point to set up bar is longitudinal rod → arrangement hound → placement transverse bar → placement passage steel pipe → stressed inspection of all steel pipe pole fasteners → placement bamboo basketry plate → placement colour bar cloth → diving inspection → draining observation inside and outside the outer vertical rod of control point → farmings rope setting-out → beat → beat interior vertical rod → placement; The steel pipe that wherein vertically inserts at the bottom of the pool is called vertical rod, and pool subsoil earth 0.5-1.0m is inserted in the vertical rod lower end, the vertical rod upper end 0.3-0.5m that surfaces, and vertical rod is divided into outer vertical rod 1 and interior vertical rod 2, and outer vertical rod 1 and interior vertical rod 2 spacing 3m are evenly arranged in a straight line; Longitudinal rod is divided into outer longitudinal rod 3 and interior longitudinal rod 8, and the inboard of outer vertical rod 1 epimere is called outer longitudinal rod 3 near being provided with a horizontal steel tube; The inboard of interior vertical rod 2 epimeres is called interior longitudinal rod 8 near being provided with a horizontal steel tube; Be provided with transverse bar 4 and hound 5 between outer vertical rod 1 and the interior vertical rod 2.
Between described outer vertical rod 1 and the outer longitudinal rod 3; Between interior vertical rod 2 and the interior longitudinal rod 8; Between outer vertical rod 1 and transverse bar 4, the hound 5; Adopt fastener to be connected between interior vertical rod 2 and transverse bar 4, the hound 5.Described fastener is that malleable cast iron is made bolt fastener; Fastening bolt is tightened torsional moment between 40N-m to 55N-m.And outer vertical rod 1, interior vertical rod 2, outer longitudinal rod 3, interior longitudinal rod 8, transverse bar 4, hound 5 all adopt steel pipe pole.
The present embodiment steel pipe pole adopts scaffolding steel pipe; Current national standard " vertical masonry joint electric welded steel pipe " (GB/T 13793-2008); Industry standard " building operations fastener type steel pipe scaffold technical specification of security " (JGJ 130-2001); Its quality specifications meets Q235-A level steel regulation in the current national standard " structural carbon steel " (GB/T 700-2006), tension, resistance to compression and flexural strength design load f=205N/mm
2Using always has two kinds of steel pipe pole specifications, diameter 48mm wall thickness 3.5mm and diameter 51mm wall thickness 3.0mm.Table 1 is the steel tube section characteristic index.
Fastener adopts malleable cast iron to make bolt fastener.As the node of right angle, rotation, butt joint power transmission, when guaranteeing that bolt is tightened torsion and reached 65N.m, do not destroy.Quality and performance National standard " steel tube scaffold clasp " (GB 15831-2006) regulation, fastener connects the antiskid bearing capacity and is not less than 8kN.
Described cofferdam corner is made three continuous 30 ° of corners, and corner outer rim length of side L is 7 times of transverse bar 4 spacings, and is as shown in Figure 8.Vertical rod position lateral deviation≤20mm, along track bias≤35mm, verticality departs from≤and 1.5%.Described transverse bar 4 and hound 5 are also vertical with outer longitudinal rod 3, interior longitudinal rod 8 respectively, and fastener is put on transverse bar 4, all fastener center to center distance host node place≤150mm (host node is a point of resultant force).Present embodiment adopts the monocline support, and the position that hound 5 is provided with is employed between outer vertical rod 1 upper end and interior vertical rod 2 lower ends.The vertical bamboo chip of described bamboo basketry plate 6 is parallel to vertical rod to be placed, and is close to the outer vertical rod outside, like Fig. 6, shown in 7; Mud at the bottom of the outer vertical rod 1 and the insertion pool, interior vertical rod 2 lower ends, surface >=100mm in the upper end; Two bamboo basketry plates 6 and neat on the corner, surplus long part is pressed folded at adjacent bamboo basketry plate 6, and all bamboo basketry plate 6 upper ends and longitudinal rod watchman's wooden clapper are firmly fixed.Bamboo basketry plate 6 adopts mao bamboon or the bamboos of growth more than 3 years, withered and yellow, blackspot, damage by worms, rotten bamboo can not use.Bamboo chip width 600mm, length 1700mm, thickness is not less than 6mm, deadweight 0.08kN/m
2About, horizontal close volume, vertical sheet distance is not more than 160mm, and vertically both sides clamp with bamboo chip, and the perforating hole, wear iron wire and fasten.
Described colour bar cloth 7 length must integral body continue, and two ends are overlapping to be sewed up with fine rule; Begin from the bank end earlier during placement that total length is to another bank end along the dam, colour bar cloth 7 is shelved on the transverse bar 4, stretches to the water surface then, and the place of every interval 20m folds 0.5m, and 2m is extended in two ends on former earth embankment.Colour bar cloth 7 sinks at the bottom of the pool, makes it near at the bottom of bamboo basketry plate 6 and the pool, divides in bottom, the pool and leaves the above length of 2m.Plastics colour bar cloth 7 is raw material by propylene, polyvinyl, makes through heating extruded plastic foil → scraping → heat drawing → oven dry → rolling → operations such as circular weaving machine braiding → PE hot pressing coating → scissors finished product.General fabric width 4m, length 50m, weight specification has 100g/m
2-190g/m
2, antiseepage film has dual coated and single face to apply, and material has brand-new PE and new and old PE to mix.Being used in cofferdam construction colour bar cloth should be 100% virgin material PE, flat filament pricker degree 1500D, weight specification 150g/m
2More than, fabric width 4-6m, dual coated, soft, structure is tight.
The present invention is basis with the innovative idea of the protection environment that economizes on resources, and tries to explore new technology, new technology, and successfully having obtained employing steel pipe bamboo basketry, to mould cloth be the job practices that material carries out the cofferdam dash.With steel pipe pole horizontal, vertical with diagonal brace uniqueness structural arrangement in an orderly manner, outside sealed envelope colour bar cloth, liner bamboo basketry plate is discharged the water in the place, cofferdam just blocks water firmly.Adopt steel pipe bamboo basketry of the present invention to mould the cofferdam dash job practices that cloth is material, through different electric pressures, corner and straight line tower base form; The cofferdam construction practice of different depth; With the soil comparison of building a dam, the engineering time shortens 20 days at least, and engineering cost is practiced thrift more than 50%.Be the green engineering of pollution-free, a no building waste, in the transmission line construction engineering, play a positive role.
Embodiment 2
The fish pond of present embodiment:, otherwise can influence the quality of pearl, river Acidity of Aikalinity pH value 7-8, water temperature 10-30 ℃, the dark 2.0m of the water surface because pearl culturing clam is relatively stricter to environmental requirement.During the transmission line of electricity location, the tower position is chosen near earth embankment, preferably is selected in the two dike arms of angle.Like Fig. 1, shown in Figure 3.
The cofferdam scope: the cofferdam scope according to the iron tower root open, basic pattern and digging mode decide.The basis volume of placing into the soil is big, needs to consider to pile up earth and area increases.Adopt machinery to cut the earth, consider the excavation machinery working face.Generally serve as the rectangle on long limit with former earth embankment, the place net area, left and right sides minor face edge of foundation adds 15m, and the outer long side edge of foundation adds 10m.
It is that material carries out the cofferdam job practices that a kind of employing steel pipe bamboo basketry of present embodiment indication is moulded cloth, comprises following processing step: selecting starting point and intersecting point to set up bar is longitudinal rod → arrangement hound → placement transverse bar → placement passage steel pipe → stressed inspection of all steel pipe pole fasteners → placement bamboo basketry plate → placement colour bar cloth → diving inspection → draining observation inside and outside the outer vertical rod of control point → farmings rope setting-out → beat → beat interior vertical rod → placement; The steel pipe that wherein vertically inserts at the bottom of the pool is called vertical rod, and pool subsoil earth 0.5-1.0m is inserted in the vertical rod lower end, the vertical rod upper end 0.3-0.5m that surfaces, and vertical rod is divided into outer vertical rod 1 and interior vertical rod 2, and outer vertical rod 1 and interior vertical rod 2 spacing 3m are evenly arranged in a straight line; Longitudinal rod is divided into outer longitudinal rod 3 and interior longitudinal rod 8, and the inboard of outer vertical rod 1 epimere is called outer longitudinal rod 3 near being provided with a horizontal steel tube; The inboard of interior vertical rod 2 epimeres is called interior longitudinal rod 8 near being provided with a horizontal steel tube; Be provided with transverse bar 4 and hound 5 between outer vertical rod 1 and the interior vertical rod 2.
Between described outer vertical rod 1 and the outer longitudinal rod 3; Between interior vertical rod 2 and the interior longitudinal rod 8; Between outer vertical rod 1 and transverse bar 4, the hound 5; All adopt fastener to be connected between interior vertical rod 2 and transverse bar 4, the hound 5.Described fastener is that malleable cast iron is made bolt fastener; Fastening bolt is tightened torsional moment between 40N-m to 55N-m.And outer vertical rod 1, interior vertical rod 2, outer longitudinal rod 3, interior longitudinal rod 8, transverse bar 4, hound 5 all adopt steel pipe pole.
The present embodiment steel pipe pole adopts scaffolding steel pipe; Current national standard " vertical masonry joint electric welded steel pipe " (GB/T 13793-2008); Industry standard " building operations fastener type steel pipe scaffold technical specification of security " (JGJ 130-2001); Its quality specifications meets Q235-A level steel regulation in the current national standard " structural carbon steel " (GB/T 700-2006), tension, resistance to compression and flexural strength design load f=205N/mm
2Using always has two kinds of steel pipe pole specifications, diameter 48mm wall thickness 3.5mm and diameter 51mm wall thickness 3.0mm.Table 1 is the steel tube section characteristic index.
Fastener adopts malleable cast iron to make bolt fastener.As the node of right angle, rotation, butt joint power transmission, when guaranteeing that bolt is tightened torsion and reached 65N.m, do not destroy.Quality and performance National standard " steel tube scaffold clasp " (GB 15831-2006) regulation, fastener connects the antiskid bearing capacity and is not less than 8kN.
Described cofferdam corner is made three continuous 30 ° of corners, and corner outer rim length of side L is 8 times of transverse bar 4 spacings, and is as shown in Figure 8.Described outer vertical rod 1 is adopted single placement with interior vertical rod 2.As shown in Figure 3.And vertical rod position lateral deviation≤20mm, along track bias≤35mm, verticality departs from≤and 1.5%.Between outer vertical rod 1 and the interior vertical rod 2 diclinic strut 5 is set, between position vertical rod outside 1 upper and lower side and interior vertical rod 2 upper and lower sides that promptly hound 5 is provided with, between outer vertical rod 1 and interior vertical rod 2 upper ends transverse bar 4 is set.Between outer vertical rod 1 and interior vertical rod 2 upper ends transverse bar 4 is set, all the fastener center to center distance host node place≤150mm (host node is a point of resultant force) on the transverse bar 4.Described transverse bar 4 and hound 5 are also vertical with outer longitudinal rod 3, interior longitudinal rod 8 respectively, and the vertical bamboo chip of described bamboo basketry plate 6 is parallel to vertical rod to be placed, and is close to outside the outer vertical rod, like Fig. 6, shown in 7; Two bamboo basketry plates 6 and neat on the corner, surplus long part is pressed folded at adjacent bamboo basketry plate 6, and all bamboo basketry plate 6 upper ends and longitudinal rod watchman's wooden clapper are firmly fixed.Bamboo basketry plate 6 adopts mao bamboon or the bamboos of growth more than 3 years, withered and yellow, blackspot, damage by worms, rotten bamboo can not use.Bamboo chip width 600mm, length 1100mm, thickness is not less than 6mm, about deadweight 0.08kN/m2, horizontal close volume, vertical sheet distance is not more than 160mm, and vertically both sides clamp with bamboo chip, and the perforating hole, wear iron wire and fasten.
Described colour bar cloth 7 length must integral body continue, and two ends are overlapping to be sewed up with fine rule; Begin from the bank end earlier during placement that total length is to another bank end along the dam, colour bar cloth 7 is shelved on the transverse bar 4, stretches to the water surface then, and the place of every interval 20m folds 0.5m, and 2m is extended in two ends on former earth embankment.Colour bar cloth 7 sinks at the bottom of the pool, makes it near at the bottom of bamboo basketry plate 6 and the pool, divides in bottom, the pool and leaves the above length of 2m.Plastics colour bar cloth 7 is raw material by propylene, polyvinyl, makes through heating extruded plastic foil → scraping → heat drawing → oven dry → rolling → operations such as circular weaving machine braiding → PE hot pressing coating → scissors finished product.General fabric width 4-8m, length 50m, weight specification has 100g/m
2-190g/m
2, antiseepage film has dual coated and single face to apply, and material has brand-new PE and new and old PE to mix.Being used in cofferdam construction colour bar cloth should be 100% virgin material PE, flat filament pricker degree 1500D, weight specification 150g/m
2More than, fabric width 4.5m, dual coated, soft, structure is tight.
The present invention is basis with the innovative idea of the protection environment that economizes on resources, and tries to explore new technology, new technology, and successfully having obtained employing steel pipe bamboo basketry, to mould cloth be the job practices that material carries out the cofferdam dash.With steel pipe pole horizontal, vertical with diagonal brace uniqueness structural arrangement in an orderly manner, outside sealed envelope colour bar cloth, liner bamboo basketry plate is discharged the water in the place, cofferdam just blocks water firmly.Adopt steel pipe bamboo basketry of the present invention to mould the cofferdam dash job practices that cloth is material, through different electric pressures, corner and straight line tower base form; The cofferdam construction practice of different depth; With the soil comparison of building a dam, the engineering time shortens 20 days at least, and engineering cost is practiced thrift more than 50%.Be the green engineering of pollution-free, a no building waste, in the transmission line construction engineering, play a positive role.
Embodiment 3
The fish pond of present embodiment:, otherwise can influence the quality of pearl, river Acidity of Aikalinity pH value 7-8, water temperature 10-30 ℃, the dark 2.5m of the water surface because pearl culturing clam is relatively stricter to environmental requirement.During the transmission line of electricity location, the tower position is chosen near earth embankment, preferably is selected in the two dike arms of angle.Like Fig. 1, shown in Figure 4.
The cofferdam scope: the cofferdam scope according to the iron tower root open, basic pattern and digging mode decide.The basis volume of placing into the soil is big, needs to consider to pile up earth and area increases.Adopt machinery to cut the earth, consider the excavation machinery working face.Generally serve as the rectangle on long limit with former earth embankment, the place net area, left and right sides minor face edge of foundation adds 15m, and the outer long side edge of foundation adds 10m.
It is that material carries out the cofferdam job practices that a kind of employing steel pipe bamboo basketry of present embodiment indication is moulded cloth, comprises following processing step: selecting starting point and intersecting point to set up bar is longitudinal rod → arrangement hound → placement transverse bar → placement passage steel pipe → stressed inspection of all steel pipe pole fasteners → placement bamboo basketry plate → placement colour bar cloth → diving inspection → draining observation inside and outside the outer vertical rod of control point → farmings rope setting-out → beat → beat interior vertical rod → placement; The steel pipe that wherein vertically inserts at the bottom of the pool is called vertical rod, and pool subsoil earth 0.5-1.0m is inserted in the vertical rod lower end, the vertical rod upper end 0.3-0.5m that surfaces, and vertical rod is divided into outer vertical rod 1 and interior vertical rod 2 spacing 3m, and interior vertical rod 2 has two to arrange spacing 3m; Vertical rod side outside is outer longitudinal rod 3, and in interior vertical rod is interior longitudinal rod 8; Between outer vertical rod 1 and the interior vertical rod 2 diclinic bar 5 is set, monocline bar 5 is set between interior vertical rod, transverse bar 4 is arranged at vertical rod top.
Between described outer vertical rod 1 and the outer longitudinal rod 3; Between interior vertical rod 2 and the interior longitudinal rod 8; Between outer vertical rod 1 and transverse bar 4, the hound 5; All adopt fastener to be connected between interior vertical rod 2 and transverse bar 4, the hound 5.Described fastener is that malleable cast iron is made bolt fastener; Fastening bolt is tightened torsional moment between 40N-m to 55N-m.And outer vertical rod 1, interior vertical rod 2, outer longitudinal rod 3, interior longitudinal rod 8, transverse bar 4, hound 5 all adopt steel pipe pole.
The present embodiment steel pipe pole adopts scaffolding steel pipe; Current national standard " vertical masonry joint electric welded steel pipe " (GB/T 13793-2008); Industry standard " building operations fastener type steel pipe scaffold technical specification of security " (JGJ 130-2001); Its quality specifications meets Q235-A level steel regulation in the current national standard " structural carbon steel " (GB/T 700-2006), tension, resistance to compression and flexural strength design load f=205N/mm
2Using always has two kinds of steel pipe pole specifications, diameter 48mm wall thickness 3.5mm and diameter 51mm wall thickness 3.0mm.Table 1 is the steel tube section characteristic index.
Fastener adopts malleable cast iron to make bolt fastener.As the node of right angle, rotation, butt joint power transmission, when guaranteeing that bolt is tightened torsion and reached 65N.m, do not destroy.Quality and performance National standard " steel tube scaffold clasp " (GB 15831-2006) regulation, fastener connects the antiskid bearing capacity and is not less than 8kN.
Described cofferdam corner is made three continuous 30 ° of corners, and corner outer rim length of side L is 9 times of transverse bar 4 spacings, and is as shown in Figure 8.Vertical rod position lateral deviation≤20mm, along track bias≤35mm, verticality departs from≤and 1.5%.As shown in Figure 4, between the outer vertical rod 1 of a side and the interior vertical rod 2 diclinic strut 5 is set, between the outer vertical rod 1 of opposite side and the interior vertical rod 2 monocline strut 5 is set; Set up between i.e. vertical rod outside 1 and interior vertical rod 2 upper and lower sides between 5, two adjacent interior vertical rods 2 of hound and interior vertical rod 2 upper and lower sides and set up hound 5.Between outer vertical rod 1 and interior vertical rod 2 upper ends transverse bar 4 is set, all the fastener center to center distance host node place≤150mm (host node is a point of resultant force) on the transverse bar 4.Described transverse bar 4 and hound 5 are also vertical with outer longitudinal rod 3, interior longitudinal rod 8 respectively.The vertical bamboo chip of described bamboo basketry plate 6 is parallel to vertical rod to be placed, and is close to the outer vertical rod outside, like Fig. 6, shown in 7; Earlier just two bamboo basketry plates continue and are 2.3m, are close to outer vertical rod 1, mud at the bottom of the insertion pool, lower end, and surface >=100mm in the upper end, and adjacent bamboo basketry plate 6 is side by side near placement; Two bamboo basketry plates 6 and neat on the corner, surplus long part is pressed folded at adjacent bamboo basketry plate 6, and all bamboo basketry plate 6 upper ends and longitudinal rod watchman's wooden clapper are firmly fixed.Bamboo basketry plate 6 adopts mao bamboon or the bamboos of growth more than 3 years, withered and yellow, blackspot, damage by worms, rotten bamboo can not use.Bamboo chip width 800mm, length 1200mm, thickness is not less than 6mm, about deadweight 0.08kN/m2, horizontal close volume, vertical sheet distance is not more than 160mm, and vertically both sides clamp with bamboo chip, and the perforating hole, wear iron wire and fasten.
Described colour bar cloth 7 length must integral body continue, and two ends are overlapping to be sewed up with fine rule; Begin from the bank end earlier during placement that total length is to another bank end along the dam, colour bar cloth 7 is shelved on the transverse bar 4, stretches to the water surface then, and the place of every interval 20m folds 0.5m, and 2m is extended in two ends on former earth embankment.Colour bar cloth 7 sinks at the bottom of the pool, makes it near at the bottom of bamboo basketry plate 6 and the pool, divides in bottom, the pool and leaves the above length of 2m.Plastics colour bar cloth 7 is raw material by propylene, polyvinyl, makes through heating extruded plastic foil → scraping → heat drawing → oven dry → rolling → operations such as circular weaving machine braiding → PE hot pressing coating → scissors finished product.General fabric width 5m, length 50m, weight specification has 100g/m
2-190g/m
2, antiseepage film has dual coated and single face to apply, and material has brand-new PE and new and old PE to mix.Being used in cofferdam construction colour bar cloth should be 100% virgin material PE, flat filament pricker degree 1500D, weight specification 150g/m
2More than, fabric width 4-6m, dual coated, soft, structure is tight.
The present invention is basis with the innovative idea of the protection environment that economizes on resources, and tries to explore new technology, new technology, and successfully having obtained employing steel pipe bamboo basketry, to mould cloth be the job practices that material carries out the cofferdam dash.With steel pipe pole horizontal, vertical with diagonal brace uniqueness structural arrangement in an orderly manner, outside sealed envelope colour bar cloth, liner bamboo basketry plate is discharged the water in the place, cofferdam just blocks water firmly.Adopt steel pipe bamboo basketry of the present invention to mould the cofferdam dash job practices that cloth is material, through different electric pressures, corner and straight line tower base form; The cofferdam construction practice of different depth; With the soil comparison of building a dam, the engineering time shortens 20 days at least, and engineering cost is practiced thrift more than 50%.Be the green engineering of pollution-free, a no building waste, in the transmission line construction engineering, play a positive role.
Embodiment 4
The fish pond of present embodiment:, otherwise can influence the quality of pearl, river Acidity of Aikalinity pH value 7-8, water temperature 10-30 ℃ because pearl culturing clam is relatively stricter to environmental requirement.During the transmission line of electricity location, the tower position is chosen near earth embankment, preferably is selected in the two dike arms of angle.Like Fig. 1, shown in Figure 5.
The cofferdam scope: the cofferdam scope according to the iron tower root open, basic pattern and digging mode decide.The basis volume of placing into the soil is big, needs to consider to pile up earth and area increases.Adopt machinery to cut the earth, consider the excavation machinery working face.Generally serve as the rectangle on long limit with former earth embankment, the place net area, left and right sides minor face edge of foundation adds 15m, and the outer long side edge of foundation adds 10m.
It is that material carries out the cofferdam job practices that a kind of employing steel pipe bamboo basketry of present embodiment indication is moulded cloth, comprises following processing step: selecting starting point and intersecting point to set up bar is longitudinal rod → arrangement hound → placement transverse bar → placement passage steel pipe → stressed inspection of all steel pipe pole fasteners → placement bamboo basketry plate → placement colour bar cloth → diving inspection → draining observation inside and outside the outer vertical rod of control point → farmings rope setting-out → beat → beat interior vertical rod → placement; The steel pipe that wherein vertically inserts at the bottom of the pool is called vertical rod; Pool subsoil earth 0.5-1.0m is inserted in the vertical rod lower end; 0.3-0.5m surfaces in the vertical rod upper end; Vertical rod is divided into outer vertical rod 1 and interior vertical rod 2 (three rows are arranged), and it is 1.5m, 1.5m, 3.0m that outer vertical rod 1 is arranged in order spacing with interior vertical rod 2, and all evenly arranged in a straight line; Longitudinal rod is divided into outer longitudinal rod 3 and interior longitudinal rod 8, and the inboard of outer vertical rod 1 epimere is called outer longitudinal rod 3 near being provided with a horizontal steel tube; Interior vertical rod 2 epimeres are provided with a horizontal steel tube and are called interior longitudinal rod 8; Between outer vertical rod 1 and the interior vertical rod 2 (middle row) diclinic bar 5 is set, interior vertical rod 2 (removing middle exclusive) is provided with monocline bar 5, is provided with transverse bar 4 between vertical rod.
Between described outer vertical rod 1 and the outer longitudinal rod 3; Between interior vertical rod 2 and the interior longitudinal rod 8; Between outer vertical rod 1 and transverse bar 4, the hound 5; Adopt fastener to be connected between interior vertical rod 2 and transverse bar 4, the hound 5.Described fastener is that malleable cast iron is made bolt fastener; Fastening bolt is tightened torsional moment between 40N-m to 55N-m.And outer vertical rod 1, interior vertical rod 2, outer longitudinal rod 3, interior longitudinal rod 8, transverse bar 4, hound 5 all adopt steel pipe pole.
The present embodiment steel pipe pole adopts scaffolding steel pipe; Current national standard " vertical masonry joint electric welded steel pipe " (GB/T 13793-2008); Industry standard " building operations fastener type steel pipe pin is in the frame technical specification of security " (JGJ 130-2001); Its quality specifications meets Q235-A level steel regulation in the current national standard " structural carbon steel " (GB/T 700-2006), tension, resistance to compression and flexural strength design load f=205N/mm
2Using always has two kinds of steel pipe pole specifications, diameter 48mm wall thickness 3.5mm and diameter 51mm wall thickness 3.0mm.Table 1 is the steel tube section characteristic index.
Fastener adopts malleable cast iron to make bolt fastener.As the node of right angle, rotation, butt joint power transmission, when guaranteeing that bolt is tightened torsion and reached 65N.m, do not destroy.Quality and performance National standard " steel tube scaffold clasp " (GB 15831-2006) regulation, fastener connects the antiskid bearing capacity and is not less than 8kN.
Described cofferdam corner is made three continuous 30 ° of corners, and corner outer rim length of side L is 10 times of transverse bar 4 spacings, and is as shown in Figure 8.How side by side accommodated position is not enough for described outer vertical rod 1 factor amount, and is can two folded and place and squeeze into simultaneously together; Vertical rod position lateral deviation≤20mm, along track bias≤35mm, verticality departs from≤and 1.5%.As shown in Figure 5, described interior vertical rod 2 is provided with three rows, spacing 1500,1500,3000mm; Outer vertical rod 1 and one of interior vertical rod 2 centre are provided with diclinic strut 5, and other two interior vertical rods are provided with monocline strut 5; Set up between i.e. vertical rod outside 1 and interior vertical rod 2 upper and lower sides between 5, two adjacent interior vertical rods 2 of hound and interior vertical rod 2 upper and lower sides and set up hound 5.Between outer vertical rod 1 and interior vertical rod 2 upper ends transverse bar 4 is set, all the fastener center to center distance host node place≤150mm (host node is a point of resultant force) on the transverse bar 4.Described transverse bar 4 and hound 5 are also vertical with outer longitudinal rod 3, interior longitudinal rod 8 respectively.The vertical bamboo chip of described bamboo basketry plate 6 is parallel to vertical rod to be placed, and is close to the outer vertical rod outside, like Fig. 6, shown in 7; Earlier bamboo basketry plate length being continued is 3300, and mud at the bottom of the pool is inserted in the lower end, surfaces >=100mm in the upper end, and adjacent bamboo basketry plate 6 is side by side near placement; Two bamboo basketry plates 6 and neat on the corner, surplus long part is pressed repeatedly at adjacent bamboo basketry plate 6, and all bamboo basketry plate 6 upper ends and longitudinal rod watchman's wooden clapper are firmly fixed.Bamboo basketry plate 6 adopts mao bamboon or the bamboos of growth more than 3 years, withered and yellow, blackspot, damage by worms, rotten bamboo can not use.Bamboo chip width 600mm, length 1100mm, thickness is not less than 6mm, about deadweight 0.08kN/m2, horizontal close volume, vertical sheet distance is not more than 160mm, and vertically both sides clamp with bamboo chip, and the perforating hole, wear iron wire and fasten.
Described colour bar cloth 7 length must integral body continue, and two ends are overlapping to be sewed up with fine rule; Begin from the bank end earlier during placement that total length is to another bank end along the dam, colour bar cloth 7 is shelved on the transverse bar 4, stretches to the water surface then, and the place of every interval 20m folds 0.5m, and 2m is extended in two ends on former earth embankment.Colour bar cloth 7 sinks at the bottom of the pool, makes it near at the bottom of bamboo basketry plate 6 and the pool, divides in bottom, the pool and leaves the above length of 2m.Plastics colour bar cloth 7 is raw material by propylene, polyvinyl, makes through heating extruded plastic foil → scraping → heat drawing → oven dry → rolling → operations such as circular weaving machine braiding → PE hot pressing coating → scissors finished product.General fabric width 7m, length 50m, weight specification has 100g/m
2-190g/m
2, antiseepage film has dual coated and single face to apply, and material has brand-new PE and new and old PE to mix.Being used in cofferdam construction colour bar cloth should be 100% virgin material PE, flat filament pricker degree 1500D, weight specification 150g/m
2More than, fabric width 4-6m, dual coated, soft, structure is tight.
The present invention is basis with the innovative idea of the protection environment that economizes on resources, and tries to explore new technology, new technology, and successfully having obtained employing steel pipe bamboo basketry, to mould cloth be the job practices that material carries out the cofferdam dash.With steel pipe pole horizontal, vertical with diagonal brace uniqueness structural arrangement in an orderly manner, outside sealed envelope colour bar cloth, liner bamboo basketry plate is discharged the water in the place, cofferdam just blocks water firmly.Adopt steel pipe bamboo basketry of the present invention to mould the cofferdam dash job practices that cloth is material, through different electric pressures, corner and straight line tower base form; The cofferdam construction practice of different depth; With the soil comparison of building a dam, the engineering time shortens 20 days at least, and engineering cost is practiced thrift more than 50%.Be the green engineering of pollution-free, a no building waste, in the transmission line construction engineering, play a positive role.