CN102029457A CN 201010568444 CN201010568444A CN102029457A CN 102029457 A CN102029457 A CN 102029457A CN 201010568444 CN201010568444 CN 201010568444 CN 201010568444 A CN201010568444 A CN 201010568444A CN 102029457 A CN102029457 A CN 102029457A
Authority
CN
China
Prior art keywords
welding
adopt
strength steel
butt
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010568444
Other languages
Chinese (zh)
Other versions
CN102029457B (en
Inventor
范为
严俊
王宇
王波
张丽杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuchang Shipbuilding Industry Group Co Ltd
Original Assignee
WUCHANG SHIPBUILDING INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUCHANG SHIPBUILDING INDUSTRY Co Ltd filed Critical WUCHANG SHIPBUILDING INDUSTRY Co Ltd
Priority to CN 201010568444 priority Critical patent/CN102029457B/en
Publication of CN102029457A publication Critical patent/CN102029457A/en
Application granted granted Critical
Publication of CN102029457B publication Critical patent/CN102029457B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention particularly relates to a vertical butt welding process of high-strength steel for ships, and discloses a welding process in allusion to the vertical butt welding of EH3630mm steel plates of high-strength steel ship structures. In the welding process, effective specifications are provided to the groove welding, the preheating before the welding, the welding temperature, the welding sequence, the welding specification parameter and the cold treatment after the welding, so that the welding process of the ultra-thick high-strength steel can be realized smoothly, the labor efficiency is improved, the raw materials are saved, the production cost is reduced, the ship building period is decreased and the domestic technical specification blank in the vertical butt welding of the EH3630mm steel plates of the high-strength steel ship structures is made up.

Description

A kind of high strength ship hull structure use steel founds the butt welding welding technique
Technical field
The invention particularly relates to the upright butt welding welding procedure of high-strength steel peculiar to vessel.
Background technology
Solder technology is one of key process technology of modern ships construction engineering, and the Ship Welding quality is to estimate the important indicator of shipbuilding quality in hull construction.Therefore, the solder technology progress has crucial meaning to the development that promotes shipbuilding production.In the world, the high strength steel solder technology develops aspect wlding composition and technological design comparatively fast, and application is also in continuous expansion.Make the field at the steel construction that relates under special instructions for use or the bad working environments environment, high strength steel occupies more and more important position, has been widely used in fields such as boats and ships, bridge, automobile, skyscraper construction.And domestic, the range of application of high-strength steel is also increasing gradually, but to use generally that is that all right ripe, only account for about 10% of the total consumption of steel, and ratio is less.Because high-strength steel intensity height peculiar to vessel can create conditions for saving steel and alleviating the Welding Structure deadweight, so adopt the high strength steel of function admirable can promote Ship Structure to develop to maximization, lightweight and high-effect direction, its development prospect is wide.And not forming certain welding procedure file as yet about the welding procedure of high-strength steel slab, the design studies of associated welds technology exists not enough." material and the welding conditions " that publish in July, 2009 of CCS (CCS), upright butt welding welding does not provide relevant technological specification for high-strength steel EH36 30mm sheet material.
Therefore carry out slab high strength steel welding procedure Study on Measures, can promote company's technical merit and synthesized competitiveness, reduce spillage of material, save operation, raise the efficiency, and can instruct site operation, as following process modification and shipowner and go into the foundation of grade department check, in technological design and actual production, erect bridge.This patent is studied for the upright butt welding welding procedure of high-strength steel EH36 30mm sheet material through changing technological measure.
Summary of the invention
Technical problem to be solved by this invention is at the upright butt welding of the high strength ship hull structure use steel of EH36 30mm, provide a kind of high strength ship hull structure use steel to found the butt welding welding technique, more welding material, electric energy and man-hour can be saved, and be easy to processing, can effectively reduce welding deformation.
For solving the problems of the technologies described above, the invention provides the upright butt welding welding technique of a kind of high strength ship hull structure use steel, it is characterized in that, be the upright butt welding of high strength ship hull structure use steel of EH36 30mm at mother metal, comprise following technological parameter and step:
Bevel for welding: adopt two V grooves, the butt joint bevel angle is 60 ° ± 5 °.
Preheat temperature: need before the welding to adopt in oxy-acetylene mode butt welded seam and the weld seam both sides 150mm scope and carry out preheating, preheat temperature reaches 80 ℃ and begins welding.
The welding temperature: during welding between the road temperature should be controlled at 50 ℃-150 ℃.At any time adopt some temperature meter to measure.
Welding sequence: adopt multilayer welding to fill up the groove in the cross section, after positive welding is finished, workpiece should be stood up, weld seam adopts the carbon arc air gouging back chipping, implements the reverse side welding again.
Welding material: adopt 3Y welding wire or welding rod with structural steel yield strength ad eundem.
Welding parameter: welding current 170~190A, arc voltage 26~28V, speed of welding 9~14cm/min, heat input 21~32KJ/cm, electrical characteristics are dc reverse connection.
Welding manner is a carbon dioxide gas arc welding.
Adopt multilayer welding to fill up the groove in the cross section during welding, prevent the generation of weld cracking or delayed crack, simultaneously, the process that preceding one weld seam is " preheating " to one weld seam in back; One weld seam in back is equivalent to the process of " after-baking " concerning preceding one weld seam, improved stress distribution in the welding process effectively, and welding condition such as electric current, voltage and speed of welding etc. have very big influence to thermal cycle.
Original welding principle technology only sets about illustrating the welding procedure problem from position, Ship Structure place welding method, but do not refine to from ship steel own characteristic formation welding procedure, and characteristics such as the mechanical property of this patent foundation high-strength steel slab peculiar to vessel and chemical composition, form its unique welding procedure, and sum up formation welding procedure file thus, can be used as the supplementary notes of welding principle technology.
Realize that by changing technological process thickness of slab is the upright butt welding welding procedure of carbon dioxide gas arc welding of the EH36 sheet material of 30mm; by measures such as weldability test, qualifications of welding procedure; make the upright butt welding welding scheme of carbon dioxide gas arc welding of high-strength steel EH3630mm; can enhance productivity; reduce energy consumption, save raw material, reduce cost etc.
Description of drawings
Below in conjunction with the drawings and specific embodiments technical scheme of the present invention is further described in detail.
Fig. 1 is the bevel for welding schematic diagram.
Fig. 2 is the welding sequence schematic diagram.
The specific embodiment
One, prepares before the weldering
1. before the welding, the welder should conscientiously be familiar with construction drawing and technology, and the specification requirement and the quality requirement of understanding product strictly observe process discipline and weld in strict accordance with the welding requirements of this technology.
2. check conscientiously whether groove size and assembly quality meet the quality standard requirement before the weldering.
In the groove and the positive and negative in each 30mm of bevelled edge both sides and end face should remove the residual sticking carbon of water stain, greasy dirt, iron rust, dross and carbon plane etc. to the influential foreign material of welding quality, paste ceramic backing again.
4. rain, snow sky are forbidden to weld in the open.When envionmental humidity greater than 90% the time, should take corresponding measure, otherwise forbid welding; Carbon dioxide gas arc welding should be taked draught exclusion device when wind speed during greater than 2m/s during welding.
Two, welding material and welding method
1. this material can adopt carbon dioxide gas arc welding to weld.
2. welding material adopts 3Y welding wire or the welding rod with structural steel yield strength ad eundem.
Three, welding procedure
1. the bevel for welding form is as shown in Figure 1:
2. need to adopt in oxy-acetylene mode butt welded seam and the weld seam both sides 150mm scope and carry out preheating before the welding, preheat temperature reaches 80 ℃ and begins welding, during welding between the road temperature should be controlled at 50 ℃-150 ℃.At any time adopt some temperature meter to measure.
3. when welding, should monitor, observe the welding deformation state at any time,, then should stop welding, adjust welding sequence, reduce welding deformation as far as possible if find welding deformation.
4. after positive welding is finished, workpiece should be stood up, weld seam adopts the carbon arc air gouging back chipping, implements the reverse side welding again.
Four, postwelding cleaning and check
1. the postwelding welder should conscientiously remove the splash of weld seam welding slag and both sides.
2. after having welded, butt welding taps into capable outward appearance and Non-Destructive Testing.Specific requirement is carried out by relevant requirements.
3. reprocessing of weld defect need thoroughly be removed defective with carbon arc air gouging, removes the position and answers smooth transition.
Embodiment 1
Adopt carbon dioxide gas arc welding:
1, welding material is as follows: welding wire HTW-711 (E501T-1) Φ 1.2 carbon dioxide purity 〉=99.5%
2, welding sequence and groove yardstick are as shown in Figure 2.
3, welding variables sees the following form 1:
Table 1 welding variables
Figure BDA0000035536500000041
It should be noted last that, the above specific embodiment is only unrestricted in order to technical scheme of the present invention to be described, although the present invention is had been described in detail with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can make amendment or be equal to replacement technical scheme of the present invention, and not breaking away from the spirit and scope of technical solution of the present invention, it all should be encompassed in the middle of the claim scope of the present invention.

Claims (2)

1. the upright butt welding welding technique of high strength ship hull structure use steel is characterized in that, is the upright butt welding of high strength ship hull structure use steel of EH36 30mm at mother metal, comprises following technological parameter and step:
Bevel for welding: adopt double V-shaped groove, the butt joint bevel angle is 60 ° ± 5 °;
Preheat temperature: need before the welding to adopt in oxy-acetylene mode butt welded seam and the weld seam both sides 150mm scope and carry out preheating, preheat temperature reaches 80 ℃ and begins welding;
The welding temperature: during welding between the road temperature should be controlled at 50 ℃-150 ℃; At any time adopt some temperature meter to measure;
Welding sequence: adopt multilayer welding to fill up the groove in the cross section, after positive welding is finished, workpiece should be stood up, weld seam adopts the carbon arc air gouging back chipping, implements the reverse side welding again;
Welding material: adopt 3Y welding wire or welding rod with structural steel yield strength ad eundem;
Welding parameter: welding current 170~190A, arc voltage 26~28V, speed of welding 9~14 cm/min, heat input 21~32KJ/cm, electrical characteristics are dc reverse connection.
2. high strength ship hull structure use steel according to claim 1 founds the butt welding welding technique, it is characterized in that welding manner is a carbon dioxide gas arc welding.
CN 201010568444 2010-12-01 2010-12-01 Vertical butt welding process of high-strength steel for ship structures Active CN102029457B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010568444 CN102029457B (en) 2010-12-01 2010-12-01 Vertical butt welding process of high-strength steel for ship structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010568444 CN102029457B (en) 2010-12-01 2010-12-01 Vertical butt welding process of high-strength steel for ship structures

Publications (2)

Publication Number Publication Date
CN102029457A true CN102029457A (en) 2011-04-27
CN102029457B CN102029457B (en) 2012-10-03

Family

ID=43883209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010568444 Active CN102029457B (en) 2010-12-01 2010-12-01 Vertical butt welding process of high-strength steel for ship structures

Country Status (1)

Country Link
CN (1) CN102029457B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102909456A (en) * 2012-10-31 2013-02-06 南通港闸船舶制造有限公司 Dredger welding method
CN103273209A (en) * 2013-06-05 2013-09-04 天顺风能(苏州)股份有限公司 Welding process of outside wind tower U-shaped grooves
CN104646803A (en) * 2015-02-15 2015-05-27 中船桂江造船有限公司 Welding method of low alloy steel plate and ship plate
CN104676236A (en) * 2013-11-27 2015-06-03 江南造船(集团)有限责任公司 Double-bulb flat-bulb steel component and welding method thereof
CN104801821A (en) * 2014-07-23 2015-07-29 烟台中集来福士海洋工程有限公司 Steel plate butt welding method
CN105234525A (en) * 2015-10-27 2016-01-13 武昌船舶重工集团有限公司 Structural steel and forged steel stud butt joint welding method for hull
CN105436659A (en) * 2016-01-08 2016-03-30 招商局重工(江苏)有限公司 Process for replacing pile leg rack of self-elevating drilling platform
CN106312269A (en) * 2016-10-13 2017-01-11 广西大学 Welding method for medium steel plates for boilers
EP3153628A4 (en) * 2014-06-05 2018-01-17 Hitachi Construction Machinery Co., Ltd. Boom for construction machinery
CN113843483A (en) * 2021-10-21 2021-12-28 江南造船(集团)有限责任公司 Welding process of low-alloy high-strength steel for ship pod propeller
CN115415643A (en) * 2022-09-23 2022-12-02 南京钢铁股份有限公司 Welding method of carbon-manganese low-temperature steel for VLGC ship

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1490118A (en) * 2003-07-29 2004-04-21 沪东中华造船(集团)有限公司 Vertical welding method for high-strength superthick structural steel board
WO2008031210A1 (en) * 2006-09-15 2008-03-20 Algoma Steel Inc. Method for manufacturing a welded assembly
CN101564785A (en) * 2008-04-25 2009-10-28 中国海洋石油总公司 Double wire automatic submerged arc welding process

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1490118A (en) * 2003-07-29 2004-04-21 沪东中华造船(集团)有限公司 Vertical welding method for high-strength superthick structural steel board
WO2008031210A1 (en) * 2006-09-15 2008-03-20 Algoma Steel Inc. Method for manufacturing a welded assembly
CN101564785A (en) * 2008-04-25 2009-10-28 中国海洋石油总公司 Double wire automatic submerged arc welding process

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《机电技术》 20030228 方克 EH36船用高强度钢的焊接工艺 第46页左栏第1-6段 1-2 , 第2期 2 *
《机电技术》 20070228 黄增忠 船体EH36高强度钢焊接工艺认可试验 第77页左栏第1段-第78页左栏第6段,图1-2 1-2 , 第2期 2 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102909456B (en) * 2012-10-31 2014-04-23 南通港闸船舶制造有限公司 Dredger welding method
CN102909456A (en) * 2012-10-31 2013-02-06 南通港闸船舶制造有限公司 Dredger welding method
CN103273209A (en) * 2013-06-05 2013-09-04 天顺风能(苏州)股份有限公司 Welding process of outside wind tower U-shaped grooves
CN104676236B (en) * 2013-11-27 2017-08-15 江南造船(集团)有限责任公司 The welding method of double bulb flat-bulb steel components
CN104676236A (en) * 2013-11-27 2015-06-03 江南造船(集团)有限责任公司 Double-bulb flat-bulb steel component and welding method thereof
US10370817B2 (en) 2014-06-05 2019-08-06 Hitachi Construction Machinery Co., Ltd. Boom for construction machine
EP3153628A4 (en) * 2014-06-05 2018-01-17 Hitachi Construction Machinery Co., Ltd. Boom for construction machinery
CN104801821B (en) * 2014-07-23 2017-02-15 烟台中集来福士海洋工程有限公司 Steel plate butt welding method
CN104801821A (en) * 2014-07-23 2015-07-29 烟台中集来福士海洋工程有限公司 Steel plate butt welding method
CN104646803A (en) * 2015-02-15 2015-05-27 中船桂江造船有限公司 Welding method of low alloy steel plate and ship plate
CN105234525A (en) * 2015-10-27 2016-01-13 武昌船舶重工集团有限公司 Structural steel and forged steel stud butt joint welding method for hull
CN105436659A (en) * 2016-01-08 2016-03-30 招商局重工(江苏)有限公司 Process for replacing pile leg rack of self-elevating drilling platform
CN106312269A (en) * 2016-10-13 2017-01-11 广西大学 Welding method for medium steel plates for boilers
CN113843483A (en) * 2021-10-21 2021-12-28 江南造船(集团)有限责任公司 Welding process of low-alloy high-strength steel for ship pod propeller
CN113843483B (en) * 2021-10-21 2023-02-17 江南造船(集团)有限责任公司 Welding process of low-alloy high-strength steel for ship pod propeller
CN115415643A (en) * 2022-09-23 2022-12-02 南京钢铁股份有限公司 Welding method of carbon-manganese low-temperature steel for VLGC ship
CN115415643B (en) * 2022-09-23 2023-11-03 南京钢铁股份有限公司 Welding method of carbon-manganese low-temperature steel for VLGC ship

Also Published As

Publication number Publication date
CN102029457B (en) 2012-10-03

Similar Documents

Publication Publication Date Title
CN102029457B (en) Vertical butt welding process of high-strength steel for ship structures
CN102009255B (en) Downward and butt welding process for high strength steel for ship structure
CN102019481B (en) Plain butt welding process for high-strength hull structural steel
CN102009252A (en) Vertical position welding process method of steel for high-strength hull structure
CN102009253A (en) Transverse welding technical method for high-strength steel for ship structure
CN103317218B (en) Double-sided dual-narrow-gap non-back-gouging welding method for large thick plates
CN101607342A (en) A kind of submerged arc welding method of plank boards and jointing boards
CN103801808B (en) Narrow clearance melting electrode metal active gas arc welding technique
CN102009257B (en) Process for welding high-strength hull structural steel by fillet welding in vertical position
CN103331504A (en) Single-side welding and double-side forming welding method for ceramic gasket
CN105436673A (en) Automatic welding process for Invar die steel
CN103433603A (en) Equal-strength matching submerged arc welding method for strong-strength P690QL1 steel
CN107598340B (en) Method for welding T-shaped joint of large thick plate
CN104475920A (en) Electro-gas welding method suitable for steel plate 50-80mm in thickness
CN105665933A (en) Laser-arc hybrid welding method for Invar die steel
CN103692061A (en) Butt-welding method using dual-gun automatic horizontal welding bogie
CN106695080A (en) Welding method for plates for ships and marine engineering
CN104259633A (en) Efficient single-face submerged arc welding method
CN105234525B (en) A kind of hull structural steel founds butt welding method with forged steel
CN103464873B (en) Electric-arc welding process for Ti alloy and nickel-base high-temperature alloy
CN102029458B (en) Butt welding technique of steel crossbar for high-strength ship body structure
CN105195858B (en) A kind of steel for ship structure straight angle connects welding method
CN204234946U (en) Based on the cut deal butt seam welding connected components of ceramic striking liner
CN206474820U (en) The narrow gap welding groove of sheet material
CN105195873B (en) A kind of steel for ship structure founds corner connection welding method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wang Yu

Inventor after: Yan Jun

Inventor after: Cai Dian

Inventor after: Liang Tianshan

Inventor after: Zhang Yadong

Inventor after: Fan Wei

Inventor after: Cao Nan

Inventor after: Wang Tao

Inventor before: Fan Wei

Inventor before: Yan Jun

Inventor before: Wang Yu

Inventor before: Wang Bo

Inventor before: Zhang Lijie

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: FAN WEI YAN JUN WANG YU WANG BO ZHANG LIJIE TO: WANG YU YAN JUN CAI DIAN LIANG TIANSHAN ZHANG YADONG FAN WEI CAO NAN WANG TAO

C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: WUCHANG SHIPBUILDING INDUSTRY GROUP CO., LTD.

Free format text: FORMER NAME: WUCHANG SHIPBUILDING INDUSTRY CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 430060 Hubei city of Wuhan province Wuchang Ziyang Road No. 2

Patentee after: WUCHANG SHIPBUILDING INDUSTRY GROUP CO., LTD.

Address before: 430060 Hubei city of Wuhan province Wuchang Ziyang Road No. 2

Patentee before: Wuchang Shipbuilding Industry Co., Ltd.