CN103273209A - Welding process of outside wind tower U-shaped grooves - Google Patents
Welding process of outside wind tower U-shaped grooves Download PDFInfo
- Publication number
- CN103273209A CN103273209A CN2013102187802A CN201310218780A CN103273209A CN 103273209 A CN103273209 A CN 103273209A CN 2013102187802 A CN2013102187802 A CN 2013102187802A CN 201310218780 A CN201310218780 A CN 201310218780A CN 103273209 A CN103273209 A CN 103273209A
- Authority
- CN
- China
- Prior art keywords
- steel plate
- type groove
- welding
- wind tower
- groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention discloses a welding process of outside wind tower U-shaped grooves. The process includes the steps of preparing grooves to be welded and making double-V grooves by thermal cutting; welding the single side of each groove before machining the reverse sides of the U-shaped grooves; and welding the reverse sides. The welding process of outside wind tower U-shaped grooves is high in machining efficiency, low in noise, dust-free, and accurate in groove machining size; the grooves are machined into standard U shapes; welding quality is high; and welding materials are saved.
Description
Technical field
The present invention relates to the U-shaped groove welding procedure in a kind of wind tower outside.
Background technology
At present, the longitudinal joint on the wind tower and circumferential weld mostly adopt double V-shaped groove design, and when finishing one-sided groove welding, reverse side adopts the method back chipping of carbon arc air gouging, and by abrasive machine reconditioning groove, finishes the welding of reverse side then.The operating efficiency of this method is very low, and noise and dust are bigger, and the reverse side groove that carbon digs and polishing is come out, and size can not be very accurate, and may will increasing of weld defect appears in follow-up welding.
Summary of the invention
Goal of the invention: the objective of the invention is in order to solve the deficiencies in the prior art, the U-shaped groove welding procedure in a kind of wind tower outside that provides, it is low to be intended to solve reverse side groove back chipping and grinding efficiency, and the noise dust is big, the coarse problem of groove processing dimension.
Technical scheme: in order to realize above purpose, the U-shaped groove welding procedure in a kind of wind tower outside of the present invention, concrete steps are as follows:
(a) with the mode of thermal cutting the obverse and reverse of steel plate is opened " V " type groove respectively;
When (b) steel plate being heated to 65 ℃-110 ℃, " V " type groove in steel plate front is welded;
(c) after the welding of " V " type groove in steel plate front was finished, when treating that steel billet temperature drops to 10 ℃-50 ℃, " V " type groove with the steel plate reverse side adopted mach mode to process " U " type groove again;
(d) after " U " type groove machines, steel plate is heated to 65 ℃-110 ℃, again " U " type groove is welded;
(f) the reverse side welding is finished.
Machining mode described in the step (c) is for to carry out method for processing by artificial employing beveling machine or milling machine to steel plate.
Beneficial effect: the U-shaped groove welding procedure in a kind of wind tower outside provided by the invention has the following advantages:
1, working (machining) efficiency height;
2, noise is very low, free from dust;
3, the groove dimensioned is accurate;
4, to be processed into standard U-shaped for groove, the welding quality height, and, saved welding material.
Description of drawings
Fig. 1 is for finishing the structural representation that the steel plate obverse and reverse is opened " V " type groove respectively;
Fig. 2 is for finishing the structural representation of the positive welding of steel plate " V " type groove;
Fig. 3 is for finishing the structural representation that the steel plate reverse side processes " U " type groove;
Fig. 4 is for finishing steel plate reverse side welded structure schematic diagram.
The specific embodiment
Below in conjunction with drawings and Examples, further illustrate the present invention, should understand these embodiment only is used for explanation the present invention and is not used in and limits the scope of the invention, after having read the present invention, those skilled in the art all fall within the application's claims institute restricted portion to the modification of the various equivalent form of values of the present invention.
Embodiment 1
The U-shaped groove welding procedure in a kind of wind tower outside of the present invention, concrete steps are as follows:
(a) with the mode of thermal cutting the obverse and reverse of steel plate is opened " V " type groove respectively;
When (b) steel plate being heated to 65 ℃, " V " type groove in steel plate front is welded;
(c) after " V " type groove in steel plate front welding is finished, when treating that steel billet temperature drops to 10 ℃, again " V " type groove of steel plate reverse side mode by artificial employing beveling machine or milling machine is processed " U " type groove to steel plate;
(d) after " U " type groove machines, steel plate is heated to 65 ℃, again " U " type groove is welded;
(f) the reverse side welding is finished.
Embodiment 2
The U-shaped groove welding procedure in a kind of wind tower outside of the present invention, concrete steps are as follows:
(a) with the mode of thermal cutting the obverse and reverse of steel plate is opened " V " type groove respectively;
When (b) steel plate being heated to 90 ℃, " V " type groove in steel plate front is welded;
(c) after " V " type groove in steel plate front welding is finished, when treating that steel billet temperature drops to 35 ℃, again " V " type groove of steel plate reverse side mode by artificial employing beveling machine or milling machine is processed " U " type groove to steel plate;
(d) after " U " type groove machines, steel plate is heated to 90 ℃, again " U " type groove is welded;
(f) the reverse side welding is finished.
Embodiment 3
The U-shaped groove welding procedure in a kind of wind tower outside of the present invention, concrete steps are as follows:
(a) with the mode of thermal cutting the obverse and reverse of steel plate is opened " V " type groove respectively;
When (b) steel plate being heated to 110 ℃, " V " type groove in steel plate front is welded;
(c) after " V " type groove in steel plate front welding is finished, when treating that steel billet temperature drops to 50 ℃, again " V " type groove of steel plate reverse side mode by artificial employing beveling machine or milling machine is processed " U " type groove to steel plate;
(d) after " U " type groove machines, steel plate is heated to 110 ℃, again " U " type groove is welded;
(f) the reverse side welding is finished.
Claims (2)
1. the U-shaped groove welding procedure in the wind tower outside, it is characterized in that: the U-shaped groove welding procedure concrete steps in the described novel wind tower outside are as follows:
(a) with the mode of thermal cutting the obverse and reverse of steel plate is opened " V " type groove respectively;
When (b) steel plate being heated to 65 ℃-110 ℃, " V " type groove in steel plate front is welded;
(c) after the welding of " V " type groove in steel plate front was finished, when treating that steel billet temperature drops to 10 ℃-50 ℃, " V " type groove with the steel plate reverse side adopted mach mode to process " U " type groove again;
(d) after " U " type groove machines, steel plate is heated to 65 ℃-110 ℃, again " U " type groove is welded;
(f) the reverse side welding is finished.
2. the U-shaped groove welding procedure in a kind of wind tower outside according to claim 1, it is characterized in that: the machining mode described in the step (c) is for to carry out method for processing by artificial employing beveling machine or milling machine to steel plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102187802A CN103273209A (en) | 2013-06-05 | 2013-06-05 | Welding process of outside wind tower U-shaped grooves |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102187802A CN103273209A (en) | 2013-06-05 | 2013-06-05 | Welding process of outside wind tower U-shaped grooves |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103273209A true CN103273209A (en) | 2013-09-04 |
Family
ID=49055886
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013102187802A Pending CN103273209A (en) | 2013-06-05 | 2013-06-05 | Welding process of outside wind tower U-shaped grooves |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103273209A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08243754A (en) * | 1995-03-08 | 1996-09-24 | Nippon Steel Corp | Inner face welding method of clad steel tube |
CN1593835A (en) * | 2004-07-02 | 2005-03-16 | 渤海船舶重工有限责任公司 | Welding used groove |
CN2758002Y (en) * | 2004-09-20 | 2006-02-15 | 四川石油管理局 | Composite welding edge beveling |
CN101367153A (en) * | 2008-07-14 | 2009-02-18 | 武汉钢铁(集团)公司 | High-strength bridge steel-gas protective welding method |
CN101502891A (en) * | 2009-03-05 | 2009-08-12 | 苗建春 | Tracking profiling bevel milling machine |
CN101607342A (en) * | 2009-06-26 | 2009-12-23 | 广州中船黄埔造船有限公司 | A kind of submerged arc welding method of plank boards and jointing boards |
CN101733508A (en) * | 2010-01-27 | 2010-06-16 | 天顺风能(苏州)股份有限公司 | Wind tower carbon-free plane welding technology |
CN102029457A (en) * | 2010-12-01 | 2011-04-27 | 武昌船舶重工有限责任公司 | Vertical butt welding process of high-strength steel for ship structures |
CN102284775A (en) * | 2010-06-17 | 2011-12-21 | 上海宝钢设备检修有限公司 | Method for welding roll gaps of large-diameter technical roller coiled by plank stuffs |
-
2013
- 2013-06-05 CN CN2013102187802A patent/CN103273209A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08243754A (en) * | 1995-03-08 | 1996-09-24 | Nippon Steel Corp | Inner face welding method of clad steel tube |
CN1593835A (en) * | 2004-07-02 | 2005-03-16 | 渤海船舶重工有限责任公司 | Welding used groove |
CN2758002Y (en) * | 2004-09-20 | 2006-02-15 | 四川石油管理局 | Composite welding edge beveling |
CN101367153A (en) * | 2008-07-14 | 2009-02-18 | 武汉钢铁(集团)公司 | High-strength bridge steel-gas protective welding method |
CN101502891A (en) * | 2009-03-05 | 2009-08-12 | 苗建春 | Tracking profiling bevel milling machine |
CN101607342A (en) * | 2009-06-26 | 2009-12-23 | 广州中船黄埔造船有限公司 | A kind of submerged arc welding method of plank boards and jointing boards |
CN101733508A (en) * | 2010-01-27 | 2010-06-16 | 天顺风能(苏州)股份有限公司 | Wind tower carbon-free plane welding technology |
CN102284775A (en) * | 2010-06-17 | 2011-12-21 | 上海宝钢设备检修有限公司 | Method for welding roll gaps of large-diameter technical roller coiled by plank stuffs |
CN102029457A (en) * | 2010-12-01 | 2011-04-27 | 武昌船舶重工有限责任公司 | Vertical butt welding process of high-strength steel for ship structures |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104295608B (en) | Ring processing method in oscillating bearing | |
CN103878256B (en) | Two-sided bearing shell nosing device and preparation method thereof | |
CN104141129A (en) | Repairing method for threaded rod | |
CN104227345A (en) | Processing method for high-precision thin step shaft and grinding chuck for processing method | |
CN109352270B (en) | Male head processing technology | |
CN109732293A (en) | A kind of thin-walled divergence type solid cage processing method | |
CN106312152A (en) | Method for machining thin-walled components | |
CN102145445B (en) | Ultraprecise drum-shaped roller and processing method thereof | |
CN107498398A (en) | A kind of rolling spline axle raceway high-efficiency machining method | |
CN203471501U (en) | Inner bore grinding cutter | |
CN102848152B (en) | Processing method of manipulators | |
CN204657946U (en) | A kind of Metal Cutting Machine Tool | |
CN203266406U (en) | Work-piece fixing device on cylindrical grinding machine | |
CN103273209A (en) | Welding process of outside wind tower U-shaped grooves | |
CN103433815B (en) | The processing method of bolt head combination socket drill | |
CN206464558U (en) | A kind of Novel cutter grain formula cutter | |
CN101912981A (en) | Lathe tool and welding process thereof | |
CN206047105U (en) | A kind of practical Double-side rounding special plane | |
CN101804590A (en) | Method for eliminating grinding crack of transition fillet externally connected with shaft shoulder | |
CN205614074U (en) | Compound pressing mode twolip billmpse tool | |
CN106271425A (en) | A kind of mechanical processing technique of connecting rod | |
CN204584877U (en) | A kind of multifunction machine | |
CN202825551U (en) | Finishing tool for carborundum grinding wheel | |
CN205928253U (en) | A bistrique cutter for glass laps processing | |
CN205764096U (en) | A kind of energy-saving light quantifies metal saw |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130904 |