CN102021867B - Embedded combined high manganese steel frog - Google Patents

Embedded combined high manganese steel frog Download PDF

Info

Publication number
CN102021867B
CN102021867B CN 201010606116 CN201010606116A CN102021867B CN 102021867 B CN102021867 B CN 102021867B CN 201010606116 CN201010606116 CN 201010606116 CN 201010606116 A CN201010606116 A CN 201010606116A CN 102021867 B CN102021867 B CN 102021867B
Authority
CN
China
Prior art keywords
rail
heart
fork
wing
frog
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201010606116
Other languages
Chinese (zh)
Other versions
CN102021867A (en
Inventor
李毅
董彦录
李松
费维周
孙立彬
翟耀忠
王建国
宋金海
程亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Baoji Bridge Group Co Ltd
Original Assignee
China Railway Baoji Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Baoji Bridge Group Co Ltd filed Critical China Railway Baoji Bridge Group Co Ltd
Priority to CN 201010606116 priority Critical patent/CN102021867B/en
Publication of CN102021867A publication Critical patent/CN102021867A/en
Application granted granted Critical
Publication of CN102021867B publication Critical patent/CN102021867B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Heat Treatment Of Articles (AREA)
  • Forklifts And Lifting Vehicles (AREA)

Abstract

The invention discloses an embedded combined high manganese steel frog, which is provided with a frog center, frog heel rails and wing rails, wherein the frog center is integrally cast by a high-strength wear-resistant material and is embedded between two symmetrical wing rails, and the two wing rails and the frog center are connected and fixed through a bolt connecting pair and a steel rail gasket; and two frog heel rails are symmetrically connected and fixed on two sides of the tail of the frog center and are positioned between the two wing rails, and the two wing rails, the tail of the frog center and the two frog heel rails are connected and fixed through the bolt connecting pair, the steel rail gasket and a filler. The frog center is integrally cast by the high-strength wear-resistant material and the surface of the frog center is hardened, so that the service life of the high manganese steel frog is prolonged, and the requirement of an overloading railway is met; and steel rails are subjected to on-line heat treatment at two ends of the frog, so that the problem of field welding of laying of continuous welded rails is solved.

Description

Embedded combined high manganese steel frog
Technical field
The present invention relates to a kind of embedded combined high manganese steel frog, belong to the railway switch technical field.
Background technology
Along with the fast development of national economy, railway operation speed improves day by day, and the track switch of using on the circuit is had higher requirement.Railway frog directly affects application life and the overall trip speed of track switch as a critical component of track switch.The fixed solid manganese steel frog can't satisfy the trans-section seamless railway requirement, and application life is shorter owing to can not directly weld at the laying scene with the circuit rail, is replaced by alloy steel combination frog gradually on the railway main track.Although alloy steel combination frog has solved gapless track Site Welding problem, improved the application life of heart rail, but because the wing rail employing is common rail, cause the abrasion of wing rail end face very fast, fail to bring into play fully the antiwear characteristic of alloy steel core rail, whole group of railway frog can't satisfy user's high life, reduced-maintenance requirement just because wing rail wears away limit.
The utility model content
The technical problem that the present invention solves: a kind of embedded combined high manganese steel frog is provided, it wears away comparatively fast and affects the fork heart position employing High Strength Wear-Resistance Material block cast moulding of railway frog bulk life time, and adopt advanced hardening process that cure process is carried out on its surface, thereby improve the application life of railway frog, satisfy the heavy-haul line demand; The online heat-treated rail of 60kg/m, 75kg/m is adopted at the railway frog two ends, solves gapless track and lays the Site Welding problem.
Technical solution of the present invention: a kind of embedded combined high manganese steel frog has the fork heart (1), fork with rail (2) and wing rail (3).The described fork heart (1) adopts High Strength Wear-Resistance Material block cast moulding, and the fork heart (1) is embedded between the wing rail (3) of two symmetric arrays, is bolted pair (6) and rail packing ring (5) two wing rails (3) and the fork heart (1) are connected and fixed; Two forks are fastened on the both sides of the afterbody of the fork heart (1) with rail (2) symmetry, and be positioned between two wing rails (3), and be bolted pair (6), rail packing ring (5) and interval iron (4) afterbody and two forks of two wing rails (3) with the fork heart (1) are connected and fixed with rail (2).
Have on the described fork heart (1) heart rail (7) and with the into a single integrated structure two fork heart wing rails (8) of heart rail (7), and the afterbodys of two fork heart wing rails (8) are positioned at the both sides of heart rail (7) end.
The described fork heart (1) adopts potassium steel material block cast moulding, and the tread surface of the heart rail (7) on it and fork heart wing rail (8) all adopts the explosion hardening treatment process to carry out cure process; Described wing rail (3) and fork adopt online heat-treated rail to make with rail (2).
The uniform flange of bilateral symmetry (9) of the described fork heart (1), flange (9) locates to be shaped with bolt connecting hole (10) on the one hand, and the shape of flange (9) and wing rail (3) and fork are fitted with the web of the rail inside wall of rail (2) on the other hand; On the one hand bolt connection pair (6) passes that bolt connecting hole (10) will pitch the heart (1) and two wing rails (3) are connected and fixed; Bolt connection pair (6) passes bolt connecting hole (10) and will pitch afterbody and two forks of the heart (1) and be connected and fixed with rail (2) on the other hand.
The advantage that the present invention compared with prior art has and effect:
1, the present invention pitches the heart and adopts the potassium steel material, has good impact toughness and abrasion resistance, and the tread surface carries out explosion hardening and process, and has improved the initial hardness on driving surface, strengthens the railway frog abrasion resistance.The online heat-treated rail of 60kg/m, 75kg/m is adopted at the railway frog two ends, satisfies the Site Welding requirement of gapless track.
2, the present invention's fork heart rail and wing rail relative position relation in the heart is reasonable in design, and is the potassium steel material, has realized can giving full play to impact toughness and the antiwear characteristic of potassium steel with the same life-span of material.
3, to pitch heart section structure simple in the present invention, casting, processing both be beneficial to, be beneficial to again the assembling of whole group of railway frog, particularly the internal soundness of the wing rail of heart rail tip to 50mm section zone and this zone correspondence can reach 1~2 grade (ASTM of ASTM high manganese steel casting X-ray procedure standard), further improved fork in the heart heart rail and the application life of wing rail.
Above-mentioned advantage and effect have determined that bulk life time of the present invention all is significantly improved than fixed solid manganese steel frog, alloy steel combination frog, adapt to transregional seamless raising speed railway, heavy-haul line demand.
Description of drawings
Fig. 1 is structure top view of the present invention,
Fig. 2 is the A-A sectional view of Fig. 1,
Fig. 3 is the B-B sectional view of Fig. 1,
Fig. 4 is the C-C sectional view of Fig. 1,
Fig. 5 is the D-D sectional view of Fig. 1;
Fig. 6 is alloy steel core rail structure top view of the present invention,
Fig. 7 is the A-A sectional view of Fig. 6,
Fig. 8 is the B-B sectional view of Fig. 6,
Fig. 9 is the C-C sectional view of Fig. 6,
Figure 10 is the D-D sectional view of Fig. 6.
The specific embodiment
Describe a kind of embodiment of the present invention in detail below in conjunction with accompanying drawing 1,2,3,4,5,6,7,8,9,10.
A kind of embedded combined high manganese steel frog has the fork heart 1, fork with rail 2 and wing rail 3.The fork heart 1 adopts potassium steel material block cast moulding, and the fork heart 1 is embedded between the wing rail 3 of two symmetric arrays.The uniform flange 9 of bilateral symmetry of the fork heart 1, flange 9 places are shaped with bolt connecting hole 10 on the one hand, the shape of flange 9 and wing rail 3 and fork are fitted with the web of the rail inside wall of rail 2 on the other hand, and bolt connection pair 6 passes that bolt connecting hole 10 will be pitched the heart 1 by rail packing ring 5 and two wing rails 3 are connected and fixed.Two forks are symmetricly set on the both sides of the afterbody of the fork heart 1 with rail 2, and between two wing rails 3, bolt connection pair 6 passes bolt connecting hole 10 and by rail packing ring 5 and interval iron 4 two wing rails 3 afterbody and two forks with the fork heart 1 is connected and fixed with rail 2.
Have on the described fork heart 1 heart rail 7 and with the into a single integrated structure two fork heart wing rails 8 of heart rail 7, and the afterbodys of two fork heart wing rails 8 are positioned at the both sides of heart rail 7 ends.And the tread surface of heart rail 7 and fork heart wing rail 8 all adopts the explosion hardening treatment process to carry out cure process; Described wing rail 3 and fork adopt online heat-treated rail to make with rail 2.
The present invention pitches the heart 1 and adopts the potassium steel material, has good impact toughness and abrasion resistance, and the tread surface of driving carried out the explosion hardening processing, and tread surface initial hardness is increased to 352HB, has further strengthened the abrasion resistance of railway frog.Wing rail 3 and the fork that make by the online heat-treated rail of employing 60kg/m, 75kg/m at the railway frog two ends directly weld at the scene of laying and circuit with rail 2.
It is simple that the present invention pitches the heart 1 section structure, casting, processing both be beneficial to, be beneficial to again the assembling of whole group of railway frog, particularly section structure simple in structure reduced pore, burning into sand that casting process produces, be mingled with, the defective such as shrinkage cavity and porosity, make the internal soundness of the wing rail 8 of heart rail 7 tips to 50mm section zone and this zone correspondence can reach 1~2 grade (ASTM of ASTM high manganese steel casting X-ray procedure standard), further improved fork in the heart heart rail 7 and the application life of wing rail 8.
Heart rail 7 and wing rail 8 relative position relations that the present invention pitches on the heart 1 are reasonable in design, and are the potassium steel material, have realized can giving full play to impact toughness and the antiwear characteristic of potassium steel with the same life-span of material.
Above-described embodiment proves absolutely that bulk life time of the present invention all is significantly improved than fixed solid manganese steel frog, alloy steel combination frog, adapts to transregional seamless raising speed railway, heavy-haul line demand.

Claims (2)

1. embedded combined high manganese steel frog, have the fork heart (1), fork with rail (2) and wing rail (3), it is characterized in that: the described fork heart (1) is embedded between the wing rail (3) of two symmetric arrays, is bolted pair (6) and rail packing ring (5) two wing rails (3) and the fork heart (1) are connected and fixed; Two forks are symmetricly set on the both sides of the afterbody of the fork heart (1) with rail (2), and be positioned between two wing rails (3), and be bolted pair (6), rail packing ring (5) and interval iron (4) afterbody and two forks of two wing rails (3) with the fork heart (1) are connected and fixed with rail (2); Have on the described fork heart (1) heart rail (7) and with the into a single integrated structure two fork heart wing rails (8) of heart rail (7), and the afterbodys of two fork heart wing rails (8) are positioned at the both sides of heart rail (7) end; The described fork heart (1) adopts potassium steel material block cast moulding, and the tread surface of the heart rail (7) on it and fork heart wing rail (8) all adopts the explosion hardening treatment process to carry out cure process; Described wing rail (3) and fork adopt online heat-treated rail to make with rail (2).
2. embedded combined high manganese steel frog according to claim 1, it is characterized in that: the uniform flange of bilateral symmetry (9) of the described fork heart (1), flange (9) locates to be shaped with bolt connecting hole (10) on the one hand, and the shape of flange (9) and wing rail (3) and fork are fitted with the web of the rail inside wall of rail (2) on the other hand; On the one hand bolt connection pair (6) passes that bolt connecting hole (10) will pitch the heart (1) and two wing rails (3) are connected and fixed; Bolt connection pair (6) passes bolt connecting hole (10) and will pitch afterbody and two forks of the heart (1) and be connected and fixed with rail (2) on the other hand.
CN 201010606116 2010-12-20 2010-12-20 Embedded combined high manganese steel frog Active CN102021867B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010606116 CN102021867B (en) 2010-12-20 2010-12-20 Embedded combined high manganese steel frog

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010606116 CN102021867B (en) 2010-12-20 2010-12-20 Embedded combined high manganese steel frog

Publications (2)

Publication Number Publication Date
CN102021867A CN102021867A (en) 2011-04-20
CN102021867B true CN102021867B (en) 2013-01-02

Family

ID=43863609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010606116 Active CN102021867B (en) 2010-12-20 2010-12-20 Embedded combined high manganese steel frog

Country Status (1)

Country Link
CN (1) CN102021867B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433805B (en) * 2011-11-12 2015-03-25 中铁宝桥集团有限公司 Special-structure high manganese steel frog and design method
CN105239466A (en) * 2015-11-09 2016-01-13 中铁宝桥集团有限公司 Novel embedded manganese fork core structure
CN106149482A (en) * 2016-07-25 2016-11-23 中铁宝桥集团有限公司 A kind of embedded combined high manganese steel frog of embedded alloy steel core rail wing rail
CN107829337A (en) * 2017-09-26 2018-03-23 中铁宝桥集团有限公司 Heart assembled frog is pitched in asymmetric formula potassium steel block cast
CN108103855A (en) * 2018-01-05 2018-06-01 龙运生 A kind of fixed alloy steel combination frog
CN108642976A (en) * 2018-05-18 2018-10-12 中铁山桥集团有限公司 A kind of manganese steel fork heart obtuse angle assembly frog structure
CN108774923A (en) * 2018-08-23 2018-11-09 中铁宝桥集团有限公司 Combined type high manganese steel frog
CZ33029U1 (en) 2019-04-11 2019-07-30 DT - Výhybkárna a strojírna, a.s. Valve with shortened cast monoblock
CN113668299B (en) * 2021-08-20 2023-04-25 宜兴市鑫煜科技有限公司 Integral casting type frog structure for railway track train turnout and preparation process thereof
CN114318963B (en) * 2021-12-17 2023-03-14 中铁宝桥集团有限公司 Fixed combined frog

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2042488A1 (en) * 1970-08-27 1972-03-09 Schreck-Mieves Kg, 4600 Dortmund Soft
DE19621018C1 (en) * 1996-05-24 1997-10-16 Butzbacher Weichenbau Gmbh Rail track component e.g. frog with layered structure
CN2326633Y (en) * 1998-03-17 1999-06-30 铁道部宝鸡桥梁工厂 Alloy steel-band wing-rail central-rail welded frog
CN2332751Y (en) * 1998-05-29 1999-08-11 关铁 Austenite forged steel frog centre
CN1583324A (en) * 2004-06-04 2005-02-23 中国科学院金属研究所 High manganese steel railway assembled frog centre rail casting process
CN100999781A (en) * 2007-01-13 2007-07-18 燕山大学 High manganese steel frog surface explosive harden tech.

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201924243U (en) * 2010-12-20 2011-08-10 中铁宝桥集团有限公司 Embedded type combined high manganese steel frog

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2042488A1 (en) * 1970-08-27 1972-03-09 Schreck-Mieves Kg, 4600 Dortmund Soft
DE19621018C1 (en) * 1996-05-24 1997-10-16 Butzbacher Weichenbau Gmbh Rail track component e.g. frog with layered structure
CN2326633Y (en) * 1998-03-17 1999-06-30 铁道部宝鸡桥梁工厂 Alloy steel-band wing-rail central-rail welded frog
CN2332751Y (en) * 1998-05-29 1999-08-11 关铁 Austenite forged steel frog centre
CN1583324A (en) * 2004-06-04 2005-02-23 中国科学院金属研究所 High manganese steel railway assembled frog centre rail casting process
CN100999781A (en) * 2007-01-13 2007-07-18 燕山大学 High manganese steel frog surface explosive harden tech.

Also Published As

Publication number Publication date
CN102021867A (en) 2011-04-20

Similar Documents

Publication Publication Date Title
CN102021867B (en) Embedded combined high manganese steel frog
CN201924243U (en) Embedded type combined high manganese steel frog
CN202072990U (en) Alloy steel rail combined type obtuse frog
CN104060503A (en) Combined frog with core rail and wing rail embedding blocks adopting forged high manganese steel
CN206173745U (en) Inlay embedded combination high manganese steel frog of alloy steel core rail wing rail
CN104499382A (en) Combined frog of forged high-manganese-steel point rail
CN204491321U (en) Forging potassium steel heart rail assembled frog
CN204000475U (en) A kind of heart rail, wing rail are inserted and are adopted the assembled frog that forges potassium steel
CN205077334U (en) Novel embedded manganese fork core structure
CN201530964U (en) Novel alloy tamping pick for welding
CN101704092B (en) Bimetal liquid-liquid composite packer and production method thereof
CN201254681Y (en) Tamping pick for railway tamping machine
CN1233899C (en) Fixed railroad frog center rail made of composite parts
CN207727363U (en) A kind of fixed alloy steel combination frog
CN201659628U (en) Scraper
CN108326298A (en) 3D printing alloy steel combination frog processing method
CN203668763U (en) Manganese steel fork core and steel rail spliced type frog
CN201221043Y (en) Combined alloyed steel frog centre rail
CN205907551U (en) Smithwelding combination formula obtuse frog
CN202343917U (en) Casting mold device of two-liquid bimetal vertical-parted hammer head
CN201738198U (en) Tamping pick
CN101758370A (en) Manufacturing process for high-energy brake disc in bimetal structure and brake disc
CN108103855A (en) A kind of fixed alloy steel combination frog
CN201880564U (en) Hammer head of hammer crusher
CN205917535U (en) Alloy steel assembled frog

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant