CN1020204C - Enclosing treatment of soft-earth fundation for buildings and structures - Google Patents

Enclosing treatment of soft-earth fundation for buildings and structures Download PDF

Info

Publication number
CN1020204C
CN1020204C CN 88101349 CN88101349A CN1020204C CN 1020204 C CN1020204 C CN 1020204C CN 88101349 CN88101349 CN 88101349 CN 88101349 A CN88101349 A CN 88101349A CN 1020204 C CN1020204 C CN 1020204C
Authority
CN
China
Prior art keywords
earth
hoop
pedosphere
enclosing
foundations
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 88101349
Other languages
Chinese (zh)
Other versions
CN1035860A (en
Inventor
吴卓光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OIL REFINERY TIANJIN PETRO-CHEMICAL CORP
Original Assignee
OIL REFINERY TIANJIN PETRO-CHEMICAL CORP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OIL REFINERY TIANJIN PETRO-CHEMICAL CORP filed Critical OIL REFINERY TIANJIN PETRO-CHEMICAL CORP
Priority to CN 88101349 priority Critical patent/CN1020204C/en
Publication of CN1035860A publication Critical patent/CN1035860A/en
Application granted granted Critical
Publication of CN1020204C publication Critical patent/CN1020204C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The present invention relates to a method for consolidating building foundations. An annular earth enclosing ring is arranged around foundations, and an earth enclosing inner ring can also be arranged at the foundations in the earth enclosing ring. The height of the earth enclosing ring can be determined according to geological conditions and foundation load, and the earth enclosing ring can be made of reinforced concrete or steel plates on site and can also be formed by that prefabricated piles are hammered into the earth. The present invention can be used for treating the foundations of high buildings and structures with larger load and is suitable for shallow foundation design and deep foundation design. The foundations treated by an earth enclosing method can reduce the foundation sinking quantity and uneven sinking quantity.

Description

Enclosing treatment of soft-earth fundation for buildings and structures
The present invention relates to a kind of reinforcement means of building structure ground.
Sink and uneven subsidence for reducing the building structure base, the way one that adopts both at home and abroad is a consolidated subsoil at present, the 2nd, select suitable basis.Consolidated subsoil often adopts methods such as compacting, precompressed, the stake of notes sandstone, chemical treatment.The method of introducing consolidated subsoil among the clear 62-233321 of TOHKEMY is that the soft sheet material of utilization is made circular cylinder, and lower limb tumbles in the frame that stiff materials is made thereon, and whole tube is vertically sunk to underground under exerting pressure; One or more such tubes can be set on the plot base; Things such as the interior all right fluid concrete of tube, thus moving of soil layer controlled, consolidated subsoil.But the problem that this method exists is, the diameter of tube can not be done very greatly, otherwise can't be pressed into undergroundly, and the manufacturing of tube is also cumbersome.
The objective of the invention is to design a kind of new foundation reinforcement method, can make consolidated subsoil eliminate soil body lateral displacement, improve supporting capacity, reduce between the adjacent building because inequality ground distortion and making a difference each other.
The objective of the invention is to realize by around ground, the circumferential band pedosphere being set.The hoop pedosphere also can be provided with the native inner ring of hoop with interior ground, also can adopt other reinforcement means to reinforce.The hoop pedosphere can steel concrete or steel plate making.The height of hoop pedosphere can design according to geological conditions and foundation load.Hoop pedosphere height hour can excavate an annular ditch, field fabrication hoop pedosphere in ditch in advance around ground.When hoop pedosphere when being used for deep foundation design, can be made into and give the system stake and be driven underground and enclose system hoop pedosphere.
Below in conjunction with accompanying drawing the present invention is further described.
Accompanying drawing 1 is hoop pedosphere lateral view (section).
1, the tank body on the ground, 2, the hoop pedosphere.
Accompanying drawing 2 is hoop pedosphere vertical view.
2, the hoop pedosphere that surrounds of flute profile stake.
Prefabricated pile can be made into " groove " shape and "T"-shaped two kinds. Can adopt " groove " shape when big load basis, lateral pressure are big, the stake of " groove " shape is squeezed into around ground, adjacent spill of stake inwards, a spill is outside, staggered noose surrounds annular (consulting Fig. 2). Load is littler, and soil body lateral pressure hour can adopt "T"-shaped stake to enclose system hoop pedosphere. Pile length (namely binding round the height of pedosphere) is determined by design. " groove " shape or "T"-shaped horizontal edge length can be 300-400NN.
Operation principle of the present invention is summarized as follows.
When the load of soft soil foundation constantly increased, the distortion of ground can present three phases: densification stage, partial cut stage, north stream stage. Foundation deformation in the densification stage mainly is that reduce in the grogs space, and grogs produces vertical deflection. The foundation deformation in partial cut stage is existing vertically again side direction. The ground grogs in north stream stage mainly is lateral displacement, and ground gradually destroys in time. Adopt hoop local method Ground Treatment to be controlled at the phase I to the foundation stress state fully, under foundation load constantly increased, the shear stress that surpasses the shearing strength of soil can be born by the hoop pedosphere, and grogs is not producing lateral displacement, thereby ground can not destroy. The soil body of hoop pedosphere outside becomes the stable soil body, has changed the original stress of the soil body. The constraint that the soil body of hoop in the pedosphere is subjected to binding round pedosphere no longer produces lateral displacement, the bearing capacity of ground Greatly improve. Because the hoop pedosphere of ground is cut apart outer two zones of lopping inner ring with the soil body, the Soil mass state in a zone no longer affects another regional Soil mass state, therefore bind round the ground of local method processing and can eliminate the impact that causes owing to the ground different distortion between the adjacent buildings, reduced the differential settlement of ground.
The hoop local method can be used as that foundation reinforcement method independently is used for highrise building and the bigger structure ground of load is handled, also can with other reinforcement means in conjunction with Ground Treatment, all can obtain comparatively ideal effect.The hoop local method is all applicable to the shallow foundation deep foundation design, also can eliminate simultaneously in the foundation construction influence to surrounding buildings thing structure.
Embodiment:
No. 2 petroleum tank grounds of Oil Refinery, Tianjin Petro-Chemical Corp. are handled through the hoop local method, produce and use 4 years, 19 tons/square metre of maximum loads; No. 1 the petroleum tank ground is handled without the hoop local method, and operating period and load situation and No. 2 petroleum tanks are basic identical; Fixed two the oil tank bottom plate sedimentation situations of side as can be known, No. 2 jar foundation settlement are less than No. 1 jar:
Tank skin 1/4R 1/2R 3/4R R
1# jar 0 275 432 401 274(mm)
2# jar 0 176 252 232 104(mm)
(R is the oil tank radius)

Claims (2)

1, a kind of soft foundation hoop soil facture, its step is provided with a circumferential band pedosphere around being included in ground, and ground is provided with the native inner ring of hoop again in the hoop pedosphere, and above-mentioned hoop pedosphere is made by steel concrete or steel plate.
2, according to the described facture of claim 1, it is characterized in that binding round pedosphere and be driven underground by preformed pile and surround, the preformed pile cross section is " groove " shape or "T"-shaped.
CN 88101349 1988-03-18 1988-03-18 Enclosing treatment of soft-earth fundation for buildings and structures Expired - Fee Related CN1020204C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 88101349 CN1020204C (en) 1988-03-18 1988-03-18 Enclosing treatment of soft-earth fundation for buildings and structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 88101349 CN1020204C (en) 1988-03-18 1988-03-18 Enclosing treatment of soft-earth fundation for buildings and structures

Publications (2)

Publication Number Publication Date
CN1035860A CN1035860A (en) 1989-09-27
CN1020204C true CN1020204C (en) 1993-03-31

Family

ID=4831720

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 88101349 Expired - Fee Related CN1020204C (en) 1988-03-18 1988-03-18 Enclosing treatment of soft-earth fundation for buildings and structures

Country Status (1)

Country Link
CN (1) CN1020204C (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100560876C (en) * 2007-01-22 2009-11-18 宝山钢铁股份有限公司 The stiffening device of round-arch casing foundation
CN102021871B (en) * 2009-09-15 2012-05-23 中国石油化工集团公司 Foundation treatment method for temporary construction subgrade on dredge fill soft foundation site
CN107989017A (en) * 2017-12-15 2018-05-04 中科纳达新材料(广西)有限公司 A kind of fixing device for building lot bottom
CN112627249B (en) * 2020-12-07 2022-02-25 马鞍山钢铁建设集团有限公司 Construction method for shallow foundation reinforcement
CN112813954A (en) * 2020-12-31 2021-05-18 常州工学院 Structure for controlling differential settlement and construction method

Also Published As

Publication number Publication date
CN1035860A (en) 1989-09-27

Similar Documents

Publication Publication Date Title
CN114109394B (en) Method for determining pile length of tunnel shallow-buried weak surrounding rock high-pressure jet grouting pile method ground surface reinforcement
US10941534B2 (en) Methods and apparatuses for compacting soil and granular materials
CN1020204C (en) Enclosing treatment of soft-earth fundation for buildings and structures
CN111676750A (en) Roadbed treatment method based on vacuum dewatering and dynamic compaction
CN109594575A (en) A kind of open caisson periphery grouting and reinforcing soil body construction method
CN1131912C (en) Variable supporting-plate club-footed embedded pile and its forming method
CN1743561A (en) Column-hammer forced tamping substitution method
CN113863294B (en) PHC pipe pile internally provided with pile end grouting device and construction process thereof
CN1182301C (en) Technology for boring and prefabricating cast piles for foundation of building
CN1827924A (en) Foundation treatment method by static pressure replacement and multi-purpose press pipe thereof
CN105256790A (en) Prefabricated skirt type pipe pile used for drainage and added with pile body inclined support and construction method thereof
CN106958176A (en) Quick prefabricated pin-connected panel soft base processing method
JPH05302318A (en) Method and apparatus for stabilizing friction soiland adjacent cohesion soil layers
CN1047716A (en) Utilize the method and the facility of industrial residue comprehensive treatment soft foundation
CN212742608U (en) Soft soil foundation pile group semi-supported disc pile foundation structure
DE19521986A1 (en) Mfg. dry construction pit sole located below ground water level
CN106337409A (en) Method for treating peat soil foundation through preloading in combination with salt piles
CN102619218B (en) Rear slotting reinforcing cage CFG and piling method thereof
CN1116674A (en) Method for handling foundation
CN110700233A (en) Foundation structure of stock yard and construction method thereof
CN110629742B (en) Soft foundation bearing capacity improving method
EP1609914A1 (en) Method and structure for ground improvement
CN211228446U (en) Foundation structure of stock yard
CN103266624A (en) Method for supporting oil and gas pipeline penetrating through karst active zone
CN217782117U (en) Go into rock and plant stake additional strengthening

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee