CN102011351A - 一种铁路加固的施工方法 - Google Patents

一种铁路加固的施工方法 Download PDF

Info

Publication number
CN102011351A
CN102011351A CN 201010536607 CN201010536607A CN102011351A CN 102011351 A CN102011351 A CN 102011351A CN 201010536607 CN201010536607 CN 201010536607 CN 201010536607 A CN201010536607 A CN 201010536607A CN 102011351 A CN102011351 A CN 102011351A
Authority
CN
China
Prior art keywords
railway
construction
steel
concrete pile
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010536607
Other languages
English (en)
Inventor
孟伟林
尹宝华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN 201010536607 priority Critical patent/CN102011351A/zh
Publication of CN102011351A publication Critical patent/CN102011351A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

一种铁路加固的施工方法,属于铁路工程技术领域。施工步骤为:在影响铁路运行的线路两侧分别做加固混凝土桩基;待混凝土桩基达到要求强度后,在桩基顶部安装型钢做支撑横梁;从横梁顶部沿铁路枕木间距安装加固钢轨,将运行铁路进行支撑。优点在于,即对在运行铁路按照枕木的间距使用型钢以及混凝土桩进行加固,将钢轨与枕木、枕木与路基的受力关系转移到起支撑作用的型钢和混凝土桩上,从而实现对铁路路基的掏空开挖。既不影响生产运行,又为工程建设节约了宝贵的工期,有效解决了铁路地下工程施工与铁路运输冲突的难题,取得了良好的经济技术效益。

Description

一种铁路加固的施工方法
技术领域
本发明属于铁路工程技术领域,特别是提供了一种铁路加固的施工方法,适用于运输工程。
背景技术
首钢迁钢公司配套完善工程建设中,各区域的土建基础和地下综合管网施工,不可避免的出现与铁路运输线交叉、冲突等问题。地下工程施工会影响铁路行车安全,按照常规做法将铁路断道施工,严重影响生产运行以及建设工期。
迁钢配套完善原料站新建3Q2通廊基础距离原料站接轨线铁路、10#线铁路、1、2#线路道岔太近,影响铁路安全运行,运输部生产处不同意土建施工。为此,迁钢工程指挥部组织首钢运输部、设计院、首建集团迁钢配套项目部、管铁专业项目部召开专题会议进行研究,“铁路加固”方案得到与会单位的支持及肯定。
发明内容
本发明的目的在于提供一种铁路加固的施工方法,解决地下工程施工影响铁路运行相冲突的问题,在首钢迁钢公司配套完善工程建设中,地下基础与综合管网施工和铁路运输冲突的问题频繁发生,通过采取对在运行的铁路路基加固、替换枕木的方法,有效的解决了这一难题,取得了良好的技术效果。
本发明通过对运输部的铁路运输载荷进行计算,结合丰富的铁路工程施工经验,对在运行铁路线路采取不断道加固施工技术。
本发明的施工步骤为:
(1)在影响铁路运行的线路两侧分别做加固混凝土桩基;
(2)待混凝土桩基强度达到1.2N/mm2以后,在桩基顶部安装型钢做支撑横梁;
(3)从横梁顶部沿铁路枕木间距安装加固钢轨,将运行铁路进行支撑。
在步骤(1)中,加固混凝土桩基3应位于铁路两侧、距枕木外侧0.75m位置,固混凝土桩基深度比地下工程底部标高深0.5m;采用钢管沉井法人工挖孔,加固混凝土桩基承载力高,结构传力明确,施工操作简便。
在步骤(2)中,经计算其支撑作用的加固型钢5,选用两排500×200×10×16的H型钢,两排H型钢之间采用10mm钢板间隔1m焊接固定。
在步骤(3)中,加固钢轨采用5m长度,按照铁路道枕间距排列安装,加固钢轨4与铁路钢轨1之间加绝缘橡胶垫板7,保证铁路行车信号联锁安全。
采取的本技术方案:即对既有铁路按照铁路道枕的间距使用型钢进行加固,将钢轨与枕木、枕木与路基的受力关系转移到起支撑作用的型钢上,从而在保证安全稳定前提下实现在对铁路路基的掏空开挖。
本发明的有点在于,效解决了施工与生产的矛盾,避免了地下施工造成的铁路运输安全隐患,又为如火如荼的工程建设节省了宝贵的工期,创造了可观的经济效益,得到了建设单位的好评,在以后的类似工程建设中值得推广。
附图说明
图1是铁路线加固平面示意图。其中,铁路钢轨1、道枕2、加固混凝土桩3、加固钢轨4、加固型钢5。
图2是铁路线加固剖面示意图。其中,铁路钢轨1、加固混凝土桩3、加固钢轨4、加固型钢5、预埋件6、绝缘橡胶热板7、扁钢管卡8。
具体实施方式
1、在需加固的铁路线枕木两侧做Φ1500mm的C25混凝土桩,铁路同侧的桩距10m,铁路两侧的桩距4.0m,桩深比埋地管线或基础底部深0.5m。桩顶预埋M4-139埋件。
由于铁路线路施工现场狭窄,为了避免大范围开挖造成的塌陷事故,参照人工挖孔桩的施工方法,使用DN1500焊接钢管人工沉井法施工。人工挖孔桩的好处在于不需要施工机具,操作简便,占场地小,对周围建筑物无影响;又能保证桩直径、垂直度要求。
将钢管最下端焊接4根100mm长的短腿,人工挖孔到位后先浇筑C10混凝土,形成100mm厚的垫层,再向钢管内浇筑C25混凝土。
混凝土应连续浇筑、分层振荡夯实。在混凝土浇筑12h后进行湿水养护,养护时间不少于7d。
2、在已浇筑的混凝土强度达到1.2N/mm2以后,允许在桩基埋件上安装作业。
沿铁路一侧的砼桩埋件上焊接两根并排500×200×10×16的H型钢梁,两梁顶每隔1m用-10×300×200钢板连接,从铁路线枕木之间穿钢轨将铁路线进行支护。
3、沿铁路方向,轨枕头以外的道碴清到轨底下320mm深,使用25t吊车安装加固钢轨,将5m长的短轨穿入枕木之间,短轨与两侧的钢梁用扁钢制作的卡子捆绑。短轨轨顶与加固线路主轨轨底之间放10mm厚橡胶垫板,起铁路信号绝缘作用。枕木之间的短轨托住两根主轨,来承受来自车轮向下的压力。
混凝土强度检验:由连续的3组试件组成一个验收批,其强度应满足下列要求:
C25混凝土强度的最小值应满足:fcu,min≥0.90fcu,k;
式中:fcu,min——同一验收批混凝土立方体抗压强度的最小值(N/mm2);
fcu,k——混凝土立方体抗压强度标准值(N/mm2),见下表3
混凝土强度标准值(N/mm2)        表3
Figure BSA00000338992100021
待混凝土强度达到上述要求后,铁路加固完毕,铁路行车时钢轨承受的载荷已均匀分布到H型钢上。土建基础或者地下管网施工时,可以实现对铁路下方路基和道床的全面开挖。
4、荷载计算
4.1荷载:根据首钢运输部提供的火车荷载及加固材料的荷载如下:
4.1.1作用在梁上的一个火车轮压重26t,即集中荷载:P=26000kg
4.1.2插入枕木间的钢轨0.5L=6.0m,每米两根:均布荷载q1=50*6*2=600kg/m,
原有铁路钢轨及枕木重:q2=100kg/m,
钢梁经计算,选用2根500×200×10×16的H型钢,q3=75kg/m×2=150kg/m,
故均布荷载:q=q1+q2+q3=600+100+150=850kg/m
4.2内力计算:
4.2.1弯矩: Mx = 1 8 ql 2 + 1 4 PL
式中L=(10.0-1.5)×1.05=9.0m
均载安全系数1.2,故q=850×1.2=1020kg/m
活载安全系数1.4,P=26000×1.4=36300kg
因此Mx=92981Kg.m=9298100kg.cm
应力检验:≤f=2150kg/cm2
式中:Wx=2342cm3.Vx取1.05
故:t=1890.5≤f,因此满足要求。
4.2.2剪应力计算
剪力:V=0.5×(1020+36400)=18710kg
剪应力
Figure BSA00000338992100033
按选用的H型钢,Ix=37570
Sx=868.8cm3,
故Q=428.9/cm2<fv=1250Kg/cm2,因此满足剪应力要求。
4.3钢度验算
标准荷载值:q=850kg/m,P=26000kg,E=2.1×106
Uq = 5 . qL 4 384 EIx = 5 × 8.5 × 900 4 384 × 2.1 × 10 6 × 37570 × 2
= 0.283 cm
Up = qL 3 48 EIx = 5 × 8.5 × 900 4 48 × 2.1 × 10 6 × 37570 × 2
= 1.433 cm
U=Uq+Up=0.283+2.33=1.716cm
u L = 1.716 900 = 1 524 < 1 500 , 因此满足要求。
通过实践证明,上述对铁路做加固的施工方法是成功可行的它有效解决了施工与生产的矛盾,避免了地下施工造成的铁路运输安全隐患,又为如火如荼的工程建设节省了宝贵的工期,创造了可观的经济效益,得到了建设单位的好评,在以后的类似工程建设中值得推广。
铁路加固技术在工程应用中要注意:第一,要根据现场实际情况确定需加固的铁路长度,从而科学合理的布置混凝土桩,做桩基时使用钢管沉井法施工,避免大开挖非常必要;第二,桩顶上的两根H型钢之间用钢板焊接固定,可以有效降低向下的挠度;第三,代替枕木起加固作用的钢轨与铁路之间必须用橡胶垫板绝缘,保证铁路信号连锁的畅通。

Claims (4)

1.一种由于地下工程施工影响铁路行车安全采取的对铁路加固方法,其特征在于,施工步骤为:
(1)在影响铁路运行的线路两侧分别做加固混凝土桩基;
(2)待混凝土桩基强度达到1.2N/mm2以后,在桩基顶部安装型钢做支撑横梁;
(3)从横梁顶部沿铁路枕木间距安装加固钢轨,将运行铁路进行支撑。
2.根据权利要求1所述的方法,其特征在于:在步骤(1)中,加固混凝土桩基(3)应位于铁路两侧、距枕木外侧0.75m位置,加固混凝土桩基深度比地下工程底部标高深0.5m;。
3.根据权利要求1所述的方法,其特征在于:在步骤(2)中,经计算其支撑作用的加固型钢(5),选用两排500×200×10×16的H型钢,两排H型钢之间采用10mm钢板间隔1m焊接固定。
4.根据权利要求1所述的方法,其特征在于:在步骤(3)中,加固钢轨采用5m长度,按照铁路道枕间距排列安装,加固钢轨(4)与铁路钢轨1之间加绝缘橡胶垫板(7),保证铁路行车信号联锁安全。
CN 201010536607 2010-11-04 2010-11-04 一种铁路加固的施工方法 Pending CN102011351A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010536607 CN102011351A (zh) 2010-11-04 2010-11-04 一种铁路加固的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010536607 CN102011351A (zh) 2010-11-04 2010-11-04 一种铁路加固的施工方法

Publications (1)

Publication Number Publication Date
CN102011351A true CN102011351A (zh) 2011-04-13

Family

ID=43841665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010536607 Pending CN102011351A (zh) 2010-11-04 2010-11-04 一种铁路加固的施工方法

Country Status (1)

Country Link
CN (1) CN102011351A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433810A (zh) * 2011-10-09 2012-05-02 石家庄铁道大学 无砟轨道抢通设备
CN102758387A (zh) * 2011-04-27 2012-10-31 中铁六局集团有限公司 H型钢线路加固施工方法
CN104609300A (zh) * 2015-02-02 2015-05-13 宏华海洋油气装备(江苏)有限公司 万吨级可移动门式起重机的轨道结构
CN105889624A (zh) * 2016-04-27 2016-08-24 河北钢铁股份有限公司邯郸分公司 一种穿越铁路线的地下管道施工方法
CN105908579A (zh) * 2016-04-27 2016-08-31 河北钢铁股份有限公司邯郸分公司 一种铁路轨道基础在线加固方法
CN106638168A (zh) * 2017-01-17 2017-05-10 马鞍山钢铁股份有限公司 加固注浆整治冶金铁路路基病害装置及施工方法
CN107700284A (zh) * 2017-09-27 2018-02-16 中铁六局集团天津铁路建设有限公司 采用滑床板增强线路加固效果的箱体顶进方法
CN111089804A (zh) * 2020-01-20 2020-05-01 福建工程学院 一种危桥爆破拆除对地下结构剪切破坏的安全性预测方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11350897A (ja) * 1998-06-10 1999-12-21 Kajima Corp 地下構造物の施工方法
CN2527710Y (zh) * 2002-01-22 2002-12-25 高学敏 带拖梁的组合支架
JP4020876B2 (ja) * 2003-10-23 2007-12-12 芳一 谷 建造物の基礎構造物
CN101413235A (zh) * 2008-11-25 2009-04-22 中国第一冶金建设有限责任公司 地道桥下穿铁路轨道施工前对铁路进行加固的方法
CN201305800Y (zh) * 2008-11-25 2009-09-09 中国第一冶金建设有限责任公司 地道桥下穿铁路轨道施工前对铁路进行加固的装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11350897A (ja) * 1998-06-10 1999-12-21 Kajima Corp 地下構造物の施工方法
CN2527710Y (zh) * 2002-01-22 2002-12-25 高学敏 带拖梁的组合支架
JP4020876B2 (ja) * 2003-10-23 2007-12-12 芳一 谷 建造物の基礎構造物
CN101413235A (zh) * 2008-11-25 2009-04-22 中国第一冶金建设有限责任公司 地道桥下穿铁路轨道施工前对铁路进行加固的方法
CN201305800Y (zh) * 2008-11-25 2009-09-09 中国第一冶金建设有限责任公司 地道桥下穿铁路轨道施工前对铁路进行加固的装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《湖南交通科技》 20051231 祝金莲,张显利 用新技术"钢盾构法"进行下穿高速公路地道桥顶进施工 90-92 1-4 第31卷, 第4期 2 *
《铁道建筑》 20050630 曾云川 下穿铁路编组场地道桥的桥式方案设计 53-55 1-4 , 第6期 2 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102758387A (zh) * 2011-04-27 2012-10-31 中铁六局集团有限公司 H型钢线路加固施工方法
CN102433810A (zh) * 2011-10-09 2012-05-02 石家庄铁道大学 无砟轨道抢通设备
CN104609300A (zh) * 2015-02-02 2015-05-13 宏华海洋油气装备(江苏)有限公司 万吨级可移动门式起重机的轨道结构
CN104609300B (zh) * 2015-02-02 2017-02-22 宏华海洋油气装备(江苏)有限公司 万吨级可移动门式起重机的轨道结构
CN105889624A (zh) * 2016-04-27 2016-08-24 河北钢铁股份有限公司邯郸分公司 一种穿越铁路线的地下管道施工方法
CN105908579A (zh) * 2016-04-27 2016-08-31 河北钢铁股份有限公司邯郸分公司 一种铁路轨道基础在线加固方法
CN106638168A (zh) * 2017-01-17 2017-05-10 马鞍山钢铁股份有限公司 加固注浆整治冶金铁路路基病害装置及施工方法
CN107700284A (zh) * 2017-09-27 2018-02-16 中铁六局集团天津铁路建设有限公司 采用滑床板增强线路加固效果的箱体顶进方法
CN111089804A (zh) * 2020-01-20 2020-05-01 福建工程学院 一种危桥爆破拆除对地下结构剪切破坏的安全性预测方法
CN111089804B (zh) * 2020-01-20 2022-04-26 福建工程学院 一种危桥爆破拆除对地下结构剪切破坏的安全性预测方法

Similar Documents

Publication Publication Date Title
CN102011351A (zh) 一种铁路加固的施工方法
CN101963061B (zh) 一种铁路既有线地下箱涵的施工方法
CN111676819A (zh) 组合式工便梁连续加固线路大跨度框构桥顶进施工方法
CN107268366B (zh) 一种装配化墙板、桩板组合式无土路基
CN101725149B (zh) 长大明挖隧道施工方法
CN105926669A (zh) 一种地铁车站施工方法
CN108867310A (zh) 先张法预应力混凝土矮肋t梁桥及其施工方法
KR100891961B1 (ko) 가설구조물을 이용하여 도로 또는 철도의 노후된 교량이나 무도상 교량을 유도상화 하기 위한 교량 교체공법 및 그 장치
CN104480915B (zh) 一种用于高陡边坡混凝土浇筑的反轨液压爬模
CN106702912A (zh) 一种既有铁路拆旧梁顶进新桥的施工方法
CN105239475B (zh) 复杂既有铁路线下涵洞顶进过程中的线路加固结构
CN107988921B (zh) 一种上跨铁路、高速公路的跨线桥梁单点连续顶推施工方法
CN115434191B (zh) 一种运营铁路有砟轨道路基深层变形整治方法
CN110258217A (zh) 预应力横抬梁架空线路施工方法
CN212714296U (zh) 一种箱式路基与桥梁过渡结构
CN110700116A (zh) 一种适用于黄土地区的天桥逆作施工方法
JP5139718B2 (ja) プレパックドコンクリート桁の構築工法
CN206667292U (zh) 一种紧邻桥墩圆桩基础扶壁式挡墙车站路基结构
CN211006761U (zh) 循环水管的安装结构
CN109826059B (zh) 一种在车站主体安装起重设备配合拼装轨排的施工方法
CN114439489B (zh) 适用于有限空间的地铁隧道盾构机接收装置及其施工方法
CN112878216A (zh) 一种悬吊式铁路下穿箱涵顶进的轨道加固方法
CN106555379A (zh) 穿越既有线高路基组合式便桥施工方法
CN106759490A (zh) 一种紧邻桥墩圆桩基础扶壁式挡墙车站路基结构
CN217419727U (zh) 用于铁路检测设备的预制式基础结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110413