CN102003921A - 一种平衡爆破方法 - Google Patents
一种平衡爆破方法 Download PDFInfo
- Publication number
- CN102003921A CN102003921A CN2010105138325A CN201010513832A CN102003921A CN 102003921 A CN102003921 A CN 102003921A CN 2010105138325 A CN2010105138325 A CN 2010105138325A CN 201010513832 A CN201010513832 A CN 201010513832A CN 102003921 A CN102003921 A CN 102003921A
- Authority
- CN
- China
- Prior art keywords
- cooling tower
- balance
- blasting
- window
- disintegration
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 36
- 238000005422 blasting Methods 0.000 title claims abstract description 33
- 238000001816 cooling Methods 0.000 claims abstract description 39
- 239000002360 explosive Substances 0.000 claims abstract description 4
- 241000209094 Oryza Species 0.000 claims description 12
- 235000007164 Oryza sativa Nutrition 0.000 claims description 12
- 235000009566 rice Nutrition 0.000 claims description 12
- 238000009412 basement excavation Methods 0.000 claims description 7
- 239000011435 rock Substances 0.000 abstract 1
- 238000004880 explosion Methods 0.000 description 16
- 235000019994 cava Nutrition 0.000 description 6
- 230000000694 effects Effects 0.000 description 6
- 230000003014 reinforcing effect Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 230000007423 decrease Effects 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 230000001052 transient effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005474 detonation Methods 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 230000003245 working effect Effects 0.000 description 1
Images
Abstract
一种平衡爆破方法,该方法包括以下步骤:(1)在冷却塔圈梁及其上部筒体开挖减荷窗,在减荷窗上部开挖解体窗;(2)在人字支腿上和圈梁上没有开挖减荷窗的部位布设炮孔;(3)在上述炮孔中安装塑料导爆管雷管和炸药,在关于冷却塔底部圆心中心对称的两点同时引爆。采用本发明的方法可有效避免在冷却塔定向爆破倾倒时直接砸坏四周设施和引起的飞石及高压气流对四周设施的损坏。能适用于各种复杂条件下的冷却塔爆破拆除,并可节约工程投资,加快工程进度。
Description
技术领域
本发明属于爆破技术领域,具体涉及一种用于拆除冷却塔的平衡爆破方法。
背景技术
冷却塔为一个双曲线空间旋转体钢筋混凝土薄壳结构体。底部直径大,上部直径小,上部口径大于中间口径,高宽比小。下部由几十对人字支腿支撑,下部圈梁厚度为0.4m~0.5m,筒体厚度由下部的0.4m~0.5m,到上口部的0.14m~0.2m,双层布筋。目前冷却塔的拆除方法均采用定向倒塌爆破法,即在冷却塔底部某处开挖一个爆破切口,通过引爆使冷却塔失衡,在自身重力作用下冷却塔上部开始倾倒,翻转倒地然后解体。这种爆破方法仅适用于冷却塔周围场地宽阔的情况,且冷却塔定向爆破时产生的飞石及高压气流对四周设施造成损坏。若是冷却塔周围场地狭小,只能采用人工拆除,费时费力。
发明内容
本发明的目的在于解决现有技术中存在的上述问题,提供一种用于拆除冷却塔的平衡爆破方法。
为实现上述发明目的,本发明采用的技术方案如下:
本发明的平衡爆破方法,该方法包括以下步骤:
(1)在冷却塔圈梁及其上部筒体开挖减荷窗,在减荷窗上部开挖解体窗;
(2)在人字支腿上和圈梁上没有开挖减荷窗的部位布设炮孔;
(3)在上述炮孔中安装塑料导爆管雷管和炸药,在关于冷却塔底部圆心中心对称的两点同时引爆。
步骤(1)中解体窗的顶部距地面的高度是冷却塔高度的20-25%。
步骤(1)中所述减荷窗的宽度为1.5-2米,间距为9-10米。
步骤(1)中所述解体窗的宽度为1.5-2米,间距为9-10米。
本发明中的平衡爆破法是指在对被爆建筑物实施爆破过程中,在未完成爆破前,能够使整个被爆物体的受力系统始终相对地处于平衡状态的爆破方法,该爆破方法主要用于冷却塔原地坍塌爆破拆除施工中。
本发明的爆破方法主要适用于冷却塔,还可用于水压爆破等爆破施工中。
由于本发明采用了上述技术方案,其有益效果如下:
(1)可有效避免在冷却塔定向爆破倾倒时直接砸坏四周设施和引起的飞石及高压气流对四周设施的损坏。
(2)能适用于各种复杂条件下的冷却塔爆破拆除,并可节约工程投资,加快工程进度。
(3)我国今后几年将淘汰大量小功率、低效率、高能耗电厂中的冷却塔等设施,而且有的四周环境非常复杂,用平衡爆破法能够很好地完成这些建筑物的拆除任务。
附图说明
图1是冷却塔的外部结构示意图。
图2是图1的俯视图。
图3是冷却塔原地坍塌爆破切口布孔范围示意图。
图4是冷却塔原地坍塌爆破传爆方向和瞬间爆口示意图。
图中,1.解体窗,2.钢筋,3.减荷窗,4.人字支腿,5.炮孔,6.圈梁,7.瞬间爆口。
具体实施方式
实施例1
本发明的用于拆除冷却塔的平衡爆破方法,方法包括以下步骤:
本发明的平衡爆破方法,该方法包括以下步骤:
(1)在冷却塔圈梁6及其上部筒体开挖减荷窗3,在减荷窗3上部开挖解体窗1;
(2)在人字支腿4上和圈梁6上没有开挖减荷窗的部位布设炮孔5;
(3)在上述炮孔5中安装塑料导爆管雷管和炸药,在关于冷却塔底部圆心中心对称的两点A点和B点同时引爆。
步骤(1)中解体窗的顶部距地面的高度是冷却塔高度的20-25%。
步骤(1)中所述减荷窗的宽度为1.5-2米,间距为9-10米。
步骤(1)中所述解体窗的宽度为1.5-2米,间距为9-10米。
现以对冷却塔实施原地坍塌爆破拆除为例,详述平衡爆破法原理,冷却塔为一个双曲线空间旋转体薄壳钢筋混土结构体,为冷却塔建立的立体坐标系如图1所示。在该坐标系中,Z轴为冷却塔的立体几何对称轴,X轴和Y轴为塔体在地平面上的垂直对称轴。
在应用本发明的平衡爆破法对冷却塔实施原地坍塌爆破过程中,首先从X(或Y)轴对称于Z轴的塔体上的A、B(或C、D)两点处的炮位同时点火起爆,爆破沿着塔体向两个相反方向对称等速传爆,瞬间分别形成两个对称于Z轴的大小近似相等的瞬间爆口7。同时,两个瞬间爆口7对应的上部塔体,就会因失去了下部的支撑而悬空,这两部分对称于Z轴的悬空塔体的体积应当近似相等,而其自重就产生了两个方向指向地心的作用力P1和P2,力P1应当近似地等于力P2且都对称于Z轴。这时,由于塔体其它部位仍保持原有的平衡状态不变,又力P1和P2都对称地作用在塔体两边,因此,整个塔体应当相对地处于瞬间平衡受力状态,如图4所示。
随着两个对称的瞬间爆口不断扩大,加之两边向两个相反方向的传爆速度相等,所以,两个瞬间爆口的大小应当始终近似地相等且对称,其上部所对应的悬空塔体的体积和重量也应当始终近似地相等且对称。因此,在未完成爆破前的任何瞬间,力P1都应当近似地等于力P2且都对称地作用在塔体两边,所以,塔体应当始终相对地处于瞬间平衡受力状态。在完成全部爆破后的瞬间,上部塔体全部悬空,这部分塔体在其自重力的作用下,只能迅速垂直塌落,在减荷窗、解体窗的协助下,25m高度以下塔体很快折断解体,随后,在上部塔体下降惯性力的作用下,塔体上部很快坍塌在下边碴堆上解体加之塔体高宽比小,塔体不可能向任何方向偏斜倒塌。爆破完成后,上部塔体全部悬空,各爆破部位的混凝土脱离钢筋,只剩下钢筋和个别混凝土块,根本无能力承载上部悬空塔体的重量,上部悬空塔体在其自重力的作用下,迅速垂直塌落,在减荷窗、解体窗的共同协助下,25m高度以下塔体很快折断解体。随后在上部塔体下降惯性力的作用下,塔体上部很快坍塌在下边碴堆上解体,从而完成了冷却塔原地坍塌爆破的平衡爆破法爆破施工。
在未完成塔体下部爆破之前的任何瞬间,塔体始终是处于平衡受力状态,在完成下部塔体爆破后,上部悬空塔体在其自重的作用下只能垂直塌落解体,加之塔体高宽比小,因此,剩余塔体不可能向任何方向偏斜倒塌。这就是用平衡爆破法进行冷却塔原地坍塌爆破施工塔体受力分析及解体的全过程。
Claims (4)
1.一种平衡爆破方法,其特征在于,方法包括以下步骤:
(1)在冷却塔圈梁及其上部筒体开挖减荷窗,在减荷窗上部开挖解体窗;
(2)在人字支腿上和圈梁上没有开挖减荷窗的部位布设炮孔;
(3)在上述炮孔中安装塑料导爆管雷管和炸药,在关于冷却塔底部圆心中心对称的两点同时引爆。
2.根据权利要求1所述的平衡爆破方法,其特征在于:步骤(1)中解体窗的顶部距地面的高度是冷却塔高度的20-25%。
3.根据权利要求1或2所述的平衡爆破方法,其特征在于:步骤(1)中所述减荷窗的宽度为1.5-2米,间距为9-10米。
4.根据权利要求1或2所述的平衡爆破方法,其特征在于:步骤(1)中所述解体窗的宽度为1.5-2米,间距为9-10米。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010513832 CN102003921B (zh) | 2010-10-21 | 2010-10-21 | 一种平衡爆破方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010513832 CN102003921B (zh) | 2010-10-21 | 2010-10-21 | 一种平衡爆破方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102003921A true CN102003921A (zh) | 2011-04-06 |
CN102003921B CN102003921B (zh) | 2013-04-10 |
Family
ID=43811482
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010513832 Expired - Fee Related CN102003921B (zh) | 2010-10-21 | 2010-10-21 | 一种平衡爆破方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102003921B (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102589371A (zh) * | 2012-03-19 | 2012-07-18 | 贵州新联爆破工程有限公司 | 大板房的爆破拆除方法 |
CN103148749A (zh) * | 2013-03-25 | 2013-06-12 | 姬云峰 | 一种对称双旋爆破方法 |
CN103175452A (zh) * | 2013-03-25 | 2013-06-26 | 姬云峰 | 一种对称摆动爆破方法 |
CN104089550A (zh) * | 2014-03-21 | 2014-10-08 | 河南理工大学 | 一种钢筋混凝土冷却塔高卸荷槽复合切口爆破拆除方法 |
CN115235285A (zh) * | 2022-07-20 | 2022-10-25 | 浙江科路核工程服务有限公司 | 一种用于冷却塔的爆破拆除装置及其使用方法 |
CN115523814A (zh) * | 2022-10-10 | 2022-12-27 | 武汉科技大学 | 一种钢筋混凝土冷却塔原地坍塌爆破拆除方法 |
CN115523813A (zh) * | 2022-10-10 | 2022-12-27 | 武汉爆破有限公司 | 一种水平与垂直切口相结合的烟囱原地坍塌爆破拆除方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU736715A1 (ru) * | 1978-12-29 | 1995-10-20 | Специализированный Проектно-Изыскательский И Экспериментально-Конструкторский Институт "Гидроспецпроект" | Способ обрушения высотного железобетонного сооружения типа дымовой трубы |
GB2399133A (en) * | 2003-03-06 | 2004-09-08 | John Turner | Demolition apparatus and method |
JP2004293260A (ja) * | 2003-03-28 | 2004-10-21 | Sumitomo Mitsui Construction Co Ltd | 鉄筋コンクリート構造物の爆破解体方法 |
CN1556294A (zh) * | 2004-01-12 | 2004-12-22 | 广东宏大爆破工程有限公司 | 钢筋混凝土烟囱折叠爆破拆除方法 |
KR100885925B1 (ko) * | 2008-09-29 | 2009-03-06 | 주식회사 코리아카코 | 대단면 원통형 구조물인 사일로의 발파해체 방법 |
-
2010
- 2010-10-21 CN CN 201010513832 patent/CN102003921B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU736715A1 (ru) * | 1978-12-29 | 1995-10-20 | Специализированный Проектно-Изыскательский И Экспериментально-Конструкторский Институт "Гидроспецпроект" | Способ обрушения высотного железобетонного сооружения типа дымовой трубы |
GB2399133A (en) * | 2003-03-06 | 2004-09-08 | John Turner | Demolition apparatus and method |
JP2004293260A (ja) * | 2003-03-28 | 2004-10-21 | Sumitomo Mitsui Construction Co Ltd | 鉄筋コンクリート構造物の爆破解体方法 |
CN1556294A (zh) * | 2004-01-12 | 2004-12-22 | 广东宏大爆破工程有限公司 | 钢筋混凝土烟囱折叠爆破拆除方法 |
KR100885925B1 (ko) * | 2008-09-29 | 2009-03-06 | 주식회사 코리아카코 | 대단면 원통형 구조물인 사일로의 발파해체 방법 |
Non-Patent Citations (3)
Title |
---|
张继春: "《工程控制爆破》", 31 December 2001, article "《工程控制爆破》", pages: 71 - 85 * |
王希之等: "遵义电厂冷却塔爆破拆除", 《爆破》, vol. 27, no. 1, 31 March 2010 (2010-03-31), pages 64 - 66 * |
谢胜军等: "爆破技术在电厂冷却塔拆除工程中的应用", 《工程爆破》, vol. 15, no. 2, 30 June 2009 (2009-06-30), pages 70 - 73 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102589371A (zh) * | 2012-03-19 | 2012-07-18 | 贵州新联爆破工程有限公司 | 大板房的爆破拆除方法 |
CN103148749A (zh) * | 2013-03-25 | 2013-06-12 | 姬云峰 | 一种对称双旋爆破方法 |
CN103175452A (zh) * | 2013-03-25 | 2013-06-26 | 姬云峰 | 一种对称摆动爆破方法 |
CN103148749B (zh) * | 2013-03-25 | 2015-08-05 | 姬云峰 | 一种对称双旋爆破方法 |
CN104089550A (zh) * | 2014-03-21 | 2014-10-08 | 河南理工大学 | 一种钢筋混凝土冷却塔高卸荷槽复合切口爆破拆除方法 |
CN104089550B (zh) * | 2014-03-21 | 2016-03-09 | 河南理工大学 | 一种钢筋混凝土冷却塔高卸荷槽复合切口爆破拆除方法 |
CN115235285A (zh) * | 2022-07-20 | 2022-10-25 | 浙江科路核工程服务有限公司 | 一种用于冷却塔的爆破拆除装置及其使用方法 |
CN115523814A (zh) * | 2022-10-10 | 2022-12-27 | 武汉科技大学 | 一种钢筋混凝土冷却塔原地坍塌爆破拆除方法 |
CN115523813A (zh) * | 2022-10-10 | 2022-12-27 | 武汉爆破有限公司 | 一种水平与垂直切口相结合的烟囱原地坍塌爆破拆除方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102003921B (zh) | 2013-04-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102003921B (zh) | 一种平衡爆破方法 | |
CN110779403B (zh) | 一种复杂环境下露天深孔台阶预裂孔逐孔起爆预裂爆破成缝的方法 | |
CN202630821U (zh) | 切缝管定向聚能断裂爆破装置 | |
CN105133506A (zh) | 冲击钻限位成孔植入结合履带吊的钢栈桥施工方法及设施 | |
CN104089550B (zh) | 一种钢筋混凝土冷却塔高卸荷槽复合切口爆破拆除方法 | |
CN102127975A (zh) | 混凝土预成孔静态破碎技术 | |
CN105157491A (zh) | 隧道大断面成穹顶的爆破方法 | |
CN104654941B (zh) | 一种基于混装炸药车的坝基快速开挖爆破成型方法 | |
CN103439200A (zh) | 不同类型锚杆实际抗岩爆能力测试方法 | |
CN102031782A (zh) | 多层类复杂流沙地基分层斜孔爆破施工方法 | |
CN104990471A (zh) | 一种极近距离爆破施工减振方法及减振聚能切缝药包 | |
CN203203487U (zh) | 运用导爆管进行缓冲毫秒微差爆破减震的装置 | |
CN110196002A (zh) | 一种立井井壁梁窝安全高效爆破施工方法 | |
CN103148749B (zh) | 一种对称双旋爆破方法 | |
CN101493305A (zh) | 用于隧洞开挖中的减震爆破方法 | |
CN105423831A (zh) | 一种锥形建筑物叠套式原地控制爆破拆除方法 | |
CN110530221B (zh) | 一种减小围岩损伤和降低爆破振动的爆破方法 | |
CN110657723A (zh) | 一种复杂环境下逐孔起爆的光面爆破方法 | |
CN110030889A (zh) | 一种深孔分区三角网掏槽一次爆破成井的方法 | |
CN103175452A (zh) | 一种对称摆动爆破方法 | |
CN113587760B (zh) | 热膨胀破岩管、硬岩地层基坑的组合破岩方法 | |
CN102927863B (zh) | 一种全岩巷道爆破施工的新方法 | |
CN107843160A (zh) | 一种深基坑钢筋混凝土支撑梁爆破拆除的起爆网络 | |
CN109488309A (zh) | 高地应力、玄武岩地下厂房洞室施工方法 | |
CN101709939B (zh) | 拆除构筑物深孔爆破的起爆方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20181017 Address after: 510000 Jinan University, 601 Whampoa Avenue West, Tianhe District, Guangzhou, Guangdong Patentee after: Ji Rongfeng Address before: 450000 C 26, A block, Fuhua building, 59 East Street, Zhengzhou, Henan. Co-patentee before: Ji Zhenxi Patentee before: Ji Yunfeng |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130410 |
|
CF01 | Termination of patent right due to non-payment of annual fee |