CN101992391A - Guide way mounting tool and guide way fixing method - Google Patents

Guide way mounting tool and guide way fixing method Download PDF

Info

Publication number
CN101992391A
CN101992391A CN2010102473938A CN201010247393A CN101992391A CN 101992391 A CN101992391 A CN 101992391A CN 2010102473938 A CN2010102473938 A CN 2010102473938A CN 201010247393 A CN201010247393 A CN 201010247393A CN 101992391 A CN101992391 A CN 101992391A
Authority
CN
China
Prior art keywords
nut
guide rail
plate
pair
recess
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010102473938A
Other languages
Chinese (zh)
Other versions
CN101992391B (en
Inventor
富田正道
松浦厚
山本恭平
长濑厚史
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Ltd
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd, Hitachi Building Systems Co Ltd filed Critical Hitachi Ltd
Publication of CN101992391A publication Critical patent/CN101992391A/en
Application granted granted Critical
Publication of CN101992391B publication Critical patent/CN101992391B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The object of the invention is to provide a guide way mounting tool and a guide way fixing method, capable of reducing cost and improving operation safety and efficiency. The guide way mounting tool includes a flat board main body (11) and magnets (31) arranged on the board main body (11). The board main body (11) is provided with a pair of bolts (5) respectively penetrating a first board through hole (17) and a second board through hole (22), a first nut holding dent (18) and a second nut holding dent (23) for holding a pair of nuts (6) without rotation. Furthermore, the magnets (31, 32) adsorb the nuts held in the first nut holding dent (18) and the second nut holding dent (23) to fix the nuts (6) temporarily.

Description

Guide rail erecting tools and guide rail fixing means
Technical field
The present invention relates to the guide rail fixing means that a kind of guide rail that is used for guiding car of elevator and balance weight is fixed in the guide rail erecting tools of rail brackets and uses this guide rail erecting tools.
Background technology
Usually in elevator, the guide rail of guiding car and balance weight is erect and is arranged in the hoist trunk.And guide rail is fixed in by fixture on the steel of the wall of hoist trunk or the beam of building etc. at a plurality of positions that its setting is provided with direction.
In the installation procedure of elevator,, the operation that rail brackets is fixed in guide rail is arranged at first for guide rail being fixed in the hoist trunk wall.In this operation, between the spring clip (spring clip) of spring and rail brackets, clip guide rail and carry out bolted, be fixed as one guide rail and rail brackets (with reference to patent documentation 1).
But, in the fixing means of the guide rail shown in the patent documentation 1,, therefore have the problem of operating efficiency variation owing to must under a pair of nut is hidden in the state of inboard of rail brackets, carry out the terminal operation of pair of bolts.For the efficient activity of the terminal operation of realizing this bolt, for example propose to have in the plate main body technology of welded nut (with reference to patent documentation 2) in advance.
In these patent documentation 2 disclosed technology, at first by spring clip and rail brackets gripper rail, in the inboard of rail brackets configuration band nutplate.Then, use fastened tools such as box spanner with pair of bolts with to be welded in a pair of nut of band nutplate fastening fixing.
Patent documentation 1: Japan opens clear 52-150168 communique in fact
Patent documentation 2: TOHKEMY 2004-99277 communique
Yet, in patent documentation 2 disclosed technology, because therefore welded nut and plate main body after fixed operation finishes, can't take off the plate main body from rail brackets.Because this plate main body is just finished its effect after fixed operation finishes, therefore, after this can not play special function and become and do not need.
In addition, in an elevator, need four guide rails to guide car and balance weight.And, in hoist trunk, be provided with the position of a plurality of fixed guides.Therefore needing to prepare a plurality of band nutplate in the hoist trunk of an elevator fixes four guide rails.
Consequently, in patent documentation 2 disclosed technology, need a plurality of band nutplate, so the increase of the parts number of packages of power tool, cause cost to rise.And, needing to carry out a plurality of nuts are welded in the operation of plate main body in advance, the preparation that is used to carry out fixed operation is also numerous and diverse.And,, therefore exist to cause operating efficiency to reduce and the security of operation is brought the such problem of influence because the operator must a plurality of band nutplate by the eminence band in hoist trunk.
Summary of the invention
Consider above problem points, the object of the present invention is to provide and a kind ofly can realize the reduction of cost and can improve the security of operation and the guide rail erecting tools and the guide rail fixing means of operating efficiency.
In order to address the above problem, finish purpose of the present invention, the guide rail erecting tools uses when being fixed in rail brackets at the guide rail by utilizing a pair of spring clip clamping elevator and fastening fixing a pair of nut and bolt and with guide rail.
The guide rail erecting tools possesses flat plate main body and is arranged at the magnet of plate main body.The plate main body has the first plate through hole that pair of bolts connects respectively and the second plate through hole, form and a pair of nut is remained non-rotary first nut on coaxial with the first plate through hole and the second plate through hole and keep the recess and second nut to keep recess.And magnet absorption remains in first nut and keeps the recess and second nut to keep a pair of nut in the recess and should a pair of nut temporary fixed.
And guide rail fixing means of the present invention comprises the operation shown in (1) to (4).
(1) first nut on being formed at the plate main body of guide rail erecting tools keeps the recess and second nut to keep in the recess a pair of nut remained not rotating, and by being arranged on that magnet on the plate main body adsorbs a pair of nut and will the temporary fixed operation of this a pair of nut,
(2) on the face of rail brackets and opposition side opposed of guide rail, keep the recess and second nut to keep the face of recess and dispose the operation of described guide rail erecting tools towards first nut that is formed with a pair of nut temporary fixed,
(3) by a pair of spring clip and rail brackets clamping guide rail, make slotting leading to of pair of bolts reach a pair of inserting hole that on rail brackets, is provided with in the through hole that on a pair of spring clip, is provided with, and with pair of bolts and the fastening fixing operation of a pair of nut that is temporarily fixed on the guide rail erecting tools
(4) the guide rail erecting tools is separated from rail brackets, take off the operation of a pair of nut from the guide rail erecting tools.
According to guide rail erecting tools of the present invention and guide rail fixing means,, therefore after fixed operation finishes, can easily unload lower nut from the guide rail erecting tools owing to pass through the temporary fixed nut of magnetic force of magnet.Consequently, the guide rail erecting tools can be repeatedly utilized again, thereby the reduction of cost can be realized.And the operator does not need to carry a plurality of power tools when carrying out the operation of eminence just can carry out operation, can realize the raising of operating efficiency, and can realize the security of operation.
Description of drawings
Fig. 1 is the stereogram of state that the guide rail erecting tools of the first embodiment of the present invention has been used in expression.
Fig. 2 is the front view of the guide rail erecting tools of the expression first embodiment of the present invention.
Fig. 3 is the side elevation in partial section of the guide rail erecting tools of the expression first embodiment of the present invention.
Fig. 4 is the side elevation in partial section of state that the guide rail erecting tools of the first embodiment of the present invention has been used in expression.
Fig. 5 is the front view of the guide rail erecting tools of the expression second embodiment of the present invention.
Fig. 6 is the side elevation in partial section of the guide rail erecting tools of the expression second embodiment of the present invention.
Fig. 7 is the side view of the guide rail erecting tools of the expression third embodiment of the present invention.
Symbol description:
1 guide rail
2 rail bracketses
3 fasteners
4 spring clips
The 4a through hole
5 bolts
The 5a threaded portion
The 5b head
6 nuts
8 inserting holes
10,10A, 10B guide rail erecting tools
11,11B plate main body
12,12A first plate
12a, 13a face portion
12b back side portion
12cA, 13cA side
13,13A second plate
14 coupling members
16,16A elastomer
17, the 17B first plate through hole
18,18B first nut keeps recess
19,24 magnet fitting portions
21,26B magnet equipped section
22, the 22B second plate through hole
23,23B second nut keeps recess
28 tapes
31,32 magnet
The specific embodiment
Below, with reference to Fig. 1~Fig. 7, the embodiment of guide rail erecting tools of the present invention is described.Need to prove, to parts mark prosign identical among each figure.And the present invention is not limited to following mode.
In addition, illustrate in the following order and carry out.
1. first embodiment
1-1. the structure of guide rail erecting tools
1-2. the fixing means of guide rail
2. second embodiment
3. the 3rd embodiment
<1. first embodiment 〉
1-1. the structure of guide rail erecting tools
At first, with reference to Fig. 1~Fig. 4, the embodiment (below, be called " this example ") of guide rail erecting tools of the present invention is described.
Fig. 1 is the stereogram that the state of rail brackets is fixed in guide rail in expression, Fig. 2 is the front view of expression guide rail erecting tools, Fig. 3 is the side elevation in partial section of expression guide rail erecting tools, and Fig. 4 is the side elevation in partial section that the state of guide rail erecting tools has been used in expression.
As shown in Figure 1, in the hoist trunk of elevator, erect the guide rail 1 that is provided with guiding car and balance weight.Guide rail 1 is fixed in rail brackets 2 by a pair of spring clip 4, bolt 5, nut 6.That is, guide rail 1 is by a pair of spring clip 4 of rubber-like and rail brackets 2 clampings, and fastening fixing by pair of bolts 5 and nut 6, and, when the fixed operation of this guide rail 1, use guide rail erecting tools 10.
The cross sectional shape of rail brackets 2 forms roughly L word shape.This rail brackets 2 is fixed in by for example fixing means such as bolt or welding on the fastener 3 of Liang Dengshang of the wall that is arranged on hoist trunk or building.In addition, in this example, rail brackets 2 is provided with and is used to use the bolt 5 fastening fixing holes 7 that are fixed in the roughly rectangular shape of fastener 3.And, rail brackets 2 with 1 opposed on guide rail on separate a pair of inserting hole 8 of being arranged at intervals with of regulation (with reference to Fig. 4).
Next, with reference to Fig. 1~Fig. 4, the guide rail erecting tools 10 that this is routine is described.
As shown in Figures 1 and 2, guide rail erecting tools 10 forms and is roughly rectangular tabular.This guide rail erecting tools 10 possesses: the plate main body 11 that is made of two plates 12,13; The coupling member 14 that links two plates 12,13; And the elastomer 16 of configuration between two plates 12,13.
As shown in Figure 3, first plate 12 and second plate 13 form respectively and are roughly rectangular tabular.First plate 12 is provided with the first plate through hole 17, first nut keeps recess 18, magnet fitting portion 19 and two magnet equipped sections 21.And same with first plate 12, second plate 13 is provided with the second plate through hole 22, second nut keeps recess 23, magnet fitting portion 24 and two magnet equipped sections 26.
In addition, on second plate 13, also be provided with tape 28.Thus, can guide rail erecting tools 10 be remained in operator's wrist, can prevent that operation middle guide erecting tools 10 falls aloft by tape 28.
And then, also can possess lanyard (hanging over the rope on the neck) and replace tape 28.When lanyard is set, preferably possesses the safety device that the holding section comes off easily when its local action has excessive tension force.Thus, can prevent fasten operator's neck of lanyard.And the position that safety device is set is configured in to restrict when applying tension force becomes the position of linearity.That is, preferably avoiding plate main body 11 disposes with the part of beating about the bush of opposition side.
In addition, because two plates 12,13 have same structure respectively, therefore first plate 12 is described.
The first plate through hole 17 is arranged on the substantial middle of first plate 12, is the hole of the circle that connects from the face portion 12a of first plate 12 to the 12b of back side portion.The diameter of this first plate through hole 17 is set to the diameter big (with reference to Fig. 4) than the threaded portion 5a of bolt 5.In an axial side of the first plate through hole 17, promptly the face portion 12a of first plate 12 is provided with first nut and keeps recess 18.And, at the axial opposite side of the first plate through hole 17, promptly the 12b of back side portion of first plate 12 is provided with magnet fitting portion 19.
First nut keep the recess 18 and the first plate through hole 17 be configured in coaxial on, it is the spot-facing that the profile than nut 6 forms greatly slightly roughly hexagonal shape that first nut keeps recess 18.And, keep recess 18 retention nuts 6 at this first nut.
In addition, in this example, illustrated to keep the recess 18 and second nut to keep recess 23 to form the roughly example of hexagonal shape on first nut, but when the profile of nut 6 was quadrangle, two nuts kept recess 18,23 also should form roughly quadrangle form.That is, two nuts keep the shape of recesses 18,23 should be corresponding with the profile of nut and suitable setting.
In addition, keep the both sides of recess 18 to be provided with two magnet equipped sections 21,21 continuously at first nut.Two magnet equipped sections 21,21 are for being the roughly recess of rectangular shape depression, and form the width almost parallel with first plate 12.And, as shown in Figure 3, in above-mentioned two magnet equipped sections 21,21, imbed the magnet keeper 32 of holding magnet 31.
Magnet keeper 32 forms roughly rectangular-shaped, has columned through hole 32a.And embedding in this through hole 32a has columned magnet 31, and this magnet 31 is by magnetic force absorption nut 6.And this columned magnet 31 is in axial two ends magnetic pole difference.Therefore, when being disposed at magnet equipped section 21, the line of magnetic induction of magnet 31 keeps the inside of recess 18 towards first nut.Thus, under the magneticaction of magnet 31, can efficient adsorb the nut 6 that remains in first nut maintenance recess 18 well.In addition, the shape of this through hole 32a and magnet 31 not only can form cylindric, also can form prism-shaped.
And, in this example, the examples that first nut keeps recess 18 and two magnet equipped sections 21,21 to form continuously have been described, still, between first nut maintenance recess 18 and two magnet equipped sections 21,21, the next door is set and also can finishes this purpose.
Magnet fitting portion 19 is the spot-facings that form with the circle of the first plate through hole, 17 concentric circles.And, be useful on absorption in these magnet fitting portion 19 embeddings and remain in the magnet 33 that first nut keeps the ring-type of the nut 6 in the recess 18.In addition, with magnet fitting portion 19 as spot-facing, be the recess of circular and being illustrated, but be not limited to this, for example, also can form quadrangle or hexagonal recess.And the magnet 33 that embeds this magnet fitting portion 19 is not limited to ring-type, also can be corresponding with the shape of magnet fitting portion and form the prism-shaped that has through hole at the center.
At this, in order to adsorb and temporary fixed by magnet 31,33, the material of the nut 6 that uses in this example can be used the metal with magnetic.
In addition, as the material of two plates 12,13, metals such as preference such as stainless steel, but certainly use other metal, beyond metal, can also use engineering plastics etc.
In addition, in this example, the example that disposes magnet 31,33 on every side respectively that keeps recess 18 around the first plate through hole 17 with first nut has been described, still has been not limited to this.Remain in that first nut keeps nut 6 in the recess 18 and nut 6 is temporary fixed as long as can adsorb, also can be only the first plate through hole 17 and first nut keep either party in the recess 18 around distributed magnet.
Return Fig. 2 and describe, first plate 12 keeps the recess 18 and second nut to keep face portion 12a, the 13a of recess 23 to connect to one towards the state of identical direction by coupling member 14 with second plate 13 to be provided with first nut.As coupling member 14, for example enumerated heat-shrinkable tube etc.
And when forming plate main body 11 linking two plates 12,13, the interval that the interval of the first plate through hole 17 and the second plate through hole 22 was set to and was arranged on a pair of inserting hole 8 on the rail brackets 2 about equally.That is, first nut keep recess 18 and second nut maintenance recess 23 the interval also with the interval that is arranged on a pair of inserting hole 8 on the rail brackets 2 about equally.
And then, between two plates 12,13, dispose the elastomer 16 of circular shape.Thus, when producing error, can eliminate this error by the strain of elastomer 16 at the interval of the interval of a pair of inserting hole 8 of rail brackets 2 and two plate through holes 17,22.And, even plate main body 11 is rotated a little when the bolted operation of folk prescription, and cause the opposing party's the inserting hole 8 of rail brackets 2 and the position of the second plate through hole 22 to produce the changing of the relative positions, also can eliminate this changing of the relative positions by the strain of elastomer 16.Therefore, the obstacle in the time of can preventing the opposing party's of producing by plate main body 11 rotation bolted operation.And,, for example enumerated rubber or rubber-like resin etc. as the material of elastomer 16.
1-2. the fixing means of guide rail
Next, the fixing means of the guide rail 1 that has used this routine guide rail erecting tools 10 is described.
At first, the sidepiece by a pair of spring clip 4 and rail brackets 2 clamping guide rails 1.At this moment, first nut that in advance a pair of nut 6 is remained in guide rail erecting tools 10 keeps the recess 18 and second nut to keep recess 23, and by magnet 31,33 absorption a pair of nut 6 is temporarily fixed on guide rail erecting tools 10.Because therefore nut 6, can prevent in fixed operation that nut 6 from keeping recess 18,23 to come off from nut by the absorption of the magnetic force of magnet 31,33.Here, two nuts keep recess 18,23 to have profile corresponding shape with nut 6 respectively.Thus, can prevent nut 6 rotation in nut keeps recess 18,23.
Next, as shown in Figure 4, on the face of rail brackets 2 and opposition side 1 opposed on guide rail towards face portion 12a, the 13a of two plates 12,13 and arrangement guide rail erecting tools 10.Then, the threaded portion 5a of pair of bolts 5 is inserted lead to, and bolt 5 is screwed into nut 6 and carries out fastening fixing in the through hole 4a of a pair of spring clip 4 and the inserting hole 8 of rail brackets 2.At this moment, a pair of nut 6 remains in the nut maintaining part 18,23 with the state that is limited to rotate.Therefore, the operator only pushes the terminal operation that guide rail erecting tools 10 just can carry out bolt 5 and nut 6 easily.In addition, as required, can between the head 5b of bolt 5 and spring clip 4, accompany packing ring.
Next, when fastening fixing ends of a pair of nut 5 and bolt 6, with guide rail erecting tools 10 from rail brackets 2 separation.At this moment, keep a pair of nut 6 in the recess 18,23 fastening with bolt 5 owing to be temporarily fixed on two nuts, therefore a pair of nut 6 is unloaded from guide rail erecting tools 10.Thus, the fixed operation of guide rail 1 finishes.
In addition, because the terminal operation middle guide erecting tools 10 of bolt 5 is not fixed in rail brackets 2, so guide rail erecting tools 10 can repeatedly utilize again.Thus, can realize the reduction of cost, and need a plurality of instruments by the eminence band in hoist trunk, thereby can improve efficiency of operation, and, the security of operation can be improved.
And then, because only by keeping a pair of nuts 6 of recess 18,23 mountings just can utilize the magnetic force of magnet 31,32 that a pair of nut 6 is temporarily fixed on guide rail erecting tools 10, so can save nut is welded to time and time on the plate at two nuts.Consequently, the early-stage preparations that can be used in fixed operation are oversimplified.
In addition, usually since need be in the hoist trunk of elevator fixedly main guide rail and two pairs of guide rails of balance weight guide rail size, therefore need to set the size of two groups of a pair of nuts and be provided with at interval.Therefore, preferably prepare these two guide rail erecting tools of guide rail erecting tools that guide rail erecting tools that main guide rail uses and balance weight are used.
<2. second embodiment 〉
Next, with reference to Fig. 5 and Fig. 6, the guide rail erecting tools of the second embodiment of the present invention is described.
Fig. 5 is the front view of guide rail erecting tools, and Fig. 6 is the side elevation in partial section of expression guide rail erecting tools.
The difference of the guide rail erecting tools 10A of this second embodiment and the guide rail erecting tools 10 of first embodiment is elastomeric shape.Therefore, at this, to the part mark prosign identical and the repetitive description thereof will be omitted with guide rail erecting tools 10.
As shown in Figure 5, the elastomer 16A that is provided with on the guide rail erecting tools 10A of second embodiment forms roughly rectangular-shaped.And, as shown in Figure 6, be provided with the patchhole 29 of the end insertion of ammunition feed gonosome 16A at mutual opposed side 12cA, the 13cA of the first plate 12A and the second plate 13A.
Because other structure is identical with the guide rail erecting tools 10 of above-mentioned first embodiment, therefore omission explanation.Also can access the effect same by guide rail erecting tools 10A with the guide rail erecting tools 10 of the first above-mentioned embodiment with this spline structure, and, when the bolted operation of folk prescription, not only, also bear the torque that is applied to the first plate 12A or the second plate 13A by elastomer 16A by coupling member 14.
<3. the 3rd embodiment 〉
Next, with reference to Fig. 7, the guide rail erecting tools of the third embodiment of the present invention is described.
Fig. 7 is the front view of guide rail erecting tools.
The guide rail erecting tools 10B of the 3rd embodiment removes elastomer 16 and coupling member 14 from the guide rail erecting tools 10 of first embodiment, and is formed the instrument of plate main body by a member.Therefore, the plate main body is described, to the part mark prosign identical and the repetitive description thereof will be omitted with the guide rail erecting tools 10 of first embodiment at this.
As shown in Figure 7, plate main body 11B forms roughly rectangular-shaped flat member.The both sides of the length direction of rectangular face portion 11aB that are roughly at this plate main body 11B are respectively arranged with nut and keep recess 18B, 23B, plate through hole 17B, 22B, two magnet equipped section 21B, 26B.
Because other structure is identical with the guide rail erecting tools 10 of above-mentioned first embodiment, therefore omit explanation.Also can access the effect same by guide rail erecting tools 10B with the guide rail erecting tools 10 of above-mentioned first embodiment with this spline structure.
In addition,, compare, can cut down the parts number of packages with the guide rail erecting tools of first embodiment and the guide rail erecting tools of second embodiment according to the guide rail erecting tools of the 3rd embodiment.Thus, can realize the reduction of cost, and make the guide rail erecting tools easily.
In addition, the present invention is not limited to the embodiment shown in above-mentioned and the diagram, can implement various distortion in the scope of the purport that does not break away from the invention that claims put down in writing.For example, illustrated in the above-described embodiments main board is formed the roughly example of rectangular shape, but do not limited to therewith, also main board can have been formed the elliptical shape of growing crosswise.

Claims (8)

1. guide rail erecting tools, it uses when being fixed in rail brackets at the guide rail by utilizing a pair of spring clip clamping elevator and fastening fixing a pair of nut and bolt and with described guide rail,
Described guide rail erecting tools is characterised in that to possess:
Flat plate main body, described plate main body have the first plate through hole that described pair of bolts connects respectively and the second plate through hole, with the described first plate through hole and the second plate through hole be formed on coaxial go up and will described a pair of nut remain non-rotary first nut keep recess and second nut maintenance recess;
Magnet, described magnet are arranged at described plate main body, and absorption remains in described first nut and keeps recess and described second nut to keep described a pair of nut in the recess and described a pair of nut is temporary fixed.
2. guide rail erecting tools according to claim 1 is characterized in that,
Described magnet be arranged on the described first plate through hole and the described second plate through hole or described first nut keep recess and described second nut keep in the recess at least one side around.
3. guide rail erecting tools according to claim 1 is characterized in that,
It is to form respectively and the profile of the described nut spot-facing of same shape roughly that described first nut keeps recess and described second nut to keep recess.
4. guide rail erecting tools according to claim 1 is characterized in that,
The interval of described first plate through hole and the described second plate through hole and described first nut keep recess and described second nut to keep interval that the interval of recess was set at and was arranged on a pair of inserting hole on the described rail brackets about equally.
5. according to each described guide rail erecting tools in the claim 1~4, it is characterized in that,
Described plate main body has:
First plate with described first plate through hole and described first nut maintenance recess;
Second plate with described second plate through hole and described second nut maintenance recess,
Described guide rail erecting tools possesses: the coupling member that links described first plate and described second plate;
The elastomer that between described first plate and described second plate, disposes.
6. guide rail erecting tools according to claim 5 is characterized in that,
Described elastomer forms the circular shape.
7. guide rail erecting tools according to claim 5 is characterized in that,
Described elastomer forms roughly rectangular-shaped,
Mutual opposed one side at described first plate and described second plate is provided with the patchhole that inserts for described elastomer.
8. guide rail fixing means, it is used for the guide rail of elevator is fixed in rail brackets,
Described guide rail fixing means is characterised in that, comprising:
First nut on being formed at the plate main body of guide rail erecting tools keeps the recess and second nut to keep in the recess a pair of nut remained not rotating, and by being arranged on that magnet on the described plate main body adsorbs described a pair of nut and with the temporary fixed operation of described a pair of nut;
On the face of described rail brackets and opposition side opposed of described guide rail, keep recess and described second nut to keep the face of recess and dispose the operation of described guide rail erecting tools towards described first nut that is formed with temporary fixed described a pair of nut;
By a pair of spring clip and the described guide rail of described rail brackets clamping, make slotting leading to of pair of bolts reach a pair of inserting hole that on described rail brackets, is provided with in the through hole that on described a pair of spring clip, is provided with, and with described pair of bolts and the fastening fixing operation of described a pair of nut that is temporarily fixed on described guide rail erecting tools;
Described guide rail erecting tools is separated the operation of taking off described a pair of nut from described guide rail erecting tools from described rail brackets.
CN 201010247393 2009-08-10 2010-08-05 Guide way mounting tool and guide way fixing method Expired - Fee Related CN101992391B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2009185882A JP4964278B2 (en) 2009-08-10 2009-08-10 Guide rail mounting jig
JP2009-185882 2009-08-10

Publications (2)

Publication Number Publication Date
CN101992391A true CN101992391A (en) 2011-03-30
CN101992391B CN101992391B (en) 2013-03-06

Family

ID=43765787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010247393 Expired - Fee Related CN101992391B (en) 2009-08-10 2010-08-05 Guide way mounting tool and guide way fixing method

Country Status (2)

Country Link
JP (1) JP4964278B2 (en)
CN (1) CN101992391B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102249129A (en) * 2011-05-30 2011-11-23 张凡 Modular mounting elevator guide rails and installation method thereof
CN103663046A (en) * 2012-09-07 2014-03-26 S.A.德贝拉(萨贝拉)公司 Integral flange system used for fastening elevator guiding device onto fixing structure
CN104159841A (en) * 2012-03-09 2014-11-19 株式会社日立制作所 Device for attaching elevator guide rail
CN104589040A (en) * 2015-01-23 2015-05-06 巨人通力电梯有限公司 T-shaped guide rail mounting tool for elevator
CN105084153A (en) * 2014-05-13 2015-11-25 株式会社日立建筑系统 Guide rail fixing apparatus for lift
CN106064773A (en) * 2015-04-23 2016-11-02 通力股份公司 Cage guide fixation clamp
CN108290714A (en) * 2015-11-30 2018-07-17 奥的斯电梯公司 The railway clamp of elevator device
CN110206798A (en) * 2019-03-14 2019-09-06 苏州同捷汽车工程技术股份有限公司 A kind of fixed structure of nutplate in aluminum profile
CN113602934A (en) * 2021-08-12 2021-11-05 广东奥菱电梯有限公司 Installation method of elevator guide rail

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107911987B (en) * 2017-12-12 2023-05-16 无锡优耐特能源科技有限公司 C-shaped rail capable of being provided with multiple terminal strips at will

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61168312U (en) * 1985-04-09 1986-10-18
CN87102507A (en) * 1986-05-07 1987-11-25 三菱电机株式会社 Jacking system
CN1189443A (en) * 1997-01-23 1998-08-05 奥蒂斯电梯公司 Elevator guide rail
JP2004099277A (en) * 2002-09-11 2004-04-02 Hitachi Building Systems Co Ltd Securing device and method for elevator guide rail
CN1761607A (en) * 2004-03-18 2006-04-19 三菱电机株式会社 Rail fixing device of elevator
JP2007331878A (en) * 2006-06-14 2007-12-27 Mitsubishi Electric Corp Guide rail fixing device for elevator

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61168312U (en) * 1985-04-09 1986-10-18
CN87102507A (en) * 1986-05-07 1987-11-25 三菱电机株式会社 Jacking system
CN1189443A (en) * 1997-01-23 1998-08-05 奥蒂斯电梯公司 Elevator guide rail
JP2004099277A (en) * 2002-09-11 2004-04-02 Hitachi Building Systems Co Ltd Securing device and method for elevator guide rail
CN1761607A (en) * 2004-03-18 2006-04-19 三菱电机株式会社 Rail fixing device of elevator
JP2007331878A (en) * 2006-06-14 2007-12-27 Mitsubishi Electric Corp Guide rail fixing device for elevator

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102249129B (en) * 2011-05-30 2014-03-26 张凡 Modular mounting elevator guide rails
CN102249129A (en) * 2011-05-30 2011-11-23 张凡 Modular mounting elevator guide rails and installation method thereof
CN104159841B (en) * 2012-03-09 2016-06-08 株式会社日立制作所 The rail fixing device of elevator
CN104159841A (en) * 2012-03-09 2014-11-19 株式会社日立制作所 Device for attaching elevator guide rail
CN103663046A (en) * 2012-09-07 2014-03-26 S.A.德贝拉(萨贝拉)公司 Integral flange system used for fastening elevator guiding device onto fixing structure
CN105084153A (en) * 2014-05-13 2015-11-25 株式会社日立建筑系统 Guide rail fixing apparatus for lift
CN105084153B (en) * 2014-05-13 2017-08-25 株式会社日立建筑系统 The guide rail fixer of elevator
CN104589040A (en) * 2015-01-23 2015-05-06 巨人通力电梯有限公司 T-shaped guide rail mounting tool for elevator
CN104589040B (en) * 2015-01-23 2017-02-22 巨人通力电梯有限公司 T-shaped guide rail mounting tool for elevator
CN106064773A (en) * 2015-04-23 2016-11-02 通力股份公司 Cage guide fixation clamp
CN108290714A (en) * 2015-11-30 2018-07-17 奥的斯电梯公司 The railway clamp of elevator device
CN110206798A (en) * 2019-03-14 2019-09-06 苏州同捷汽车工程技术股份有限公司 A kind of fixed structure of nutplate in aluminum profile
CN113602934A (en) * 2021-08-12 2021-11-05 广东奥菱电梯有限公司 Installation method of elevator guide rail

Also Published As

Publication number Publication date
JP2011037567A (en) 2011-02-24
JP4964278B2 (en) 2012-06-27
CN101992391B (en) 2013-03-06

Similar Documents

Publication Publication Date Title
CN101992391B (en) Guide way mounting tool and guide way fixing method
US7726922B2 (en) Quick release support post and associated method
JP4832267B2 (en) Chain clamp device
AU2018309117B2 (en) Connection structure and system of integrated brake device for rail vehicle
US9022357B2 (en) Aerial roller spacer apparatus and associated methods thereof
JP2015506448A (en) Self-indexing nut plate
US8070113B1 (en) Sway brace
CN203099173U (en) Clamping hoop
KR100710835B1 (en) A clamping device for fixing pipe
CN102979714A (en) Chain lathedog and concrete pumping system
JP5160965B2 (en) Fitting
CN104220302A (en) Quick fastening device for panels
CN111765153A (en) Fixing device
GB2477550A (en) Threaded insert
CN101364716A (en) Clamp type hot-line work fastener and using method
CN202946366U (en) Chained clamp and concrete pumping system
CN201891938U (en) Fixture component for fixing cable rope on structural support and wind turbine
EP1914461A1 (en) System for securing pipes to a supporting structural element
CN202326621U (en) Supporting plate self-locking nut
CN207087761U (en) The demounting tool of cylinder head spron dedicated tool
JP2012001348A (en) Guide rail mounting implement and guide rail fixing method
US7748326B2 (en) Docking station for rail trolley
CN202608763U (en) Air reservoir installing structure
CN106379307B (en) A kind of adjustable-angle pipeline fixing support
CN213027235U (en) Fixed subassembly of pencil and vehicle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130306

CF01 Termination of patent right due to non-payment of annual fee