CN101988385B - 岩溶大水矿山透气方法 - Google Patents

岩溶大水矿山透气方法 Download PDF

Info

Publication number
CN101988385B
CN101988385B CN2009101159423A CN200910115942A CN101988385B CN 101988385 B CN101988385 B CN 101988385B CN 2009101159423 A CN2009101159423 A CN 2009101159423A CN 200910115942 A CN200910115942 A CN 200910115942A CN 101988385 B CN101988385 B CN 101988385B
Authority
CN
China
Prior art keywords
mine
water
karst
sleeve pipe
lake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009101159423A
Other languages
English (en)
Other versions
CN101988385A (zh
Inventor
杨建安
蒋义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China ruim engineering technology Limited by Share Ltd
Original Assignee
China Nerin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nerin Engineering Co Ltd filed Critical China Nerin Engineering Co Ltd
Priority to CN2009101159423A priority Critical patent/CN101988385B/zh
Publication of CN101988385A publication Critical patent/CN101988385A/zh
Application granted granted Critical
Publication of CN101988385B publication Critical patent/CN101988385B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

一种岩溶大水矿山透气方法,位于湖泊地区的岩溶大水矿山在疏干排水时,由于真空吸蚀作用,容易引起湖底淤泥的塌陷,造成湖水灌入矿坑,在湖区设置透气孔后,可将溶洞、岩溶裂隙等导水通道与外面空气导通,可减轻湖区的塌陷程度,减小湖水对矿坑的灌入量,避免矿坑内透水事故的发生以及减少矿坑的排水量及排水经营费用,减少矿山的地表塌陷及水土流失现象,为矿山的安全生产及节能环保提供有力保障。

Description

岩溶大水矿山透气方法
技术领域
本发明涉及一种矿区透气方法,尤其涉及一种矿区内存在湖泊、河流等地表水体的岩溶大水矿山的透气方法。
背景技术
位于湖泊地区的岩溶大水矿山疏干排水时,可将溶洞、岩溶裂隙中水、气排出,这些导水通道中就会形成真空,在外部压力的作用下,容易引起湖底淤泥的塌陷,造成湖水灌入矿坑,地表容易产生塌陷破坏,即“真空吸蚀”作用。目前岩溶塌陷地区有一种充气孔的岩溶塌陷防治方法,其机理是采用钻孔将地表与溶洞贯通,然后采用空压机等机器向溶洞充气来平衡溶洞内外气压,防止地表产生塌陷。充气防塌法需要动力和人为控制,现急需一种自然条件下平衡溶洞内外气压,能够长久使用,无需动力、不受人为因素制约的岩溶塌陷防治方法。由于透气的应用条件为水文地质条件复杂的矿山且矿区周围存在湖泊等地表水体,地表水体底部存在淤泥或其它第四系隔水封闭地层,设置透气孔透气在节省排水经营费用及提高井下安全生产条件方面具有很大的优势,符合国家节能环保的政策。
发明内容
本发明的目的是提供一种可将溶洞、岩溶裂隙等导水通道与外面空气导通的岩溶大水矿山透气方法,减少或避免因岩溶大水矿山疏干排水引起的“真空吸蚀”作用产生的地表水体底部塌陷现象,避免矿坑内透水事故的发生以及减少矿坑的排水量及排水经营费用,减少矿山的地表塌陷及水土流失现象,为矿山的安全生产及节能环保提供有力保障。
本发明的岩溶大水矿山透气方法:首先采用钻孔开孔,揭穿淤泥层,在进入灰岩地层2-3米后下入套管,然后采用水泥止水,止水厚度1-2米,完成止水工作后换直径稍小的钻头开孔直到孔底,该段根据井壁工程地质情况采用套管或者裸壁,套管在溶洞上下1米左右,根据溶洞充填物情况改制为打孔过滤器,透气孔孔深控制在距较大溶洞底10-15米深。地层内钻孔完成后,需在地表进行防杂物弯头与套管的焊接工作,防杂物弯头高度应为地表水体的最高洪水位标高0.5米以上,然后在防杂物弯头进行透气孔保护设施的施工,防止意外破坏。
本发明的岩溶大水矿山透气方法:打孔过滤器孔眼为条孔,过滤器孔隙率不小于30%。
本发明的优点在于:
1、节能环保,减少矿山地表塌陷、水土流失;
2、减少排水设施的排水量及排水经营费用。
3、可防止矿坑内透水事故的发生,避免发生安全生产事故
附图说明
图1为本发明的岩溶大水矿山透气方法实施例结构示意图。
图2为本发明的实施例中打孔过滤器结构示意图
具体实施方式
本发明的岩溶大水矿山透气方法,首先采用钻孔成孔,开孔Φ127毫米,揭穿淤泥层5,在进入灰岩地层7后大约2-3米时下入Φ127毫米套管3,然后采用水泥2止水,止水厚度1-2米,完成止水工作后换径为Φ110毫米直到孔底,该段根据井壁工程地质情况采用套管3,套管3在溶洞6上下1米左右,根据溶洞充填物情况改制为打孔过滤器8,孔眼为条孔,过滤器孔隙率不小于30%,透气孔孔深控制在距较大溶洞底15米深。地层内钻孔完成后,需在地表进行防杂物弯头4与套管3的焊接工作,防杂物弯头4高度应为地表水体的最高洪水位标高以上0.5米,然后在防杂物弯头4进行透气孔保护设施的施工,防止意外破坏。
设置透气孔透气的主要目的是减轻疏干排水对地表水体底部的塌陷破坏程度,减轻湖区的塌陷程度,减少地表水进入矿坑的水量,可减少矿山的排水经营费用。其主要工作原理就是将溶洞、岩溶裂隙等导水通道与外面大气层导通,防止导水通道形成真空,从而减轻或者避免地表塌陷的形成,防止地表水体突然溃入矿坑内,一方面可减少矿山地表塌陷、水土流失、减少排水设施的排水量及排水经营费用,另一方面可防止矿坑内透水事故的发生,避免发生安全生产事故。
以上内容是结合具体的优选实施方式对本发明所作的进一步详细说明,不能认定本发明的具体实施只局限于这些说明。对于本发明所属技术领域的普通技术人员来说,在不脱离本发明构思的前提下做出若干等同替代或明显变型,而且性能或用途相同,则应当视为属于本发明由所提交的权利要求书确定的保护范围。

Claims (3)

1.一种岩溶大水矿山透气方法:首先采用钻孔开孔,揭穿淤泥层,在进入灰岩地层2-3米后下入套管,然后采用水泥止水,止水厚度1-2米,完成止水工作后换直径稍小的钻头开孔直到孔底,该段根据井壁工程地质情况采用套管或者裸壁,套管在溶洞上下1米左右,根据溶洞充填物情况改制为打孔过滤器,透气孔孔深控制在距较大溶洞底10-15米深,地层内钻孔完成后,需在地表进行防杂物弯头与套管的焊接工作,防杂物弯头高度应为地表水体的最高洪水位标高0.5米以上,然后在防杂物弯头进行透气孔保护设施的施工,防止意外破坏。
2.根据权利要求1所述的岩溶大水矿山透气方法,其特征在于:打孔过滤器的孔眼为条孔,打孔过滤器孔隙率不小于30%。
3.根据权利要求1或2所述的岩溶大水矿山透气方法,其特征在于:钻孔开孔直径Φ127毫米,直径稍小的钻头为Φ110毫米,直到孔底。
CN2009101159423A 2009-08-07 2009-08-07 岩溶大水矿山透气方法 Active CN101988385B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101159423A CN101988385B (zh) 2009-08-07 2009-08-07 岩溶大水矿山透气方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101159423A CN101988385B (zh) 2009-08-07 2009-08-07 岩溶大水矿山透气方法

Publications (2)

Publication Number Publication Date
CN101988385A CN101988385A (zh) 2011-03-23
CN101988385B true CN101988385B (zh) 2012-07-25

Family

ID=43745146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101159423A Active CN101988385B (zh) 2009-08-07 2009-08-07 岩溶大水矿山透气方法

Country Status (1)

Country Link
CN (1) CN101988385B (zh)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19831234A1 (de) * 1998-07-11 2000-01-13 Kavernen Bau Betriebs Gmbh Verfahren und Vorrichtung zur Aussolung geneigter Lagerstätten
US6609761B1 (en) * 1999-01-08 2003-08-26 American Soda, Llp Sodium carbonate and sodium bicarbonate production from nahcolitic oil shale
CN101012756A (zh) * 2007-02-11 2007-08-08 杜志刚 煤矿煤层钻孔增加抽放瓦斯量的方法
CN101012755A (zh) * 2007-02-11 2007-08-08 杜志刚 煤矿煤层钻孔增加抽放瓦斯量的设备
CN101144389A (zh) * 2007-04-06 2008-03-19 中国矿业大学 网格式穿层钻孔孔群增透瓦斯抽采方法
CN101382073A (zh) * 2007-09-29 2009-03-11 永城煤电集团有限责任公司 “三软”低透气性高瓦斯煤层快速掘进方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19831234A1 (de) * 1998-07-11 2000-01-13 Kavernen Bau Betriebs Gmbh Verfahren und Vorrichtung zur Aussolung geneigter Lagerstätten
US6609761B1 (en) * 1999-01-08 2003-08-26 American Soda, Llp Sodium carbonate and sodium bicarbonate production from nahcolitic oil shale
CN101012756A (zh) * 2007-02-11 2007-08-08 杜志刚 煤矿煤层钻孔增加抽放瓦斯量的方法
CN101012755A (zh) * 2007-02-11 2007-08-08 杜志刚 煤矿煤层钻孔增加抽放瓦斯量的设备
CN101144389A (zh) * 2007-04-06 2008-03-19 中国矿业大学 网格式穿层钻孔孔群增透瓦斯抽采方法
CN101382073A (zh) * 2007-09-29 2009-03-11 永城煤电集团有限责任公司 “三软”低透气性高瓦斯煤层快速掘进方法

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
JP特开2001-042765A 2001.02.16
冯兴隆等.基于三维模拟技术的矿岩可崩性评价.《煤炭学报》.2008,(第9期), *
曹国华
曹国华;田富超;郝从娜.地质构造对寺河矿煤层瓦斯赋存规律的影响分析.《煤炭工程》.2009,(第3期), *
田富超
郝从娜.地质构造对寺河矿煤层瓦斯赋存规律的影响分析.《煤炭工程》.2009,(第3期),

Also Published As

Publication number Publication date
CN101988385A (zh) 2011-03-23

Similar Documents

Publication Publication Date Title
CN107246019A (zh) 一种边坡地下水钻孔自启动负压排水系统及方法
CN109026010B (zh) 一种矿山渗井注浆型凿井施工方法
CN104594327B (zh) 一种基坑工程降水保泉回灌一体化装置
CN101294393A (zh) 一种基坑外设置减压降水井的施工方法
CN104762981A (zh) 一种降水井的成孔方法
CN104929135A (zh) 深基坑地下连续墙围护结构及其旋喷桩止水施工方法
CN104047280B (zh) 软弱地基快速分离夯实法
CN108104814A (zh) 高含铁地下含水层受采煤破坏的人工促进修复方法
CN103615014B (zh) 一种软土基坑的降水装置及其使用方法
CN203960941U (zh) 一种承压水取水井
CN213867881U (zh) 地墙渗漏抢险系统
CN201554005U (zh) 高压水头下大流量高速射流封堵钻灌孔口安全控制装置
CN101988385B (zh) 岩溶大水矿山透气方法
CN103898915A (zh) 建筑物小面积深基坑抗浮止水施工方法
CN204703180U (zh) 一种基坑降水封井装置
CN106592546B (zh) 一种利用开孔圆筒辅助边坡排水的装置
CN106402505B (zh) 可调节式穿墙洞止水装置
CN213204183U (zh) 一种基坑内、外承压井结构
CN104863502A (zh) 一种含气土层防溢流和井喷的安全钻孔装置及其方法
CN106988330A (zh) 软土地基分层降水施工结构以及施工方法
CN106894429B (zh) 基坑工程软土地基分层降水施工结构以及施工方法
CN203284787U (zh) 复合式管井降水系统
CN206706793U (zh) 一种用于降低承压水头压力的组合式减压井
CN206438498U (zh) 一种自制降水井管
CN110630187A (zh) 一种预防井下用水文钻孔孔口管断裂的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 330031 No. 888, Qian Hu Road, Hongjiao Island, Nanchang, Jiangxi.

Patentee after: China ruim engineering technology Limited by Share Ltd

Address before: No. 1, Bayi Avenue, Nanchang, Jiangxi Province, Jiangxi

Patentee before: China Nerin Engineering Co., Ltd.

CP03 Change of name, title or address