Summary of the invention
Therefore technical matters to be solved by this invention is the requirement that existing super-large diameter shield-tunneling construction synchronous grouting method can not satisfy moulding section of jurisdiction quality and ground settlement fully.
At the problems referred to above, the present invention relies on concrete engineering to carry out the experimental study of system, has proposed the scaling method of a kind of shield synchronization slip casting amount and grouting pressure, may further comprise the steps:
(1) test hose pipe damping power loss, it further comprises:
Connect grouting pump and the native case of a test by flexible pipe;
In the native case of described test, apply an emulation reservoir pressure;
By described grouting pump via described flexible pipe to the native case slip casting of described test;
Measure described flexible pipe inlet pressure and top hole pressure, calculate the loss of flexible pipe pipe damping power thus;
(2) test shield grouting pipeline pipe damping power loss, it further comprises:
Be connected grouting pump and the native case of a test with flexible pipe by the shield grouting pipeline;
In the native case of described test, apply an emulation reservoir pressure;
By described grouting pump via described shield grouting pipeline and described flexible pipe to the native case slip casting of described test;
Measure the inlet pressure and the top hole pressure of described shield grouting pipeline, calculate described shield grouting pressure loss in piping thus;
In conjunction with the result of described step (1), step (2), demarcate grouting pressure;
(3) before and after the beginning of described step (1), step (2), respectively the native case of described test is weighed, determine the soil paste weight injected in the experimentation, and, determine the grouting amount of grouting pump piston single stroke in conjunction with the number of stroke of grouting pump described in the experimentation.
Further improvement of the present invention is that the described flexible pipe pipe of synchronism detection damping power is lost in step (2), and comes the flexible pipe pipe damping power in the verification step (1) to lose test result with described test result.
Further improvement of the present invention is that above-mentioned steps further comprises in (1):
Before connecting grouting pump and test native case that flexible pipe and the water filling of synchronous grouting pipeline is lubricated by flexible pipe.
Further improvement of the present invention is that above-mentioned emulation reservoir pressure value is 0.3MPa.
Embodiment
Below in conjunction with a specific embodiment the present invention is illustrated.
One shield tunnel construction adopts the earth pressure balanced shield, EPBS of Ф 14270mm, tunnel lining structure external diameter 13950mm, internal diameter 12750mm, thick 600mm, ring width 2000mm: shield tunnel main line maximum longitudinal grade is 5.5%, and minimum radius of horizontal curve is R700m, tunnel total length 1860m.The long distance of shield structure is passed through the airport section and is closely passed through airport aviation fuel pipe, and both are very high to the requirement of ground settlement.In view of shield machine takes the principle of " two control " to control distortion, the ground posterior settlement that can reduce the rear effectively when the synchronous grouting, shorten the stabilization time of posterior settlement, and the demarcation of shield machine synchronous grouting pressure that adopts and grouting amount is the basis of two controls, by the present invention, it is as follows to specify implementation step in conjunction with Fig. 1 to Fig. 2 for this reason:
Test native case installation, weigh and pressure testing;
Place the place, vacant lot, ellipse head, 2 flange plates are installed, and at pump discharge place setting pressure table 71, at flexible pipe stage casing setting pressure table 72, at pipe exit setting pressure table 73, at the top setting pressure table 74 of the native case 10 of test;
When ellipse head and flange plate were installed, the flange face cementing was pasted intact rubber gasket; The bolt symmetry is pretension repeatedly, and the test soil case 10 of installation as shown in Figure 1.Because the native case 10 of test need provide the pressure effect in the process of the test, in order to guarantee safety, need carry out pressure testing to it before on-test, to verify its sealing and crushing resistance.
Intact and sealing for the transition section pipeline used in check test soil case 10 and the test, it is on the flanged plate of F750mm that the transition pipeline is received native case 10 latus rectums of test, and safety overflow valve, turnover tracheae and valve on installation test soil case 10 ellipse heads.Draft tube connected begin pressurization behind the air compressor, the classification pressurization is adopted in pressurization, every grade of pressurization 0.1MPa, be 10 minutes every grade of stabilization time, make discovery from observation, be about 15 minutes every grade of pressing time, and every grade of pressurization finishes in the stabilization process, soil box top tensimeter 74 values remain unchanged substantially, and are can the native case sealing of confirmed test good.After being forced into 0.3MPa, continue pressurization, native case safety overflow valve begins release, and is working properly.
Mouth of pipe transition section 20 is connected on the native case 10 of test, utilizes electronic hanger scale to weigh to testing native case 10, obtaining its initial weight is 5060kg.
(2) mix the system simultaneous grouting slurry;
The simultaneous grouting slurry proportioning of test usefulness is as table 1(kg/m3) shown in, test with the on-the-spot automatic slurry mixing plant of simultaneous grouting slurry utilization by construction period the slurries whipping procedure mix system.It is as shown in table 2 to mix the size performance index of making.
(3) test hose pipe damping power loss testing equipment is installed;
1) lifting of the native case 10 of test;
The native case 10 of test is placed on the end that shield duct piece is fed the sheet machine, the below of section of jurisdiction hole for hoist in this test; By the driving of section of jurisdiction hole for hoist top, test native case 10 with having a try and be positioned over the end that shield duct piece is fed the sheet machine.
2) flexible pipe connects;
Connect from shield machine dismounting flexible pipe down, flexible pipe one end is connected in the grouting hole 42 of grouting pump 40, the other end places abandons slurry barrel.At first squeeze into the bentonitic clay lubricating pipe, after bentonitic clay has been beaten, slowly squeeze into simultaneous grouting slurry, emit slurry to 20 mouthfuls of mouth of pipe transition sections till; Be full of slurries in the pipeline this moment, connecting pipe mouth transition section 20 and the native case 10 of test.
3) native case 10 pressurizations of test;
Close the ball valve on the mouth of pipe transition section 20 that is connected in the native case 10 of test, utilize air compressor will test native case 10 and be forced into 0.3MPa, close air intake valve then, will test native case 10 and form a closed container.
(4) test hose pipe damping power loss experiment process;
After above-mentioned work is finished, promptly begin to carry out the test of test hose pipe damping power loss, get the flexible pipe of three kinds of different pipe ranges in the process of the test and test, because grouting pump of the present invention is same model, so to arbitrary grouting pump test all can, the concrete operations flow process is as follows:
Open the ball valve on the mouth of pipe transition section 20, at this moment,, form the part space, so official test is made a call to three stroke slurries in advance before beginning pipeline is refilled because the pressure in the native case of test 10 may make the slurries in the pipeline produce certain compression.
Formally begin test, flow control is made as 80%, continue in the native case 10 of test, to squeeze into 10 stroke slurries, squeeze in the process tensimeter on the pipeline 71, tensimeter 72, tensimeter 73 are carried out record, the ball valve after grouting pump 40 quits work on the blanked-off pipe mouth transition section 20.
The pressure-release valve of opening on the transition section 30 carries out release to the slurries in the pipeline, removes first flexible pipe then, and second flexible pipe of second kind of length is connected to transition section 30 pipelines.
Open the ball valve on the mouth of pipe transition section 20, continue in the native case 10 of test, to squeeze into 9 stroke slurries, squeeze in the process tensimeter on the pipeline 71, tensimeter 72, tensimeter 73 are carried out record.Ball valve after grouting pump 40 quits work on the blanked-off pipe mouth transition section 20.
The pressure-release valve of opening on the transition section 30 carries out release to the slurries in the pipeline, removes second flexible pipe then, and the 3rd flexible pipe of the third length is received transition section 30 pipelines.
Open the ball valve on the mouth of pipe transition section 20, continue in the native case 10 of test, to squeeze into 10 stroke slurries, squeeze in the process tensimeter on the pipeline 71, tensimeter 72, tensimeter 73 are carried out record.Ball valve after grouting pump 40 quits work on the blanked-off pipe mouth transition section 20.
After above-mentioned work is finished, promptly begin to test the test of shield grouting pipeline pipe damping power loss; All be connected with the long flexible pipe of 29.5m behind each grouting hole in the test shield grouting pipeline pipe damping power loss process of the test.Because test shield grouting pipeline pipe damping power loss duration of test runs is longer, therefore be divided into two stages to finish, the concrete operations flow process is as follows:
Stage one:
Transition section on the flexible pipe 30 is connected in grouting hole 41, and the other end places abandons slurry bucket, slowly squeezes into simultaneous grouting slurry, emit slurry to 20 mouthfuls of mouth of pipe transition sections till, be full of slurries in the pipeline this moment, connecting pipe mouth transition section 20 and the native case 10 of test.
Open mouth of pipe transition section 20 ball valves, formally begin test, flow control is made as 80%.Continue in the native case 10 of test, to squeeze into 30 stroke slurries, squeeze in the process pumping hole, grouting hole and the tensimeter 74 tested on the native case 10 are carried out record, also write down near the tensimeter of shield structure self being placed in simultaneously to proofread.Ball valve after grouting pump 40 quits work on blanked-off pipe mouth transition section 20 and the transition section 30 makes the flexible pipe complete closed;
Respectively the grouting pipeline of grouting hole 43,44,46 correspondences is slowly squeezed into simultaneous grouting slurry, emit slurry to grouting hole till;
Transition section 30 is connected to grouting hole 46, open the ball valve on transition section 30 and the mouth of pipe transition section 20, continue to squeeze into 30 stroke slurries, squeeze in the process tensimeter 71, tensimeter 72, tensimeter 73, tensimeter 74 carries out record, the ball valve after grouting pump 40 quits work on blanked-off pipe mouth transition section 20 and the transition section 30.
Transition section 30 is connected to grouting hole 44, opens the ball valve on transition section 30 and the mouth of pipe transition section 20, continue to squeeze into 30 stroke slurries, squeeze in the process tensimeter 71, tensimeter 72, tensimeter 73, tensimeter 74 carries out record.Ball valve after grouting pump quits work on blanked-off pipe mouth transition section 20 and the transition section 30.
Transition section 30 is connected to grouting hole 43, opens the ball valve on transition section 30 and the mouth of pipe transition section 20, continue to squeeze into 30 stroke slurries, squeeze in the process tensimeter 71, tensimeter 72, tensimeter 73, tensimeter 74 carries out record.Ball valve after grouting pump quits work on blanked-off pipe mouth transition section 20 and the transition section 30.
Stage two:
Remove flexible pipe, clean all pipelines, and the pipeline of grouting hole 42,45 correspondences is recovered.
According to in-site measurement, remove the flexible pipe on the grouting pipeline of grouting hole 41,44 correspondences finished test, its total length be identical with flexible pipe, is used for alternative flexible pipe (the flexible pipe mark is still used in the back).
With flexible pipe two ends difference connecting pipe mouth transition section 20 and transition section 30, transition section 30 is connected to grouting hole 45.The grouting pipeline of lubricated grouting hole 42,45 correspondences is squeezed into slurries till the mouth of pipe emits slurry.
Mouth of pipe transition section 20 is connected to the native case 10 of test, opens mouth of pipe transition section 20 ball valves, continue to squeeze into 30 stroke slurries, squeeze in the process to tensimeter 71, tensimeter 72, tensimeter 73, tensimeter 74 carries out record.Ball valve after grouting pump 40 quits work on blanked-off pipe mouth transition section 20 and the transition section 30.
Transition section 30 is connected to grouting hole 42, opens pumping hole and mouth of pipe transition section 20 ball valves.Continue to squeeze into 30 stroke slurries, squeeze in the process tensimeter 71, tensimeter 72, tensimeter 73, tensimeter 74 carries out record.Ball valve after grouting pump 40 quits work on blanked-off pipe mouth transition section 20 and the transition section 30.
To test native case 10 releases, and utilize electronic hanger scale to claim its weight, obtaining its weight is 12050kg.
So far, test is all finished.Subsequently, test native case 10 releases, tear work such as pipe, pigging and pipeline recovery open.
(5) demarcate grouting amount and grouting pressure according to test findings;
Grouting pressure demarcate for actual grouting pressure and each grouting pipeline pipe hinder poor, the grouting pipeline pipe hinders by above-mentioned test determination, the result as table 3 to shown in the table 7:
Table 3: grouting hole 41 corresponding pipeline pipe resistiveizations
Table 4: grouting hole 42 corresponding pipeline pipe resistiveizations
Table 5: grouting hole 44 corresponding pipeline pipe resistiveizations
Table 6: grouting hole 45 corresponding pipeline pipe resistiveizations
Table 7: grouting hole 46 corresponding pipeline pipe resistiveizations
Weigh and to find according to the soil of twice test in process of the
test case 10,
native case 10 deadweights of test are 5060kg before the test,
native case 10 of test and slurries general assembly (TW) reach 12050kg after the off-test, promptly squeeze into the heavy 6990kg of slurries in the
native case 10 of test in the process of the test.Because always squeezing into number of stroke in the process of the test is 191, simultaneous grouting slurry density is 2.1kg/L, so the grouting amount of grouting pump 40 piston single strokes
For:
In sum, utilize pressure test soil case 10 simulation grouting hole place water and soil pressure environments,, successfully carry out slurries pumping test in conjunction with the synchronous grouting equipment of shield machine.In the process of the test, by the data that are installed on pipeline upward pressure table are carried out record, obtain the pressure of key position slurries in the Grouting Pipe, according to test figure, obtain the pressure differential at each grouting port place of shield machine and corresponding pumping hole place, practice of construction is had crucial directive significance.
Weigh to testing native case 10 before and after the test,, obtain the grouting amount of grouting pump 40 piston single strokes in the process of the test, can be used for the demarcation of grouting amount in the practice of construction by calculating its weight change, record grouting pump 40 stroke of piston numbers.