CN101980417B - Digital substation testing simulation method - Google Patents

Digital substation testing simulation method Download PDF

Info

Publication number
CN101980417B
CN101980417B CN2010105286219A CN201010528621A CN101980417B CN 101980417 B CN101980417 B CN 101980417B CN 2010105286219 A CN2010105286219 A CN 2010105286219A CN 201010528621 A CN201010528621 A CN 201010528621A CN 101980417 B CN101980417 B CN 101980417B
Authority
CN
China
Prior art keywords
test
simulation
substation
calculation
digital
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010105286219A
Other languages
Chinese (zh)
Other versions
CN101980417A (en
Inventor
马亮
崔斌
李升健
潘本仁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN2010105286219A priority Critical patent/CN101980417B/en
Publication of CN101980417A publication Critical patent/CN101980417A/en
Application granted granted Critical
Publication of CN101980417B publication Critical patent/CN101980417B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

一种数字变电站测试仿真方法,该方法采用基于IEC61850标准的数字动态测试仿真技术的变电站系统测试方法:建立变电站仿真模型,模拟其实际运行,进行系统闭环测试,检测被测装置的动态特性。系统整体设计采用了PCI板卡和多CPU台式机的框架结构,建立了由多CPU台式计算机、基于PCI总线的IEC61850通信卡和小信号及开关量接口卡组成的系统仿真测试装置;多CPU台式机是系统控制的平台,进行绘图、仿真计算、人机交互等处理;基于PCI总线的通信卡提供多个光纤以太网端口与多个保护装置及控制设备相连;保护装置接受通讯卡的MU数据,产生的开关变位等信息通过通讯卡返回台式机,参与仿真模型的电磁暂态计算。A digital substation test simulation method, the method adopts the substation system test method based on the IEC61850 standard digital dynamic test simulation technology: establishes a substation simulation model, simulates its actual operation, performs a system closed-loop test, and detects the dynamic characteristics of the device under test. The overall design of the system adopts the framework structure of PCI board and multi-CPU desktop computer, and establishes a system simulation test device composed of multi-CPU desktop computer, IEC61850 communication card based on PCI bus, small signal and switching value interface card; multi-CPU desktop The computer is a platform for system control, which performs processing such as drawing, simulation calculation, and human-computer interaction; the communication card based on the PCI bus provides multiple optical fiber Ethernet ports to connect with multiple protection devices and control equipment; the protection device accepts the MU data of the communication card , the generated switch displacement and other information are returned to the desktop computer through the communication card, and participate in the electromagnetic transient calculation of the simulation model.

Description

Digital substation testing simulation method
Technical field
The present invention relates to a kind of digital substation testing simulation method, belong to the power automation technical field.
Background technology
In recent years, along with IEC 61850 standards at home apply and the research of digital transformer substation correlation technique progressively deeply, the digital transformer substation Pilot project construction advances rapidly at home.Compare with traditional transformer station, digital transformer substation adopts unified communication standard system, description to transformer station's internal information model and communication process is unified and standard, information digitalization, modeling standardization, transmission networkization have become the key character of digital transformer station secondary system, it has overturned the pattern of traditional transformer station communication and control, again major transformation of Substation Automation System, represented from now on one period electric substation automation system developing direction.
Digital transformer substation is as the digitlization object take first and second system of transformer station, digital information is carried out unified Modeling, physical equipment is virtual, adopt standardized network communication platform, realize information sharing and interoperability, the modernized transformer station of satisfy safety, stablize, reliable, economical operation requires.
Electronic mutual inductor and IEC61850 standard are after digital transformer substation is used, a lot of original problems (the routine transformer electromagnetism is saturated, secondary circuit electromagnetic interference, transmission pressure drop etc.) are very significantly improved, but also bring new problem simultaneously, the test event of digital transformer station secondary system relevant device, method of testing, means of testing etc. have had larger change.
Now widely used on the market is two kinds of testing apparatuss, and a kind of is the conventional tester with power amplifier, obviously can not satisfy the test request of digital transformer substation, does not meet the IEC61850 standard; Another kind is the numerical protection testing apparatus of output IEC61850-9 form; still the follow conventional lines thinking of transformer station test of the testing apparatus that provides; only cancelled original power amplifying device; to have increased an interface arrangement on the Microcomputer Protection test instrument basis of routine; electric current, the voltage analog information of the output of routine test instrument are inputed to protective device after converting light signal to, and these schemes only can be as the transiens testing scheme of digital transformer substation first stage of construction.
The test device for relay protection that uses at present also is not suitable with the needs of electric power digital; existing method of testing simple so that the function imperfection; can only do some simple Basic function testings; can not carry out system's closed cycle simulation test and to the test of the allomeric function of power system device; because the extensive use of digital transformer substation; method of testing and functional limitation seriously limit and have hindered field adjustable and examination; thereby affected the safe and stable operation of digital transformer substation operation and electric power system, can not satisfy the needs of power system development.
Summary of the invention
The objective of the invention is; be not suitable with the needs of electric power digital for the test device for relay protection that solves present use; simple and the incomplete defective of function of existing method of testing; the present invention proposes the brand-new test emulation method of a kind of digital transformer station secondary system; namely based on the transformer substation system method of testing of the digital dynamic test emulation technology of IEC61850 standard; purpose is the digital transformer substation IED test macro of researching and developing based on the IEC61850 standard, the allomeric function test request that satisfies the substation field test and check and accept.
Technical scheme of the present invention is, the present invention adopts the transformer substation system method of testing based on the digital dynamic test emulation technology of IEC61850 standard, and method of testing comprises: set up the substation simulation model, simulate its actual motion, carry out system's closed loop test, detect the dynamic characteristic of tested device.For guaranteeing simultaneously a plurality of devices to be carried out system-level emulation testing, overall system design has adopted the frame structure of PCI integrated circuit board and many CPU desktop computer, sets up the system emulation testing apparatus that forms by many CPU desktop computer, based on the IEC61850 communication card of pci bus and small-signal and switching value interface card.
Many CPU desktop computer is the platform of system control, draws, the processing such as simulation calculation, man-machine interaction.Communication card based on pci bus provides a plurality of fiber optic Ethernet ports to link to each other with a plurality of protective devices and control appliance.Protective device is accepted the MU data of address card, and the information exchanges such as the switch changed position of generation are crossed address card and returned desktop computer, and the electro-magnetic transient that participates in simulation model calculates, and has realized dynamic closed loop test.
What 61850 communication cards and small-signal integrated circuit board and many CPU compunication were adopted is pci bus interface, and pci bus can provide high data transfer rate (132MB/s).Pci bus and CPU are irrelevant, and be also irrelevant with clock frequency, applicable to various platforms, supports multiprocessor and concurrent work.Pci bus also has good autgmentability, by the PCI-PCI bridge circuit, can allow expansion.Provide enough pci bus slots as long as calculate function, 61850 communication cards and small-signal card just can be expanded.
The present invention provides good hardware foundation for testing simultaneously a plurality of tested IED and transformer substation system.Communication interface and small-signal can expand arbitrarily; The real-time calculating of system is distributed on each integrated circuit board, and test macro can greatly not increase amount of calculation because of the increase of light mouth and small-signal.
The present invention has realized the real-time closed-loop test to tested device, this real-time closed-loop test both can detect the dynamic characteristic of tested device (IED) in the digital transformer substation system of actual complex, can reflect in real time that again tested IED action is on the impact of digital transformer substation system.In order to solve the cumbersome amount of calculation because adopting closed loop test to bring, the Software for Design combined with hardware platform of system carries out new design.
The present invention is finished by testing software the real-time calculating that system carries out closed loop test, the decomposition of system mathematic model and data calculating section are on many CPU desktop computer in the software, resolved and be distributed to each pci card, calculating and Communication processing part is finished by DSP on pci card in real time, give full play to so the powerful computing capability of many CPU desktop computer, avoided again the poor shortcoming of its real-time; Because in real time processing is to be finished by the DSP on the every pci card, therefore increases measurement system interface, namely expands pci card, the real-time of system is processed and is not affected, and Design of System Software as shown in Figure 2.The process that the software closed loop is calculated is, in the regular hour step-length, (be 20us to the maximum) by external digital amount interface analysis goose information by computer control system, obtain the external information amount, carry out again the analysis of system mathematic model according to its data, finish the closed loop of model and calculate in real time, and simultaneously the calculation result packing is generated the data output of IEC61850-9 or FT3 form.
Test macro of the present invention set up in the digital transformer substation each once, the Mathematical Modeling of secondary device, the user can be according to on-the-spot actual needs, tested primary system model is set up in combination, tested a plurality of IED carry out real-time emulation testing in this primary system model, true its actual dynamic characteristic of reflection, realize true digital transformer substation digital dynamic analog functuion, i.e. emulation testing.
Each once in the digital transformer substation, the Mathematical Modeling of secondary device is for the user provides powerful basis of software to the overall dynamics test of transformer station, makes the transformer substation system method of testing become possibility.
The present invention's beneficial effect compared with the prior art is, the present invention has changed the pattern of former customizations checkout equipment, has realized the real-time simulation function, and can be simultaneously to a plurality of IED tests, real simulated field transformer station state provides a general digital transformer substation test platform.The present invention can dynamically simulate the transient characterisitics of practical power systems in real time, the actual motion environment of real-time simulation tested device, particularly with the real-time simulation Test Application in on-the-spot test, improved on-the-spot testing level to protective device; The present invention can detect a plurality of tested IED simultaneously according to customer requirements, checks influencing each other under its complicated presence states, can pinpoint the problems in advance.Simulation software is simulated field truly, and protective device is carried out system level testing, greatly improves electric power system personnel's technical merit and power system device production development personnel's research level.
Description of drawings
Fig. 1 is system global structure example block diagram of the present invention;
Fig. 2 is systems soft ware schematic diagram of the present invention;
Picture in picture number expression: the 1st, many CPU desktop computer; The 2nd, the desktop computer internal pci bus; 61850 communication cards of the 3rd, PCI; The 4th, a plurality of fiber ports; The DA small-signal card of the 5th, PCI; The 6th, fiber optic Ethernet; The 7th, protective device equipment; The 8th, simulation small-signal and switching value interface.
Embodiment
The specific embodiment of the present invention as shown in Figure 1.
Open computer, enter the test emulation software systems; Correct with tested a plurality of IED wiring; " real-time simulation " project of selection.
The system testing step is as follows:
(1) computer control system is at first carried out self check:
Automatically search the connection status of bottom communication card, do not connect such as address card and PC, or its card has hardware fault, then computer system can not be carried out hardware operation, and the prompt system mistake.
(2) by the parameter characteristic of on-the-spot tested IED, goose and the smv parameter of communication is set.
The user is parameters directly, also can be by reading in icd configuration file Lookup protocol.To the goose parameter, device also can be directly from tested IED intercepting goose message, automatically configuration.
(3) carry out the parameter setting of simulation software according to the parameter of adjusting in the tested protective relaying device, tester simulation primary system docks with protective device.
" parameter setting area "---the requirement according to protective device arranges primary system parameter and system emulation parameter.The button of clicking main interface right side central arranges frame with all parameters and activates, and successively each parameter is arranged;
The primary system parameter arranges:---all primary system relevant parameters are arranged: CT no-load voltage ratio, electric pressure, system frequency (Hz), total track length, positive sequence impedance, positive sequence impedance angle, zero sequence impedance, zero sequence impedance angle;
The system emulation parameter arranges---all system emulation relevant parameters arranged: load percentage, transition resistance, fault type, the position of fault, Conversion fault time;
(4) press the " RUN " button, system enters normal operating condition, computer system is carried out real-time simulation according to the parameter of the structure of the topology of system and setting and is calculated, and all differential equations are resolved and further calculate the information that the relevant devices being tested such as voltage and current signal of electric current, output of both sides voltage transformer voltage and current flowing instrument transformer need.
(5) these information generate IEC61850-9 or FT3 data through packing, download in each address card, export to device being tested or system; System accepts the goose information that the tested device in the address card sends, and analyzes its switching value and changes.
(6) test process
The test emulation device is exported first normal information, is in normal operating condition, is equivalent to the normal operation of device being tested under the electric power system actual conditions;
By " fault " button, system parameters changes, this is that the electric power system topological structure that simulated changes, computer resolves the differential equation according to the model and algorithm of electrical network, the condition of resolving the differential equation is namely decided by boundary condition and the both sides killer switch on off operating mode of fault, by the correct analogue system transient process of differential equation energy of resolving;
Parameter during output system fault under output system is nonserviceabled is given tested system or device, and parameter comprises fault current, voltage and aperiodic component etc., can react really operation, the failure condition of practical power systems;
After device being tested receives fault message, fault is judged to select correct operation, testing software by Real-time Simulation Technology within the time interval, the jumping that gathers tested system closes signal, determine that the jumping of both sides circuit breaker closes state, and judges the lower for the moment system mode in step according to new topological structure;
The electric power system of tested protective device and institute's emulation consists of closed loop, comes tripping or the killer switch of the system of closing by its action behavior.Thereby simulation algorithm carries out the real-time resolving work of system according to the topological structure that the tripping of killer switch or the state that closes obtain system just, simulation process send data while calculating, therefore the voltage current waveform that observes is with synchronous, the dynamic process of the realistic system of process of the test of this quick real-time resolving and real closed loop;
(7) tested protective relaying device sends actuating signal; PC receives tested protective device feedack, and is presented on the interface, and simultaneity factor provides test report; information when comprising normal, fault and the action message of device being tested etc., save data and waveform.Can so just can test out protective relaying device regular event under the various failure conditions of primary system of simulation, and every defencive function running order of protective device and satisfy system operate time to the requirement of protective device; Thereby properties and the accuracy of action of checking protective relaying device.
(8) stop output, by " stopping " button, test macro enters the wait running status.

Claims (2)

1.一种数字变电站测试仿真方法,其特征在于,所述方法采用基于IEC61850标准的数字动态测试仿真技术的变电站系统测试方法,所述测试方法包括:建立变电站仿真模型,模拟其实际运行,进行系统闭环测试,检测被测装置的动态特性;为保证同时对多个装置进行系统级仿真测试,系统整体设计采用了PCI板卡和多CPU台式机的框架结构,建立了由多CPU台式计算机、基于PCI总线的IEC61850通信卡和小信号及开关量接口卡组成的系统仿真测试装置;多CPU台式机是系统控制的平台,进行绘图、仿真计算、人机交互处理;基于PCI总线的通信卡提供多个光纤以太网端口与多个保护装置及控制设备相连;保护装置接受通讯卡的MU数据,产生的开关变位信息通过通讯卡返回台式机,参与仿真模型的电磁暂态计算,实现了动态闭环测试。1. A digital substation test emulation method, is characterized in that, described method adopts the substation system test method based on the digital dynamic test emulation technology of IEC61850 standard, and described test method comprises: set up substation emulation model, simulate its actual operation, carry out The closed-loop test of the system detects the dynamic characteristics of the device under test; in order to ensure the system-level simulation test of multiple devices at the same time, the overall design of the system adopts the frame structure of PCI board and multi-CPU desktop computer, and establishes a multi-CPU desktop computer, The system simulation test device is composed of IEC61850 communication card based on PCI bus and small signal and switch value interface card; multi-CPU desktop is the platform for system control, which is used for drawing, simulation calculation and human-computer interaction processing; the communication card based on PCI bus provides Multiple optical fiber Ethernet ports are connected to multiple protection devices and control equipment; the protection device receives the MU data of the communication card, and the generated switch displacement information is returned to the desktop computer through the communication card, and participates in the electromagnetic transient calculation of the simulation model, realizing the dynamic Closed loop test. 2.根据权利要求1所述的一种数字变电站测试仿真方法,其特征在于,所述方法对系统进行闭环测试的实时计算由测试软件完成,软件中系统数学模型的分解和数据计算部分在多CPU台式机上,解算好了分发给各个PCI卡,实时计算和通讯处理部分在PCI卡上由DSP完成,软件闭环计算的过程为,由计算机控制系统在一定的时间步长内通过外部数字量接口分析goose信息,得到外部信息量,再根据其数据进行系统数学模型的分析,完成模型的闭环实时计算,并同时将解算结果打包生成IEC61850-9和FT3格式的数据输出。2. a kind of digital substation test emulation method according to claim 1, it is characterized in that, the real-time calculation that described method carries out closed-loop test to system is finished by test software, the decomposition and data calculation part of system mathematical model in the software are in multiple On the CPU desktop, the calculation is completed and distributed to each PCI card. The real-time calculation and communication processing part is completed by DSP on the PCI card. The software closed-loop calculation process is that the computer control system passes the external digital quantity within a certain time step. The interface analyzes the goose information to obtain the amount of external information, and then analyzes the system mathematical model according to the data, completes the closed-loop real-time calculation of the model, and at the same time packs the solution results to generate data output in IEC61850-9 and FT3 formats.
CN2010105286219A 2010-11-02 2010-11-02 Digital substation testing simulation method Active CN101980417B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105286219A CN101980417B (en) 2010-11-02 2010-11-02 Digital substation testing simulation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105286219A CN101980417B (en) 2010-11-02 2010-11-02 Digital substation testing simulation method

Publications (2)

Publication Number Publication Date
CN101980417A CN101980417A (en) 2011-02-23
CN101980417B true CN101980417B (en) 2013-05-01

Family

ID=43600909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105286219A Active CN101980417B (en) 2010-11-02 2010-11-02 Digital substation testing simulation method

Country Status (1)

Country Link
CN (1) CN101980417B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102403788B (en) * 2011-04-28 2014-03-26 广东省电力调度中心 Test system applicable to southern power grid communication guaranteeing system
CN102820703B (en) * 2011-06-09 2014-08-27 国家电网公司 Method and system for determining switch deflection in real time
CN103185848B (en) * 2012-07-12 2016-12-28 深圳市康必达控制技术有限公司 The practical emulation test system of system of entirely standing for digital intelligent transformer station
CN102759692B (en) * 2012-07-24 2014-12-10 广州供电局有限公司 Simulation method for detecting local discharge of switch cabinet based on virtual reality technology
CN103176084B (en) * 2013-03-07 2014-04-16 江苏省电力公司电力科学研究院 Intelligent substation simulation system in panoramic replace mode and integration testing method for intelligent substation simulation system
CN104378413B (en) * 2014-06-27 2018-04-24 许继电气股份有限公司 A kind of intelligent substation simulation system data transmission method
CN106407492A (en) * 2016-02-03 2017-02-15 上海交通大学 Micro-grid real-time simulation method for processing multi-break switches of power systems
CN105891637A (en) * 2016-04-14 2016-08-24 云南电网有限责任公司电力科学研究院 Intelligent substation secondary device testing method and intelligent substation secondary device testing system
CN106204326B (en) * 2016-07-11 2019-12-31 国网浙江省电力公司杭州供电公司 A detection method for power distribution terminal IED equipment used in power distribution system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1929223A (en) * 2005-09-07 2007-03-14 上海东捷建设(集团)有限公司 Integrated automation converting station debugging apparatus
CN101158847A (en) * 2007-08-23 2008-04-09 济南钢铁集团总公司 Electric power substation software emulation platform building method and no power off upgrading improved method
CN101594004A (en) * 2009-06-29 2009-12-02 江苏金智科技股份有限公司 The intelligence control method of electric substation automation system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010226906A (en) * 2009-03-25 2010-10-07 Tokyo Electric Power Co Inc:The Power system analysis model evaluation device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1929223A (en) * 2005-09-07 2007-03-14 上海东捷建设(集团)有限公司 Integrated automation converting station debugging apparatus
CN101158847A (en) * 2007-08-23 2008-04-09 济南钢铁集团总公司 Electric power substation software emulation platform building method and no power off upgrading improved method
CN101594004A (en) * 2009-06-29 2009-12-02 江苏金智科技股份有限公司 The intelligence control method of electric substation automation system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开2010-226906A 2010.10.07

Also Published As

Publication number Publication date
CN101980417A (en) 2011-02-23

Similar Documents

Publication Publication Date Title
CN101980417B (en) Digital substation testing simulation method
CN103105550B (en) A kind of intelligent relay protection device detection method and system
CN109582004B (en) Intelligent detection platform
CN103076520A (en) Dynamic analogue simulation detection platform and analogue simulation method for secondary system of intelligent substation
CN102510131A (en) Method and device for testing overall performance of intelligent transformer substation
CN101685147B (en) Simulation field electric energy metering test device and method
CN105824001B (en) A digital energy meter IEC61850 compliance test method and system
CN103885438A (en) Automatic test system and method for transformer substation measurement and control device
CN103344883A (en) Simulation testing device and method achieving cable fault simulation through wireless network
CN101867225A (en) Integrated debugging method for substation comprehensive automation and relay protection system
CN105044450A (en) Metering error analysis device and method
CN110865263A (en) A virtual test method for smart substation based on minimum test system
CN106329720A (en) Detecting and debugging method for reconstruction and extension project secondary system for intelligent substation
CN105242134A (en) Distributed test method suitable for system-grade test of intelligent high-voltage equipment
CN107543986A (en) A kind of relay protection test system based on mobile platform
CN116243230A (en) On-line fault diagnosis method for voltage transformer
CN107845304A (en) A kind of relay protection teaching experiment simulation platform and its emulation mode
CN114239291A (en) Intelligent substation simulation test method, device, equipment and storage medium
CN204331019U (en) A kind of digital electricity meter IEC61850 compliance test system
CN103605293B (en) A kind of substation relay protection emulation test system and emulation test method thereof
CN109586406B (en) The third-generation intelligent substation analog on-site module test system and its application method
CN110703180A (en) Multi-mode intelligent substation simulation system and method
CN204463622U (en) A smart substation experimental device
CN107219492B (en) High-voltage integrated semi-physical simulation test device for medium-voltage grid electric energy metering
CN206223953U (en) A kind of electronic mutual inductor transient test device based on RTDS real-time simulations

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121206

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121206

Address after: 330000 No. 88 min Qiang Road, private science and Technology Park, Jiangxi, Nanchang

Applicant after: Jiangxi Electric Power Science Academy

Applicant after: State Grid Corporation of China

Address before: 330000 No. 88 min Qiang Road, private science and Technology Park, Jiangxi, Nanchang

Applicant before: Jiangxi Electric Power Science Academy

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180628

Address after: 330096 No. 88, min Qiang Road, private science and Technology Park, Nanchang, Jiangxi

Co-patentee after: State Grid Corporation of China

Patentee after: Power Science Research Institute of Jiangxi Electric Power Co., Ltd.

Address before: 330000 No. 88, min Qiang Road, private science and Technology Park, Nanchang, Jiangxi

Co-patentee before: State Grid Corporation of China

Patentee before: Jiangxi Electric Power Science Academy

TR01 Transfer of patent right