CN105044450A - Metering error analysis device and method - Google Patents
Metering error analysis device and method Download PDFInfo
- Publication number
- CN105044450A CN105044450A CN201510132901.0A CN201510132901A CN105044450A CN 105044450 A CN105044450 A CN 105044450A CN 201510132901 A CN201510132901 A CN 201510132901A CN 105044450 A CN105044450 A CN 105044450A
- Authority
- CN
- China
- Prior art keywords
- electric energy
- energy meter
- stealing
- voltage
- meter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004458 analytical method Methods 0.000 title claims abstract description 63
- 238000000034 method Methods 0.000 title abstract description 25
- 238000005259 measurement Methods 0.000 claims abstract description 104
- 230000005611 electricity Effects 0.000 claims abstract description 83
- 238000001514 detection method Methods 0.000 claims description 26
- 230000001939 inductive effect Effects 0.000 claims description 6
- 238000004364 calculation method Methods 0.000 claims description 2
- 238000012549 training Methods 0.000 abstract description 5
- 230000006870 function Effects 0.000 description 18
- 238000010586 diagram Methods 0.000 description 8
- 238000012360 testing method Methods 0.000 description 8
- 238000005070 sampling Methods 0.000 description 6
- 230000006399 behavior Effects 0.000 description 4
- 238000007405 data analysis Methods 0.000 description 2
- 238000013480 data collection Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000013642 negative control Substances 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 238000004088 simulation Methods 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 238000012795 verification Methods 0.000 description 2
- 238000004590 computer program Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000011897 real-time detection Methods 0.000 description 1
- 238000003892 spreading Methods 0.000 description 1
Landscapes
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
Abstract
本发明提供一种计量误差分析装置及方法,该方法包括:向标准电能表和窃电演示电能表施加虚拟负荷电压及电流;对窃电演示电能表的表尾错接线方式进行设置,模拟仿真现场的各种接线;将窃电演示电能表的电能计量高频脉冲输入到所述计量误差计算器的脉冲接入口;将标准的电能计量高频脉冲输入到所述计量误差计算器的标准脉冲接入口;根据所述标准电能表和窃电演示电能表输出的电能计量高频脉冲计算两者之间的计量误差。本发明提供的计量误差分析装置及方法不仅可以用于用电检查人员的培训,提升其反窃电能力;还可以对追补电量的确定起到一定的辅助作用。
The invention provides a metering error analysis device and method, the method comprising: applying a virtual load voltage and current to a standard electric energy meter and an electricity stealing demonstration electric energy meter; Various wiring on site; input the electric energy measurement high-frequency pulse of the power-stealing demonstration electric energy meter to the pulse input port of the metering error calculator; input the standard electric energy metering high-frequency pulse to the standard pulse of the metering error calculator Access port; calculate the measurement error between the standard electric energy meter and the electric energy metering high-frequency pulse output by the electricity stealing demonstration electric energy meter. The metering error analysis device and method provided by the present invention can not only be used for the training of electricity inspectors to improve their anti-stealing ability, but also play a certain auxiliary role in the determination of supplementary electricity.
Description
技术领域 technical field
本发明涉及电力技术领域,尤其涉及计量误差分析装置及方法。 The invention relates to the field of electric power technology, in particular to a measurement error analysis device and method.
背景技术 Background technique
随着社会经济的发展和用电量的增大,社会上窃电问题变得越来越突出,且窃电手法越发隐蔽,利用无线遥控等高科技手段进行窃电的行为更是越来越猖獗且有蔓延之势。窃电给供电企业造成的损失是巨大的。据保守估算,中国每年因电能被盗造成的经济损失达200亿元。 With the development of social economy and the increase of electricity consumption, the problem of stealing electricity has become more and more prominent in society, and the methods of stealing electricity are becoming more and more hidden, and the behavior of stealing electricity by using high-tech means such as wireless remote control is becoming more and more serious. Rampant and spreading. The loss caused by electricity theft to power supply enterprises is huge. According to a conservative estimate, China's annual economic loss due to theft of electric energy reaches 20 billion yuan.
然而,对于供电企业的多数用电检查人员,尤其是新晋用电检查人员来说,查处遥控窃电等高科技手段窃电案件的反窃电经验尚有不足,反窃电技能有待提高,尤其是通过分析计量误差等数据判断相应窃电方式的能力有待提高。 However, for the majority of electricity inspectors in power supply companies, especially the newly promoted inspectors, the anti-stealing experience in investigating and handling high-tech cases such as remote-control electricity theft is still insufficient, and the anti-stealing skills need to be improved. In particular, the ability to judge the corresponding way of stealing electricity by analyzing data such as measurement errors needs to be improved.
发明内容 Contents of the invention
本发明提供的计量误差分析装置及方法从实际角度出发,尽可能贴近实际生产现场,将常见的、典型的窃电手法,如遥控电能表、遥控CT、遥控接线盒、破坏电表等,在实验室进行重现,并通过计量误差的演示、分析,将各种窃电方式引起的计量误差以展示屏对比显示的方式直观展现出来,找出规律,为反窃电措施的研究分析提供科学依据与平台。 The metering error analysis device and method provided by the present invention proceed from a practical point of view and are as close as possible to the actual production site. Common and typical methods of stealing electricity, such as remote-controlled electric energy meters, remote-controlled CTs, remote-controlled junction boxes, and damaged electric meters, are used in the experimental Through the demonstration and analysis of measurement errors, the measurement errors caused by various electricity stealing methods are displayed intuitively by means of comparison and display on the display screen, so as to find out the rules and provide a scientific basis for the research and analysis of anti-electricity theft measures. with the platform.
本发明提供的计量误差分析装置及方法对电能表计量误差的测试与分析功能不仅可以用于用电检查人员的培训,使培训人员在较短的时间了解各种窃电手段对计量准确性的影响程度,提升其反窃电能力;还可以对追补电量的确定起到一定的辅助作用,提高反窃电工作效率和成果。 The measurement error analysis device and method provided by the present invention can not only test and analyze the measurement error of the electric energy meter, but also be used for the training of electricity inspectors, so that the trainers can understand the impact of various electricity theft methods on the accuracy of measurement in a relatively short period of time. It can also play a certain auxiliary role in the determination of supplementary power, and improve the efficiency and results of anti-stealing work.
为解决上述技术问题,本发明提供一种计量误差分析装置,包括: In order to solve the above technical problems, the present invention provides a measurement error analysis device, including:
虚拟负荷电子源,用于向标准电能表和窃电演示电能表施加虚拟负荷电压及电流; Virtual load electronic source, used to apply virtual load voltage and current to the standard electric energy meter and electric stealing demonstration electric energy meter;
标准电能表,与计量误差计算器连接,用于在演示计量误差时,将标准的电能计量高频脉冲输入到所述计量误差计算器的标准脉冲接入口; The standard electric energy meter is connected with the measurement error calculator, and is used to input the standard electric energy measurement high-frequency pulse into the standard pulse input port of the measurement error calculator when demonstrating the measurement error;
窃电演示电能表,通过接线故障切换箱、互感器箱和虚拟负荷电子源连接,用于在演示计量误差时,将自身的电能计量高频脉冲输入到所述计量误差计算器的脉冲接入口; Electricity stealing demonstration electric energy meter is connected through the wiring fault switch box, transformer box and virtual load electronic source, and is used to input the high-frequency pulse of its own electric energy measurement to the pulse input port of the measurement error calculator when demonstrating the measurement error ;
故障切换箱和互感器箱,用于对窃电演示电能表的表尾错接线方式进行设置,模拟仿真现场的各种接线,包括但不限于三相三线高压表,三相四线高、低压电能表、电压互感器二次接线、电流互感器二次接线; Fault switching box and transformer box are used to set the wrong wiring mode of the meter tail of the electricity stealing demonstration electric energy meter, and simulate various wiring on the scene, including but not limited to three-phase three-wire high voltage meter, three-phase four-wire high and low voltage Electric energy meter, voltage transformer secondary wiring, current transformer secondary wiring;
计量误差计算器,用于根据所述标准电能表和窃电演示电能表输出的电能计量高频脉冲计算两者之间的计量误差。 The metering error calculator is used to calculate the metering error between the standard electric energy meter and the electric energy metering high-frequency pulse output by the electricity stealing demonstration electric energy meter.
其中,所述互感器箱包括:电压互感器和电流互感器;所述互感器箱还用于模拟电压互感器电流互感器接地与不接地。 Wherein, the transformer box includes: a voltage transformer and a current transformer; the transformer box is also used to simulate whether the voltage transformer and the current transformer are grounded or not.
其中,所述虚拟负荷电子源输出电压范围0.0V到380.0V,输出电流范围0.0A到5.0A,输出的频率范围45.0Hz到65.0Hz,相位0.00o到359.99o。 Wherein, the virtual load electronic source has an output voltage range of 0.0V to 380.0V, an output current range of 0.0A to 5.0A, an output frequency range of 45.0Hz to 65.0Hz, and a phase of 0.00° to 359.99°.
其中,所述计量误差计算器所计量的标准电能表和窃电演示电能表之间的误差包括有功功率的误差和无功功率的误差,以及所述标准电能表和窃电演示电能表对于感性负载的误差和对于容性负载的误差。 Wherein, the error between the standard watt-hour meter measured by the metering error calculator and the electricity-stealing demonstration watt-hour meter includes the error of active power and the error of reactive power, and the standard watt-hour meter and the electricity-stealing demonstration watt-hour meter are for inductive load and error for capacitive loads.
其中,所述窃电演示电能表的电压、电流输入端装安有相位伏安检测模块,用于实时对回路电压和电流进行检测,当电压和电流回路出现故障时,相位伏安检测模块上传回路报警信息,并降调对应故障表位的输出。 Wherein, the voltage and current input terminals of the power-stealing demonstration watt-hour meter are equipped with a phase volt-ampere detection module for real-time detection of loop voltage and current. When the voltage and current loop fails, the phase volt-ampere detection module uploads Loop alarm information, and lower the output corresponding to the fault table.
其中,所述计量误差分析装置还包括:显示模块,用于在演示界面显示窃电状态下各运行参数与图表的对比,包括计量误差计算器所计算得出的误差,以及标准电能表和窃电演示电能表的表尾电压、电流幅值、相位及功率。 Wherein, the metering error analysis device also includes: a display module, which is used to display the comparison of each operating parameter and the chart in the stealing state on the demonstration interface, including the error calculated by the metering error calculator, as well as the standard electric energy meter and the stealing power meter. Demonstrate the meter tail voltage, current amplitude, phase and power of the electric energy meter.
相应的,本发明还提供一种计量误差分析方法,包括: Correspondingly, the present invention also provides a measurement error analysis method, including:
向标准电能表和窃电演示电能表施加虚拟负荷电压及电流; Apply virtual load voltage and current to the standard electric energy meter and the electricity stealing demonstration electric energy meter;
对窃电演示电能表的表尾错接线方式进行设置,模拟仿真现场的各种接线; Set up the wrong connection mode of the meter tail of the electricity stealing demonstration electric energy meter, and simulate various connections on the scene;
将窃电演示电能表的电能计量高频脉冲输入到所述计量误差计算器的脉冲接入口;将标准的电能计量高频脉冲输入到所述计量误差计算器的标准脉冲接入口; Inputting the electric energy measurement high-frequency pulse of the electricity-stealing demonstration electric energy meter into the pulse inlet of the metering error calculator; inputting the standard electric energy metering high-frequency pulse into the standard pulse inlet of the metering error calculator;
根据所述标准电能表和窃电演示电能表输出的电能计量高频脉冲计算两者之间的计量误差。 The measurement error between the standard electric energy meter and the electric energy metering high-frequency pulse output by the electricity stealing demonstration electric energy meter is calculated.
其中,所述向标准电能表和窃电演示电能表施加虚拟负荷电压及电流中电压范围0.0V到380.0V,输出电流范围0.0A到5.0A,输出的频率范围45.0Hz到65.0Hz,相位0.00o到359.99o。 Wherein, the voltage range of the virtual load voltage and current applied to the standard electric energy meter and the electricity stealing demonstration electric energy meter is 0.0V to 380.0V, the output current range is 0.0A to 5.0A, the output frequency range is 45.0Hz to 65.0Hz, and the phase is 0.00 o to 359.99o.
其中,所述根据所述标准电能表和窃电演示电能表输出的电能计量高频脉冲计算两者之间的计量误差之后还包括:在演示界面显示窃电状态下各运行参数与图表的对比,包括计量误差计算器所计算得出的误差,以及标准电能表和窃电演示电能表的表尾电压、电流幅值、相位及功率。 Wherein, after the calculation of the metering error between the two according to the electric energy metering high-frequency pulse output of the standard electric energy meter and the electricity-stealing demonstration electric-energy meter output, it also includes: the contrast between each operating parameter and the graph under the electricity-stealing state displayed on the demonstration interface , including the error calculated by the metering error calculator, as well as the meter tail voltage, current amplitude, phase and power of the standard energy meter and the power-stealing demonstration energy meter.
其中,所述计量误差分析方法还包括:实时对回路电压和电流进行检测,当电压和电流回路出现故障时,相位伏安检测模块上传回路报警信息,并降调对应故障表位的输出。 Wherein, the measurement error analysis method further includes: detecting the loop voltage and current in real time, and when the voltage and current loop fails, the phase volt-ampere detection module uploads the loop alarm information, and lowers the output corresponding to the fault indicator.
本发明还提供一种计量误差分析装置及方法施加到计量表尾电压和电流为虚负荷电压、电流,幅值、相位及频率可调,模拟电能计量线路,对于电流互感器(TA)接线,可实现对不完全星形接线、完全星形接线的相线短接、公共线断开和两相TA二次回路串联连接等接线功能的设置;对于电压互感器(TV)接线,可实现对V-V接线(由两个单相TV组成)、Y-Y接线(由单只三相四线制TV组成)的一次断相、二次断相、一次极性反接、二次极性反接和压流不同相等接线功能的设置;能够模拟窃电现场实际接线,或更动电能表内部元件窃电方式,并自动测定误差数据,具有测定窃电器具窃电能力的功能,通过对施加窃电器具先后电力数据的分析,可以测定施加窃电器具对计量误差的影响,从而判断其窃电能力。 The present invention also provides a metering error analysis device and method applied to the meter tail voltage and current as dummy load voltage and current with adjustable amplitude, phase and frequency, simulating electric energy metering circuit, and for current transformer (TA) wiring, It can realize the setting of wiring functions such as incomplete star connection, phase line short connection of complete star connection, common line disconnection, and two-phase TA secondary circuit series connection; for voltage transformer (TV) wiring, it can be realized V-V wiring (composed of two single-phase TVs), Y-Y wiring (composed of a single three-phase four-wire TV), primary phase failure, secondary phase failure, primary polarity reverse connection, secondary polarity reverse connection and pressure It can simulate the actual wiring of the electricity-stealing site, or change the electricity-stealing mode of the internal components of the electric energy meter, and automatically measure the error data. It has the function of measuring the stealing ability of the electricity-stealing appliance. The analysis of successive power data can determine the impact of the application of electrical stealing appliances on measurement errors, thereby judging their electrical stealing capabilities.
附图说明 Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。 In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only These are some embodiments of the present invention. Those skilled in the art can also obtain other drawings based on these drawings without creative work.
图1为本发明提供的计量误差分析装置第一实施例结构示意图; Fig. 1 is a structural schematic diagram of the first embodiment of the measurement error analysis device provided by the present invention;
图2为本发明提供的计量误差分析装置第二实施例结构示意图; Fig. 2 is a schematic structural diagram of the second embodiment of the measurement error analysis device provided by the present invention;
图3为本发明提供的计量误差分析装置中电压互感器结构示意图; Fig. 3 is the schematic structural diagram of the voltage transformer in the metering error analysis device provided by the present invention;
图4为本发明提供的计量误差分析装置中电流互感器结构示意图; Fig. 4 is the schematic structural diagram of the current transformer in the metering error analysis device provided by the present invention;
图5为本发明提供的计量误差分析方法第一实施例流程示意图; 5 is a schematic flow chart of the first embodiment of the measurement error analysis method provided by the present invention;
图6为本发明提供的计量误差分析方法第二实施例流程示意图。 Fig. 6 is a schematic flow chart of the second embodiment of the measurement error analysis method provided by the present invention.
具体实施方式 Detailed ways
本发明提供的计量误差分析装置及方法从实际角度出发,尽可能贴近实际生产现场,将常见的、典型的窃电手法,如遥控电能表、遥控CT、遥控接线盒、破坏电表等,在实验室进行重现,并通过计量误差的演示、分析,将各种窃电方式引起的计量误差以展示屏对比显示的方式直观展现出来,找出规律,为反窃电措施的研究分析提供科学依据与平台。 The metering error analysis device and method provided by the present invention proceed from a practical point of view and are as close as possible to the actual production site. Common and typical methods of stealing electricity, such as remote-controlled electric energy meters, remote-controlled CTs, remote-controlled junction boxes, and damaged electric meters, are used in the experimental Through the demonstration and analysis of measurement errors, the measurement errors caused by various electricity stealing methods are displayed intuitively by means of comparison and display on the display screen, so as to find out the rules and provide a scientific basis for the research and analysis of anti-electricity theft measures. with the platform.
本发明提供的计量误差分析装置及方法对电能表计量误差的测试与分析功能不仅可以用于用电检查人员的培训,使培训人员在较短的时间了解各种窃电手段对计量准确性的影响程度,提升其反窃电能力;还可以对追补电量的确定起到一定的辅助作用,提高反窃电工作效率和成果。 The measurement error analysis device and method provided by the present invention can not only test and analyze the measurement error of the electric energy meter, but also be used for the training of electricity inspectors, so that the trainers can understand the impact of various electricity theft methods on the accuracy of measurement in a relatively short period of time. It can also play a certain auxiliary role in the determination of supplementary power, and improve the efficiency and results of anti-stealing work.
参见图1,为本发明提供的计量误差分析装置第一实施例结构示意图,如图所示,该计量误差分析装置包括:虚拟负荷电子源1,标准电能表2,窃电演示电能表3,故障切换箱4,互感器箱5,计量误差计算器6。 Referring to Fig. 1, it is a schematic structural diagram of the first embodiment of the metering error analysis device provided by the present invention. As shown in the figure, the metering error analysis device includes: a virtual load electronic source 1, a standard electric energy meter 2, an electricity stealing demonstration electric energy meter 3, Failover box 4, transformer box 5, measurement error calculator 6.
虚拟负荷电子源1,用于向标准电能表2和窃电演示电能表3施加虚拟负荷电压及电流。 The dummy load electronic source 1 is used to apply dummy load voltage and current to the standard watt-hour meter 2 and the power-stealing demonstration watt-hour meter 3 .
标准电能表2,与计量误差计算器6连接,用于在演示计量误差时,将标准的电能计量高频脉冲输入到所述计量误差计算器6的标准脉冲接入口。 The standard electric energy meter 2 is connected with the metering error calculator 6, and is used for inputting standard electric energy metering high-frequency pulses to the standard pulse input port of the metering error calculator 6 when demonstrating the metering error.
窃电演示电能表3,通过接线故障切换箱4、互感器箱5和虚拟负荷电子源1连接,用于在演示计量误差时,将自身的电能计量高频脉冲输入到所述计量误差计算器的脉冲接入口。 Electricity theft demonstration electric energy meter 3 is connected through wiring fault switching box 4, transformer box 5 and virtual load electronic source 1, and is used to input its own electric energy measurement high-frequency pulse to the measurement error calculator when demonstrating measurement error pulse input port.
故障切换箱4和互感器箱5,用于对窃电演示电能表3的表尾错接线方式进行设置,模拟仿真现场的各种接线,包括但不限于三相三线高压表,三相四线高、低压电能表、电压互感器二次接线、电流互感器二次接线。 The fault switching box 4 and the transformer box 5 are used to set the wrong wiring mode of the meter tail of the electricity stealing demonstration electric energy meter 3, and simulate various wirings on the scene, including but not limited to three-phase three-wire high-voltage meters, three-phase four-wire High and low voltage watt-hour meters, secondary wiring of voltage transformers, secondary wiring of current transformers.
计量误差计算器6,用于根据所述标准电能表2和窃电演示电能表3输出的电能计量高频脉冲计算两者之间的计量误差。 The metering error calculator 6 is used to calculate the metering error between the standard electric energy meter 2 and the electric energy metering high-frequency pulse outputted by the electricity stealing demonstration electric energy meter 3 .
本发明提供的计量误差分析装置对电能表计量误差的测试与分析功能不仅可以用于用电检查人员的培训,使培训人员在较短的时间了解各种窃电手段对计量准确性的影响程度,提升其反窃电能力;还可以对追补电量的确定起到一定的辅助作用,提高反窃电工作效率和成果。 The measurement error analysis device provided by the present invention can test and analyze the measurement error of the electric energy meter. It can not only be used for the training of electricity inspectors, but also enable the trainers to understand the degree of influence of various means of stealing electricity on the accuracy of measurement in a relatively short period of time. , improve its anti-stealing ability; it can also play a certain auxiliary role in the determination of supplementary electricity, and improve the efficiency and results of anti-stealing work.
参见图2,为本发明提供的计量误差分析装置第二实施例结构示意图。在本实施例中,将更为详细的描述该计量误差分析装置各个模块的功能及结构。如图所示,该计量误差分析装置包括:虚拟负荷电子源1,标准电能表2,窃电演示电能表3,故障切换箱4,互感器箱5,计量误差计算器6。 Referring to FIG. 2 , it is a schematic structural diagram of the second embodiment of the measurement error analysis device provided by the present invention. In this embodiment, the function and structure of each module of the measurement error analysis device will be described in more detail. As shown in the figure, the metering error analysis device includes: a virtual load electronic source 1 , a standard electric energy meter 2 , an electricity stealing demonstration electric energy meter 3 , a fault switch box 4 , a transformer box 5 , and a metering error calculator 6 .
虚拟负荷电子源1,用于向标准电能表2和窃电演示电能表3施加虚拟负荷电压及电流。所述虚拟负荷电子源1输出电压范围0.0V到380.0V,输出电流范围0.0A到5.0A,输出的频率范围45.0Hz到65.0Hz,相位0.00o到359.99o。虚拟负荷电子源1施加到计量表尾电压和电流为虚负荷电压、电流,幅值、相位及频率可调,并满足技术指标要求。更为具体的,本实施例中的虚拟负荷电子源1在实际使用中可以采用WT-FY50型程控电子源,其技术指标为:使用环境:温度:-10℃~+40℃;湿度:≤85海拔高度:4000m以下;输入电源:单相220V±10%,50Hz±0.2Hz;输出电压档位:57.7V、100V、220V、380V;输出电流档位:0.5A、1A、1.5A、2.5A、5A;输出频率范围:45~65Hz,调节细度:<0.01Hz;相位:0~359.9°;调节细度0.1°;相位调节准确度:0.5°。 The dummy load electronic source 1 is used to apply dummy load voltage and current to the standard watt-hour meter 2 and the power-stealing demonstration watt-hour meter 3 . The virtual load electronic source 1 has an output voltage range of 0.0V to 380.0V, an output current range of 0.0A to 5.0A, an output frequency range of 45.0Hz to 65.0Hz, and a phase of 0.00o to 359.99o. The voltage and current applied to the end of the meter by the virtual load electronic source 1 are the virtual load voltage and current, the amplitude, phase and frequency are adjustable, and meet the requirements of technical indicators. More specifically, the virtual load electron source 1 in this embodiment can use the WT-FY50 program-controlled electron source in actual use, and its technical indicators are: operating environment: temperature: -10°C ~ +40°C; humidity: ≤ 85 altitude: below 4000m; input power: single-phase 220V±10%, 50Hz±0.2Hz; output voltage range: 57.7V, 100V, 220V, 380V; output current range: 0.5A, 1A, 1.5A, 2.5 A, 5A; output frequency range: 45~65Hz, adjustment fineness: <0.01Hz; phase: 0~359.9°; adjustment fineness 0.1°; phase adjustment accuracy: 0.5°.
标准电能表2,与计量误差计算器6连接,用于在演示计量误差时,将标准的电能计量高频脉冲输入到所述计量误差计算器6的标准脉冲接入口。更为具体的,在本发明实施例中,标准电能表2可以是高精度三相标准电能表WT-B3E5,其误差精度<0.1%。 The standard electric energy meter 2 is connected with the metering error calculator 6, and is used for inputting standard electric energy metering high-frequency pulses to the standard pulse input port of the metering error calculator 6 when demonstrating the metering error. More specifically, in the embodiment of the present invention, the standard electric energy meter 2 may be a high-precision three-phase standard electric energy meter WT-B3E5, and its error accuracy is less than 0.1%.
窃电演示电能表3,通过接线故障切换箱4、互感器箱5和虚拟负荷电子源1连接,用于在演示计量误差时,将自身的电能计量高频脉冲输入到所述计量误差计算器的脉冲接入口。进一步的,在本发明实施例中,计量误差分析装置可以包含2个或2个以上的窃电演示电能表3。在窃电演示时,将多个窃电演示电能表3的脉冲输出端口接入到计量误差计算器6,进行多个电能表的误差校验,且多个表位可同时相互独立校验误差。 Electricity theft demonstration electric energy meter 3 is connected through wiring fault switching box 4, transformer box 5 and virtual load electronic source 1, and is used to input its own electric energy measurement high-frequency pulse to the measurement error calculator when demonstrating measurement error pulse input port. Further, in the embodiment of the present invention, the metering error analysis device may include 2 or more than 2 power-stealing demonstration electric energy meters 3 . During the electricity stealing demonstration, the pulse output ports of multiple electric energy stealing demonstration energy meters 3 are connected to the measurement error calculator 6 to perform error verification of multiple electric energy meters, and multiple meter positions can simultaneously and independently verify errors .
故障切换箱4和互感器箱5,用于对窃电演示电能表3的表尾错接线方式进行设置。更为具体的,每个窃电演示电能表3对应配备接线故障切换箱4。接线故障切换箱4可对每个表位的表尾错接线方式分别设置,可以模拟仿真现场的各种接线,其中包括三相三线高压表,三相四线高、低压电能表、电压互感器TV二次接线、电流互感器TA二次接线等,包括:三相三线(经TV、TA接线,TA简化接线,约为129024种);三相三线(经TV、TA接线,TA四线制,约为516096种);三相四线(经TV、TA接线,TA简化接线,约为235929种);三相四线(经TV、TA接线,TA六线制,约为235929种);三相四线(经TA无TV接线,TA六线制,约为196608种);三相四线(直接接入式,共8种)。在本实施例中,所述故障切换箱可以采用WT-CH24型故障切换箱 The fault switching box 4 and the transformer box 5 are used to set the wrong wiring mode of the meter tail of the electricity stealing demonstration electric energy meter 3 . More specifically, each power-stealing demonstration energy meter 3 is correspondingly equipped with a wiring fault switching box 4 . The wiring fault switching box 4 can set the wrong wiring at the end of each meter separately, and can simulate various wiring on the scene, including three-phase three-wire high-voltage meters, three-phase four-wire high-voltage and low-voltage electric energy meters, and voltage transformers TV secondary wiring, current transformer TA secondary wiring, etc., including: three-phase three-wire (via TV, TA wiring, TA simplified wiring, about 129024 kinds); three-phase three-wire (via TV, TA wiring, TA four-wire system , about 516,096 kinds); three-phase four-wire (via TV, TA connection, TA simplified wiring, about 235,929 kinds); three-phase four-wire (via TV, TA connection, TA six-wire system, about 235,929 kinds); Three-phase four-wire (via TA without TV connection, TA six-wire system, about 196608 types); three-phase four-wire (direct access type, a total of 8 types). In this embodiment, the failover box can be a WT-CH24 failover box
进一步的,所述互感器箱5包括:电压互感器(如图3所示)和电流互感器(如图4所示);所述互感器箱还用于模拟电压互感器电流互感器接地与不接地。故障切换箱4和互感器箱5由PC软件程控选择。各种接线方式通过PC软件的故障设置界面进行各种组合的设置。 Further, the transformer box 5 includes: a voltage transformer (as shown in Figure 3) and a current transformer (as shown in Figure 4); the transformer box is also used for simulating the voltage transformer, current transformer grounding and Not grounded. The failover box 4 and the transformer box 5 are selected by PC software program control. Various wiring modes can be set in various combinations through the fault setting interface of the PC software.
计量误差计算器6,用于根据所述标准电能表2和窃电演示电能表3输出的电能计量高频脉冲计算两者之间的计量误差。更为具体的,所述计量误差计算器6所计量的标准电能表2和窃电演示电能表3之间的误差包括有功功率的误差和无功功率的误差,以及所述标准电能表2和窃电演示电能表3对于感性负载的误差和对于容性负载的误差。在实际应用中,本实施例中的计量误差计算器6可以采用WT-K3BM多通道计量误差计算器。 The metering error calculator 6 is used to calculate the metering error between the standard electric energy meter 2 and the electric energy metering high-frequency pulse outputted by the electricity stealing demonstration electric energy meter 3 . More specifically, the error between the standard watt-hour meter 2 measured by the metering error calculator 6 and the electricity-stealing demonstration watt-hour meter 3 includes the error of active power and the error of reactive power, and the standard watt-hour meter 2 and Stealing electricity demonstrates the error of the energy meter 3 for inductive loads and for capacitive loads. In practical applications, the metering error calculator 6 in this embodiment may use a WT-K3BM multi-channel metering error calculator.
优选的,所述窃电演示电能表3的电压、电流输入端装安有相位伏安检测模块7,相位伏安检测模块7分别对各个表位的表尾数据进行数据采集分析,并上传到PC机,PC对数据进行解析,在演示界面,显示标准表与各测试表位的表尾电压、电流幅值,元件相位及功率,功率表达式及向量图,以实现窃电状态下各运行参数与图表的对比。同时,相位伏安检测模块7还用于实时对回路电压和电流进行检测,当电压和电流回路出现故障时,相位伏安检测模块上传回路报警信息,并降调对应故障表位的输出。本实施例中的相位伏安检测模块7可以采用WT-XFDB相位伏安检测模块。 Preferably, the voltage and current input terminals of the power-stealing demonstration watt-hour meter 3 are equipped with a phase volt-ampere detection module 7, and the phase volt-ampere detection module 7 carries out data collection and analysis to the table tail data of each table position respectively, and uploads to PC, PC analyzes the data, and in the demonstration interface, displays the voltage and current amplitude, component phase and power, power expression and vector diagram of the standard table and each test table, so as to realize the operation under the power stealing state. Comparison of parameters with graphs. At the same time, the phase volt-ampere detection module 7 is also used to detect the loop voltage and current in real time. When the voltage and current loops fail, the phase volt-ampere detection module uploads the loop alarm information and lowers the output of the corresponding fault indicator. The phase volt-ampere detection module 7 in this embodiment may use a WT-XFDB phase volt-ampere detection module.
进一步的,本发明实施例提供的计量误差分析装置还包括:显示模块8,用于在演示界面显示窃电状态下各运行参数与图表的对比,包括计量误差计算器所计算得出的误差,以及标准电能表和窃电演示电能表的表尾电压、电流幅值、相位及功率。更为具体的,显示模块8通过装置控制软件误差演示界面显示到电脑上,同时也可切换到大屏幕上。另外,显示模块8演示的误差除有功误差外,还可以演示无功误差。显示模块8在演示误差时,通过控制软件可进行相位在0.5L(感性负载,功率因数为0.5)和0.5C(容性负载,功率因数为0.5)测试点的快速切换,以实现在这两种负载下测量结果的快速比对。 Further, the metering error analysis device provided by the embodiment of the present invention also includes: a display module 8, which is used to display the comparison of each operating parameter and the chart in the stealing state on the demonstration interface, including the error calculated by the metering error calculator, And the meter tail voltage, current amplitude, phase and power of the standard electric energy meter and the electricity stealing demonstration electric energy meter. More specifically, the display module 8 displays the error demonstration interface on the computer through the device control software, and can also switch to the large screen at the same time. In addition, the errors demonstrated by the display module 8 can also demonstrate reactive errors in addition to active errors. When the display module 8 demonstrates the error, the phase can be quickly switched between 0.5L (inductive load, power factor 0.5) and 0.5C (capacitive load, power factor 0.5) test points through the control software, so as to realize Quick comparison of measurement results under various loads.
进一步的,本实施例提供的计量误差分析装置具备演示用的辅助功能,包括:控终端控制及控制状态指示功能和表箱门开门检测功能。 Furthermore, the measurement error analysis device provided in this embodiment has auxiliary functions for demonstration, including: terminal control and control status indication functions, and meter box door opening detection functions.
一、负控终端控制及控制状态指示功能。装置配备了检测控制器WT-CH98,用来实现负控终端控制演示功能,实现方法:演示时,通过PC控制软件向终端下发轮调命令,下发一轮次跳闸命令时,一轮次的跳闸指示灯点亮,同时合闸灯熄灭,1号表位输出降掉。二轮次实现方法和一轮次相同,用来演示负控控制管理功能。PC控制软件记录事件功能及事件发生时间存储在数据库中。 1. The function of negative control terminal control and control status indication. The device is equipped with a detection controller WT-CH98, which is used to realize the control demonstration function of the negative control terminal. The realization method is: during the demonstration, the PC control software sends a rotation command to the terminal, and when a round trip command is issued, a round The trip indicator light of the switch is on, and the closing indicator light is off at the same time, and the output of the No. 1 gauge is dropped. The implementation method of the second round is the same as that of the first round, and it is used to demonstrate the function of load control management. The PC control software records the event function and the event occurrence time and stores it in the database.
二、表箱门开门检测功能。装置将台体前面板的两扇门用来模拟表箱门,演示表箱门被打开后的检测和报警记录功能,装置在两扇门上分别安装了微动开关和接近检测开关,实现两种不同的检测方式,装置配备的检测控制器WT-CH98检测两个门开关的状态,有开门行为时,WT-CH98及时把信息上传到PC控制软件,PC在演示界面以图案的方式提示开门报警信息,并记录门开启的时间。 2. The door opening detection function of the meter box. The device uses the two doors on the front panel of the platform to simulate the meter box door, and demonstrates the detection and alarm recording functions after the meter box door is opened. The device installs a micro switch and a proximity detection switch on the two doors to realize two Two different detection methods, the detection controller WT-CH98 equipped with the device detects the status of the two door switches, when there is a door opening behavior, WT-CH98 uploads the information to the PC control software in time, and the PC prompts to open the door in the form of a pattern on the demonstration interface Alarm information, and record the time when the door is opened.
本领域技术人员可以理解的是,本发明实施例所提供的计量误差分析装置施加到计量表尾电压和电流为虚负荷电压、电流,幅值、相位及频率可调,模拟电能计量线路,对于电流互感器(TA)接线,可实现对不完全星形接线、完全星形接线的相线短接、公共线断开和两相TA二次回路串联连接等接线功能的设置;对于电压互感器(TV)接线,可实现对V-V接线(由两个单相TV组成)、Y-Y接线(由单只三相四线制TV组成)的一次断相、二次断相、一次极性反接、二次极性反接和压流不同相等接线功能的设置;本发明实施例所提供的计量误差分析装置能够模拟窃电现场实际接线,或更动电能表内部元件窃电方式,并自动测定误差数据,具有测定窃电器具窃电能力的功能,通过对施加窃电器具先后电力数据的分析,可以测定施加窃电器具对计量误差的影响,从而判断其窃电能力。 Those skilled in the art can understand that the voltage and current applied to the tail of the meter by the metering error analysis device provided by the embodiment of the present invention are dummy load voltage and current, with adjustable amplitude, phase and frequency, and analog electric energy metering circuit. Current transformer (TA) wiring can realize the setting of wiring functions such as incomplete star connection, phase line short connection of complete star connection, common line disconnection, and two-phase TA secondary circuit series connection; for voltage transformers (TV) wiring, which can realize primary phase failure, secondary phase failure, primary polarity reverse connection, The setting of secondary polarity reverse connection and different voltage and equal wiring functions; the measurement error analysis device provided by the embodiment of the present invention can simulate the actual wiring on the spot of stealing electricity, or change the electricity stealing mode of the internal components of the electric energy meter, and automatically measure the error The data has the function of measuring the electricity stealing ability of electric stealing appliances. Through the analysis of the power data of the electric stealing appliances, the influence of the electric stealing appliances on the measurement error can be determined, so as to judge its electricity stealing ability.
对应的,本发明还提供一种计量误差分析方法,该方法可以由前述的计量误差分析装置实施执行。 Correspondingly, the present invention also provides a measurement error analysis method, which can be implemented by the aforementioned measurement error analysis device.
参见图5,为本发明提供的计量误差分析方法第一实施例流程示意图,如图5所示,该计量误差分析方法包括: Referring to FIG. 5, it is a schematic flow chart of the first embodiment of the measurement error analysis method provided by the present invention. As shown in FIG. 5, the measurement error analysis method includes:
步骤S101,向标准电能表和窃电演示电能表施加虚拟负荷电压及电流。 Step S101 , applying virtual load voltage and current to the standard electric energy meter and the electricity stealing demonstration electric energy meter.
步骤S102,对窃电演示电能表的表尾错接线方式进行设置,模拟仿真现场的各种接线。 Step S102, setting the wrong wiring mode of the meter tail of the electricity stealing demonstration electric energy meter, and simulating various wirings on the simulation site.
步骤S103,将窃电演示电能表的电能计量高频脉冲输入到所述计量误差计算器的脉冲接入口。 Step S103, inputting the electric energy measurement high-frequency pulse of the electricity stealing demonstration electric energy meter to the pulse input port of the measurement error calculator.
步骤S104,将标准的电能计量高频脉冲输入到所述计量误差计算器的标准脉冲接入口。步骤S104与S103可以同时执行。 Step S104, input the standard electric energy measurement high-frequency pulse into the standard pulse input port of the measurement error calculator. Steps S104 and S103 can be executed simultaneously.
步骤S105,根据所述标准电能表和窃电演示电能表输出的电能计量高频脉冲计算两者之间的计量误差。 Step S105, calculating the measurement error between the standard electric energy meter and the electric energy measurement high-frequency pulse outputted by the electricity stealing demonstration electric energy meter.
本发明提供的计量误差分析方法对电能表计量误差的测试与分析功能不仅可以用于用电检查人员的培训,使培训人员在较短的时间了解各种窃电手段对计量准确性的影响程度,提升其反窃电能力;还可以对追补电量的确定起到一定的辅助作用,提高反窃电工作效率和成果。 The measurement error analysis method provided by the present invention can not only test and analyze the measurement error of the electric energy meter, but also be used for the training of electricity inspectors, so that the trainers can understand the degree of influence of various means of stealing electricity on the accuracy of measurement in a relatively short period of time , improve its anti-stealing ability; it can also play a certain auxiliary role in the determination of supplementary electricity, and improve the efficiency and results of anti-stealing work.
参见图6,为本发明提供的计量误差分析方法第二实施例流程示意图。在本实施例中,将更为详细的描述该计量误差分析方法的流程步骤。如图6所示,该计量误差分析方法包括: Referring to FIG. 6 , it is a schematic flowchart of the second embodiment of the measurement error analysis method provided by the present invention. In this embodiment, the flow steps of the measurement error analysis method will be described in more detail. As shown in Figure 6, the measurement error analysis method includes:
步骤S201,向标准电能表和窃电演示电能表施加虚拟负荷电压及电流。所述虚拟负荷电压及电流由虚拟负荷电子源输出电压范围0.0V到380.0V,输出电流范围0.0A到5.0A,输出的频率范围45.0Hz到65.0Hz,相位0.00°到359.99°。虚拟负荷电子源施加到计量表尾电压和电流为虚负荷电压、电流,幅值、相位及频率可调,并满足技术指标要求。更为具体的,本实施例中的虚拟负荷电子源在实际使用中可以采用WT-FY50型程控电子源,其技术指标为:使用环境:温度:-10℃~+40℃;湿度:≤85海拔高度:4000m以下;输入电源:单相220V±10%,50Hz±0.2Hz;输出电压档位:57.7V、100V、220V、380V;输出电流档位:0.5A、1A、1.5A、2.5A、5A;输出频率范围:45~65Hz,调节细度:<0.01Hz;相位:0~359.9°;调节细度0.1°;相位调节准确度:0.5°。 Step S201 , applying virtual load voltage and current to the standard electric energy meter and the electricity stealing demonstration electric energy meter. The dummy load voltage and current are output by the dummy load electronic source in a voltage range of 0.0V to 380.0V, an output current range of 0.0A to 5.0A, an output frequency range of 45.0Hz to 65.0Hz, and a phase of 0.00° to 359.99°. The voltage and current applied to the tail of the meter by the virtual load electronic source are the virtual load voltage and current, the amplitude, phase and frequency are adjustable, and meet the requirements of technical indicators. More specifically, the virtual load electron source in this embodiment can be used in actual use WT-FY50 program-controlled electron source, and its technical indicators are: operating environment: temperature: -10°C ~ +40°C; humidity: ≤85 Altitude: below 4000m; input power: single-phase 220V±10%, 50Hz±0.2Hz; output voltage range: 57.7V, 100V, 220V, 380V; output current range: 0.5A, 1A, 1.5A, 2.5A , 5A; output frequency range: 45~65Hz, adjustment fineness: <0.01Hz; phase: 0~359.9°; adjustment fineness 0.1°; phase adjustment accuracy: 0.5°.
步骤S202,对窃电演示电能表的表尾错接线方式进行设置,模拟仿真现场的各种接线。更为具体的,本实施例中通过故障切换箱和互感器箱对窃电演示电能表的表尾错接线方式进行设置。接线故障切换箱可对每个表位的表尾错接线方式分别设置,可以模拟仿真现场的各种接线,其中包括三相三线高压表,三相四线高、低压电能表、电压互感器TV二次接线、电流互感器TA二次接线等,包括:三相三线(经TV、TA接线,TA简化接线,约为129024种);三相三线(经TV、TA接线,TA四线制,约为516096种);三相四线(经TV、TA接线,TA简化接线,约为235929种);三相四线(经TV、TA接线,TA六线制,约为235929种);三相四线(经TA无TV接线,TA六线制,约为196608种);三相四线(直接接入式,共8种)。在本实施例中,所述故障切换箱可以采用WT-CH24型故障切换箱。进一步的,所述互感器箱包括:电压互感器(如图3所示)和电流互感器(如图4所示);所述互感器箱还用于模拟电压互感器电流互感器接地与不接地。故障切换箱4和互感器箱由PC软件程控选择。各种接线方式通过PC软件的故障设置界面进行各种组合的设置。 Step S202, setting the wrong wiring mode of the meter tail of the electricity stealing demonstration electric energy meter, and simulating various wirings on the simulation site. More specifically, in this embodiment, the faulty switching box and the transformer box are used to set the wrong connection mode of the meter tail of the power-stealing demonstration electric energy meter. The wiring fault switching box can set the wrong wiring mode of the end of each meter separately, and can simulate various wiring on the scene, including three-phase three-wire high-voltage meters, three-phase four-wire high-voltage and low-voltage electric energy meters, voltage transformer TV Secondary wiring, current transformer TA secondary wiring, etc., including: three-phase three-wire (via TV, TA wiring, TA simplified wiring, about 129024 types); three-phase three-wire (via TV, TA wiring, TA four-wire system, About 516,096 kinds); three-phase four-wire (via TV, TA connection, TA simplified wiring, about 235,929 kinds); three-phase four-wire (via TV, TA connection, TA six-wire system, about 235,929 kinds); three Phase four-wire (via TA without TV connection, TA six-wire system, about 196608 types); three-phase four-wire (direct access type, a total of 8 types). In this embodiment, the failover box may be a WT-CH24 failover box. Further, the transformer box includes: a voltage transformer (as shown in Figure 3) and a current transformer (as shown in Figure 4); the transformer box is also used to simulate the grounding of the voltage transformer and current transformer grounded. The failover box 4 and the transformer box are selected by PC software program control. Various wiring modes can be set in various combinations through the fault setting interface of the PC software.
步骤S203,将窃电演示电能表的电能计量高频脉冲输入到所述计量误差计算器的脉冲接入口。更为具体的,在演示计量误差时,窃电演示电能表将自身的电能计量高频脉冲输入到所述计量误差计算器的脉冲接入口。进一步的,在本发明实施例中,可以包含2个或2个以上的窃电演示电能表3。在窃电演示时,将多个窃电演示电能表的脉冲输出端口接入到计量误差计算器,进行多个电能表的误差校验,且多个表位可同时相互独立校验误差。 Step S203, inputting the electric energy measurement high-frequency pulse of the electricity stealing demonstration electric energy meter to the pulse input port of the measurement error calculator. More specifically, when demonstrating the measurement error, the power-stealing demonstration electric energy meter inputs its own electric energy measurement high-frequency pulse to the pulse input port of the measurement error calculator. Further, in the embodiment of the present invention, two or more power-stealing demonstration electric energy meters 3 may be included. During the electricity stealing demonstration, the pulse output ports of multiple electricity stealing demonstration energy meters are connected to the metering error calculator to perform error verification of multiple energy meters, and multiple meter positions can simultaneously and independently verify errors.
步骤S204,将标准的电能计量高频脉冲输入到所述计量误差计算器的标准脉冲接入口。步骤S204与S203可以同时执行。更为具体的,在演示计量误差时,标准电能表将标准的电能计量高频脉冲输入到所述计量误差计算器6的标准脉冲接入口。更为具体的,在本发明实施例中,标准电能表2可以是高精度三相标准电能表WT-B3E5,其误差精度<0.1%。 Step S204, input the standard electric energy measurement high-frequency pulse into the standard pulse input port of the measurement error calculator. Steps S204 and S203 can be executed simultaneously. More specifically, when demonstrating measurement errors, the standard electric energy meter inputs standard electric energy measurement high-frequency pulses to the standard pulse input port of the measurement error calculator 6 . More specifically, in the embodiment of the present invention, the standard electric energy meter 2 may be a high-precision three-phase standard electric energy meter WT-B3E5, and its error accuracy is less than 0.1%.
步骤S205,根据所述标准电能表和窃电演示电能表输出的电能计量高频脉冲计算两者之间的计量误差。更为具体的,计量误差计算器计量的准电能表2窃电演示电能表3间的误差,所述误差包括有功功率的误差和无功功率的误差,以及所述标准电能表和窃电演示电能表对于感性负载的误差和对于容性负载的误差。在实际应用中,本实施例中的计量误差计算器可以采用WT-K3BM多通道计量误差计算器。 Step S205, calculating the measurement error between the standard electric energy meter and the electric energy measurement high-frequency pulse outputted by the electricity stealing demonstration electric energy meter. More specifically, the measurement error calculator measures the error between the quasi-electric energy meter 2 stealing demonstration electric energy meter 3, the error includes the error of active power and the error of reactive power, and the standard electric energy meter and electric stealing demonstration The error of the energy meter for the inductive load and the error for the capacitive load. In practical applications, the metering error calculator in this embodiment can use the WT-K3BM multi-channel metering error calculator.
步骤S206,在演示界面显示窃电状态下各运行参数与图表的对比,包括计量误差计算器所计算得出的误差,以及标准电能表和窃电演示电能表的表尾电压、电流幅值、相位及功率。更为具体的,演示界面显示窃电状态下各运行参数与图表的对比,包括计量误差计算器所计算得出的误差,以及标准电能表和窃电演示电能表的表尾电压、电流幅值、相位及功率。通过装置控制软件误差演示界面显示到电脑上,同时也可切换到大屏幕上。在演示误差时,通过控制软件可进行相位在0.5L(感性负载,功率因数为0.5)和0.5C(容性负载,功率因数为0.5)测试点的快速切换,以实现在这两种负载下测量结果的快速比对。 Step S206, displaying the comparison of various operating parameters and charts in the power stealing state on the demonstration interface, including the error calculated by the measurement error calculator, and the meter tail voltage, current amplitude, phase and power. More specifically, the demonstration interface displays the comparison of various operating parameters in the power-stealing state with the chart, including the error calculated by the measurement error calculator, as well as the meter tail voltage and current amplitude of the standard electric energy meter and the electricity-stealing demonstration electric energy meter , phase and power. The error demonstration interface of the device control software is displayed on the computer, and can also be switched to the large screen at the same time. When demonstrating the error, the phase can be quickly switched between the 0.5L (inductive load, power factor of 0.5) and 0.5C (capacitive load, power factor of 0.5) test points through the control software, so as to realize the two loads Quick comparison of measurement results.
步骤S207,实时对回路电压和电流进行检测,当电压和电流回路出现故障时,相位伏安检测模块上传回路报警信息,并降调对应故障表位的输出。更为具体的,所述窃电演示电能表的电压、电流输入端装安有相位伏安检测模块,相位伏安检测模块分别对各个表位的表尾数据进行数据采集分析,并上传到PC机,PC对数据进行解析,在演示界面,显示标准表与各测试表位的表尾电压、电流幅值,元件相位及功率,功率表达式及向量图,以实现窃电状态下各运行参数与图表的对比。同时,相位伏安检测模块还用于实时对回路电压和电流进行检测,当电压和电流回路出现故障时,相位伏安检测模块上传回路报警信息,并降调对应故障表位的输出。本实施例中的相位伏安检测模块可以采用WT-XFDB相位伏安检测模块。本领域技术人员可以理解的是,步骤S207与之前的步骤S201~206之间没有特定的时间顺序关系,步骤S207在本发明提供的计量误差分析方法实施例整个过程中均可以全程实时执行。 In step S207, the loop voltage and current are detected in real time. When the voltage and current loops fail, the phase volt-ampere detection module uploads the loop alarm information and lowers the output corresponding to the fault indicator. More specifically, a phase volt-ampere detection module is installed on the voltage and current input terminals of the power-stealing demonstration electric energy meter, and the phase volt-ampere detection module performs data collection and analysis on the meter tail data of each meter position respectively, and uploads to the PC Computer and PC analyze the data. On the demonstration interface, the voltage and current amplitude, component phase and power, power expression and vector diagram of the standard table and each test table are displayed, so as to realize the operating parameters in the stealing state. Comparison with chart. At the same time, the phase volt-ampere detection module is also used to detect the loop voltage and current in real time. When the voltage and current loop fails, the phase volt-ampere detection module uploads the loop alarm information and lowers the output of the corresponding fault indicator. The phase volt-ampere detection module in this embodiment may use a WT-XFDB phase volt-ampere detection module. Those skilled in the art can understand that there is no specific chronological relationship between step S207 and the previous steps S201-206, and step S207 can be executed in real time throughout the whole process of the measurement error analysis method embodiment provided by the present invention.
本领域技术人员可以理解的是,本发明实施例所提供的计量误差分析方法施加到计量表尾电压和电流为虚负荷电压、电流,幅值、相位及频率可调,模拟电能计量线路,对于电流互感器(TA)接线,可实现对不完全星形接线、完全星形接线的相线短接、公共线断开和两相TA二次回路串联连接等接线功能的设置;对于电压互感器(TV)接线,可实现对V-V接线(由两个单相TV组成)、Y-Y接线(由单只三相四线制TV组成)的一次断相、二次断相、一次极性反接、二次极性反接和压流不同相等接线功能的设置;本发明实施例所提供的计量误差分析装置能够模拟窃电现场实际接线,或更动电能表内部元件窃电方式,并自动测定误差数据,具有测定窃电器具窃电能力的功能,通过对施加窃电器具先后电力数据的分析,可以测定施加窃电器具对计量误差的影响,从而判断其窃电能力。 Those skilled in the art can understand that the metering error analysis method provided by the embodiment of the present invention is applied to the tail voltage and current of the meter as the dummy load voltage and current, the amplitude, phase and frequency are adjustable, and the analog electric energy metering circuit is used for Current transformer (TA) wiring can realize the setting of wiring functions such as incomplete star connection, phase line short connection of complete star connection, common line disconnection, and two-phase TA secondary circuit series connection; for voltage transformers (TV) wiring, which can realize primary phase failure, secondary phase failure, primary polarity reverse connection, The setting of secondary polarity reverse connection and different voltage and equal wiring functions; the measurement error analysis device provided by the embodiment of the present invention can simulate the actual wiring on the spot of stealing electricity, or change the electricity stealing mode of the internal components of the electric energy meter, and automatically measure the error The data has the function of measuring the electricity stealing ability of electric stealing appliances. Through the analysis of the power data of the electric stealing appliances, the influence of the electric stealing appliances on the measurement error can be determined, so as to judge its electricity stealing ability.
本发明各实施例提供的计量误差分析方法及装置,可以在计算出标准电能表和窃电演示电能表可以计量误差之后,对窃电数据分析进行分析、结果记录、储存、上传。具体包括: The measurement error analysis method and device provided by each embodiment of the present invention can analyze, record, store and upload the data of stealing electricity after calculating the measurement error of the standard electric energy meter and the electricity stealing demonstration electric energy meter. Specifically include:
一、窃电点在电表内部的误差分析:1、装置在进行窃电现场还原或演示时,首先读取施加窃电行为前的表尾数据和电能表的电能采样数据(包括:电压、电流、功率及相位),计算误差后,将数据进行保存,然后读取施加窃电行为后表尾数据和电能表的电能采样数据(包括:电压、电流、功率及相位),计算的误差。2、读取施加窃电行为后电能表的电能采样数据(包括:电压、电流、功率及相位),与标准表对比,计算其的误差。 1. Error analysis of electricity stealing points inside the meter: 1. When the device is restoring or demonstrating electricity stealing on the spot, it first reads the data at the end of the meter before the act of stealing electricity and the energy sampling data of the electric energy meter (including: voltage, current, etc.) , power and phase), after calculating the error, save the data, and then read the end-of-meter data and the energy sampling data (including: voltage, current, power and phase) of the electric energy meter after the stealing behavior is applied, and calculate the error. 2. Read the energy sampling data (including: voltage, current, power and phase) of the electric energy meter after the act of stealing electricity, compare it with the standard meter, and calculate its error.
二、窃电点在外部接线的误差分析:1、装置在进行窃电现场还原或演示时,首先读取施加窃电行为前的表尾数据和电能表的电能采样数据(包括:电压、电流、功率及相位),计算误差后,将数据进行保存,然后读取施加窃电行为后表尾数据和电能表的电能采样数据(包括:电压、电流、功率及相位),计算其误差。2、读取施加窃电行为后电能表的电能采样数据(包括:电压、电流、功率及相位),与标准表对比,计算其的误差。 2. Error analysis of the external wiring of the stealing point: 1. When the device is restoring or demonstrating on-site stealing, it first reads the data at the end of the meter before the act of stealing electricity and the energy sampling data of the electric energy meter (including: voltage, current, etc.) , power and phase), after calculating the error, save the data, and then read the end-of-meter data and the energy sampling data (including: voltage, current, power and phase) of the energy meter after the stealing behavior is applied, and calculate the error. 2. Read the energy sampling data (including: voltage, current, power and phase) of the electric energy meter after the act of stealing electricity, compare it with the standard meter, and calculate its error.
最后,计算出24小时电能表累计的电能,显示施加窃电行为后少计的电能量。 Finally, the accumulated electric energy of the 24-hour electric energy meter is calculated, and the undercounted electric energy is displayed after the act of stealing electricity is applied.
本领域普通技术人员可以理解实现上述实施例方法中的全部或部分流程,是可以通过计算机程序来指令相关的硬件来完成,所述的程序可存储于计算机可读取存储介质中,该程序在执行时,可包括如上述各方法的实施例的流程。其中,所述的存储介质可为磁碟、光盘、只读存储记忆体(Read-OnlyMemory,ROM)或随机存储记忆体(RandomAccessMemory,RAM)等。 Those of ordinary skill in the art can understand that all or part of the processes in the methods of the above embodiments can be implemented through computer programs to instruct related hardware, and the programs can be stored in computer-readable storage media. During execution, it may include the processes of the embodiments of the above-mentioned methods. Wherein, the storage medium may be a magnetic disk, an optical disk, a read-only memory (Read-Only Memory, ROM) or a random access memory (Random Access Memory, RAM) and the like.
以上内容是结合具体的优选实施方式对本发明所作的进一步详细说明,不能认定本发明的具体实施只局限于这些说明。对于本发明所属技术领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干简单推演或替换,都应当视为属于本发明的保护范围。 The above content is a further detailed description of the present invention in conjunction with specific preferred embodiments, and it cannot be assumed that the specific implementation of the present invention is limited to these descriptions. For those of ordinary skill in the technical field of the present invention, without departing from the concept of the present invention, some simple deduction or replacement can be made, which should be regarded as belonging to the protection scope of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510132901.0A CN105044450A (en) | 2015-03-25 | 2015-03-25 | Metering error analysis device and method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510132901.0A CN105044450A (en) | 2015-03-25 | 2015-03-25 | Metering error analysis device and method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN105044450A true CN105044450A (en) | 2015-11-11 |
Family
ID=54451139
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510132901.0A Pending CN105044450A (en) | 2015-03-25 | 2015-03-25 | Metering error analysis device and method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105044450A (en) |
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105259395A (en) * | 2015-11-13 | 2016-01-20 | 国网江西省电力科学研究院 | Metering condition characteristic detector |
| CN106355979A (en) * | 2016-10-14 | 2017-01-25 | 深圳供电局有限公司 | Electric energy metering error display device and method |
| CN106707079A (en) * | 2015-11-18 | 2017-05-24 | 中国电力科学研究院 | Electric power user metering disconnection check method |
| CN107390158A (en) * | 2017-06-21 | 2017-11-24 | 中国电力科学研究院 | A kind of charging post system and method for carrying out electric energy metrical virtual load test |
| CN107942113A (en) * | 2017-11-29 | 2018-04-20 | 国家电网公司 | Failure electric quantity compensating method and system |
| CN110045311A (en) * | 2019-04-25 | 2019-07-23 | 云南电网有限责任公司昆明供电局 | Metering secondary global error on-the-spot test method and its system |
| CN110208586A (en) * | 2019-05-15 | 2019-09-06 | 广州供电局有限公司 | Multiplexing electric abnormality analog circuit and multiplexing electric abnormality analog machine |
| CN112649662A (en) * | 2020-12-02 | 2021-04-13 | 贵州电网有限责任公司 | Distribution network line fault metering device based on voltage characteristics |
| CN114063001A (en) * | 2021-11-26 | 2022-02-18 | 广东电网有限责任公司 | System and method for restoring electricity stealing working condition |
| CN114217262A (en) * | 2021-12-16 | 2022-03-22 | 烟台东方威思顿电气有限公司 | Electric energy meter automatic testing method based on paravirtualization |
| CN115372695A (en) * | 2022-08-29 | 2022-11-22 | 国网重庆市电力公司营销服务中心 | Anti-electricity-stealing identification method and device for intelligent electric energy meter, storage medium and equipment |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2702320Y (en) * | 2002-10-08 | 2005-05-25 | 北京北研兴电力仪表有限责任公司 | Electric energy meter fault connection stored program controlled simulation arrangement |
| CN101615357A (en) * | 2009-05-15 | 2009-12-30 | 郑州万特电气有限公司 | Electricity meter-reading check charging training device |
| CN101718853A (en) * | 2009-11-20 | 2010-06-02 | 深圳市科陆电子科技股份有限公司 | Detecting device and detecting method of single-phase double-loop metering electric energy meter |
| CN102087348A (en) * | 2009-12-07 | 2011-06-08 | 河南省电力公司许昌供电公司 | Energy meter error tester |
| EP2354799A1 (en) * | 2010-02-08 | 2011-08-10 | Schneider Electric Industries SAS | Device and method for metering electric energy |
| CN102353926A (en) * | 2011-07-13 | 2012-02-15 | 北京北研兴电力仪表有限责任公司 | Electric energy metering simulation operation test method and device |
| CN203275634U (en) * | 2013-04-16 | 2013-11-06 | 海盐新跃电器有限公司 | Single-phase field inspection device capable of being applied indoors |
| CN104240568A (en) * | 2014-09-09 | 2014-12-24 | 国家电网公司 | Power-theft-prevention training device |
-
2015
- 2015-03-25 CN CN201510132901.0A patent/CN105044450A/en active Pending
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2702320Y (en) * | 2002-10-08 | 2005-05-25 | 北京北研兴电力仪表有限责任公司 | Electric energy meter fault connection stored program controlled simulation arrangement |
| CN101615357A (en) * | 2009-05-15 | 2009-12-30 | 郑州万特电气有限公司 | Electricity meter-reading check charging training device |
| CN101718853A (en) * | 2009-11-20 | 2010-06-02 | 深圳市科陆电子科技股份有限公司 | Detecting device and detecting method of single-phase double-loop metering electric energy meter |
| CN102087348A (en) * | 2009-12-07 | 2011-06-08 | 河南省电力公司许昌供电公司 | Energy meter error tester |
| EP2354799A1 (en) * | 2010-02-08 | 2011-08-10 | Schneider Electric Industries SAS | Device and method for metering electric energy |
| CN102353926A (en) * | 2011-07-13 | 2012-02-15 | 北京北研兴电力仪表有限责任公司 | Electric energy metering simulation operation test method and device |
| CN203275634U (en) * | 2013-04-16 | 2013-11-06 | 海盐新跃电器有限公司 | Single-phase field inspection device capable of being applied indoors |
| CN104240568A (en) * | 2014-09-09 | 2014-12-24 | 国家电网公司 | Power-theft-prevention training device |
Non-Patent Citations (1)
| Title |
|---|
| 董生怀等: "基于数学模型方式的电能表接线智能仿真系统的研制", 《电测与仪表》 * |
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105259395A (en) * | 2015-11-13 | 2016-01-20 | 国网江西省电力科学研究院 | Metering condition characteristic detector |
| CN106707079B (en) * | 2015-11-18 | 2020-09-25 | 中国电力科学研究院 | Method for checking metering cross-family of power consumers |
| CN106707079A (en) * | 2015-11-18 | 2017-05-24 | 中国电力科学研究院 | Electric power user metering disconnection check method |
| CN106355979A (en) * | 2016-10-14 | 2017-01-25 | 深圳供电局有限公司 | Electric energy metering error display device and method |
| CN107390158A (en) * | 2017-06-21 | 2017-11-24 | 中国电力科学研究院 | A kind of charging post system and method for carrying out electric energy metrical virtual load test |
| CN107942113A (en) * | 2017-11-29 | 2018-04-20 | 国家电网公司 | Failure electric quantity compensating method and system |
| CN110045311A (en) * | 2019-04-25 | 2019-07-23 | 云南电网有限责任公司昆明供电局 | Metering secondary global error on-the-spot test method and its system |
| CN110208586A (en) * | 2019-05-15 | 2019-09-06 | 广州供电局有限公司 | Multiplexing electric abnormality analog circuit and multiplexing electric abnormality analog machine |
| CN112649662A (en) * | 2020-12-02 | 2021-04-13 | 贵州电网有限责任公司 | Distribution network line fault metering device based on voltage characteristics |
| CN114063001A (en) * | 2021-11-26 | 2022-02-18 | 广东电网有限责任公司 | System and method for restoring electricity stealing working condition |
| CN114063001B (en) * | 2021-11-26 | 2023-08-22 | 广东电网有限责任公司 | System and method for restoring power stealing conditions |
| CN114217262A (en) * | 2021-12-16 | 2022-03-22 | 烟台东方威思顿电气有限公司 | Electric energy meter automatic testing method based on paravirtualization |
| CN115372695A (en) * | 2022-08-29 | 2022-11-22 | 国网重庆市电力公司营销服务中心 | Anti-electricity-stealing identification method and device for intelligent electric energy meter, storage medium and equipment |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105044450A (en) | Metering error analysis device and method | |
| CN202102624U (en) | Integral experiment system for preventing electricity fraudulent use | |
| CN203965613U (en) | A kind of emulation test system of earth-fault indicator performance | |
| CN105068022A (en) | Failure simulation smart electric meter for three-phase supply and electrical test simulator | |
| CN106094571B (en) | Multifunctional anti-electricity-theft simulation experiment platform | |
| CN104269090B (en) | The analogue system of a kind of power information acquisition terminal wheel secondary control switch and method thereof | |
| CN103792505A (en) | Ground fault simulation device for electric power direct current system | |
| CN101980417B (en) | Digital substation testing simulation method | |
| CN101750555A (en) | Spare automatic switching comprehensive tester | |
| CN203276027U (en) | Digital dynamic closed-loop test system of electricity smooth and steady supply device | |
| CN103235277A (en) | Integration adjusting device for online monitoring system of intelligent converting station capacitive device | |
| CN102788902B (en) | High-voltage transmission line power frequency parameter actual measuring device capable of resisting against high-induced voltage interference | |
| CN201319052Y (en) | Auto-switch-on integrated tester | |
| CN104020376A (en) | Three-remote automatic testing method for power distribution terminal | |
| CN205263212U (en) | Select testing arrangement that closes a floodgate mutually | |
| CN111693924A (en) | System and method for detecting monitoring performance of voltage transformer metering performance on-line monitoring device | |
| CN107219492B (en) | High-voltage integrated semi-physical simulation test device for medium-voltage grid electric energy metering | |
| CN203149045U (en) | Spare power supply auto-switching calibrator | |
| CN201725016U (en) | Protection device full-interface testing device based on simulated field and wave recording | |
| CN205643556U (en) | Multi -functional power distribution terminal integrated test system | |
| CN209641125U (en) | Power cable simulation test device | |
| CN203811797U (en) | Analog electrician/electronic signal and digital signal electric energy meter verification apparatus | |
| CN114167750B (en) | Simulation training system for line loss exception handling of transformer area | |
| CN202282094U (en) | Passive load circuit device for access demonstration in electric larceny prevention comprehensive experiment device | |
| CN205374724U (en) | An anti-theft test device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151111 |