CN101934465B - Installing process for fin stabilizer - Google Patents

Installing process for fin stabilizer Download PDF

Info

Publication number
CN101934465B
CN101934465B CN2009100325426A CN200910032542A CN101934465B CN 101934465 B CN101934465 B CN 101934465B CN 2009100325426 A CN2009100325426 A CN 2009100325426A CN 200910032542 A CN200910032542 A CN 200910032542A CN 101934465 B CN101934465 B CN 101934465B
Authority
CN
China
Prior art keywords
stabilizer
welding
outside plate
steps
mounting process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009100325426A
Other languages
Chinese (zh)
Other versions
CN101934465A (en
Inventor
杨定敏
闫慧朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING JINLING SHIPYARD FACTORY CSC
Original Assignee
NANJING JINLING SHIPYARD FACTORY CSC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING JINLING SHIPYARD FACTORY CSC filed Critical NANJING JINLING SHIPYARD FACTORY CSC
Priority to CN2009100325426A priority Critical patent/CN101934465B/en
Publication of CN101934465A publication Critical patent/CN101934465A/en
Application granted granted Critical
Publication of CN101934465B publication Critical patent/CN101934465B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)
  • Arc Welding In General (AREA)

Abstract

The invention provides an installing process for a fin stabilizer. The process comprises the following steps of: a, preparing and inspecting before installing; b, determining a hanging clamp; c, installing the fin stabilizer; and d, welding and fixing. The fin stabilizer of the invention is installed in such a manner that the installation time of the fin stabilizer is shortened, the installation efficiency of the fin stabilizer is improved and installation cost is lowered.

Description

A kind of stabilizer mounting process
Technical field
The present invention relates to a kind of boats and ships mounting process, particularly a kind of stabilizer mounting process.
Background technology
When the naval vessel goes in proud sea, played pendulum by wind wave action, the top is floating up and down, and this is wherein severe with rolling.Because wave, make the goods in the cargo hold be easy to wave, influence the operate as normal of equipment and instrument, increase crewman's workload.So in the Ship Design process, can take the form of shaking that subtracts that adapts to different ship types, and fin stabilizer to be the countries in the world roll-on-roll-off ship use maximum a kind of stabilizers.
The stabilizer of being adopted is at present installed owing to there is not the mounting process of system, so construction period is long, inefficiency and cost are also very high, and the one-tenth product of shipbuilding unit is caused great adverse effect.
Summary of the invention
Goal of the invention provides a kind of time short, and efficient is high, and the stabilizer mounting process that cost is low the invention provides a kind of stabilizer mounting process:
A kind of stabilizer mounting process comprises the steps:
A. prepare and check before installing, may further comprise the steps:
1) is familiar with stabilizer cabin layout drawing;
2) be familiar with piecewise graph;
3) whether inspection stabilizer equipment is complete;
4) the external frame size of inspection stabilizer equipment;
Whether floor and the outside plate that 5) need when stabilizer is installed, cut off in the inspection segmentation unload.
B. hang sign indicating number and confirm, may further comprise the steps:
1) on four hoisting pad bases, original stabilizer unit, increases by 2 again and hang sign indicating number;
2) on Ship Structure, increase by 4 and hang sign indicating number;
3) in the hull distance, respectively increase by 2 on longitudinal wall and the larboard deck and hang sign indicating number.
C. stabilizer is installed, and may further comprise the steps:
1) when mounted; At first want setting-out; After having confirmed the direction of unit; Make the center line and the corresponding position line of hull of stabilizer unit, make the outside plate center mark of stabilizer unit and the theoretical level on hull consistent, and the mating surface of assurance Ship Structure and stabilizer unit there is the gradient of 15 degree;
2) the lifting stabilizer arrives the relevant position, and positions, and will add interim support and fixing in the unit on every side after having good positioning;
3) hull floor and the outside plate that will cut off in advance are in place, guarantee simultaneously the stabilizer unit floor and reinforcement will with Ship Structure to muscle;
4) prepackage define no problem after finishing and deliver for a check qualified.
D. welding is fixing, may further comprise the steps:
1) abutment joint of weldering stabilizer and outside plate;
2) abutment joint of weldering stabilizer and segmental structure;
3) corner connection of welding structure and outside plate, structure and structure seam;
4) the butt weld postwelding is checked:
The inspection face of weld has flawless, pore, undercut, weld defects such as overlap. and weld seam is full smooth;
5) 100% ultrasonic examination is carried out in butt welded seam inside, as finding defective, need reprocess immediately.
Said steps d welding material optional basic electrode by hand E5015 or CO 2Gas shielded arc welding.
The welding sequence of said corner connection seam is welded to both sides from middle structure.
Said stabilizer butted part, outside plate, wallboard all require bevel and through welding.
Will clean groove before the said welding, foreign material such as oil, water, rust dirt can not be arranged in the 50mm scope of groove both sides, the blemish of groove must repair and handle appropriate.
Said welding abutment joint adopts multi-pass welding, after every layer of welding bead scarfing cinder, uses hand hammer to knock weld seam to discharge welding stress, prevents the generation of crackle.Also to carry out repair process like defectiveness in time with emery wheel or reamer polishing.
A kind of stabilizer mounting process of the present invention has shortened the time that stabilizer is installed, and has improved the efficient that stabilizer is installed, and has reduced installation cost.
The specific embodiment
Below in conjunction with embodiment detailed explanation is done in invention.
Focus on the location and the welding of stabilizer unit and main hull structure in the process of installation stabilizer.
A kind of stabilizer mounting process comprises the steps:
A. prepare and check before installing, may further comprise the steps:
Closing up order and cycle selection general employing plug-in type or hanging formula according to boats and ships.This roll-on-roll-off ship ship has been accomplished greatly when stabilizer is installed and has been closed up, so we have just selected plug-in type.
1) is familiar with stabilizer cabin layout drawing;
2) be familiar with piecewise graph;
3) whether inspection stabilizer equipment is complete;
4) the external frame size of inspection stabilizer equipment;
Whether floor and the outside plate that 5) need when stabilizer is installed, cut off in the inspection segmentation unload.
B. hang sign indicating number and confirm, may further comprise the steps:
Because each stabilizer unit that producer only provides only is made up of four hoisting pads; But only depend on these four hoisting pads to be difficult to accomplish the plug-type installation of stabilizer; So hang sign indicating number in the installation of following relevant position, be convenient to hang when the stabilizer unit gets into hull and draw and adjust the location.
1) on four hoisting pad bases, original stabilizer unit, increases by 2 again and hang sign indicating number;
2) on Ship Structure, increase by 4 and hang sign indicating number;
3) in the hull distance, respectively increase by 2 on longitudinal wall and the larboard deck and hang sign indicating number.
C. stabilizer is installed, and may further comprise the steps:
1) when mounted; At first want setting-out, confirmed the direction of stabilizer unit after, make the corresponding position line of its center line and hull; Make the outside plate center mark and the theoretical level on hull of stabilizer unit consistent, and the mating surface of assurance Ship Structure and stabilizer unit have the gradient of 15 degree;
2) the lifting stabilizer arrives the relevant position, and positions, and will add interim support and fixing in the unit on every side after having good positioning;
In the handling process, note not running into top equipment and piping.
3) hull floor and the outside plate that will cut off in advance are in place, and guarantee that simultaneously the floor of stabilizer unit reaches
Reinforcement will with Ship Structure to muscle;
4) prepackage define no problem after finishing and deliver for a check qualified.
D. welding is fixing, may further comprise the steps:
1) abutment joint of weldering stabilizer and outside plate;
2) abutment joint of weldering stabilizer and segmental structure;
3) corner connection of welding structure and outside plate, structure and structure seam;
4) the butt weld postwelding is checked:
The inspection face of weld has flawless, pore, undercut, weld defects such as overlap. and weld seam is full smooth;
5) 100% ultrasonic examination is carried out in butt welded seam inside, as finding defective, need reprocess immediately.
Said steps d welding material optional basic electrode by hand E5015 or CO 2Gas shielded arc welding.
The welding sequence of said stabilizer and outside plate abutment joint is welded to both sides from middle structure.
Said stabilizer butted part, outside plate, wallboard all require bevel and through welding.
Will clean groove before the said welding, foreign material such as oil, water, rust dirt can not be arranged in the 50mm scope of groove both sides, the blemish of groove must repair and handle appropriate.
Said welding abutment joint adopts multi-pass welding, after every layer of welding bead scarfing cinder, uses hand hammer to knock weld seam to discharge welding stress, prevents the generation of crackle.Also to carry out repair process like defectiveness in time with emery wheel or reamer polishing.
Owing to the welding requirement is very high, said welding welder must hold the certificates for technical proficiency (with the corresponding qualification certificates of job specification) that effective special work post operation is demonstrate,proved and classification society issues could be on duty.
A kind of stabilizer mounting process of the present invention has shortened the time that stabilizer is installed, and has improved the efficient that stabilizer is installed, and has reduced installation cost.

Claims (6)

1. a stabilizer mounting process is characterized in that, comprises the steps:
A. prepare and check before installing, may further comprise the steps:
1) is familiar with stabilizer cabin layout drawing;
2) be familiar with piecewise graph;
3) whether inspection stabilizer equipment is complete;
4) the external frame size of inspection stabilizer equipment;
Whether floor and the outside plate that 5) need when stabilizer is installed, cut off in the inspection segmentation unload;
B. hang sign indicating number and confirm, may further comprise the steps:
1) on four hoisting pad bases, original stabilizer unit, increases by 2 again and hang sign indicating number;
2) on Ship Structure, increase by 4 and hang sign indicating number;
3) in the hull distance, respectively increase by 2 on longitudinal wall and the larboard deck and hang sign indicating number;
C. stabilizer is installed, and may further comprise the steps:
1) when mounted; At first want setting-out, confirmed the direction of stabilizer unit after, make the corresponding position line of its center line and hull; Make the outside plate center mark and the theoretical level on hull of stabilizer unit consistent, and the mating surface of assurance Ship Structure and stabilizer unit have the gradient of 15 degree;
2) the lifting stabilizer arrives the relevant position, and positions, and will add interim support and fixing in the unit on every side after having good positioning;
3) hull floor and the outside plate that will cut off in advance are in place, guarantee simultaneously the stabilizer unit floor and reinforcement will with Ship Structure to muscle;
4) prepackage define no problem after finishing and deliver for a check qualified;
D. welding is fixing, may further comprise the steps:
1) abutment joint of weldering stabilizer and outside plate;
2) abutment joint of weldering stabilizer and segmental structure;
3) corner connection of welding structure and outside plate, structure and structure seam;
4) the butt weld postwelding is checked:
The inspection face of weld has flawless, pore, and undercut, the overlap weld defect, weld seam is full smooth;
5) 100% ultrasonic examination is carried out in butt welded seam inside, as finding defective, need reprocess immediately.
2. a kind of stabilizer mounting process according to claim 1 is characterized in that: said steps d welding material optional basic electrode by hand E5015 or CO 2Gas shielded arc welding.
3. a kind of stabilizer mounting process according to claim 1 is characterized in that: the welding sequence of said corner connection seam is welded to both sides from middle structure.
4. a kind of stabilizer mounting process according to claim 1 is characterized in that: said stabilizer butted part, outside plate, wallboard all require bevel and through welding.
5. a kind of stabilizer mounting process according to claim 1 is characterized in that: will clean groove before the said welding, oil, water, the dirty foreign material of rust can not be arranged in the 50mm scope of groove both sides, the blemish of groove must repair and handle appropriate.
6. a kind of stabilizer mounting process according to claim 1; It is characterized in that: said welding abutment joint adopts multi-pass welding; After every layer of welding bead scarfing cinder, use hand hammer to knock weld seam, prevent the generation of crackle to discharge welding stress; Also to carry out repair process like defectiveness in time with emery wheel or reamer polishing.
CN2009100325426A 2009-07-01 2009-07-01 Installing process for fin stabilizer Expired - Fee Related CN101934465B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100325426A CN101934465B (en) 2009-07-01 2009-07-01 Installing process for fin stabilizer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100325426A CN101934465B (en) 2009-07-01 2009-07-01 Installing process for fin stabilizer

Publications (2)

Publication Number Publication Date
CN101934465A CN101934465A (en) 2011-01-05
CN101934465B true CN101934465B (en) 2012-01-11

Family

ID=43388165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100325426A Expired - Fee Related CN101934465B (en) 2009-07-01 2009-07-01 Installing process for fin stabilizer

Country Status (1)

Country Link
CN (1) CN101934465B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111843259A (en) * 2020-06-02 2020-10-30 中煤北京煤矿机械有限责任公司 Welding method for post-welding stress-relief-free annealing of Q550-grade thick plate

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5365870A (en) * 1991-09-04 1994-11-22 Blohm & Voss Ag Body equipped with a streamlined profile, in particular a stabilizer fin for ships with a turbulence reducing structure and method of using the turbulence reducing structure
CN1521083A (en) * 2003-02-12 2004-08-18 松村纪孝 Controlling means for ship stabilizing gear
CN101386338A (en) * 2007-09-14 2009-03-18 中国船舶重工集团公司第七○四研究所 Modularized front foldable stabilizing fin executing mechanism

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5365870A (en) * 1991-09-04 1994-11-22 Blohm & Voss Ag Body equipped with a streamlined profile, in particular a stabilizer fin for ships with a turbulence reducing structure and method of using the turbulence reducing structure
CN1521083A (en) * 2003-02-12 2004-08-18 松村纪孝 Controlling means for ship stabilizing gear
CN101386338A (en) * 2007-09-14 2009-03-18 中国船舶重工集团公司第七○四研究所 Modularized front foldable stabilizing fin executing mechanism

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
谭新东.客滚船减摇鳍安装工艺.《船海工程》.2010,第39卷(第4期),24-26. *

Also Published As

Publication number Publication date
CN101934465A (en) 2011-01-05

Similar Documents

Publication Publication Date Title
CN102874379B (en) Manufacture method of offshore riprap leveling ship
CN100594158C (en) Method for mounting large-scale gangplank of ro-ro vessel
CN1751960A (en) Lengthening reform technology of ship
JPH04231275A (en) Hull structure and constructing method thereof
CN102848091A (en) Ship double bottom block assembly welding technology
CN109896408B (en) Orange juice ship cargo storehouse deck total section hoist and mount frock
CN110182313B (en) 30-ten-thousand-ton floating production oil storage tanker bow cargo hold side general section different-place general assembly process
CN1955066A (en) Shipmaking method of split building and dock closure
CN102357783A (en) Manufacturing process of pile shoe of wind power installation vessel
CN202541781U (en) Novel hatch coaming
CN204916044U (en) Marine removable wooden deck fixing device
CN101934465B (en) Installing process for fin stabilizer
CN105109617B (en) A kind of Ship Structure for the large-scale A cabinet frames of reassembling type
CN107521621B (en) Ship with inclined transverse wall stool
KR102051645B1 (en) Method for turret installation using jig for maintaining turret circularity
CN104691704A (en) Building method of inland ship
CN102218587B (en) Fillet-welding method for trough-shaped bulkhead and upper deck of vessel
CN104296941A (en) Fillet weld tightness test method of hull structure
CN109665441B (en) Method for installing crane track of floating dock
CN204507169U (en) Dull and stereotyped depth measurement injector head
CN112479006A (en) Segmented turning tongue-and-groove protection device and using method thereof
KR20130013329A (en) Structure of tanker with lower stool
CN112849362A (en) Large-area renewing and repairing process for longitudinal wall in ship cabin
JP2006021721A (en) Inspecting device for hold side wall structural member
CN115123463B (en) Temporary sea binding structure of large ship superstructure and sea binding method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120111

Termination date: 20150701

EXPY Termination of patent right or utility model